Findings - DR - 2017 - DR-13-17 - Construct A Trailhead Parking Area Nd Pthways Within Pamela Baker ParkBEFORE THE EAGLE DESIGN REVIEW BOARD
IN THE MATTER OF AN APPLICATION
FOR A DESIGN REVIEW TO CONSTRUCT A
TRAILHEAD PARKING AREA AND
PATHWAYS WITHIN PAMELA BAKER PARK
FOR DENNIS M. BAKER FOUNDATION
FINDINGS OF FACT AND CONCLUSIONS OF LAW
CASE NUMBER DR -13-17
The above -entitled design review application came before the Eagle Design Review Board for their action
on May 11, 2017. The Design Review Board having heard and taken oral and written testimony, and having
duly considered the matter, makes the following Findings of Fact and Conclusions of Law;
FINDINGS OF FACT:
A. PROJECT SUMMARY:
Dennis M. Baker Foundation, represented by Dan Torfin, is requesting design review approval to
construct a trailhead parking lot and pathway within Pamela Baker Park. The pathway will connect the
pathway along East Colchester Drive to the Boise River Greenbelt located on the south side of the south
channel of the Boise River just east of Laguna Point Subdivision (Coast to Coast Subdivision). The
23.05 -acre site is located on the north side of East Colchester Drive, adjacent to Lakemoor Subdivision
No. 2.
B. APPLICATION SUBMITTAL:
The City of Eagle received the application for this item on March 7, 2017.
C. NOTICE OF AGENCIES' REVIEW:
Requests for agencies' reviews were transmitted on March 21, 2017, in accordance with the
requirements of the Eagle City Code.
D. HISTORY OF RELEVANT PREVIOUS ACTIONS:
On January 28, 1992, the City Council denied an annexation, rezone, and preliminary plat (A-91/ R2-
91/ PP -91) for Fall Creek Subdivision.
On January 4, 1993, the City Council approved an annexation, rezone, and preliminary plat (A-91/ R2-
91/ PP -91) for a revised version of Fall Creek Subdivision. That preliminary plat approval has since
lapsed.
On July 22, 2003, the City Council approved a Comprehensive Plan Amendment (CPA -4-02) to change
the land use designation on the Comprehensive Plan Land Use Map from Residential Two (up to two
dwelling units per acre) to Mixed Use, an annexation and rezone (A-3-02 & RZ-5-02) from RUT (Rural
Urban Transitional) to MU -DA (Mixed Use with Development Agreement) and a rezone from R-2
(Residential -up to two dwelling units per acre) to MU -DA (Mixed Use with Development Agreement)
for this site for B.W. Eagle, Inc.
On May 10, 2005, the City Council approved the preliminary plat for Lakemoor Subdivision a 178.52 -
acre, 240 -lot (142 -residential, 53 -commercial, 45 -common) subdivision (PP -03-05).
On February 28, 2006, the City Council approved the final plats for Lakemoor Subdivision No. 1 and
Lakemoor Subdivision No. 2 for DMB Investments, Inc., (FP-13-05/FP-14-05).
Page 1 of 13
K:\Planning Dept\Eagle Applications \Dr\2017\DR-13-17 Trailhead Parking and Pathway within Pamela Baker Park drfdocx
On June 19, 2007, the City Council approved a modification to the development agreement for DMB
Investments, LLC, and Eagle Lifestyle Center, LLC, by amending and restating the original
development agreement (recorded as Instrument No. 105048971) (RZ-05-02 MOD).
On December 8, 2008, the City Council approved the final plat for Lakemoor Subdivision No. 3 for
DMB Investments, LLC (FP -04-06).
On December 15, 2009, the City Council approved a two (2) year extension of time for the final plat
for Lakemoor Subdivision No. 3 for DMB Investments, LLC. The extension of time is valid until
December 8, 2011 (EXT -21-09).
On October 25, 2011, the City Council approved a one (1) year extension of time for the final plat for
Lakemoor Subdivision No. 3 for DMB Investments, LLC. The extension of time is valid until
December 8, 2012 (EXT -08-11).
On February 26, 2013, the City Council approved a development agreement modification for DMB
Investments (RZ-05-02 MOD2).
On February 26, 2013, the City Council approved a modification of the preliminary plat associated with
Lakemoor Subdivision (PP -03-05 MOD).
