Loading...
Minutes - 2000 - Planning & Zoning - 08/21/2000 - Special ORIGINAL EAGLE PLANNING AND ZONING COMMISSION Special Meeting August 21, 2000 7:00 PM The Planning and Zoning Commission met in regular session on August 21, 2000 Chairman Franden presiding. 1. CALL TO ORDER: 2. ROLL CALL: The following members were present FRANDEN, BLOOM, NORDSTROM. Absent: DECKERS. A quorum is present. 3. APPROV AL OF MINUTES: A. Minutes of August 14,2000. Bloom moves to approve the minutes of August 14, 2000. Seconded by Nordstrom. ALL A YE...MOTION CARRIES 4. OLD BUSINESS: A. PP-6-00 - OakJev Estates Subdivision - FAM Developers Inc.: FAM Developers Inc., represented by Roylance and Associates P.A., is requesting preliminary plat approval for Oakley Estates Subdivision, a 15-acre, 8-lot (7- buildable) residential subdivision located at the northeast corner of Ballantyne Lane and Floating Feather Road. (This item was continued from the August 14,2000, meeting.) Franden introduces the item. Vaughan briefly reviews events from the Aug. 14th meeting regarding this application Discussion between Vaughan and Commission regarding irrigation and water rights. Mark Butler 222 EState St. representing FAM Developers Inc. Answers questions from Commission about sufficient water rights for entire parcel. Shelly Strate 2661 N. Park Lane. General discussion regarding CC&R's, irrigation, and site access. Discussion. The Commission suggests the applicant meet with adjacent property owners to discuss the proposed development prior to council meeting. Franden moves to approve PP-6-00 Oakley Estates Subdivision - F AM Developers Inc, with site specific and standard conditions of approval. Adding the following site specific conditions. A. Applicant shall meet with the two property owners to the south of proposed road and provides written verification of that meeting. B. Before final plan is approved the city engineer shall certify there will be adequate water to irrigate lawns and any pastures. Seconded by Nordstrom. TWO A YE...ONE NAY (Bloom). MOTIONS CARRIES. 5. PUBLIC HEARINGS: A. RZ-9-00~-9-00/CU-9-00 - Picadillv Villae:e Planned Unit Development - Stacia Patterson: Stacia Patterson, represented by Mark Butler with Land Consultants Inc., is requesting a rezone from R-4 (Residential - four units per acre) to MU-DA-P (Mixed Use - with Development Agreement-PUD), conditional use, planned unit development preliminary development plan, and preliminary plat approval for Picadilly Village Subdivision. The 6.87-acre, 19-1ot (16-residential, 2-commercial, and I-common) subdivision is located on the southwest comer of State Highway 55 and Hill Road. Franden introduces the item. Mark Butler 222 E. State St. Mr. Butler reviews the application. Vaughan reviews the staff report. Franden opens the public hearing. John Evans, 5699 N, Riffle Way, Garden City. Mr. Evans is the Developer of Great Sky Subdivision located south of the proposed development. Concerned about road alignment and access to Great Sky. Established driveway could be a problem. Building a road could encroach into minimum set back of existing buildings. Not opposed to project but wants a road built out to Great Sky. Angela Deckers, 2249 Dickey Circle, representing Evans Subdivision, Eagle, Idaho. Happy single family homes are being proposed and not multi family units. Concerned as a homeowner about commercial buildings. Residents would like to see a professional office setting versus commercial/retail. Recommends prohibiting restaurants. Vaughan addresses issue of roadway. Mark Butler rebuts testimony. Franden closes public hearing. Discussion amongst the Commission. John Evans addresses the Commission to provide clarification on adjacent properties. Mark Butler addresses the Commission on the right of way and Great Sky access. General Discussion. Bloom moves to table RZ-9-00IPPUD-6-00IPP-9-00/CU-9-00 - Picadilly Village Planned Unit Development, until August 28, 2000 Planning and Zoning meeting. To allow applicant to continue negotiations with the adjoining property owner ORIGINAL regarding road alignment. Seconded by Nordstrom. ALL A YE...MOTION CARRIES. 6. NEW BUSINESS: A. Discussion of Bylaws Discussion of Planning & Zoning meeting time amongst Commission Bloom moves to amend Planning & Zoning Commission By Laws to adjust the starting time for meetings to 6:30 p.m., effective beginning on Sept 18th. Seconded by Franden. ALL AYE... MOTION CARRIES. 7. REPORTS: B. C. Commission: Bloom reports on communication with Meridian School District City Attorney: None Staff: Transportation Planning general discussion A. 8. ADJOURNMENT: Bloom moved to adjourn at 9:03p.m. Seconded Nordstrom. ALL A YE...MOTION CARRIES... ""..,r,1J,I.$8 !t:¡." ~.;Þ 0 P B./i ~""1t ~,'t <"\4... r,~"""'t'<.! C:( "~.:,. ., ~ .f'11"'- O. "Q~" <?.~ .: .1,' ,,?) it"'" ~ ".-, .. !It ,,~O"v "/'A" -:. :r; ~v "".. ~i *~ 'ff,~Q=' ~}fr = ~ ~¡,~\SE,l:;,l.:';! J \\;;'-... . . c.. ". ! ~ ~r:'-,,;. ';,'J;. r,D..:< ~;}~; ~ii;"O ";~;'of>' :f'¡:<{-f\'1~'t¥..~-rr.'. RESPECTFULLY SUBMITfED: SHARON K. MOORE CITY CLERKffREAS URER APPROVED: (' J£~ q/~ CHAIRMAN ~tØJ~ ~~S U,è::ð' Ot A illQ-1tt1V A TRANSCRIBABLE RECORD OF THIS MEETING IS A V AILABLE AT CITY HALL. EAGLE PLANNING & ZONING COMMISSION PUBLIC HEARING SIGN -IN SHEET RZ-9-00/PPUD-6-00/PP-9-00/CU-9-00 — Picadillv Village Planned Unit Development August 21, 2000 7:00 P.M. PLEASE PRINT LEGIBLY NAME ADDRESS TELEPHONE PRO? CON? 7oL- Lva0s -CM N, / 1)P-( 75 2 E32 Page 1 of 1 'Z.\ 2,\o0 Land Consultants Inc. 222 E. State Street • Suite B • Eagle Idaho 83616 • Office 208.938.3812 • Fax 208.939.7321 Date: August 21, 2000 TO: City of Eagle Attention: Eagle Planning and Zoning Commission 310 E. State Street Eagle, ID 83616 RE: Picadilly Village PUD Dear Commissioners, A site plan showing a cul-de-sac connected to a non existent road on the property to the west of Picadilly was included in the packet sent to the Commission for Picadilly Village. That plan is not Picadilly proposal. Apparently, the plan was submitted to the City by IFI Partners II. Furthermore, so you know, my Clients gave no permission to IFI Partners to engineer a plan for their site or obtain engineering plans, other than what has been submitted to the City, for their site. Thank you. cc: Stacia Patterson, Applicant Fredric V. Shoemaker, Cosho, Humphrey, Greener & Welsh, P.A. Page 1 of 1 C:wiy Docusnents1LC&Jobs 200aAax y V0ago 00160 le2.doc • 0 ° fIt'9 '1.-tevit4q °I13qq) 11c:°4:0.1A 4. If public right-of-way has been dedicated on the adjoining property to the west, along thel poi west boundary of this site (prior to submittal of a final development plan and final plat) then i ��4'\ this site shall be redesigned so that vehicle access is taken solely from twat' to-th«< . `.�- TQpp 5. The building layout and parking configuration of the commercial portion -of this site is considered "concept only." The design may change upon submittal of a final development plan. 6. Install a landscape buffer in accordance with ECC Section 8-2A-7 (J)(4)(c) along eastern side of the residential portion of the development (abutting State Highway 55). 7. Install a minimum 40 -foot wide landscape buffer along eastern side of commercial portion of the development (abutting State Highway ,55). The 40 -foot wide (minimum) landscape area shall extend around the northeast corner of this site. 8. Install a minimum 20 -foot wide landscape buffer along the northern portion of the commercial site abutting Hill Road. 9. The commercial building located along the western boundary of the site shall be setback from the property line a minimum of 40 -feet (or otherwise shall comply with ECC Section 8-3-3 (DD. 10. Comply with all site specific recommendations provided within the City's Engineering firm's (Holladay Engineering) letter dated June 28, 2000. 