Loading...
Minutes - 2005 - Planning & Zoning - 05/02/2005 - Regular THE CITY OF EAGLE PLANNING & ZONING COMMISSION MINUTES May 2, 2005 ORIGINAL 1. CALL TO ORDER: Meeting called to order at 6:35 p.m. 2. ROLL CALL: Present: ASPITARTE, LIEN, BANDY, MARKS, PIERCE. A quorum is present. 3. CONSENT AGENDA: . Consent Agenda items are considered to be routine and are acted on with one motion. There will be no separate discussion on these items unless the Chairman, a Commissioner, member of City Staff, or a citizen requests an item to be removed from the Consent Agenda for discussion. Items removed from the Consent Agenda will be placed on the Regular Agenda in a sequence determined by the Rules of Order. . Any item on the Consent Agenda that contains written recommendations from the City of Eagle shall be adopted as part of the Planning & Zoning Commission's Consent Agenda approval motion unless specifically stated otherwise. A. Minutes of April 18, 2005. Marks moves to approve the minutes. Seconded by Pierce. ALL A YE...MOTION CARRIES. 4. UNFINISHED BUSINESS: None. 5. PUBLIC HEARINGS: Bandy asks that items 5C and 5D be heard first. Staff explains the request for continuation. Marks moves that item 5C, A-3-05 and RZ-5-05 - Annexation and Rezone from RUT to R-2 and item 5D, PP-6-05 - Moffat Subdivision be continued to the June 20, 2005 meeting. Seconded by Lien. ALL A YE...MOTION CARRIES. A. A-2-05 & RZ-4-05 - Annexation and Rezone from RUT to A-R and R-3 - Goldcreek Developers. LLC: Goldcreek Developers, LLC, represented by The Land Group Inc., is requesting an annexation and rezone from RUT (Rural Urban Transition) to A-R (Agricultural-Residential) and R-3 (Residential up to three units per acre). The 27.08-acre site is located approximately 1,700 feet south of Floating Feather Road and west of Park Lane at 655 Park Lane. This item was continuedfrom the April 18, 2005 meeting. B. PP-4-05 - Ea~de Creek Subdivision - Goldcreek Developers. LLC: Goldcreek Developers, LLC, represented by The Land Group Inc., is requesting preliminary plat approval for Eagle Creek Subdivision. The 27.08-acre site consists of a 71-lot (58-buildable, 13-common) residential subdivision located approximately 1,700 feet south of Floating Feather Road and west of Park Lane at 655 Park Lane. This item was continued from the April 18, 2005 meeting. Bandy introduces the items and states that items A & B will be heard at the same time and separate motions will be made. Lien recuses herself. Phil Hull, with The Land Group, representing Goldcreek Developers, LLC, presents the applications. Page 1 of 3 K:IP&ZlMINUTESITemporary Minutes Work AreaIPZ.OS.O2.0Smin.doc City Planner, Mike Williams reviews the staff reports for the applications. Bandy opens the public hearing. Robert White, 555 Park Lane, Eagle, Idaho, has concerns about traffic impact and irrigation Issues. Hull, with The Land Group, representing Goldcreek Developers, LLC, addresses concerns and discusses zoning issues for a lot that is not included in the plat. Bandy closes the public hearing. Discussion amongst the commission and staff. Marks moves that should City Council approve the annexation that we rezone from RUT/ R-4 and RE to AR and R-3 in reference to file number A-2-05 and RZ-4-05. Seconded by Aspitarte. ALL A YE...MOTION CARRIES Bandy moves to approve PP-4-05 - Eagle Creek Subdivision with the following changes to the Site Specific Conditions of Approval: Site Specific Condition of Approval No.6, lot No. 35 will be an open space/access lot until the time which it is subdivided and a new pedestrian/vehicle access point is platted to the south and modification to Site Specific Condition of Approval No.7, insert at the beginning of that paragraph "should a sidewalk be required by ACHD, the applicant shall be required to provide a common lot landscaped area along Park Lane", also strike the parenthetical reference to Lots 11 and 24, Block 1. Seconded by Pierce. ALL A YE...MOTION CARRIES. C. A-3-05 & RZ-5-05 - Annexation and Rezone from RUT to R-2 - Chad Moffat: Chad Moffat, represented by Roylance & Associates, is requesting an annexation and rezone from RUT (Rural Urban Transition) to R-2 (Residential up to 2 units per acre). The 14.6-acre, 30 lot subdivision (24 buildable, 6 common) is located on the west side of Park Lane approximately one-half mile north of Floating Feather Road at 1835 Park Lane. Staff is requesting this item be continued to the June 20, 2005 meeting. See above motion. D. PP-6-05 - Moffat Subdivision - Chad Moffat: Chad Moffat, represented by Roylance & Associates, is requesting preliminary plat approval for Moffat Subdivision. The 14.6-acre, 30 lot subdivision (24 buildable, 6 common) is located on the west side of Park Lane approximately one-half mile north of Floating Feather Road at 1835 Park Lane. Staff is requesting this item be continued to the June 20, 2005 meeting. See above motion. 