On June 25, 2013, the City Council approved the final plat for Lakemoor Subdivision No. 4 for B.W.
Eagle, Inc. and DMB Investments, Inc. (FP -04-13).
On June 25, 2013, the City Council approved the final plat for Lakemoor Subdivision No. 5 for B.W.
Eagle, Inc. (FP -07-13).
On December 26, 2013, the Lakemoor Subdivision No. 4 final plat was recorded at the Ada County
Recorder's Office.
On June 13, 2014, the Lakemoor Subdivision No. 5 final plat was recorded at the Ada County
Recorder's Office.
On April 14, 2015, the City Engineer recommended approval of the Eagles Gates Drive Extension.
On July 14, 2015, the City Council approved the final plat for Lakemoor Subdivision No. 6 for DMB
Investments (FP -08-15).
On April 12, 2016, the City Council approved the final plat for Lakemoor Commercial Subdivision for
Hawkins Companies, LLC (FP -02-16).
On August 9, 2016, the City Council approved a rezone with a development agreement, modifications
to the preliminary plat and original development agreement associated with Lakemoor Subdivision
(RZ-05-02 MOD4/RZ-03-16/PP-03-05 MOD2).
On January 12, 2017, the Design Review Board approved a design review application for the common
area landscaping, pool, and pool house within Lakemoor Subdivision No. 7 (DR -78-16).
On February 14, 2017, the City Council approved the final plat for Lakemoor Subdivision No. 6 for
DMB Development (FP -03-17).
On April 25, 2017, the City Council approved the final plat for Pamela Baker Park Subdivision for
DMB Development (FP -02-17).
E. COMPANION APPLICATIONS: None
Page 2 of 13
K:\Planning Dept\Eagle Applications \Dr12017\DR-13-17 Trailhead Parking and Pathway within Pamela Baker Park drf.docx
F. COMPREHENSIVE PLAN LAND USE MAP AND ZONING MAP DESIGNATIONS:
COMP PLAN ZONING
DESIGNATION DESIGNATION
MU -DA (Mixed Use with a
development agreement in
lieu of a PUD)
Existing Mixed Use
Proposed No Change No Change
North of site Mixed Use
South of site Mixed Use
East of site Not in Eagle Area of
R -E -DA -P (Residential
Estates with a development
agreement in lieu of a PUD)
LAND USE
Vacant Land
Pamela Baker Park
Single-family residences (Coast
to Coast Subdivision)
MU -DA (Mixed Use with a Proposed Lakemoor
development agreement in Subdivision No. 7
lieu of a PUD)
A-1 (Agricultural) Boise City's Waste Water
Impact Treatment Facility
West of site Mixed Use
MU -DA (Mixed Use with a
development agreement in
lieu of a PUD)
Single-family residences
(Lakemoor Subdivision No. 2)
G. DESIGN REVIEW OVERLAY DISTRICT: Not in the DDA, TDA, CEDA, or DSDA.
H. EXISTING Sim CHARACTERISTICS: This site is undeveloped.
I. SITE DATA:
Total Acreage of Site: 23.05 -acres
J. GENERAL SITE DESIGN FEATURES:
Number and Uses of Proposed Buildings: N/A
Height and Number of Stories of Proposed Buildings: N/A
Gross Floor Area of Proposed Buildings: N/A
On and Off -Site Circulation:
A 14,800 -square foot (approximately) paved parking lot provides parking for vehicles using this site.
One 26 -foot wide driveway is proposed to be located on the south property line and providing access
to East Fishing Creek Drive.
K. BUILDING DESIGN FEATURES: N/A
L. LANDSCAPING DESIGN:
Retention of Existing Trees and Preservation Methods: There are existing trees adjacent to the
northernmost pond that are to be retained.
Tree Replacement Calculations: N/A
Proposed Tree Mix (Species & Number): To be reviewed by the Design Review Board.
Street Trees: Street trees are proposed along East Colchester Drive and East Fishing Creek Drive.
Page 3 of 13
K:1Planning Dept\Eagle Applications1Dr12017\DR-13-17 Trailhead Parking and Pathway within Pamela Baker Park drf.docx
Maintenance Provisions and Proposed Irrigation Methods: Automatic irrigation required.