11. Final development plans shall be reviewed as "New Business" items and not as "Public Hearing" items unless the City determines that any difference between the preliminary development plan and final development plan needs additional public comment because of possible impacts to surrounding property owners, to this development, or to the community, or inconsistency with the conditions herein. If the City determines that a public hearing shall be held on the final development plan, notice shall be provided for (as was required for the preliminary development plan). 12. Useable park amenities such as, picnic tables, gazebos, swing sets, basket ball courts, ball fields and/or similar amenities shall be provided within the open space areas. Landscape plans showing open space amenities shall be reviewed and approved by the Design Review Board. 13. Minimum building setbacks, lot sizes and lot widths shall be as stated within the "Site Data" section "H" within the City Council's Findings of Fact and Conclusions of Law with the following condition: The additional 5 -foot setback required for two story structures shall be waived for the front, back and street sides of all units within the subdivision. 14. Subdivision signage, common area, recreation center, street trees, existing trees, pathways, buffer areas, perimeter fencing, and etc. shall be reviewed and approved by the Design Review Board priof to approval of final development plan. 15. The entire Picadilly Village development shall remain under the control of one Homeowners Association. 16. Provide a 5 -foot wide concrete meandering sidewalk along Hill Road abutting the site. Page 17 of 22 AEAGLENTINCOMMOMPlaaniag DepAEagb ApplicanocsZUBS120001Picaa ly Vi[lagc PUD stf doc JAMES E. BRUCE, President GLENN J RHODES. Vice President SHERRY R. HUBER, Secretary TO: II 11 -1)4 , D;r , ,n) NOV 5 1993 li I i;�rl ,2yember 3, 1993 Pail y _ . Irl Gary Lee, J -U -B Engineering 250 S. Beechwood Boise ID 83706 FROM: Larry Sale, Development SUBJECT: GREAT SKY ESTATES SUBDIVISION - PRELIMINARY PLAT On November 3, 1993, the Commissioners of the Ada County Highway District (hereafter called "District") approved the Preliminary Plat as stated on the attached staff report. In order that the Final Plat may be considered by the District for acceptance, the Developer shall cause the following applicable standard conditions to be satisfied prior to District certification and endorsement: 1. Drainage plans shall be submitted and subject to review and approval by the District. 2. If public street imorovemrnts are required: Prior to any construction within the existing or proposed public right-of- way, the following shall be submitted and subject to review and approval by the District: a. Three complete sets of detailed street construction drawings prepared by an Idaho Registered Professional Engineer, together with payment of plan review fee. b. Execute an Inspection Agreement between the Developer and the District together with initial payment deposit for inspection and/or testing services. c. Complete all street improvements to the satisfaction of the District, or execute Surety Agreement between the Developer and the District to guarantee the completion of construction of all street improvements. ada county highway district 318 East 37th • Boise. Idaho 83714 • Phone (208) 345-7680 November 3, 1993 Page 2 3. Furnish copy of Final Plat showing street names as approved by the Local Government Agency having such authority toaether with payment of fee charged for the manufacturing and installation of all street signs, as required. 4. If Public Rights -of -Way Trust Fund deposit is required, make deposit to the District in the form of cash or cashier's check for the amount specified by the District. 5. Furnish easements, agreements, and all other datum or documents as required by the District. 6. Furnish Final Plat drawings for District acceptance, certifications, and endorsement. The final plat must contain the signed endorsement of the Owner's and Land Surveyor's certification. 7. Approval of the plat is valid for one year. An extension of .one year will be considered by the Commission if requested within 15 -days prior to the expiration date. •Please contact me at 345-7680, should you have any questions. LS cc: Development Services Chron Eagle City Hall JAMES E. BRUCE. President GLENN J. RHODES, Vice President SHERRY R. HUBER, Secretary TO: FROM: ACHD Commission Development Services TNTER- DEPARTMENT "ORRESPONDENCE JRTSKYET/DSTECH 11-3-93 DATE: 'October 29, 1993 SUBJECT: PRELIMINARY PLAT - GREAT SKY ESTATES SUBDIVISION Revised (Gary Lee, J -U -B Engineering, 250 S. Beechwood, Boise. ID 83706 - 376-7330) This is a major revision to a previous layout which was submitted to Eagle City approximately one year ago, but never approved by the District. FACTS & FINDINGS: 1. Great Sky Estates is a 193 -lot single family residential subdivision locat- ed on the north side of State Highway 44 (State St.) west of Hwy. 55; 12,820 -feet of new public streets are planned. This subdivision would be expected to add 1,930 vehicle trips per day to existing traffic on State Highway 44 and Hill Road. State Highway 44 is under the jurisdiction of Idaho Transportation Department (ITD). Submittals shall be provided to that Department for requirements and comments. The 2000 Functional Street Classification Plan designates this road as a principal arterial roadway. 3. A traffic study was submitted to the District analyzing the previous layout. It concluded that left turning traffic from the project onto Hwy. 44 would experience delays on the order of Level Of Service F and E (AM and PM). Staff recommended that the layout be re -oriented to direct traffic out to the north of the project, toward Hill Road rath- er than State Street. The applicant agreed and prepared the attached layout. Staff and the City approved the redesign, but never brought the new design to the Commissioners attention. 4. ITD is in the final design process to realign State Highway 55 along the east 120 -feet of subject parcel. The alignment has been duly adopted by ITD. 5. The revised layout effectively divides the project into two spheres of traffic influence, one south of a major drainage.canal running east to west through the property and the other sphere north of the canal, the southern sphere will be developed first. The northern sphere will not ada county highway district 318 East 37th • Boise, Idaho 83714 • Phone (208) 345-7680 1 ELIMINlRY PLAT • GREAT S ESTATES O:tober. 29 , 1993 _'age 2 be allowed to develop until Hill Road is rerouted or if a temporary roadway is constructed with at least 28 -feet of pavement from the project to the existing Hill Road. The street pattern directs most of the traffic out to the north for fu- ture connection to Hill Road after ITD constructs State Highway 55 and the Eagle By -Pass, which will severely restrict the ability to access State Street from this project. 6. Access to Hill Road cannot be obtained until the acreage north of this parcel is developed to provide the link between this project and Hill Road. Staff understands this developer is working to acquire this property to complete the reorientation of his project. SITE SPECIFIC REQUIREMENTS: 1. Direct loc or parcel access to collector streets is prohibited, in compli- ance with District policy. Lot access restrictions shall be stated on the final plat. 2. Comply with requirements of ITD for State Highway 44 and the new State Highway 55 frontage. Submit to the District a letter from ITD regarding said requirements. 