6. NEW BUSINESS: None. 7. REPORTS: Commission: None. City Attorney: None. Staff: Committee of Nine Meeting. Bandy moves to adjourn. Seconded by Pierce. ALL A YE...MOTION CARRIES. 8. ADJOURNMENT: Hearing no further business, the meeting adjourned at 7:35 p.m. Page 2 of 3 K:IP&Z\MINUTESITemporary Minutes Work AreaIPZ-OS.O2.0Smin.doc RESPECTFULLY SUBMITTED: ~ ¥- ~-e~~ SHA ON K. BERGMANN CITY CLERK/TREAS URER A TRANS CRIB ABLE RECORD OF THIS MEETING IS A V AILABLE AT CITY HALL. Page 3 of 3 K:IP&ZlMINUTESITemporary Minutes Work AreaIPZ.OS.O2-0Smin.doc Senora Creek Sub. Phases 1, 2, & 3 City of Eagle, Idaho itnet PRESSURE IRRIGATION ASSESSMENT REPORT Prepared For: JLJ Enterprises 516 S. Capitol Blvd. Boise, ID 83702 3130 South Owyhee Street Boise, Idaho 83705 Mat Weaver, P.E. Date: May 2, 2005 W&H Pacific Senora Creek - Pressure Irrigation Project No 31803 Senora Creek Subdivision Pressure Irrigation Assessment Report Senora Creek Subdivision Pressure Irrigation System Narrative INTRODUCTION 2 PREDEVELOPMENT CONDITIONS 2 POST -DEVELOPMENT CONDITIONS. ... 2 SUMMARY . ......... 3 Appendix A: Drawing Documents Preliminary Plat Document Depicting Irrigation Basin Appendix B: Calculations, Spreadsheets and Computer Model Output Storage Pond and Stream Channel Volume Calculations Pressure Irrigation Design Flowrate Calculations Ballentyne Ditch Company Rotation Schedule Appendix C: Engineering Support Documentation Ballentyne Ditch Company Water Shares - Pending W&H Pacific Senora Creek Subdivision — Pressure lnigalion Project No 31803 I. Senora Creek Subdivision Pressure Irrigation System Narrative INTRODUCTION This pressure irrigation assessment report for the Senora Creek Subdivision was prepared by W&H Pacific for the proposed residential housing development situated within the area of impact of the City of Eagle, Ada County, being a portion of the SE 1/4 and SW 1/4 of the NW % of Section 12, T.4N, R.1 W, Boise Meridian. The Senora Creek Subdivision site is located south of the Floating Feather Road and stretches from Linder Road on the east to Park Lane on the west. The objective of this report is to evaluate the feasibility of existing water shares to service the proposed subdivision and to confirm that the pressure irrigation system will be able to comply with the requirements of the City of Eagle, Idaho Pressure Irrigation Standards. PREDEVELOPMENT CONDITIONS The site is bounded to the West by Linder Road and to the south by undeveloped land and the Middleton Canal. To the north is the Dry Creek Canal and to the west is Park Lane. The site is relatively flat with the undeveloped portions of the land generally sloping at 1 % from the east to west. The Ballentyne Ditch Company supplies irrigation water to the property with all current irrigation flow ultimately ending up in unnamed drainage ditches which meander across the site and ultimately end up discharging off site at the northwest corner of the project. POST -DEVELOPMENT CONDITIONS At full build out the Senora Creek Subdivision will have 119 buildable lots on approximately 61.21 acres. In addition there is approximately 7.57 acres of open space lots and a 1 Q-acre school lot that will also be irrigated from this system. It is proposed that a pressure irrigation pump station and distribution system be constructed that will operate utilizing existing Ballentyne Ditch Company "surface irrigation water shares" currently associated with the properties that make up the Senora Creek Subdivision. The pressure irrigation system design for this project will comply with the City of Eagle Pressure Irrigation Standards and the Idaho Standards of Public Works (ISPWC). The pressure irrigation system will be comprised of storage ponds, a pump station, and a pressurized distribution system. The storage ponds have a combined storage volume of 171,779 cubic feet and have been constructed so that water can be supplied to the pump station allowing the pump station to operate independently of the Ballentyne irrigation water rotation schedule. The pump station and wet well will be designed and 2 W8H Pacific Senora Creek Subdivision — Pressure Irrigation Project No 31803 constructed