Transition Zones: N/A
Parking Lot Landscaping:
a. Perimeter Landscaping:
No perimeter landscaping is proposed around the perimeter of the parking lot.
b. Interior Landscaping: 8% interior landscaping is required, 0% is proposed (the interior landscape
islands will total 8.5% when they are landscaped).
M. TRASH ENCLOSURES: N/A
N. MECHANICAL UNITS: N/A
O. OUTDOOR LIGHTING:
A site and parking lot light plan showing location, height, and wattage is required to be reviewed and
approved by the Zoning Administrator prior to issuance of any building permits.
P. SIGNAGE:
No signs are proposed with this application. A separate design review application is required for the
approval of any signs proposed on this site.
Q. PUBLIC SERVICES AVAILABLE:
Preliminary approval letters from Central District Health Department and Eagle Fire Department have
been received by the City. A water service approval has not been received to date. Approval of the
water company having jurisdiction will be required prior to issuance of a building permit.
R. PUBLIC USES PROPOSED: None.
S. PUBLIC USES SHOWN ON FUTURE ACQUISITIONS MAP: No map currently exists
T. SPECIAL ON-SITE FEATURES:
Areas of Critical Environmental Concern - none
Evidence of Erosion - no
Fish Habitat - no
Floodplain - no
Mature Trees - yes
Riparian Vegetation - no
Steep Slopes - no
Stream/Creek - yes
Unique Animal Life - no
Unique Plant Life - no
Unstable Soils - unknown
Wildlife Habitat - no
U. SUMMARY OF REVIEW OF ENVIRONMENTAL ASSESSMENT PLAN (IF REQUIRED): Not
required.
V. AGENCY RESPONSES:
The following agencies have responded and their correspondence is attached to the staff report.
Ada County Highway District
Page 4 of 13
K:\Planning Dept\Eagle Applications\Dr\2017\DR-13-17 Trailhead Parking and Pathway within Pamela Baker Park drfdocx
Central District Health Department
City of Eagle Parks and Recreation
Eagle Fire Department
Idaho Transportation Department
Tesoro Logistics NW Pipeline
W. LE'1"1ERS FROM THE PUBLIC: None received to date.
STAFF ANALYSIS PROVIDED WITHIN THE STAFF REPORT:
A. COMPREHENSIVE PLAN PROVISIONS WHICH ARE OF SPECIAL CONCERN REGARDING
THIS PROPOSAL:
Mixed Use
Suitable primarily for a variety of uses such as limited office, limited commercial, and residential
developments. Uses should complement uses within Downtown Eagle. Development within this land
use designation should be required to proceed through the PUD and/or Development Agreement
process, see specific planning area text for a complete description.
B. DEVELOPMENT AGREEMENT PROVISIONS WHICH ARE OF SPECIAL CONCERN
REGARDING THIS PROPOSAL:
3.18 Subject to the conditions and limitations set forth herein, Owner shall provide a 23.05 acre
reconfigured park site along the eastern boundary of the Property in Area J and Area K as
generally depicted in Exhibit A2 attached hereto (hereinafter "Park Site") which Park Site is to
be owned and maintained by and at the expense of Eagle. Owner's obligations to provide said
Park Site shall be fulfilled as follows:
A. Upon the development of Areas H and I, as depicted on Exhibit A2, and/or a combination
thereof and the recordation of a final plat for any portion of Areas H and I or a combination
thereof, Owner through its Charitable Foundation shall complete certain public
improvements to the Park Site for the benefit of the public and Eagle, as follows:
1. Construct a 10 -foot wide asphalt paved pathway, approximately 4000 lineal feet to
intersect with the existing paved pathway along the south side of the south Channel of
the Boise River, as depicted on attached Exhibit Al.
2. Construct a paved "Trailhead Parking Lot" consisting of 45 spaces within the subject
Park Site, as depicted on attached Exhibit A2.
3. Construct and/or excavate approximately eight acres of ponds within the subject Park
Site, as depicted on Exhibit A2.
4. Provide utility stubs to the Park Site.
B. Upon completion of the above stated public improvements, the Owner through its
foundation will dedicate the Park Site to Eagle, which such dedication shall be subject to
the following restrictions:
1. The Park Site shall be restricted for use only as a public park and shall act as a non-
residential buffer for Boise City's waste water treatment facility and any expansions
thereof, located easterly of the Property.