3. A public road connection into the northern portion of the project (north of the canal) will be required before the District will allow platting and construction of this part of the project. Coordinate with District staff. STANDARD REQUIREMENTS: Street and drainage improvements required in the public right-of-way shall be designed and constructed in conformance with District stan- dards and policies. 2. Dedicated streets and drainage systems shall be designed and construct- ed in conformance with District standards and policies. - 3. Specifications, land surveys, reports, plats, drawings, plans, design information and calculations presented to HCHD shall be sealed, signed and dated by a Registered Professional Engineer or Professional Land Surveyor, in compliance with Idaho Code, Section 54-1215. 4. Provide written approval from the appropriate irrigation/drainage dis- trict authorizing storm runoff into their system. 5. Locate obstructions (utility facilities, irrigation and drainage appur- tenances, etc.) outside of the proposed street improvements. Authoriza- tion for relocations shall be obtained from the appropriate entity. .? :• E L 1 M I NAR I PLAT - 1REP SKY ESTATES 'ctober. 29, 1993 Page 3 6. C:antinue existing irrigation and drainage. systems across parcel. Submit three sets of street construction _Plans to the District for review and appropriate action. d. Suhmit site drainage plans and calculations for review and appropriate action by ACHD. The proposed drainage system shall conform to the requirements of the City of Eagle and shall retain all storm water on- site. Public street drainage facilities shall be located in the public right-of- way or in a drainage easement set aside specifically for that use. There shall be no trees, fences, bushes, sheds, or other valuable amen- ities placed in said easement. Provide design data for proposed access to public streets for review and appropriate action by ACHD. 10. Locate driveway curb cuts a minimum of 5 -feet from the side lot proper- ty lines when. the driveways :are not being shared with the adjacent property. 11. Developer shall provide the District with a copy of the recorded plat prior to the installation of street name signs. Street signs will not be ordered until all fees have been paid and a copy of the recorded plat has been provided to ACHD staff. The copy of the recorded plat shall show the recording information as inscribed by the Deputy County Recorder. 12. Install a stop sign on every unsignalized approach of a project street to an intersection involving a collector or arterial.as the cross -street. The stop'sign shall be installed when the project street is first accessi- ble to the motoring public. 13. A right-of-way permit must be obtained from ACHD for all street and utility construction within the public right-of-way. Contact Construc- tion Services at 345-7667 (with zoning file number) for details. ' " PRELIMINARY PLAT - ' REAT S ESTATES October 29, 1993 Page 4 14. A request for :codification, variance or waiver of any requirement or policy outlined herein shall be made, in writing, to the Manager of Engineering Services within 15 calendar days of the original Commission action. The request shall include a statement explaining why such a requirement would result in substantial hardship or inequity. Should you have any questions or comments, please contact the Develop- ment Services Division at 345-7662. STAFF SUBMITTING: DATE OF COMMISSION APPROVAL: Lacry Sale NOV 031g .00111 • ko Iaqcc:CQC,► APtriefiriga tenzikir,tvir VaPitiat s s 00' 35' 34' W 1516.10' w § • _ s02.32.3� a _ TENTATIVE STATE HIGHWAY 55 -� N 69.45' 16• W 55.5621 SOC'06'26' --E --•'-- 1[.2146.) --�--- --- -�- - 255,14• /// 9• 1640.16' ..134 ` •'1 _ hO • Zw . 'y Y• •[i .. - - _ �.._ __�__ __' \ 33 ... .25 22 s ' 212 •. SA I 4 1 13 13 II 10 il 35 \(.• vi 4, C .• • li8 36 i 1 Z Ar 3 n t 31-, as -11- P' x• 30 ' ii; 13 013 _ F y / s 1 4, 3 20 :1114 I4 --14 5 IN14 L 2 :a 1 'N ; 1 = 3 2 4 R 15 As 1 t• T ' 9 7.... 04. 140004 AVENUE7++ IO SI 34 I 33 11» 120 11 10 I 17 I ti I IS 114 M *33134.1 11,141 s o0• o6' I r w 669.59' 5 1T'•6 oil 2 gI N. SUN AVENUE ' •1 r • 1 Seal: 1 •t0? r ^ N oo' 1r 421 E r � `1 11£!JP'ti N. 140004 AVEC .-;3 v 1 M .1 •4. 1,4 11 •v LEGEND '102.2117 0000441 101 1AK MEM( ' CO11101 O4M1 !AQ /03120.4 111 • • 74313.0 • • 1.11r 10' 1 . 131)1 • /11..421 C • 0114V Cr. 2 41.14' 34' • 2407E5 I 11.. 04.0-•11 w 4.1.1 0.• 1{1•)11 s.•..... • 644 M..rl. 0. 7.0.•.• • 422 1... 4 1••.12 • 2+2101 (..01022 1311 ere. 0.4 10 I. MM. /.01214••4 1 1101.1.. 0•.0.1 (414) 1H1.1w1 1 M 104•.21 r 1.1 01 01..0104 0 220-1 1110.01••[ 130 Il 4.......4 Ilrr I1w.a *201. 111212•.2..1. 3t 4.1.1 M•.• 1 0A A 2. PILLS 1 221 •.11..221 mow. •1 211 .... 1.0. 1.•+121 Iota M :3 swami woe oar 111. w 0414 01.1 0. 0..014. ..el. 00 M ...4.M. w *mime 2242- wowed 0•• CNN • A• ..we11c22 S1 1....• 2101214 ••w a••�•221 11224111.4 be 2.. 001*, 21141 010101.211 • 111 0.1101 ors. 11012122 401..4 44 11. pr. is C-1122 M.-31•. 4.101 tar 0-4 14. ono ■1.2• .r- 1.41114 . M 4011 MU40 4• M 4.•.....♦ 111. ow. M M 24.•••• .240122•11 M be 22.4 11.22 .. w 0114022 WPM M«•.. ON.. 4.1.•116.1.• 22 •1.01+0...•.• AO 61144 ••Mw triad 11.14001 214 *122221 12214• 11w.1•r. W.0. w 00 SIDS 11•...01 M SIP. •022. 42. 0101 w A.. Cs 1•►•4r 12.21 1.0.2112 0 4.22 21.421.01 .w... w 22.2 4101 1.111.1.221.1 1 VIC4O1 0104.► 014P 22-.. 401«••.• 104 112 1.2140.1- w 04222.101 M 21.11,ww4Vow M10•.2201w 0122 M-vl.• .1440 222M00 M Ow. .M0 0102011.4. 01..1 .4 11.4• 7. PAM; MIM. 021 24211. 0122 010+. *4 1.2 •.22.0 4.4 0101 01.0 014 ww. • I. 2201 .12211 wow.* 04111. 04.1..4•• 011.• 2. 4.10..4 •.122..101 .l Oa *MOW. « 01,0011 1 •.•41 owl 4y.I-1-w•F A 10 kW woo ./.1 .1010.1 12. 221 22.4 w,0.4 f 4.01 14..1-.-wp 221/1.0 0121.21: 1: 0010.2 01 ••2201.• •.11 M `...0102. w •21•)141.4 4.4.0..012 411.0 4001.1 1 r- 124.4 (.F w 0121.0..1 • •.12214 4.2..0221r M /.p ..1•..•••dw• 14 w ..14.4.0. 4 2.1••• 221w (a•0.. C.1..•4.0 4. 1;2222017 01 00.1101 014 210' 011..11 11. • 1 47 444 2401 Sr. 022222 1.02 N.* 10 A 0210.01104 12.21•11........1 01.0..1• • 4...0111. 04 row. 4224210 ....... 11. Oti 0.1 Cow 0.4 w .42.1 ....••...f rwwl1 0 22. 0.011111, 01 22.22.01 0221 22 M. p011 .21.0101 w woo soar 12. 1220 1022.4 .011.... 42. 41.01 4.422 1- • r • 0*001 Ow 100 few 4014 4114 13 AW w 1.1 2 la 04 C...w0.2 4011•'01•••'4 M I4 1•.•2274 0.4 X11014 wow+ •101 N 224.4 w .M 1.140. 224 112 LOT TABULATION RESOENTt4). [01110* 0.001 LOTS Inn rout 1 0 1 1 2 30 1 31 3 10 1 It • 1/ 2 21 7 13 0 13 a 42 3 45 2 33 S 3$ 10 t 1 2 11 IS 0 Is 12 13 1 14 TOTAL 113 1S 201 tom. attract /t St A. 01103S OO13117. 2124 1(s10(M*A1 4.011 410 AC01 IIfPM= -1- 3(M/M1te 4 1.1-P3 0/114117tD 11-4-113 tDfU1(t PUT GREAT SKY ESTATES fal.2-110 Fi4Da14rn31. S4r>rgarsSertigars Hra J -U-9 ENG[NEER5 W. 4.f .d 031.11 •1• r y1 1..1...._1.000. Y1 01 4401'.400 1"21 i 7041 1' - 10q' 541 102*- 1412 - I. •4 in JAMES E. BRUCE, President GLENN J. RHODES, Vice President SHERRY R. HUBER, Secretary TO: J -U -B Di �S ( NOV 5 1993 pH 'i ,. r--"_NA,yember 3, 1993 Gary Lee, J -U -B Engineering 250 S. Beechwood Boise ID 83706 FROM: Larry Sale, Development SUBJECT: GREAT SKY ESTATES SUBDIVISION - PRELIMINARY PLAT On November 3, 1993, the Commissioners of the Ada County Highway District (hereafter called "District") approved the Preliminary Plat as stated on the attached staff report. In order that the Final Plat may be considered by the District for acceptance, the Developer shall cause the following applicable standard conditions to be satisfied prior to District certification and endorsement: 1. Drainage plans shall be submitted and subject to review and approval by the District. 