by Precision Pump and will have an intake our of the largest storage pond. The pump station will feed a pressurized distribution system for supply to the project. At full build out of the project the pressure irrigation system including the storage ponds, pump station, and distribution system will be owned, operated, and maintained by the Homeowner's Association. Annual maintenance and operation shall be coordinated by the Homeowner's Association with an Irrigation System and Pump Maintenance Company. The current water shares associated with this property are equal to 1 miner's inch per acre or 0.02 cubic feet per second (CFS) per acre of ground. The full water share for this property is 1.22 CFS (0.02 CFS x 61.21 acres) which is the equivalent of 549 gallons per minute (GPM). Receipt of the full shares of water is dependent from year to year on natural flow and availability of stored water. The value of 549 GPM associated with the water shares of the site is the design constraint for the operating conditions of the subdivision pump station and the pump station will not be allowed to exceed these conditions. However, based upon the calculations carried out in regards to this subdivision per the City's Pressure Irrigation Standards, a demand rate of 0.95 CFS or 426 GPM is all that will be required to provide irrigation water to the project. Therefore, it has been shown that the water shares associated with this project are capable of adequately supporting the development with a factor of safety of approximately 28%. Please refer to Appendix B for detailed presentation of all consumptive and design flowrate calculations. SUMMARY In conclusion the pressure irrigation design and improvements associated with the proposed Senora Creek Subdivision have been designed to ensure that all buildable lots within the subdivision will be provided pressure irrigation water consistent with Idaho Code 31-3805. Furthermore, this design was carried out with the intent that all pressure irrigation demands be met and supported by the existing irrigation shares associated with the property and to be in compliance with the requirements of the City of Eagle, Idaho Pressure Irrigation Standards. 3 W&H Pacific Senora Creek Subdivision —Pressure irrigation Project No 31803 • O u N ai g m 0 l0 W o K 0c o TI w y t 7a .mn Y d E O 00 c c N c A Day6 Day 1 Day 2 DaV 3 I 111;;iiiin N*Nqz,,,,,,w1mw ieii:Ii:Iii 4/e A/ g F4 Orr o,000 $00 OjU' 222222 ¢¢¢aaa N 5 r Nr 0 0 N f7 o0 N PM 3:00-4:00 PM 4:00-5:00 88 /D h 00 00 1q 10 22 as IPM 7:00-8:00 PM 8:00-9:00 PM 9:00.10:00 PM 10:00-11:00 N 0 0 r N 000000000 0..00000000 `-N .a¢¢¢¢¢¢¢¢¢ 0 0 .,4 4 NC) 0 Q O Vf fD . a fOhao 0 0 01 - Sanchez Property (20•hrs) - Strider Property (12-hrsj - Strickland Property (13-hrs) - Other Property Owners (123-hrs) 0 u O 0 a 0 0 0 v c 0 0 rg • re 0 • Pond T.o.P. Area (sf) B.o.P. Area (sf) T.o.P: Elev. (ft) B.o.P. Elev. (ft) Pond Vol. (ft3) Big Pond 21,534 7,410 2,524 2,515 130,248 Little Pond 2,722 912 2,524 2,521 5,451 Irrigation Ditch X-Section (ft2) Length of Ditch (ft) Ditch Vol. (ft3) small ditch 18 900 16,200 large ditch (e) 40 155 6,200 Iarge ditch (n) 40 158 6,320 Iarge ditch (s) 40 184 7,360 Total Storage Volume: 171,779 �rn� b " v cri Q9 i' V> i c V a If i 4 Z rn kp rn - rn It r u 1 11 0 U 11 1trl o (\ . a® 2 rc§k § E��7 k $anon • CI ill ■ 66a ; 2 r f 2f K k k re 1- U)k ..1C; R o2 % § LEE k0- § o 17. o in o o s iii \ o § .0 o Z to co co 2 ® co - § ( \\ \ oi \ / k�»\ \§§\ \ 2) AREA OF IRRIGABLE LAND dd§j §§§§ § ( ro 15 8 k m % k & co co k k k (5 k '5 0 0 E 0 113 ek^§ k°01R t... ti. 2 t _ co| $\/0o co CLT E th 00 01 £ / -c 01 2 k -J 2§ kk k — R k2 4) Required Capacity Flowrate - Design Flowrate L t t N N GPM (Irrigation flowrate to individual lot) n c 8 8 U 2 8 coincidence coefficient with storage ponds c CV r� D CO N 0 0 tr O N n U O. Q. tl Ii s$ tl tl S O O I. N N CO O N n 0 0 as as 0 N m a c w 5 v am OCO C Uz CO om co m wa 0/:// „of:V/h/ "�rs,,V7\ bar'.A\d\ \ a• a• a Sanchez Pro•erty (20- rs Strider Pro•erty - rs Stnckland Pro•erty rs Other Pro.e Owners 1 rs - =r Available for Distribution from Ponds and/or the Ballentyne Ditch (1 ' rs Rt 47. n „ r �88 'FF . 6 i� ck 4,1 "O En crl :%ds y � GOLDCREEK DEVELOPERS, LLC EAGLE CREEK SUBDNISION MASTER SITE PLAN r-t-F-.P OE90RD •r DDA.• 8, (AV WI 'ill lull ioyi kk MCCRED Br: t•9 94f ROR DAK OT/N/DD ar 8, WOO R[M9OR Ofb 3 \\ 'I I M30 S. D.M.. 9. Pant WNW uTa!-.l11e Or CAME/ AD. COM. ;LE: N.T.S. PROJECT NO. 3/803 WANING FILE •AAE: 31803-LAND-PEO2 ...... o-r... • ...IRIS •••.14.1....m