Loading...
Minutes - 2007 - Planning & Zoning - 02/05/2007 - Regular THE CITY OF EAGLE PLANNING & ZONING COMMISSION MINUTES 660 E. Civic Lane February 5, 2007 6:30 P.M. I. CALL TO ORDER: Meeting called to order at 6:35 p.m. 2. ROLL CALL: Present: JACOBS, ZASTROW, PIERCE, ASPITARTE, McCARREL, Jeremy Rouche from MY AC. 3. CONSENT AGENDA: . Consent Agenda items are considered to be routine and are acted on with one motion. There will be no separate discussion on these items unless the Chairman, a Commissioner, member of City Staff, or a citizen requests an item to be removed from the Consent Agenda for discussion. Items removed from the Consent Agenda will be placed on the Regular Agenda in a sequence determined by the Rules of Order. . Any item on the Consent Agenda that contains written recommendations from the City of Eagle shall be adopted as part of the Planning & Zoning Commission's Consent Agenda approval motion unless specifically stated otherwise. A. Minutes of January 22, 2007. B. Findin!!s of Fact and Conclusions of Law for FPUD-03-06 & FP-IO-06 & FPUD-4-06 & FP-ll-06 - Final Develooment Plan and Final Plat for Ea!!Iefield Estates Subdivision Phases 1 & 2- Ea!!lefield. LLC: Eaglefield, LLC, represented by John Carpenter, PE with Landmark Engineering and Planning, Inc., is requesting final development plan and final plat approval for Eaglefield Estates Phase I, a 39.3,acre, 135- lot (\ 16,buildable, 19,common) residential subdivision and Eaglefield Estates Phase 2, a 61.8'acre, 130,lot (112-buildable, 17'commom, I ,well lot) residential subdivision. The entire Eaglefield Estates Subdivision is located on the north side of State Highway 44 approximately 650- feet west of Linder Road. C. Findin!!s of Fact and Conclusions of Law for A-17-06 & RZ-23-06 - Annexation and Rezone with a Develooment A!!reement from RUT to R-E - DA - Dave Callister: Dave Callister, represented by Penelope L. Riley, is requesting approval of an annexation and a rezone from RUT (Rural Urban Transition) to R,E,DA (Residential Estates with a Development Agreement). The 18.85,acre site is comprised of two properties located on the east and west sides of North Meridian Road between Beacon Light and Floating Feather Road at 2650 North Meridian Road and 2421 North Meridian Road. D. Findin!!s of Fact and Conclusions of Law for A-19-06/RZ-25-06 & PP-19-06- Annexation and Rezone from RUT to MU-DA and Preliminarv Plat for Castleburv West Business Park - Caoital Develooment. Inc.: Capital Development, Inc, represented by Van Elg with The Land Group, is requesting an annexation and rezone from RUT (Rural Urban Transition) to M-U-DA (Mixed Use with Development Agreement), and preliminary plat approval for Castlebury West Business Park. The 8.52, acre site is generally located on the northwest corner of West Chinden Boulevard (SH 20/26) and North Meridian Road at 6615 North Meridian Road. Pierce moves to remove item A and item D from the Consent Agenda. Seconded by Aspitarte. ALL AYES...MOTION CARRIES. Page I of 4 K\P&Z\MINlITES\Temporary Minutes Work Area\PZ-02-05-07MIN doc Pierce moves to approve the consent agenda with items Band C. Seconded by Zastrow. ALL AYES...MOTION CARRIES. Susan Buxton, City Attorney, discusses item 0 and explains that a new set of findings that clarifY Commissioner Aspitarte's concerns regarding the right of way issue were provided to them. Aspitarte moves to approve Findings of Fact and Conclusions of Law for A-19-06/RZ- 25-06 & PP-19-06 - Annexation and Rezone from RUT to MU-DA and Preliminary Plat for CastIebury West Business Park - Capital Development, Inc as amended. Seconded by McCarrel. ALL A YES...MOTION CARRIES. 