2. If public street improvenlent1s are required: Prior to any construction within the existing or proposed public right-of- way, the following shall be submitted and subject to review and approval by the District: a. Three complete sets of detailed street construction drawings prepared by an Idaho Registered Professional Engineer, together with payment of plan review fee. b. Execute an Inspection Agreement between the Developer and the District together with initial payment deposit for inspection and/or testing services. c. Complete all street improvements to the satisfaction of the District, or execute Surety Agreement between the Developer and the District to guarantee the completion of construction of all street improvements. ada county highway district 318 East 37th • Boise, Idaho 83714 • Phone (208) 345-7680 November 3, 1993 Page 2 3. Furnish copy of Final Plat showing street names as approved by the Local Government Agency having such authority toaether with payment of fee charged for the manufacturing and installation of all street signs, as required. 4. If Public Rights -of -Way Trust Fund deposit is required, make deposit to the District in the form of cash or cashier's check for the amount specified by the District. 5. Furnish easements, agreements, and all other datum or documents as required by the District. 6. Furnish Final Plat drawings for District acceptance, certifications, and endorsement. The final plat must contain the signed endorsement of the Owner's and Land Surveyor's certification. 7. Approval of the plat is valid for one year. An extension of .one year will be considered by the Commission if requested within 15 -days prior to the expiration date. •Please contact me at 345-7680, should you have any questions. LS cc: Development Services Chron Eagle City Hall JAMES E. BRUCE, President GLENN J. RHODES, Vice President SHERRY R. HUBER, Secretary TU: ACHD Commission FROM: Development Services TNTER-DEPARTMENT 'Th RESPQNDENCE :1RTSKYET/DSTECH 11-3-93 DATE: October 29, 1993 SUBJECT: PRELIMINARY PLAT - GREAT SKY ESTATES SUBDIVISION Revised (Gary Lee, J -U -B Engineering, 250 S. Beechwood, Boise. ID 83706 - 376-7330) This is a major revision to a previous layout which was submitted to Eagle City approximately one year ago, but never approved by the District. FACTS & FINDINGS: 1. Great Sky Estates is a 193 -lot single family residential subdivision locat- ed on the north side of State Highway 44 (State St.) west of Hwy. 55; 12,820 -feet of new public streets are planned. This subdivision would be expected to add 1,930 vehicle trips per day to existing traffic on State Highway 44 and Hill Road. 2. State Highway 44 is under the jurisdiction of Idaho Transportation Department (ITD). Submittals shall be provided to that Department for requirements and comments. The 2000 Functional Street Classification Plan designates this road as a principal arterial roadway. 3. A traffic study was submitted to the District analyzing the previous layout. It concluded that left turning traffic from the project onto Hwy. 44 would experience delays on the order of Level Of Service F and E (AM and PM). Staff recommended that the layout be re -oriented to direct traffic out to the north of the project, toward Hill Road rath- er than State Street. The applicant agreed and prepared the attached layout. Staff and the City approved the redesign, but never brought the new design to the Commissioners attention. 4. ITD is in the final design process to realign State Highway 55 along the east 120 -feet of subject parcel. The alignment has been duly adopted by ITD. 5. The revised layout effectively divides the project into two spheres of traffic influence, one south of a major drainage.canal running east to west through the property and the other sphere north of the canal, the southern sphere will be developed first. The northern sphere will not ada county highway district 318 East 37th • Boise, Idaho 83714 • Phone (208) 345-7680 7'RELIMINA.RY PLAT • GREAT S ESTATES Octcber.29, 1993 'r' 19 e 2 be allowed to develop until Hill Road is rerouted or if a temporary roadway is constructed with at least 28 -feet of pavement from the project to the existing Hill Road. The street pattern directs most of the traffic cut to the north for fu- ture connection to Hill Road after ITD constructs State Highway 55 and the Eagle By -Pass, which will severely restrict the ability to access State Street from this project. 6. Access to Hill Road cannot be obtained until the acreage north of this parcel is developed to provide the link between this project and Hill Road. Staff understands this developer is working to acquire this property to complete the reorientation of his project. SITE SPECIFIC REQUIREMENTS: 1. Direct lot or parcel access to collector streets is pronlnited, in compli- ance with District policy. Lot access restrictions shall be stated on the final plat. 2. Comply with requirements of ITD for State Highway 44 and the new Ltate Highway 55 frontage. Submit to the District a letter from ITD regarding said requirements. 3. A public road connection into the northern portion of the project (north of the canal) will be required before the District will allow platting and construction of this part of the project. Coordinate with District staff. STANDARD REQUIREMENTS: 1. Street and drainage improvements required in the public right-of-way shall be designed and constructed in conformance with District stan- dards and policies. 2. Dedicated streets and drainage systems shall be designed and construct- ed in conformance with District standards and policies.' 3. Specifications, land surveys, reports, plats, drawings, plans, design information and calculations presented to ACHD shall be sealed, signed and dated by a Registered Professional Engineer or Professional Land Surveyor, in compliance with Idaho Code, Section 54-1215. 4. Provide written approval from the appropriate irrigation/drainage dis- trict authorizing storm runoff into their system. 5. Locate obstructions (utility facilities, irrigation and drainage appur- tenances, etc.) outside of the proposed street improvements. Authoriza- tion for relocations shall be obtained from the appropriate entity. :RnJMIN1%RI ?LAT - GREP- 'SKY ESTATES '' ::!'.ober. 29, 1993 Page 3 . C:.ntinue existing irrigation and drainage systems across parcel. Submit three sets of street construction plans to the District for review and appropriate action. 2. Submit site drainage plans and calculations for review and appropriate action by ACHD. The proposed drainage system shall conform to the requirements of the City of Eagle and shall retain all storm water on- ;iLe. Public street drainage facilities shall be located in the public right-of- way or in a drainage easement set aside specifically for that use. There shall be no trees, fences, bushes, sheds, or other valuable amen- ities placed in said easement. Provide design data for proposed access to public streets for review and appropriate action by ACHD. 10. Locate driveway curb cuts a minimum of 5 -feet from the side lot proper- ty lines when the driveways :are not being shared with the adjacent property. 