Loading...
Service Solicited - 2002 - Wright Brothers, The Building Company - Contract for ConstructionRECEIVED & FILED CITY OF EAGLE JUL 0 2 2002 File• Route tri• CONTRACT FOR CONSTRUCTION BETWEEN CITY OF EAGLE, IDAHO AND WRIGHT BROTHERS, THE BUILDING COMPANY CHAPTER 1 BUILDER'S AGREEMENT Dated: June 28, 2002 TABLE OF CONTENTS RECITALS 2 ARTICLE 1 THE CONTRACT DOCUMENTS 3 ARTICLE 2 NOTICES 4 ARTICLE 3 COMPENSATION OF GENERAL CONTRACTOR 4 ARTICLE 4 GENERAL CONTRACTOR'S SCOPE OF WORK 5 ARTICLE 5 SPECIFIC INSURANCE REQUIREMENTS 5 ARTICLE 6 PERSONNEL, SUBCONTRACTOR, SUPPLIER, AND CONSULTANT CHARTS 6 ARTICLE 7 CONSTRUCTION SCHEDULE AND SPECIFIC BOND REQUIREMENTS 6 ARTICLE.8 AMENDMENTS TO CHAPTER 2 7 APPENDIX A GENERAL CONTRACTOR'S COMPENSATION SCHEDULE 8 APPENDIX B GENERAL CONTRACTOR'S PERSONNEL CHART 9 APPENDIX C GENERAL CONTRACTOR'S SUBCONTRACTORS AND SUPPLIERS CHART 10 APPENDIX D OWNER'S CONSULTANTS CHART 11 Contract For Construction • Chapter 1 Builder's Agreement CONTRACT FOR CONSTRUCTION CHAPTER 1 BUILDER'S AGREEMENT This Contract For Construction, is entered into between: "OWNER" And "GENERAL CONTRACTOR" City of Eagle 310 East State Street P.O. Box 1520 Eagle, ID 83616 Wright Brothers, The Building Company 825 East State Street P.O. Box 637 Eagle, Idaho 83616 This Contract For Construction is executed under seal, and shall be effective on the date signed by the last party to do so. ADDRESSES and AUTHORIZED REPRESENTATIVES: The authorized representatives and addresses of the Owner, the General Contractor and the Professional(s) are: OWNER: Representative: Address: City, State, Zip: Telephone: E-mail: GENERAL CONTRACTOR: Representative: Address: City, State, Zip: Telephone: E-mail: Sharon K. Moore, City Clerk 310 East State Street P.O. Box 1520 Eagle, Idaho 83616 208/939-6813 FAX: 208/939-6827 smoore@rmci.net Tom Golis and Ty Spring, Wright Brothers, The Building Company 825 East State Street P.O. Box 637 Eagle, Idaho 83616 208/939-0377 FAX: 208/939-0397 taolis(wbtbc.com or tsprindawbtbc.com General Contractor's License #: 12026 -AAA -1-3 FEIN / SSN #: 82-0404319 Contract For Construction • Chapter 1 Builder's Agreement 1 PROFESSIONAL: Representative: Don Belts and Bruce Taylor, Jensen -Belts Associates, PLLC Address: 495 Main Street City, State, Zip: Boise, ID 83702 Telephone: 208/343-7175 FAX: 208/343-7178 E-mail: don@jensenbelts.com and bruce@jensenbelts.com The Professional is designated as the Owner's representative pursuant to Paragraph 11.1 of Chapter 2. OWNER'S PROJECT IDENTIFICATION INFORMATION: Project Title: Reid W. Merrill Sr. Community Park - Site Improvements Project Location: Eagle, Idaho Address: 310 East State Street P.O. Box 1520 City, State, Zip: Eagle, Idaho 83616 General Project Description: Work includes the construction of a new Community Park including: demolition, restrooms, picnic shelter, earthwork, concrete paving, parking lot, asphalt paths, aquatic playground, play area, metal fabrication, site furniture, sprinkler irrigation, and planting. TIME FOR PERFORMANCE: A. Commencement of Construction: The General Contractor shall commence construction of its scope of the Work within ten (10) days after submission of the performance and payment bonds (the "Commencement Date"). B. Substantial Completion: The General Contractor shall accomplish Substantial Completion of its scope of the Work within one hundred twenty (120) days after commencement of construction as described in paragraph A alone (the "required date of Substantial Completion"). C. Final Completion : The General contractor shall accomplish Final Completion of its scope of the Work within thirty (30) days of substantial completion as defined in this agreement (the "required date of Final Completion"). RECITALS A. The Owner intends to construct the Project and is engaging the General Contractor to Contract For Construction • Chapter 1 Builder's Agreement 2 perform certain labor, supervision and services and provide certain equipment, goods and materials for the Project. B. The Owner and General Contractor each acknowledges that it will act in good faith in carrying out its duties and obligations. C. The Owner's engagement of the General Contractor is based upon the General Contractor's representations to the Owner that it (i) is experienced in the type of labor and services the Owner is engaging the General Contractor to perform; (ii) is authorized and