2. Dedication of the Park Site shall be subject to all reservations, restrictions and
easements established of record or by use upon the Premises. The Park Site shall not
be made subject to any restrictive covenants Owner may impose upon any other portion
of the Property.
Page 5 of 13
K:'Planning DeptEagle Applications\Dr\2017\DR-13-17 Trailhead Parking and Pathway within Pamela Baker Park drf.docx
3. Eagle shall obtain Owner's written approval for any and all improvements to be made
to the Park Site prior to the commencement of construction or installation thereof, such
approval not to be unreasonably withheld or delayed over thirty (30) days from the
date sent to Owner. Failure of the Owner to respond to the City within the 30 -day
period is deemed as approved by the Owner.
C. Owner's dedication of the Park Site shall include any and all water rights and/or water
shares or certificates evidencing the same, which are appurtenant to the Park Site, the
amount or number of which shall be calculated on a proportionate basis with the rights
appurtenant to the Property.
D. To the extent permissible under the law, Owner shall be entitled to claim any available
income tax benefits which may arise out of Owner' s donation (and, if applicable,
development) of the Park Site as set forth herein, and Eagle shall cooperate with Owner in
seeking any such tax benefits.
C. ZONING CODE PROVISIONS WHICH ARE OF SPECIAL CONCERN REGARDING THIS
PROPOSAL:
• Eagle City Code Section 8-2A-1: GENERAL APPLICABILITY:
This article applies to all proposed development located within the design review overlay district
which shall include the entire city limits, and any land annexed into the city after the date of
adoption hereof. Such development includes, but is not limited to, new commercial, industrial,
institutional, office, multi -family residential projects, signs, common areas, subdivision signage,
proposed conversions, proposed changes in land use and/or building use, exterior remodeling or
repainting with a color different than what is existing, exterior restoration, and enlargement or
expansion of existing buildings, signs or sites, and requires the submittal of a design review
application pursuant to this article and fee as prescribed from time to time by the city council.
• Eagle City Code Section 8 -2A -7(K) Parking Lot Landscaping:
1. Visual Impact: Landscaping shall be provided to minimize the visual impact of off street
parking:
Parking should be located to the side and rear of buildings and shall be screened so that it
does not dominate the streetscape. Fences, hedges, berms, and landscaping may be used to
screen parking areas (chainlink fencing shall not be permitted). In the design of large parking
areas, arrange bays of parking spaces to be separated by landscaping. When parking lots
occur on sloping terrain, step the parking lots to follow the terrain rather than allowing the lot
surface to extend above natural grade.
2. Parking Lot Landscape Strip: A landscape strip shall be provided when a parking lot is
located adjacent to a public right of way. The landscaped strip shall serve to shield views of
parked cars to passing motorists and pedestrians, and to establish coordination among
architecturally diverse buildings, which creates a pleasing, harmonious appearance along the
roadway.
Four (4) options are provided for fulfilling this requirement:
a. Provide a ten foot (10') wide landscaped strip between the right of way and the parking lot,
and plant with a minimum of one shade tree and ten (10) shrubs per thirty five (35) linear
feet of frontage, excluding driveway openings.
b. Provide an earth berm of thirty inches (30") minimum height (do not exceed 3:1 slope)
within a ten foot (10') wide landscaped strip between the right of way and the parking lot,
Page 6 of 13
K:\Planning Dept\Eagle Applications\Dr12017 DR -13-17 Trailhead Parking and Pathway within Pamela Baker Park drf.docx
and plant with a minimum of one shade tree and five (5) shrubs per thirty five (35) linear
feet of frontage, excluding driveway openings.
c. Provide a six foot (6') landscaped strip with a minimum thirty inch (30") grade drop from
the right of way to the parking lot, and plant with a minimum of one shade tree and five (5)
shrubs per thirty five (35) linear feet of frontage, excluding driveway openings.
d. Provide a three foot (3') high fence of wood, brick, stone, or decorative block or concrete
along with a four foot (4') wide landscaped strip between the right of way and the parking
lot, and plant a minimum of one shade tree and five (5) shrubs per thirty five (35) linear
feet of frontage, excluding driveway openings.