4. PUBLIC HEARINGS: A. A-20-06/RZ-26-06/PP-20-06 - Annexation and Rezone from RUT to R-4-DA and Preliminary Plat for Summer Cedar Subdivision - Thomas Martin: Thomas Martin, represented by Doumecq Development, is requesting annexation and rezone with development agreement from RUT (Rural Urban Transition, Ada County designation) to R-4-DA (Residential - four units per acre maximum with development agreement) and preliminary plat approval for Summer Cedar Subdivision, an eighteen (18) lot subdivision (10 residential, 4 common, 4 future residential- currently a commercial landscape nursery). The 4.94-acre site is located approximately 500,feet south of Floating Feather Road on the west side of Horseshoe Bend Road at 11075 Horseshoe Bend Road. This item was continued/rom the January 22,2007 meeting. Staffis requesting this item be remanded to staff. Pierce moves to remand A-20-06/RZ-26-06/PP-20-06 - Annexation and Rezone from RUT to R-4-DA and Preliminary Plat for Summer Cedar Subdivision. Seconded by Jacobs. ALL AYES. MOTION CARRIES. B. CU-13-06 - Summer Lawn Nursery and Landscaoe - Thomas Martin: Thomas Martin, represented by Doumecq Development, is requesting conditional use approval to maintain an existing nursery and landscape business within a proposed R-4 (Residential- up to four units per acre maximum) zoned subdivision (Summer Cedar Subdivision). The 0.92 acre site is located approximately 500 feet south of Floating Feather Road, on the west side of Horseshoe Bend Road at 11075 Horseshoe Bend Road. This item was continued/rom the January 22,2007 meeting. Staffis requesting this item be remanded to staff. Pierce moves to remand CU-13-06 - Summer Lawn Nursery and Landscape. Seconded by Zastrow. ALL AYES. MOTION CARRIES. C. ZOA-04-06 - Zoninl! Ordinance Amendment - City of Eal!le: An Ordinance of the City of Eagle, Ada County Idaho, amending Eagle City Code Title 8 "Zoning", Chapter 2 "Zoning Districts and Map", Chapter 2A "Design Review Overlay District", Chapter 6 "Planned Unit Developments", and amending Title 9, Chapter I "General Subdivision Provisions", Chapter 2 "Subdivision Plats And Procedures", Chapter 3 "Design Standards", Chapter 4 "Required Improvements", Chapter 5 "Special Development Subdivisions", providing a severability clause; and providing an effective date. This item was continued/rom the January 22,2007 meeting. Pierce introduces the item. (The public hearing was left open and continued from the December 18,2006.) Bill Vaughan, Zoning Administrator, reviews the changes since the last meeting. Page 2 of 4 K:\P&ZI}.HNUTES\Temporary Minutes Work Area\PZ-02-05-07MIN.doc Erica Schneider, 639 S. Main Street. Reads a letter on behalf of Pat Towne regarding the Mixed Use zoning district. Ron Bath, 1065 E, Winding Creek. Developed Winding Creek. Discusses lot sizes, landscaping and fencing. Dave Yorgason, Capital Development, is appreciative of the clarifications made to the document so far. Mentions there are many members of the BCA unable to make it to testify. Discusses open fencing. Still has a struggle with the 18% open space requirement. Discussion on other types of fencing. Miguel Legarretta, 6206 N. Discovery Way. Here representing the Building Contractors Association. Presents a letter to the Commission. Feels there should be more of a definition for subdivisions. Commissioner Pierce asks the thoughts regarding guidelines. Ron Whitney, 2365 Primerim Drive. Here on behalf of the BCA. Discusses PUD and ability to provide creativity and design of development. Ron Bath discusses design criteria. Dave Yorgason agrees with Mr. Bath. Discusses application reviews. Discusses design criteria and open space. Mike Hormachea, Boise, discusses baseline standards for PUD. Does not believe that certain PUDs be used. Feel there is no perfect way to articulate City's visioning. Bill Vaughan rebuts testimony. Stands for questions from the Commission. Ron Bath has concerns with a restrictive ordinance. Feels there needs to be more flexibility in the MU zone and Urban Renewal areas. Commissioner Jacobs discusses restrictions. General discussion. Aspitarte moves to continue ZOA-04-06 - Zoning Ordinance Amendment - City of Eagle to the March sth, 2007 meeting. Seconded by Zastrow. ALL AYES...MOTION CARRIES. 5. REPORTS: A, Commission: Commissioner Pierce asks about the current Eagle Water issues. SEB explains the issues with the water and service areas, etc. B. City Attorney: The County has come up with a foothills plan. M3 will be coming next Monday. C. Staff: None. 6. ADJOURNMENT: McCarrel moves to adjourn. Seconded by Zastrow. ALL AYES...MOTION CARRIES. Hearing no further business the Planning & Zoning Commission meeting adjourned at 8:05 p.m. Page 3 of 4 K\P&ZI1\.1INUTES\Ternporary Minutes Work Area\PZ-02-0S-07MIN.doc RESPECTFULLY SUBMITTED: ~{I+O~~ ~ ~ SHARON K. BERGMANN CITY CLERK/TREASURER ","'''11'.,." ~~~~' .q (11 dO.... ~~~ 0>>- ........ .!l...( '" ... ..o.:l.L'f'.lfo.. j..,.', i .eb, .,.... ~ ~ ,.. ....." }I.; o. 't: .", :iI: v~S'i\rjJ~ . ? q~.: : : ...... : : . . ..... .. . .~~ .. ; .., \'< ~ ') : ... :: \ .....~. 4'Od\\O.. ! iIJ. '.^.. .. ~ftti ..... v,., ......... \') ~~ #...., El dO}. ~ ~~~~ ., ..' ",.......1" APPROVED: ~\~ C? ----- ~N W. PIERCE AIRMAN A TRANSCRIBABLE RECORD OF THIS MEETING IS A V AILABLE AT CITY HALL. Page 4 of 4 K:\P&Z\MINllTES\Temporary Minutes Work Area'JlZ-02-05-07MIN,doc EAGLE PLANNING & ZONING COMMISSION PUBLIC HEARING SIGN -IN SHEET February 5, 2007 ZOA-04-06 - Zonine Ordinance Amendment - City of Eagle PLEASE PRINT LEGIBLY NAME ADDRESS PHONE PRO? CON? TESTIFY? r i k Cc -Inv (CCI C,r bAVA" Sdemne\`(,ler Vt'7 ,h St e4— x Yes tib Integrating Conservation and Community into Development Eagle City Hall February 14, 2007 1:30 — 4:30 You are invited to attend this informative workshop Presentation focused on the Eagle foothills planning area. The protection of open space, for scenic values, environmental and habitat protection, and public enjoyment is a shared vision by all foothills residents and landowners, but how do we accomplish this vision? Join our speakers as we explore the value of integrating conservation and community building into development and share innovative approaches for the ownership, management and funding structures to accomplish this vision. Speakers: Wayne Hyatt, Hyatt and Stubblefield P.C.; Atlanta, GA Kristine Bentz, Sonaran Institute; Tucson, AZ Tim Brewer, Land Trust of the Treasure Valley Frank Martin, Hidden Springs Planned Community Please RSVP to Rosa Lucas at 939-0343 ore -mail her at rosa.lucas@suncoraz.com b' February 9, 2007. -114)-( ,.f 6A; to azr Jir 6.)-(A /r) 4-- A7/4c 6,0 6A 1)- TY/11 fied c`V 1,aildkaz. BO— 6D'Amlea MEMORANDUM FOR RECORD TO: Planning and Zoning Commissioners, Eagle, ID 83616 FROM: Pat Towne, 200 North Edgewood Lane, Eagle, ID 83616 FILED CITY OF EAGLE FEB 0 5 2007 File: Route to: SUBJECT: ZOA-4-06 — Zoning and Subdivision Ordinance Amendment — Update to the Subdivision Planned Unit Development Standards — City of Eagle and 1. The purpose for this memorandum is to request further amendment to proposed section 9-3-8 (D), which specifies that Mixed Use Zoning Districts shall increase from a minimum of 10% to 18% common area open space. I own original parcels of land, S0509417205 and S0510325600, which comprise approximately 31.5 acres adjacent to the Winding Creek Planned Unit Development. At approximately 640 feet away, my land is one of the closest parcels near Civic Lane. 2. As we all know, there has been much growth in Eagle over the last few years. I assume that the Development Area boundaries have since been or will be extended from those represented on the enclosed 2004 overlay map. I propose an exemption for Mixed Use Zoning Districts in the region east of Eagle Road, north of the Boise River North Fork, south of Dry Creek Canal, and west of Edgewood Lane. The aforementioned region is in close proximity to downtown Eagle where an abundance of recreational areas are available within footsteps. It is also important to note that people move to and visit the downtown area to be close to commercial and office areas that provide economic opportunities and growth for the community. These are key reasons the pre-existing standard of 10% open space has worked well for Mixed Use Zoning Districts in this locality. 