licensed to perform the type of labor and services for which it is being engaged in the State and locality in which the Project is located; (iii) is qualified, willing and able to perform labor and services for the Project; and, (iv) has the expertise and ability to provide labor and services which will meet the Owner's objectives and requirements, and which will comply with the requirements of all governmental, public and quasi -public authorities and agencies having or asserting jurisdiction over the Project. D. The Owner and General Contractor each acknowledges that it has reviewed and familiarized itself with this Contract For Construction, including the documents enumerated in ARTICLE 1, and agrees to be bound by the terms and conditions contained therein. NOW, THEREFORE, for good and valuable consideration, the parties agree as follows: ARTICLE 1 THE CONTRACT DOCUMENTS 1.1 The "Contract For Construction" between the parties is comprised of the following documents: this "Chapter 1 - Builder's Agreement", including the foregoing recitals A. through D., and all attached documents and appendices; "Chapter 2 - Builder's Required Services And General Terms and Conditions" and all attached documents and appendices, incorporated herein by reference; Bid proposal submitted by General Contractor, if any, and bid proposal modifications, if any; The Construction Documents, now existing or issued hereafter; Any amendments including but not limited to and Work Change Directives executed by the Owner and the General Contractor hereafter; and, Any additional documents listed hereafter, if any: 1.2 Documents not included or expressly contemplated in this Article 1 do not, and shall not, form any part of this Contract For Construction. Contract For Construction • Chapter 1 Builder's Agreement 3 1.3.1 The Owner shall furnish the General Contractor with ten (10) copies of the Construction Documents required for the General Contractor's scope of the Work. ARTICLE 2 NOTICES 2.1 Unless otherwise provided, all notices shall be in writing and considered duly given if original is (i) hand delivered; (ii) delivered by telex, facsimile, or telecopy; or (iii) sent by U.S. Mail, postage prepaid. All notices shall be given to the addresses set forth above. Notices hand delivered or delivered by telex, facsimile, or telecopy shall be deemed given the next business day following the date of delivery. Notices given by U.S. Mail shall be deemed given as of the second business day following the date of posting. ARTICLE 3 COMPENSATION OF GENERAL CONTRACTOR 3.1 The Owner shall pay and the General Contractor shall accept, as full and complete payment for the General Contractor's timely and complete performance of its obligations hereunder the fixed price of: One million one hundred forty three thousand nine hundred thirty one dollars ($1,143.931.00). The amount set forth above is the Construction Contract Price and includes the aggregate amount of all allowances and any unit price items to be furnished �r installed. 3.2 Within seven (7) calendar days after execution of this Contract For Construction, the General Contractor shall prepare and present to the Owner and the designated Professional, as Appendix A, the General Contractor's Compensation Schedule which includes: Time Schedule for payment of the Construction Contract Price on a lump sum basis. 3.3 Within fifteen (15) calendar days after receipt by the Owner of the General Contractor's invoice, properly prepared pursuant to Article 15 of Chapter 2, the Owner shall pay to the General Contractor ninetv-five percent (95%) of the total amount approved by a Professional, withholding the balance as retainage, unless there is a dispute about the amount of compensation due the General Contractor. The date on which payment is due shall be referred to as the "Payment Date". 3.4 For change orders directed by a Professional to be performed by the General Contractor on a time and materials basis pursuant to Paragraph 9.4.1 of Chapter 2, the General Contractor shall be reimbursed the actual incurred cost and expense plus a maximum markup of ten percent (10%) for the change order Work performed by its forces. 3.5 When additional Work by the General Contractor's subcontractors and suppliers is required and approved pursuant to Paragraph 9.4.3 of Chapter 2, the General Contractor shall be reimbursed the actual incurred costs and expenses paid to those Contract For Construction • Chapter 1 Builder's Agreement 4 subcontractors and suppliers, plus a markup of not more than ten percent (10%). 