(1) The board may waive the requirement for a wood, brick, stone, decorative block or
concrete fence if the board finds the following:
(A) The applicant must design, document, and obtain city approval representing that
the overall planting design, at the time of planting, results in an effective barrier such
that the landscape strip shields the view of parked cars from passing pedestrians and
motorists; and
(B) Any such proposed design alternative is compatible with the overall site design of
the entire project and is compatible with the surrounding area.
3. Parking Lot Perimeter Landscaping: Perimeter landscaping requirements define parking areas
and prevent two (2) adjacent lots from becoming one large expanse of paving. This
requirement does not hinder the ability to provide vehicular access between lots.
a. Provide a minimum five foot (5') wide perimeter landscaped strip between the property
lines and the parking lot, and plant with a minimum of one shade tree and five (5) shrubs
per thirty five (35) linear feet of perimeter.
4. Parking Lot Interior Landscaping:
a. Calculated Amount: Interior parking lot landscaping shall be required on any parking lot
with ten (10) spaces and above. The required amount of landscaping is based on a sliding
scale, as follows:
Percent Of Total Area Of
Total Number A Lot That Must Be An
Of Snaces Interior Landscaaed Area
10 - 20 5 percent
21 - 50 T8 percent
51+ ' 10 percent
b. Additional Requirements:
(1) No interior planter shall be less than five feet (5') in any dimension.
(2) No parking space shall be more than sixty feet (60') from an interior landscaped area.
(3) Parking islands are to be as evenly spaced as feasible throughout the lot to
consistently reduce the visual impact of long rows of parked cars.
Page 7of13
K:\Planning Dept\Eagle Applications\Dr22017\DR-I3-17 Trailhead Parking and Pathway within Pamela Baker Park drEdocx
(4) Deciduous shade trees and ground covers or low shrubs are recommended as primary
plantings in interior landscaped areas. Deciduous shade trees are to be clear branched
to a height of six feet (6').
(5) A terminal island for a single row of parking spaces shall be landscaped with at least
one tree and shrubs, ground cover, or grass. A terminal island for a double row of
parking spaces shall contain not less than two (2) trees and shrubs, ground cover, or
grass.
• Eagle City Code Section 8 -2A -7(M) Parkway Strips, Separated Sidewalks, and Street Trees:
1. Except as may otherwise be required within the DDA, TDA, CEDA, and DSDA sidewalks
shall be separated from the curb along all streets. Sidewalks shall be required when space
permits. An eight foot (8') wide minimum parkway planter strip planted with shade class
(class II) trees shall be required between the sidewalk and street to provide a canopy effect
over streets.
2. In all required applications, excluding residential developments, one street tree, selected from
the approved tree list in subsection Q of this section, shall be planted per thirty five (35)
linear feet of street frontage.
4. In all cases, any planting within public rights of way shall be with approval from the public
and/or private entities owning the property.
• Eagle City Code Section 8-3-2(D)
Enclosed Trash Areas: All trash and/or garbage collection areas for commercial, industrial and
multi -family residential uses shall be enclosed on at least three (3) sides by a solid wall or fence
of at least four feet (4') in height, and a solid wood gate on a metal frame shall enclose the fourth
side, or shall be within an enclosed building or structure. Adequate vehicular access to and from
such area or areas for collection of trash and/or garbage as determined by the administrator shall
be provided.
• Eagle City Code Section 8-4-4-6: BICYCLE PARKING:
One bicycle parking space within an approved rack shall be required for each thirty (30) required
automobile parking spaces or fraction thereof for office and commercial developments. Multi-
family residential developments shall provide one bicycle rack space per each ten (10) units.
Bicycle parking racks shall be in a well lit area, and shall be designed in accordance with the
parking facility criteria of the "Bicycle -Pedestrian Design Manual For Ada County" as prepared
for the Ada County highway district with the exception that bicycle racks do not have to be
covered unless required by the design review board, or planning and zoning commission or city
council.