3. I ask that a certain degree of flexibility be built into the Planned Unit Development Standards so that the City Council has the ability to approve or disapprove projects based on the totality of their merit. A number of quality projects have been given the opportunity to proceed with development even though parts of their proposals were inconsistent with the open space requirement. An example of this rationale is the Winding Creek Planned Unit Development, which required 56% open space (due to decrease of minimum lot size which requires offsetting increase of the same square footage in open space). Obviously, 56% open space would not have been mutually beneficial to the City of Eagle and the developer. The City Council should continue to have authority to make case by case decisions that allow future developments the opportunities received in the past. 4. I respectfully request the Council to carefully consider the above recommendations. Being a long-time Eagle resident, I urge the City Council to recognize that a blanket application will not adequately address the needs of the diverse community Eagle has become. 5. Point of Contact for this memorandum is the undersigned at (208) 861-0723. Enclosures: 2004 Overlay Map Winding Creek PUD Site Data PATRICK M. TOWNE G. SITE DATA: Total Acreage of Site — 17.43 Total Number of Lots — 90 Total Number of Units — 59 Residential - 59 Commercial - 17 Industrial - 0 Common - 13 Single-family - 59 Duplex - 0 Multi -family - 0 Total Acreage of Any Out -Parcels — 3.93 (while not considered an out parcel, this acreage is to be re -subdivided at a later date) Additional Site Data Proposed Required Dwelling Units Per Gross Acre 6.14* 20-units per acre (maximum) in the MU zoning district Minimum Lot Size 2,432 sq. ft. (residential) 7,730 sq. ft. (commercial) 7,000 sq. ft. (minimum) in the MU zoning district Except that a decrease of minimum lot size in a subdivision may be allowed if there is an offsetting increase of the same square - footage in open space and a planned unit development is applied for and approved) - per ECC Section 8-2-4 (G). Minimum Lot Width 32-feet 50-feet in the MU zoning district Minimum Street Frontage 32-feet 0-feet (required only in residential zoning districts) Total Acreage of Common Lots (open space) 2.22-acres* (excluding the ditch easement - .83-acres) 5.37-acres (minimum)* .96-acres for 10% minimum plus 4.41-acres for lots smaller than the minimum (7,000 SF) - per ECC Section 8-2-4 (G) Except that, according to ECC Section 9-3-8 (C) the City may require additional public and/or private park or open space facilities in PUDs or in subdivisions with 50 or more lots. Percent of Site as Common Area (open space) 23%* 56% (minimum - see above)* Except that, according to ECC Section 9-3-8 (C) the City may require additional public and/or private park or open space facilities in PUDs or in subdivisions with 50 or more lots. * Designates data based on the exclusion of the commercial portion of the development and Lot 1, Block 3, which is to be re -subdivided at a later date. The density calculation is based on the residential portion only, consisting of 9.61-acres (total acreage of building lots, common lots, and private road). See item No. 12 on page 31 of this document for explanation of the provision for open space. Page 3 of 33 K:\Planning Dept\Eagle Applications\SUBS\2003\Winding Creek PUD ccf.doc 0 0 cn 5 = = ca 0 0 CD o< < ›a oCD ›m-o o 3 'CD CD 3 CD 1 CD (13 si) 0 0 3 cn 3 cp 0 551) = co 0 0 Wm 0 a) (fl—i-. c sJoppioo fuiu3 O 0 9 CD CDs ek) - CD CD 0_ * r•Tie m CO Q CD 3 . • 4-• . • '4"' -i., • - ' ; s ; rtl. ';11',1" •,* ••••i / r• -r •01 a', • • • . SAIL*, ir! , Ct4NDI • VP.'l 1956-2006 ErikBUILDING CONTRACTORS ASSOCIATION OF SOUTHWESTERN IDAHO, INC. "50 Years of Building Excellence" February 5, 2007 Eagle Planning and Zoning Commission P.O. Box 1520 Eagle, ID 83616 RE: Proposed Planned Unit Development Dear Commissioners; 6206 N. Discovery Way, Suite A Boise, Idaho 83713 (208) 377-3550 (208) 377-3553 fax AMI.t.A with NAHB NATIONAL ASSOCIAIIUN OF How BunDERS Website: www.bcaswi.org E-mail: bca@heritagewifi.com RECEIVED & RILED CITY OF EAGLE FEB 0 5 2007 File: Route to: Thank you for the opportunity to provide comment to you today. We appreciate Eagle working with the development and building community. We have worked hard to help provide insight in the planning process and appreciate any help to keep housing affordable and within the reach of every American family. Keeping in mind our understanding of the city of Eagle's