11. Developer shall provide the District with a copy of the recorded plat prior to the installation of street name signs. Street signs will not be ordered until all fees have been paid and a copy of the recorded plat has been provided to ACHD staff. The copy of the recorded plat shall show the recording information as inscribed by the Deputy County Recorder. 1.?. Install a stop sign on every unsignalized approach of a project street to an intersection involving a collector or arterial.as the cross -street. The stop' sign shall be installed when the project street is first accessi- ble to the motoring public. 13. A right-of-way permit must be obtained frcm ACHD for all street and utility construction within the public right-of-way. Contact Construc- tion Services at 345-7667 (with zoning file number) for details. —PRELIMINARY PLAT -. GREAT S ESTATES c coker 2q, 1993 Page 4 i4. A request for :modification, variance or waiver of any requirement or policy outlined herein shall be made, in writing, to the Manager of Engineering Services within 15 calendar days.of the original Commission action. The request shall include a statement explaining why such a requirement would result in substantial hardship or inequity. Should you have any questions or comments, please contact the Develop- ment Services Division at 345-7662. STAFF SUBMITTING: DATE OF COMMISSION APPROVAL: Lacry Sale N O V o 3 1993 r : Ir •__ _ TENTATIVE STALE HIGHWAY 55 •V ; N 69' 45' 16' W 56.56' o D' 06' 26' E Olt 11..) - - - .. 2o• _ - 25&1s' S 00.36' 39' w 1840.16' 16 ri ••1 •1s .1 .14..1• u1 666 . s 00.35'34' w 1516.10' 27 ! 20 •. • 25 23 2 • 1 21 O 14 13 12 11 10 I •'1 • - - _ 1 •r . CO' Sr 34' 1 111107 S 00.06.17' w 14 w 5 669.69' 1f '24 • SCML 1. • IOo 1• + 41 1 41 1 91 .11 ._w.-11;1 NL _SUNr A UE 45 .• 6 • w• 30 • 25 1 J1 t( •. i1w4-� - 71 v 0 •254 24I S (1S -- s I .a= 3 1`1191 14 C 2 '{`1{6.4('`1 3 1 • ! 05 t% 1 1 Pools- 22 OON • 22 72 1 21 1 29 I':1 10 1IT111tH11•1tl11N M M N Il M N O0. 17' 42• E Ir lac 3 M 1N00N AVE iti -75, lir . . . K p 4.30 M 111 2116.10' 2 .r,• 17 �r 1.EOEND ••31211.••' 9 • par se* r • 33614' 1 • 066.•5. c • 410 4r C11.•11•S4.20'. •,T NOTES 1 11.9666 .r Mal Tr11 Matti s.....w 6 6« 511.44 M 1a410r 6 100 1401 • 1066 1 (5.61x11 • M5 1177 *0.1-00! 1MM. 1x•166 c ...r..r (4181 1.7 1 164 161105. 6r or 1••w••...N r J•Y-• moan 110 I. 1.1666•66 300 11x6. U. •••••• 1••.•5.. 3* 10.16[, 14.11 • Cq 0. I. • C1! 3. 1w 4111/1/.4r1 1,6.11 .f 111 3601. 46.41 1610••* + 111. M *3 11•../. n0. 1100 11. 9l 3. 1.•1 1.• Am .•1 M. Oa M • 0•1..• .1 •••.••1 66.6 roam « 6146 • a• 6•...1.1x•.1 Own 10•61r 1.5. •.••1••5. 4061•116.6 100 6.5.106.4 w M •1.••1.x1 . 117 .11 •• •r•. Cr...• so w1 .f w mar 1 C-1 111.1 10-5061 x•••111 15. 5.4 M• aro ••••• 1r. 106 • « 66611 10.1110 10 M 1••••11.1 0311 M .611.1.6 0 M 0.0.11• •611006,/ • 04 1.6 166 ♦ M 16.1.6003. « WI.* •N 5.0x.65.01• 1x060.0 10 19006.61 1•400 AM C•+b 1H••a 0.6.06 111.0.0 15. 11.91 lames woman •6.11 1•••x1• r•• 10 0\ Lamm M i1••r1 •r4• M 1••1.1. 1/ 0.r Cr 111x.•66 W1 1146.4r1r ! 100 8910.1 ••1w w 116 •11 f•5. .• .5..10614 10 NtCYi1 0•x6 11. Owe 6600 .......111.0.•••• 1.61 M ••.x•1...1 r M 6.11.3 10 ••14/1wx 60. •.1 1•.11m. w M• • 00.00131 01.1. Immo.0M 11.1. 6.1. 1.0.00111. •••n 00 1.1.. / 1. 1M34 NWIn MM Marko •1.611••x. 15.65.6x•6 O 1•.x0 5.-a 1.5.. 0615.x9 10114 .6 •.••r a 0* 1.11 •••1•U 66x1. M M 41119.011 word 6.• 4.0•1r 1.11014 11 5.w 11114610.4 « •13•••1 1/ 1100 400 I01•41-_16 • 1+ 161 KwM 6x1 ••66x6 5.0 10 44441P41•1 400 1..10 1111 114 ••N.n 1+165. /.w,, M M 1/11••111 •• Mr • 1141.!11• ..6 4.11.6. M. N Y• ••1x0. 0 •• 5.••.1.111•sow seta vow. ••••••NMdry6ft.0 « 11A6.0r. M • prow W. C.00 l•5.• ..4. •f••• 6f•...••.•r Y M IAN M Cl•0►100•. 1 1•••1/1 n•. 01666' M n•••• 000...1 r M 5.. b •.1 Imp 1•. 01001. 4.4611.5. 11 a 10.•1.•.1.1 61161.010. ..r N 161x 0 M 01••1• • 4.401•11.1 6.1 6••••11. 6.0.14x. 10104. 660•1111•1 M /0• 61.••. 01. Op *0 C•.4 600 600 .w..•w•11 •6f 6•+61 0/013 M M 1.r.1..N 1. 3. 16x1...1611 • 11 5.1.1.1 64./06 r M 110. 13. 11.111.•/10.0... 0.1101111.6111. 10.• •r • 1 00 0. 30e 1•• 15.. 1.1.•. 13 10*. w 0110 2 10 w c•.6. 00 405.•...1 31.. 44 164.. 411 1.116.0 1.611 10.•16 46 6110 w w 1,w•.6 M NO LOT TABULATION ■05•DENOAL COWL N 2,001 LOIS LOTS gam 1 0 I 1 2 30 1 31 3 1+ I 11 4 11 2 21 S 2 0 2 t 13 0 13 3 42 3 45 • 33 3 39 10 7 1 + 11 15 0 15 12 13 1 14 10111 193 65 200 101a1 6C01aCO3 41 90 6s O10SS 00W(10. 2 M 0K300wau (015 9[11 aeon 41111111120 1.11.17 1(00= 1•5-13 "atom 11.4.12 =TAME NAT GREAT SKY ESTATES J -U -B ENGINEER Cogab ars. armors /'Ms .1yy.••r0 -11 'Yy/ •x0••1••r1.•r.•)ri 71 r1d 1100 x10.6 1031 j Vrf 1' • 1Qd 0610 1106. 1101 1•t•. M: CITY OF EAGLE IN THE MATTER OF GREAT SKY ESTATES AN APPLICATION FOR A SUBDIVISION PRELIMINARY PLAT AND REZONE FINDINGS OF FACT AND CONCLUSIONS OF LAW On February 23, 1993, pursuant to public notice and hearing procedures set forth in Section 67-6509, Idaho State Code, and Sections 8 and 9, Eagle City Code, Gary Lee, JUB Engineer and, representative for the project and Trevor Roberts the owner and developer of the Great Sky Estates project, came before the Eagle City Council for the City of Eagle, Idaho, requesting approval of a consolidated application for (1) a subdivision preliminary plat and (2) a rezone of the property from C2, General Business District to R4 -Residential, (four single family dwelling unit per acre). Based on the application, testimony from the applicant and all interested parties, including written testimony received and into record, together with all documentary evidence submitted concerning the application, the Eagle City Council finds the following: FINDINGS OF FACT AND CONCLUSIONS OF LAW 1. The records in this matter indicate all notices, and publications have occurred as required by law. The records further reflect notice of the public hearing was sent to relevant public entities, including Central District Health, Eagle Sewer District, Idaho State Transportation Dept., Meridian School District, Eagle Water Co., Eagle Fire Dept., Idaho Power, Ada County Development Services and others. Responses from those entities are as follows: Eagle Sewer Dist: property is within the planning area and annexed. The district approved the concept but must reserve final approval until detailed sewer plans are received. Drainage Dist #2: 1. needs 100 ft exclusive drainage easement and drainage plans approved by District, 2. plans for the bridge which is to go over a portion of the District's drainage ditch and across exclusive drainage easement, 3. an executed agreement and costs paid. Drainage Dist. #2: Mr. Gass, attorney for the District requires a map showing the District's one hundred foot exclusive drainage easement running 50 ft. on each side of the center line of the ditch for the bridge. There must be an agreement to grant the development license to encroach upon the exclusive drainage easement. ACHD: will require at least a 165 ft. easement and further review of the project. Boise School Dist: Pierce Park District. The elementary school is closed enrollment in some grades, students from this subdivision may be bused to another school, Hillside Jr. High will have closed enrollment before this development is built, students will be bused to North Jr. High. New Dry Creek Ditch Co: As an additional requirement, all lateral service ditches must be protected. This issue is addressed in Idaho State Code. The developer shall not impede the delivery of water to any of the shareholders. G.S. should be required to utilize as much of the irrigation water as possible. The ditch company has excellent water rights and water is inexpensive. ITD: The following