D. DISCUSSION:
• The applicant is donating 23.05 -acres of land to the City of Eagle for a park to be located on the
northeast corner of East Colchester Drive and East Fishing Creek Drive adjacent to Lakemoor
Subdivision No. 2. Pursuant to the development agreement, the applicant was required to provide
a 10 -foot wide asphalt paved pathway, construct a "Trailhead Parking Lot" consisting of 45 -
parking spaces, construct eight (8) acres of ponds within the subject site, and provide utility stubs
to the site. Upon completion of the above mentioned items, the applicant is to dedicate the land
to the City of Eagle for Pamela Baker Park. It will be the responsibility of the city to install the
required perimeter landscaping, interior parking lot landscaping, any pedestrian amenities, and
any proposed structures (i.e.: restroom facility). The city will be required to submit a design
review application for review and approval of any parking lot landscaping, perimeter landscaping,
Page 8 of 13
K:\Planning Dept\Eagle Applications\Drt2017\DR-13-17 Trailhead Parking and Pathway within Pamela Baker Park drf docx
pedestrian amenities, and structures prior to any of these improvements being constructed on site.
For the purpose of this design review application, the applicant is requesting approval of the
paved parking lot and the construction of the 10 -foot wide asphalt paved pathway. On May 3,
2017, the City of Eagle Parks and Recreation Trails Coordinator provided construction
specifications for the finish of the asphalt paved pathway located within the park. The applicant
should be required to provide revised construction documents providing the construction
specifications for the 10 -foot wide asphalt paved pathway specified by the Parks and Recreation
Trails Coordinator's email dated May 3, 2017. The revised construction specifications should be
reviewed and approved by the Parks and Recreation Trails Coordinator prior to the City Clerk
signing the final plat.
• Sheet L1.1, date stamped by the city on May 1, 2017, shows five (5) Pin Oak trees to be planted
within the parkway planter strip along East Colchester Drive and East Fishing Creek Drive.
Pursuant to Eagle City Code, the parkway planter strips are to be planted with shade class (class
II) trees. The applicant should be required to provide a revised landscape plan showing the
parkway planter strips along East Colchester Drive and East Fishing Creek Drive planted with
class II trees. The revised landscape plan should be reviewed and approved by staff and one
member of the Design Review Board prior to the City Clerk signing the final plat.
STAFF RECOMMENDATION PROVIDED WITHIN THE REPORT:
Based upon the information provided to staff to date, staff recommends approval with the site specific
conditions of approval and the standard conditions of approval provided within the staff report.
PUBLIC MEETING OF THE BOARD:
A. A meeting to consider the application was held before the Design Review Board on May 11, 2017, at
which time the Board made their decision.
B. Oral testimony in opposition to this proposal was presented to the Design Review Board by no one.
C. Oral testimony in favor of this proposal was presented to the Design Review Board by no one (not
including the applicant/representative).
BOARD DECISION:
The Board voted 3 to 0 (Grubb, Brasher, Schafer, and Baer absent) to approve DR -13-17 for a design
review application to construct a trailhead parking area and pathways within Pamela Baker Park for
Dennis M. Baker Foundation, with the following staff recommended site specific conditions of approval
and standard conditions of approval.
SITE SPECIFIC CONDITIONS OF APPROVAL:
1. Comply with all conditions of RZ-05-02 MOD4, PP -03-05 MOD, and FP -02-17.
2. Provide revised construction documents providing the construction specifications for the 10 -foot wide
asphalt paved pathway specified by the Parks and Recreation Trails Coordinator's email dated May 3,
2017. The revised construction specifications shall be reviewed and approved by the Parks and
Recreation Trails Coordinator prior to the City Clerk signing the final plat.
3. Provide a revised landscape plan showing the parkway planter strips along East Colchester Drive and
East Fishing Creek Drive planted with class II trees. The revised landscape plan shall be reviewed
and approved by staff and one member of the Design Review Board prior to the City Clerk signing
the final plat.
4. A design review application shall be submitted, reviewed, and approved for the required perimeter
landscaping, interior parking lot landscaping, any pedestrian amenities, and any proposed structures
prior to any of these improvements being constructed.
Page 9 of 13
KAPlanning DeptEEagle Applications\Dt12017\DR-13-17 Trailhead Parking and Pathway within Pamela Baker Park drfdocx
5. No signs are proposed with this application and none are approved.
NOTE: In the event a Standard Condition of Approval conflicts with a Site Specific Condition of
Approval contained herein the Site Specific Condition of Approval shall control.
STANDARD CONDITIONS OF APPROVAL:
1. The applicant shall comply with all requirements of the Ada County Highway District and/or the
Idaho Transportation Department, including but not limited to approval of the drainage system, curbs,
gutters, streets and sidewalks. A letter of approval from the highway district having jurisdiction shall
be submitted to the City prior to issuance of a Zoning Certificate for this site.