desires for future developments, we have outlined a list of our primary concerns. I believe that we can strike a balance to create desirable Eagle communities. Requiring a PUD on all subdivisions with 50 units or more: The PUD is meant not as a mandate but rather as an incentive means to creatively design desirable communities to the benefit of the community and the developer. Traditionally subdivisions have an expressed standard that can be precisely met, and PUD's are negotiated to create flexibility and creativity in developing a community. In addition PUD's are subjective which can make them more complex in the approval process. The Building Contractors Association of Southwestern Idaho (BCASWI) would ask that you keep the current standard subdivision option available and not mandate the PUD. Major subdivisions of 50 lots or more: 50 lots is too small to be defined as a large subdivision. The proposed PUD is not practical for smaller developments. It also creates an obstacle in trying to get standard size lots while maintaining the proposed percentage open space. EMBUILDING CONTRACTORS ASSOCIATION OF SOUTHWESTERN IDAHO, INC. "50 Years of Building Excellence" 6206 N. Discovery Way, Suite A Boise, Idaho 83713 Affiliated with (208) 377-3550 NAHB (208) 377-3553 fax NnnorvnL ASSOCIATION OF HOME BUILDERS Website: www.bcaswi.org E-mail: bca@heritagewifi.com Open space: The proposed PUD open space requirement is too high as is an 18% requirement for a standard subdivision. Different zones should have different open space requirements (i.e. 10% open space for R2 zones and increase 2% per class). It is not possible to achieve net density in a standard subdivision with 18% open space. Open space should be a flexible gauge because the costs/benefits will differ based on size of the development. In addition, it would be preferential to have a reduced open space requirement (approximately 3% depending on layouts) in lieu of credit for landscape strips. 50% of lots adjacent to open space in a PUD (30% in a standard subdivision): We believe that the design will suffer with stringent requirements such as 50% of lots backing up or connected to open space. This has the potential of creating small pockets of open space rather than community gathering areas. 50% of lots adjacent to open space may be achievable in some areas but not all. 30% of lots adjacent to open space in a standard subdivision is simply unachievable such as an infill project. Varied lot sizes: Varied lot sizes are appreciated as it does create flexibility, but density bonuses (i.e. 120% of density) would help the developer offset the costs of the increased design requirements without detracting from the open design. Fencing: Requiring all fencing be open creates some significant concerns (clients who want privacy, higher cost, etc.). We also feel that this is regulating ownership and not use (the PUD is meant to regulate use). Alternatives such as open fencing along all common areas could be considered if the desired outcome of the city is to provide an open feel. Open fencing suits many areas well, but it is simply just not appropriate in all areas. There are means to creating an open feeling without a 100% open fencing requirement. The building and development industry and the home buying public are very concerned about the rigidity of this restriction. Venr 1956-2006 IBM6206 N. Discovery Way, Suite A BUILDING CONTRACTORS ASSOCIATION Boise, daho 3713 .� (208) 377-3550 N�� OF SOUTHWESTERN IDAHO, INC. (208) 377-3553 fax NATIONAL sBO4 cr Ho,. Buiu u s Website: www.bcaswi.org "50 Years of Building Excellence" E-mail: bca@heritagewifi.com Different terrain / design: Not all subdivisions are the same. Flat land subdivisions have a very different design than foothills. The BCASWI would request some sort of bonus for useable open space within a development. We would also request additional credit for recreational open space such as ponds (15% in the current proposal — increase to 50%). Trails and Pathways: The change to this standard — increasing the paved portion of the pathway from 6 feet to 8-10 feet is excessive and