issues are to be discussed with the developer: 1. Right-of-way proposal, 2. Main access to the subdivision, 3. Ditch Rider access Road, 4. North access to Hill Road, 5. Utility crossings on new alignment. Further, the developer, should include provisions for noise abatement in the initial construction. Division of Environmental Quality: Concerned about adequate water and sewer service, including fire flows and wetlands. Will require additional information. Eagle Fire Dist: 1. requires address numbers on all buildings 2. Fire apparatus access roads 3. Fire flow requirements for buildings 4. compliance with spacing between hydrants 5. bridges will support weight of fire trucks 6. completion of Eagle Water Co. Hydraulic analysis 7. contingent on report, that adequate water for fire flows can be provided Eagle Water Co: 2/12/93:will provide water service to the subdivision under rules and regulations as provided for by RUC. 1/19/93: Letter of application for Franchise for Great Sky U. S. West: Requires 10 -foot wide public utilities easement Central Dist. Health: can approve with required conditions for central water and sewer. 2. On January 4, 1993, a public hearing was conducted by the Eagle Planning and Zoning Commission. Testimony was presented by neighborhood property owners that the proposed development may have an adverse impact on water and drainage. Other concerns were regarding sewer, congestion, one access and request fencing of the W. border. Written testimony was received from Michael N. and Julie Jeppson Morgen in opposition to the lot sizes and water rights. 3. A presentation by Gary Lee of JUB Engineering was given to Council. Mr. Lee informed the Council of changes in the preliminary plat to comply with ACHD and Eagle Planning and Zoning Commission recommendations and requirements. The project now includes 211 units, at 3.1 units per acre, a change from the originally proposed 226 units. There are now 22 common lots, landscape and berms along State St. and Highway 55. There are tot lots and landscaped entry. The canals will be open space and some landscaping. The 211 units will be standard structure and manufactured homes. The project will have central sewer and the water will be provided through the Eagle Water Co. The first phase would be the S boundary along Highway 55, the next phase along the alternate Highway 55. Mike Miller presented the landscaping plan for the project to Council. The pathway through the project will include a 5 ft. paved pathway along Highway 55 and a 10 ft. paved pathway along State Street. There are 15 small parks. Mr. Miller suggested because of the traffic problem they could consider just building phase 1, a total of 98 units, until the road _problems were resolved. 4. The findings of the Eagle Planning and Zoning Commission concluded that the preliminary development plan was not consistent with the intent and purpose of Title 9 of the Eagle City Code. The Commissioners concluded that the development was premature due to the conditions not being satisfied to date, specifically, questions remain regarding adequate service by essential public facilities and services, and recommended denial of the preliminary plat. The Commission concluded, however, there was, adequate evidence showing that this development use at the proposed location satisfies the general standards for approval of a rezone and subdivision set forth in said Sections of the Eagle City Code. Specifically, that the use will be harmonious with and in accordance with the general objectives of the Land Use section of the Eagle Comprehensive Plan, and Eagle City Code, Title 8, Zoning, and therefore, recommended approval of the rezone. 5. The standards used in evaluating the application are in the following sections of the Eagle City Code and Comprehensive Plan: Eagle Comprehensive Plan: Purpose and Scope: (a) to protect property rights and enhance property values, (f) to encourage urban and urban -type development within the incorporated City limits of Eagle (g) to avoid undue concentration of population overcrowding of land, (h) to ensure the development of land is commensurate with the physical characteristics of the land. Parks, Recreation and Open Space: 1. Create ample areas and facilities for our citizen's diverse indoor and outdoor park and recreational interest, 2. to encourage development of parks and recreational programs which meet the different needs, interest, and age levels of our citizens who reside in both the rural and urban areas, 3 Set aside for enjoyment adequate amounts of open space --- 4. Developers shall be encouraged to dedicate and develop areas for parks or tot lots in new residential developments. Transportation: Transportation and land use planning must be compatible. The City of Eagle is responsible for land use and transportation planning within the Eagle Impact Area. The Eagle Planning and Zoning Commission shall coordinate with the appropriate transportation network planning agency for all planned development that falls outside the authority of the City. Housing: 1. A wide diversity of housing types and choice between ownership and rental dwelling units shall be encouraged for all income groups in a variety of locations suitable for residential development. 2. The location of all housing shall be coordinated with provisions for adequate public facilities and services. 3. Developments of housing for all income groups close to employment and shopping centers shall be encouraged, 4. Housing shall be encouraged which. is in accordance with local building codes and provides for energy saving design, 5. An open housing market shall be encouraged for all persons regardless of income, race, age, sex, religion or ethnic background, 6. The use of materials and techniques that will maintain a high level of quality while lowering cost and speeding construction shall be encouraged. Land Use: Policies and Goals (1) The residential densities in the City limits shall not exceed twenty-five (25) units per acre. The proposal for this subdivision is based on the housing needs of the City of Eagle. The City of Eagle has many residential areas with larger lot sizes not economically accessible to the needs of some families. This subdivision lends itself to those families that would benefit by a subdivision developed with affordable housing by means of standard framed and manufactured housing with a minimal amount of common areas and parks in keeping with the affordable housing concept. Eagle City Code: Title 6, Chapter 5: Review of landscaping plans for entrances to subdivisions Title 9 -Land Subdivisions: 9-1-3: PURPOSE OF GENERAL SUBDIVISION REQUIREMENTS 9-2-3: PRELIMINARY PLAT PROCEDURES 9-2-4: FINAL PLAT PROCEDURES 9-3-1: Design standards A. Street location and arrangements: When an official street plan or comprehensive development plan has been adopted, subdivision streets shall conform to such plans B. Minor Streets: Minor streets shall be so arranged as to discourage their use by through traffic C. Stub Streets: Where adjoining areas are not subdivided the arrangement of streets in the new subdivisions shall be such that said streets extend to the boundary line of the tract to make provisions for the future extension of said streets into adjacent areas, and shall have a cul-de-sac or temporary cul-de-sac. D. Relation to Topography: Streets shall be arranged in proper relation to topography so as to result in usable lots, ---- E. Alleys: --- F. Frontage Roads: --- G. Cul -De -Sac Streets: shall not be more than 500 ft. in length and shall terminate with an adequate turnaround having a minimum radius of 50 ft. for right of way H. Half Streets: --- I. Private Streets: shall be prohibited --- J. Driveways: Providing access to no more than 2 dwelling units shall be allowed. 