2. Idaho Department of Health & Welfare approval of the sewer and water facilities is required prior
issuance of any building permits or Certificate of Occupancy, whichever occurs first.
3. All permits from Central District Health, Eagle Sewer District & Eagle Fire District shall be secured
prior to issuance of building permit or Certificate of Occupancy, whichever occurs first.
4. Written approval of all well water for any shared or commercial well shall be obtained from the Idaho
Department of Water Resources and shall be submitted to the City prior to issuance of any building
permits or Certificate of Occupancy, whichever occurs first.
5. Unless septic tanks are permitted, wet line sewers will be required and the applicant will be required
to furnish the City Engineer with a letter from the sewer entity serving the property, accepting the
project for service, prior to issuance of any building permits or Certificate of Occupancy, whichever
occurs first.
6. The applicant shall submit a letter from the appropriate drainage entity approving the drainage system
and/or accepting said drainage; or submit a letter from a registered professional engineer certifying
that all drainage shall be retained on-site prior to issuance of any building permits or Certificate of
Occupancy, whichever occurs first. A copy of the construction drawing(s) shall be submitted with the
letter.
7. The applicant shall submit plans and calculations prepared by a registered professional engineer to
handle the satisfactory disposal of all storm drainage on the applicant's site. Drainage system plans
shall be submitted to the City Engineer for review and approval prior to issuance of any building
permits or Certificate of Occupancy, whichever occurs first.
The plans shall show how swales, or drain piping, will be developed in the drainage easements. The
approved drainage system shall be constructed, or a performance bond shall be submitted to the City
Clerk, prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first.
The lot shall be so graded that all runoff runs either over the curb, or to the drainage easement and no
runoff shall cross any lot line onto another lot except within a drainage easement.
All design and calculations shall meet the requirements of Ada County Highway District.
Construction of the storm drain disposal system shall be complete before an occupancy permit is
issued.
8. No ditch, pipe or other structure or canal, for irrigation water or irrigation waste water owned by an
organized irrigation district, canal company, ditch association, or other irrigation entity, shall be
obstructed, routed, covered or changed in any way unless such obstruction, rerouting, covering or
changing has first been approved in writing by the entity. A Registered Engineer shall certify that
any ditch rerouting, piping, covering or otherwise changing the existing irrigation or waste ditch (1)
has been made in such a manner that the flow of water will not be impeded or increased beyond
carrying capacity of the downstream ditch; (2) will not otherwise injure any person or persons using
or interested in such ditch or their property; and (3) satisfied the Idaho Standards for Public Works
Construction. A copy of such written approval and certification shall be filed with the construction
Page 10 of 13
K:1Planning Dept AEagle Applications \Dr12017\DR-13-17 Trailhead Parking and Pathway within Pamela Baker Park drf.docx
drawing and submitted to the City prior to issuance of any building permits or Certificate of
Occupancy, whichever occurs first.
9. Encroachments including, but not limited to, landscaping, fencing, lighting, and/or pathways shall not
be located within any easement or right-of-way for any ditch, pipe or other structure, or canal used for
irrigation water or irrigation waste water without the express written approval of the organized
irrigation district, canal company, ditch association, or other irrigation entity associated with such
ditch, pipe or other structure, or canal. The applicant shall submit a copy of the written approval from
the irrigation entity prior to the City Clerk signing the final plat.
10. Street light plans shall be submitted and approved as to the location, height and wattage to the City
Engineer (if applicable) prior to issuance of any building permits or Certificate of Occupancy,
whichever occurs first. All construction shall comply with the City's specifications and standards.
The applicant shall provide a recorded easement, acceptable to the City Engineer, for the purpose of
installing and maintaining street light fixtures, conduit and wiring lying outside any dedicated public
right-of-way, prior to issuance of any building permits or Certificate of Occupancy, whichever occurs
first.
The applicant shall pay applicable street light inspection fees prior to issuance of any Certificate of
Occupancy.
11. Parking lot light plan shall be submitted and approved as to the location, height and wattage by the
City Engineer. All construction shall comply with the City's specifications and standards.
Lighting is required in the parking area and shall be properly illuminated to avoid accidents. Any
lights used to illuminate the parking lot shall be so arranged as to reflect the light away from the
adjoining property.