3.6 If the General Contractor disputes a change order decision pursuant to Paragraph 9.6 of Chapter 2, it must give the Owner its written notice of dispute, including the reasons therefore, within ten (10) calendar days of the disputed decision. 3.7 If liquidated damages are assessed pursuant to Paragraph 17.2 of Chapter 2, such damages shall be calculated at the rate of seven hundred and fifty ($750.00) Dollars per calendar day. ARTICLE 4 GENERAL CONTRACTOR'S SCOPE OF WORK 4.1 The General Contractor shall furnish or cause to be furnished, and pay for out of the Construction Contract Price, all management, supervision, financing, goods, products, materials, equipment, systems, labor, services, permits, licenses, construction machinery, water, heat, utilities, transportation and other facilities necessary for proper execution and completion of its scope of the Work in accordance with all of the terms and conditions of this Contract For Construction. The general nature of the scope of Work the General Contractor is to complete is briefly described as follows: The Contractor is responsible for the entire project. ARTICLE 5 SPECIFIC INSURANCE REQUIREMENTS 5.1 The General Contractor shall purchase and maintain, at its expense, from a company or companies authorized to do business in the state in which the Project is located, insurance policies containing the following selected types of coverages and minimum limits of liability protecting from claims which may arise out of or result from the performance or non-performance of services under this Contract For Construction by the General Contractor or by anyone directly or indirectly employed by it, or by anyone for whose acts it may be liable: (i) Workers' Compensation, Disability Benefit, or similar employee benefit act coverage, and employer's liability coverage, as required by the state in which the Project is located. (ii) General Liability which (i) includes premises/operations, product/completed operations, contractual liability, independent contractors, broad -form property damage, underground, explosion and collapse hazard, and personal / advertising injury; and, (ii) names the Owner and the Owner's Related Parties as additional insureds, with per -occurrence limits of not less than one million ($1,000,000) Dollars. (iii) Comprehensive Automobile Liability which includes contractual liability coverage and coverage for all owned, hired and non -owned vehicles with limits of not Tess than one million ($1,000,000) Dollars. per accident for bodily injury and property damage, or Contract For Construction • Chapter 1 Builder's Agreement 5 one million ($1,000,000) Dollars. combined single limit. (iv) Builder's Risk Insurance which (i) includes without duplication, but is not limited to, fire (with extended coverage), theft, vandalism, malicious mischief, collapse, earthquake, flood, windstorm, falsework, testing and startup, temporary buildings and debris removal; and, (ii) names the Owner and the Owner's Related Parties, with coverage for one hundred (100%) percent of the insurable value of the General Contractor's scope of the Work, and a per -claim deductible of one million ($1,000,000) Dollars. ARTICLE 6 PERSONNEL, SUBCONTRACTOR, SUPPLIER AND CONSULTANT CHARTS 6.1 The General Contractor shall prepare and attach as Appendix B to this Agreement the General Contractor's Personnel Chart which lists by name, job category and responsibility the General Contractor's primary employees who will work on the Project. The General Contractor shall promptly inform the Owner in writing of any proposed replacements, the reasons therefor, and the name(s) and qualification(s) of proposed replacement(s). The Owner shall have the right to reject any proposed replacement. 6.2 The General Contractor (i) shall prepare and attach as Appendix C to this Agreement the General Contractor's Subcontractors And Suppliers Chart which lists by name and general Project responsibility each subcontractor and supplier who will be utilized by the General Contractor to provide goods or services with respect to the Project; (ii) shall not enter into any agreement with any subcontractor or supplier to which the Owner raises a reasonable, timely objection; and, (iii) shall promptly inform the Owner in writing of any proposed replacements, the reasons therefor, and the name(s) and qualification(s) of proposed replacement(s). The Owner shall have the right to reject any proposed replacement. 