9-3-7: Planting strips and reserve strips standards a. planting strips shall be required to be placed next to the incompatible features such as highways, railroads, commercial or industrial uses to screen --shall be a minimum of 20 f t . wide and not part of the normal street right of way or utility easement. 9-4-1: Required improvements, (the following are only a portion of the code) a. Street lights b. Sidewalks and pedestrian walkways c. Water supply and sewer systems d. Storm drains e. Fire hydrants f. Greenbelt areas (may be required) 9-4-1-9: Water supply and sewer systems 9-4-1-10: Storm drainage, Flood controls 9-4-1-12: Greenbelt Areas, landscaping screening 9-4-2-2: Guarantee of improvements a. Performance bond b. Cash deposit 9-5-4-4: Control during development, time limit: CONCLUSION Based upon the foregoing FINDINGS OF FACTS AND CONCLUSIONS OF LAW, the Eagle City Council concludes the following: 1. The application submitted for Great Sky Estates Subdivision for a rezone from a (C2) Central Business District to a (R4) Residential Districts in accordance with the Land Use Section of the Eagle Comprehensive Plan and described in ECC 8-2-1. The requested rezone serves the welfare of the general public and is in the best public interest. 2. The granting of the application for a rezone does not violate the Idaho Code nor nullify the interests or purposes of the Eagle City Code sections listed above, or the Eagle Comprehensive Plan as outlined above. The Comprehensive Plan is a policy document intended to be used as a guide. It should be followed as closely, as reason, justice and its own general character make it practical and possible. The Comprehensive Plan is not a precise plan and does not show nor intend to show the exact outline of use distr&cts. It shows, rather, the general location, character and extend of land use patterns. 3. The Eagle City Council approves the application for a rezone from C2 (General Business District) to R4 (Residential 4 units per acre) as outlined in the Eagle City Code, Section 8-2-1. 4. The application submitted by Great Sky Estates Subdivision for a preliminary subdivision is in accordance with the Purpose and Scope, Parks and Recreation, Transportation, Housing and Public Services, Facilities and Utilities Sections of the Eagle Comprehensive Plan. 5. The granting of the application for a preliminary plat for said subdivision does not violate the Idaho Code nor nullify the interests or purposes of the Eagle City Code, specifically: Title 9-3-1 Design Standards 9-3-7: Planting strips and reserve strips standards: A condition of approval is berming of at least a four foot high sight obscuring berm along the S end and adjacent to SH 44 and the proposed new route of SH 55, bordering the E side of the development, a strip of land not less than 20 ft in width planted with dense planting acceptable by the Tree Parks Committee. Title 6: Landscaping for Entrances to Subdivisions: Compliance with the Committee recommendations. Title 9-4-1: Required Improvements: a. Street lights b. Sidewalks and pedestrian walkways c. Water supply and sewer systems d. Storm drains e. Fire hydrants f. Pathways 9-4-1-9: Water supply and sewer systems 6. Other conditions of approval are as follows: to allow development only in the southern portion of the project, bounded by Hiahwav 55 on the east, the drainage ditch #2 to the north, Randall Acres to the west and State St to the south, known as Phase 1, conditioned upon compliance of the City conditions presented tonight, and in addition, the pathway will be completed in phase 1. This project includes berming, which will have at least a four foot high sight obscuring berm along the S end and adjacent to SH -44 and the proposed new route of SH-55(bordering the E side of the development), a strip of land not less than 20ft in width planted with dense planting acceptable by the Tree/Parks Committee. 7. The City of Eagle Standard Subdivision Conditions are as follows: 1. Developer and/or owner shall comply with all requirements of Ada County Highway District including approval of the drainage plan, requirements for installing curb, gutter, sidewalks and paving throughout the subdivision or as specified by the Ada County Highway District. Signature by the Ada County Highway District on the plat is required prior to signing of the final plat by the City Engineer. (I.C. title 50, Chapter 13.) 2. Correct street names as approved by the Ada County Street Name committee shall be placed on the plat prior to signing of said plat by the City Engineer. 3. Approval of sewer and water facilities, the Idaho Dept of Health & Welfare and Central District Health are required. The signature by the Ada County Central District Health Department is required prior to signing of the final plat by the City Engineer (I.C. Title 50, Chapter 13 and I.C. 39-118) The developer shall comply with Eagle City code 9-4-1 pertaining to required improvements within subdivisions. Required improvements shall include, but not be limited to, extending all utilities to the platted property. Complete construction plans of water and sewer systems shall be submitted to and approved by the City Engineer prior to signing the final plat by the City Engineer. The developer may submit a letter in lieu of plans explaining why plans are not necessary. 4. The developer shall place a note on the face of the plat which states: "Minimum building setback lines shall be in accordance with the City of Eagle Zoning Ordinance at the time of issuance of the building permit or as specifically approved". All lot, parcel and tract sizes shall meet dimensional standards established in the City of Eagle zoning ordinance or as specifically approved. 5. Prior to submitting the final plat for recording, the following endorsements or certifications must be executed: Signatures of owners or dedicators, Certificate of the Surveyor, Certificate of the County Engineer, Certificate of Central District Health Dept., Certificate of the City Engineer and City Clerk and signatures of the Commissioners of the Ada County Highway District and the Ada County Treasurer. 6. A letter from the fire department is required stating "the developer and/or owner has made arrangements to comply with all requirements of the Fire Department", prior to signing of the final plat by the City Engineer. Eagle Fire Department shall check off and approve all fire hydrant locations, Minimum flow per hydrant shall be 1000 gallons per minute. Eagle Fire Department shall check off and approve the fire protection system prior to issuance of a building permit. 7. Compliance with Idaho Code, section 31-3805, concerning irrigation rights, transfer and disclosure. A. The water rights appurtenant to the lands in said subdivision which are within the irrigation entity will be transferred from said lands by the owner thereof; or B. The subdivider has provided for underground tile or other like satisfactory underground conduit to permit the delivery of water to those landowners within the subdivision who are also within the irrigation entity. 1. Developer may either construct prior to final platting or bond in the amount of 110% of the estimated construction costs. 2. Plans must be submitted to the City Engineer showing the delivery system and approved by a registered professional engineer prior to signing of the final plat by the City Engineer. 