unnecessary. This is not only costly but it creates the feel a road rather than a pathway. We would recommend revisiting this item. This is not the direction we believe the city or the development community wants to head down. Irrigation ditches/pathways: Irrigation easements are not part of the open space even when there are pathways. We would ask that pathways at a minimum be counted as passive open space. Private Streets: Currently 10% of lots are allowed to be private streets, this requirement should be eased. Private streets are not the same as gated streets. Private streets are there for design/use; gated streets are for restricted access. The BCASWI would recommend increased flexibility for private streets, and perhaps limiting gated streets to 10%. Easements and setbacks: 5-foot side yard setbacks are too high. The language indicating all front load garages to be set back a minimum 20 feet from the back of the sidewalk needs to be changed. This doesn't work well for corner and smaller lots. Vonr 1956-2006 IIBUIL BUILDING CONTRACTORS ASSOCIATION OF SOUTHWESTERN IDAHO, INC. "50 Years of Building Excellence" 6206 N. Discovery Way, Suite A Boise, Idaho 83713 (208) 377-3550 (�NAHB (208) 377-3553 fax NASIONAL Acttocun°H OF f cx.ff BUILDERS Website: www.bcaswi.org E-mail: bca@heritagewifi.com In summary the BCASWI, representing hundreds of local developers and builders, feels the proposed Title 8 and Title 9 amendments are not viable for development. Restrictions are already high in Eagle, coupled with high land costs, the development community is facing significant challenges. We want to see Eagle continue to be not only a desirable place to live and a family, but also a desirable place to develop. Thank you for the opportunity to provide comment to you tonight and throughout this process. Sincerely, Miguel Legarreta Government Affairs Director Building Contractors Association of Southwestern Idaho (BCASWI) 6206 N. Discovery Way, Ste A Boise, Idaho 83713 208-377-3550 RECEIVED & FILED CITY OF EAGLE Sample Property Size (Acres) City of Eagle Proposed Open Space Analysis with Proposed Minimum Lot Size 10.00 20.00 FEB 052007 File: Route to: 40.00 80.00 Acreage dedication ACHD Right of Way Percentage 25.00% (2.50) (5.00) (10.00) (20.00) Open Space 20.00% (2.00) (4.00) (8.00) (16.00) Maximum Acreage Available for Building 5.50 11.00 22.00 44.00 Square Feet Available for Building 239,580 479,160 958,320 1,916,640 Zoning District Analysis R-1 Minimum Lot Size Number of Lots Density Units per Gross Acre R-2 Minimum Lot Size Number of Lots Density Units per Gross Acre { R-3 Minimum Lot Size Number of Lots Density Units per Gross Acre R-4 Minimum Lot Size Number of Lots Density Units per Gross Acre R-5 Minimum Lot Size Number of Lots Density Units per Gross Acre 37,000 37,000 37,000 37,000 6 13 26 52 0.60 0.65 0.65 0.65 17,000 17,000 17,000 17,000 14 28 56 113 1.40 1.40 1.40 1.41 10,000 10,000 10,000 10,000 24 48 96 192 2.40 2.40 2.40 2.40 8,000 8,000 8,000 8,000 30 60 120 240 3.00 3.00 3.00 3.00 7,000 7,000 7,000 7,000 34 68 137 274 3.40 3.40 3.43 3.43 • City of Eagle Proposed Open Space Analysis with Adjusted Minimum Lot Size to Meet Zone Density Sample Property Size (Acres) 10.00 20.00 40.00 80.00 Acreage dedication ACHD Right of Way Percentage 25.00% (2.50) (5.00) (10.00) (20.00) Open Space 20.00% (2.00) (4.00) (8.00) (16.00) Maximum Acreage Available for Building 5.50 11.00 22.00 44.00 Square Feet Available for Building 239,580 479,160 958,320 1,916,640 Zoning District Analysis R-1 Minimum Lot Size Number of Lots Density Units per Gross Acre R-2 Minimum Lot Size Number of Lots Density Units per Gross Acre R-3 Minimum Lot Size Number of Lots Density Units per Gross Acre R-4 Minimum Lot Size Number of Lots Density Units per Gross Acre R-5 Minimum Lot Size Number of Lots Density Units per Gross Acre 24,000 24,000 24,000 24,000 10 20 40 80 1.00 1.00 1.00 1.00 12,000 12,000 12,000 12,000 20 40 80 160 2.00 2.00 2.00 2.00 8,000 8,000 8,000 8,000 30 60 120 240 3.00 3.00 3.00 3.00 6,000 6,000 6,000 6,000 40 80 160 319 4.00 4.00 4.00 3.99 4,800 4,800 4,800 4,800 50 100 200 399 5.00 5.00 5.00 4.99