6.3 The Owner shall prepare and attach as Appendix D to this Agreement the Owner's Consultants Chart which lists by name and general duties each consultant retained by the Owner to provide services with respect to the Project. The Owner reserves the right to engage any other consultants which it may deem necessary or desirable. ARTICLE 7 CONSTRUCTION SCHEDULE AND SPECIFIC BOND REQUIREMENTS 7.1 The General Contractor shall, not less than ten (10) calendar days after execution of this Contract For Construction, prepare and submit a proposed Construction Schedule to the Owner and the designated Professional for their review and acceptance pursuant to Paragraph 16.1 of Chapter 2. 7.2 Surety Bond Requirements: 7.2.1 The General Contractor shall be required to provide payment and performance Contract For Construction • Chapter 1 Builder's Agreement 6 bonds. The amount of the premiums for such bonds shall be included in the Construction Contract Price. 7.2.2 The General Contractor shall not be required to provide a maintenance bond. ARTICLE 8 AMENDMENTS TO CHAPTER 2 8.1 The following additions to, deletions from and/or modifications to the specifically referenced articles and paragraphs of Chapter 2 shall take precedence over the provisions of those referenced articles and paragraphs as follows: None THE PAR IES AGREE TO THE TERMS AS SET FORTH HEREIN: ("Owner") ("General Contractor") liar. By: % c 1L 'YYI — Sharon K. Moore Its: City Clerk Date: 7—„2-0„2.. Attest: #`4 oFrE4 / o�yOR4�, * : �•� * • ';•�, S E AL,a; •o 1:: .,,�q7,Eof1:c-ss• pie,,„7// Robert Wright th" Its: President Date: Io'�-1/d- [Insert Corporate Seal If Required] Contract For Construction • Chapter 1 Builder's Agreement 7 APPENDIX A GENERAL CONTRACTOR'S COMPENSATION SCHEDULE A. SCHEDULE OF VALUES FOR PAYMENT OF THE CONSTRUCTION CONTRACT PRICE ON A LUMP SUM BASIS To be delivered seven (7) days after execution of contract. B. TIME SCHEDULE FOR PAYMENT OF THE CONSTRUCTION CONTRACT PRICE ON A LUMP SUM BASIS To be delivered seven (7) days after execution of contract. C. UNIT PRICES AND ESTIMATED NUMBER OF UNITS FOR COMPENSATION FOR SERVICES RENDERED AND GOODS SUPPLIED ON A UNIT -PRICE BASIS Tree Demolition: $250 each Lawn Sod: $0.30 per Square Foot D. RATES FOR COMPENSATION FOR SERVICES RENDERED ON A TIME AND MATERIAL BASIS Not Applicable E. COMPENSATION FOR GOODS FURNISHED ON A TIME AND MATERIALS BASIS Not Applicable E. ALLOWANCES Not Applicable Contract For Construction • Chapter 1 Builder's Agreement 8 APPENDIX B GENERAL CONTRACTOR'S PERSONNEL CHART Project Manager: Phone: Project Superintendent: Phone: Cel: Tom Golis 939-0377 Ty Spring 939-0377 869-9244 Contract For Construction • Chapter 1 Builder's Agreement 9 APPENDIX C GENERAL CONTRACTOR'S SUBCONTRACTORS AND SUPPLIERS CHART S itework: Landscaping: Concrete: Playground Equip. and Misc. Accessories: Fencing: Reinforcing Steel: Concrete Material: Metals: Framing: Framing Materials: Insulation: Roofing: Doors and hardware: Glass: Warner Construction, Inc. Franz Witte Landscape Contracting, Inc. Wright Brothers, The Building Company Wasau Tile Recreation Idaho Great Western Park and Playground Cascade Fence ABCO Inc. Idaho Concrete Company KB Welding Wright Brothers, The Building Company BMC West Franklin Building Supply Lloyds Lumber Evans Building Center MDM Insulation Tolley Hughes Hardware Sales and Service Custom Glass Toilet & Bath Accessories: SBI Contracting Painting: Colorcraft Water Play Equipment: Recreation Idaho Plumbing: Tech Plumbing HVAC: Hobson Fabricating Electrical: Power Electric Contract For Construction • Chapter 1 Builder's Agreement 10 APPENDIX D OWNER'S CONSULTANTS CHART LANDSCAPE ARCHITECT JENSEN-BELTS ASSOCIATES 495 MAIN STREET BOISE, IDAHO 83702 (208) 343-7175 CONTACT: DON BELTS/BRUCE TAYLOR ARCHITECT ZGA ARCHITECTS 565 WEST MYRTLE BOISE, IDAHO 83702 (208) 345-8872 CIVIL ENGINEER J.J. HOWARD 1675 HILL ROAD BOISE, IDAHO 83703 (208) 344-0574 MECHANICAL ENGINEER MUSGROVE ENGINEERING 410 S. ORCHARD, SUITE 184 BOISE, IDAHO 83705 (208) 384-4585 ELECTRICAL ENGINEER SYNERGY ENGINEERING 410 S. ORCHARD, SUITE 132 BOISE, IDAHO 83705 (208) 336-9617 Contract For Construction • Chapter 1 Builder's Agreement 11