8. Developer and/or owner shall submit a letter from the appropriate drainage entity approving the drainage system and/or accepting said drainage; or submit a letter from a registered professional engineer certifying that all drainage shall be retained on-site prior to signing of the final plat by the Eagle City Engineer. A copy of the construction drawing(s) shall be submitted with the letter. A. For drainage facilities not belonging to ACHD, the developer may either construct prior to final platting or post bond/agreement in the amount of 110% of the estimated construction costs. 9. Covenants, homeowner's association by-laws or other similar deed restrictions, acceptable to the Eagle City Attorney which provide for the use, control and mutual maintenance all common areas, storage facilities, recreational facilities, street lights or open spaces shall be reviewed and approved by the Eagle City Attorney prior to signing of the final plat by the Eagle City Engineer. A restrictive covenant must be recorded and a note on the face of the final plat is required, providing for mutual maintenance and access easements. Appropriate papers describing decision-making procedures relating to the :maintenance of structures, grounds and parking areas shall be reviewed and approved by the Eagle City Attorney prior to signing of the final plat by the City Engineer. 10. Street light plans shall be submitted and approved as to the location, height and wattage to the City Engineer prior to signing of the final plat by the City Engineer. All construction shall comply with the City's specifications and standards. The Developer has the option of completing street light installation prior to signing of the final plat by the City Engineer or bonding for the estimated cost. NOTE: All bonding shall conform to the Eagle City Code, Title 9, Chapter 4, Section 9-4-2.2, which specifies that the improvements to be made shall be done in a time period "not to exceed one year from the date of approval of the final plat". A. Developer and/or owner shall pay street light inspection fees on the proposed subdivision prior to signing of the final plat by the Eagle City Engineer. 11. Developers and/or owner shall delineate on the face of the final plat an Eagle City street light easement, acceptable to the City Engineer, for the purpose of installing and maintaining city -owned street light fixtures, conduit and wiring lying outside the dedicated public right-of-way, prior to signing of the final plat by the City Engineer. 12. The Developer and/or owner shall provide utility easements as required by the public utility providing service prior to signing of the final plat by the City Engineer. 13. The developer and/or owner shall comply with the provisions of the Eagle City Code which specify limitation on time of filing. A request for time extension, including the appropriate fee, shall be submitted to the City Clerk for processing. 14. Should the homeowner's association be responsible for the operation and maintenance of the storm drainage facilities, the covenants and restrictions, homeowner's association by- laws or other similar deed restrictions acceptable to the Eagle City Attorney shall be reviewed and approved by the Eagle City Attorney prior to signing of the final plat by the Eagle City Engineer. 15. The developer is to place a note on the face of the plat which states: "This subdivision is subject to the requirements of the Uniform building Code (UBC) as regulated by the City of Eagle." 16. No ditch, pipe or structure for irrigation water or irrigation waste water shall be obstructed, routed, coveredor changed in any way unless such obstruction, rerouting, covering or changing has first been approved in writing by the ditch company officer in charge. A copy of such written approval by the ditch company officer shall be filed with the construction drawing and submitted to the City Clerk prior to signing of the final plat by the City Engineer. 17. Approval of all well water for domestic use by the Idaho Department of Water Resources shall be obtained prior to signing of the plat of phase 1 by the Eagle City Engineer. 18. If applicable, Developer shall comply with all requirements and restrictions of the Eagle City Code and Eagle Comprehensive Plan, sections regulating Special Development Subdivisions including, but not limited to, Hillside Subdivisions, Planned Unit Developments, Cemetery Subdivisions, Floodplain Development, Areas of Critical Concern and special designated areas recognized to be historic, environmental, scenic or have architectural significance. 19. The City Parks Committee shall review and approve or reject all landscaping applications required to be submitted for the development of parks and landscaped areas and planting of street trees, and shall oversee such development and planting for the welfare of trees, shrubs and other vegetation to all entrances to subdivisions. 20. Developer may either construct the improvements required herein before filing the final plat or provide a financial guarantee of performance as provided under Eagle City Code Section 9-4-2, such as a performance bond, cash deposit, certified check, negotiable bond or bank letter of credit, in the amount of 110% of the total estimated cost for completing construction. Such financial guarantee shall be for a period of one year, unless a different period is specified by the City Council. The described financial guarantee of performance need not be provided for those improvements for which a comparable guarantee has been provided to another political subdivision having jurisdiction over said improvements and for which proof of said comparable guarantee is provided. Any financial guarantee required hereunder must be submitted to and approved by the City Clerk and City Engineer prior to the City Engineer signing the final plat. 21. Manufactured homes will be placed on permanent concrete foundations constructed to HUD standards and the standards of the Uniform Building Code adopted by the City of Eagle. 22. Will have at least a four foot high sight obscuring berm along the along the S end and adjacent to SH -44 and the proposed new route of SH-55(bordering the E side of the development), a strip of land not less than 20 ft in width planted with dense planting acceptable by the Tree/Parks Committee. The pathways are to be completed in phase 1. ONLY PHASE ONE IS TO BE DEVELOPED AT THIS TIME Based. on the foregoing findings the Eagle City Council approves the application for the preliminary plat submitted on behalf of Great Sky Estates. ADOPTED by the Eagle City Council of the City of Eagle, Idaho this 9 ,4ay of Marcli , 1993. el\R VED: l'AS1EVE-GUERBER rErARBARA-TGOMER CMC T EST : CITY OF EAGLE Mayor: Rick Yzaguirre May 24, 2000 Mark Butler 222 E. State St Eagle, ID 83616 Dear Mr. Butler: CITY OF EAGLE P.O. Box 477 Eagle, Idaho 83616 939-6813 Council: Stanley J. Bastian Steve Guerber Nancy Merrill Lynne Sedlacek Enclosed you will find a copy of the Findings of Fact for Great Sky Estates dated March 9, 1993, which you requested in your public record request dated May 23, 2000. As for the remainder of your request "any other findings for Great Sky if there are any", our records are available for your review should you like to schedule a designated time to examine them. It is not our policy to do general searches for data. Please call to schedule a time that will be convenient for you to review the files. Sinc;rely ae Ead6C)/1-- Tracy E. O orn, Deputy City Clerk