12. The parking area shall be paved and shall be maintained in good condition without holes and free of
all dust, trash, weeds and other debris.
13. One set of building plans, for any non single-family residential use, shall be submitted to the Eagle
Fire Department for approval. An approval letter from the Eagle Fire Department shall be submitted
to the City prior to issuance of any building permits or Certificate of Occupancy, whichever occurs
first. The letter shall include the following comments and minimum requirements, and any other
items of concern as may be determined by the Eagle Fire Department officials:
a. "The applicant has made arrangements to comply with all requirements of the Fire Department."
b. The fire hydrant locations shall be reviewed and be approved in writing by the Eagle Fire
Department prior to the City Engineer signing the final plat.
c. Minimum flow per hydrant shall be 1,000 gallons per minute for one and two family dwellings,
1,500 gallons per minute for dwellings having a fire area in excess of 3,600 -square feet, and 1,500
gallons per minute for non-residential uses (i.e.; Commercial, Industrial, Schools, etc.). Flow rates
shall be inspected in accordance with all agencies having jurisdiction, and shall be verified in
writing by the Eagle Fire Department prior to issuance of any building permits or Certificate of
Occupancy, whichever occurs first.
d. The proposed fire protection system shall be reviewed and approved by the Eagle Fire Department
prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first.
14. Any recreation area, greenbelt area or pathway area along the Boise River, Dry Creek or any other
area designated by the City Council or Eagle City Park and Pathway Development Committee for a
path or walkway shall be approved in writing by the Eagle City Park and Pathway Development
Committee prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first.
15. Conservation, recreation and river access easements (if applicable) shall be approved by the Eagle
City Park and Pathway Development Committee and shall be shown on the final plat prior to issuance
Page 11 of 13
K:\Planning Dept\Eagle Applications\Dt12017\DR-13-17 Trailhead Parking and Pathway within Pamela Baker Park drf.docx
of a building permit or Certificate of Occupancy, whichever occurs first.
16. The applicant shall comply with the provisions of the Eagle City Code, pertaining to floodplain and
river protection regulations (if applicable) prior to issuance of a building permit or Certificate of
Occupancy, whichever occurs first.
17. The applicant shall obtain written approval of the development relative to the effects of the Boise
River Flood Plain (if applicable) from the Corps. of Engineers prior to issuance of a building permit
or Certificate of Occupancy, whichever occurs first.
18. The applicant shall obtain approval of the development relative to its effects on wetlands or other
natural waterways (if applicable) from the Corps. of Engineers and the Idaho Department of Water
Resources and/or any other agency having jurisdiction prior to issuance of a building permit or
Certificate of Occupancy, whichever occurs first.
19. Basements in the flood plain are prohibited.
20. The Americans with Disabilities Act, Uniform Building Code, Eagle City Code, and all applicable
County, State and Federal Codes and Regulations shall be complied with. All design and
construction shall be in accordance with all applicable City of Eagle Codes unless specifically
approved by the City Council.
21. New plans, which incorporate any required changes, shall be submitted for staff approval. Staff may
elect to take those plans to the Design Review Board and the City Council for review and approval.
22. Any changes to the plans and specifications upon which this approval is based, other than those
required by the above conditions, will require submittal of an application for modification and
approval of that application prior to commencing any change.
23. Any modification of the approved design review plans, including, but not limited to building design,
location and details, landscaping, parking, and circulation, must be approved prior to construction/
installation of such changes. Failure to do so may result in the requirement to modify the project to
comply with the approved design review and/or result in the inability to issue a final approval for
occupancy of this project.
24. Any change by the applicant in the planned use of the property which is the subject of this
application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or
other regulatory and legal restrictions in force at the time the applicant or its successors in interest
advises the City of Eagle of its intent to change the planned use of the subject property unless a
waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the
time the change in use is sought.
25. Approval of any Design Review shall expire without notice to the applicant on the date of expiration
of the Design Review if construction has not started prior to that date, as stipulated in Eagle City
Code (one year from approval date).
26. All ground -mounted accent lighting fixtures and monument sign lighting fixtures shall be screened
from view with the use of landscaping (top of the fixture shall be no higher than the surrounding
landscaping). The light source itself shall otherwise be screened as provided for within Eagle City
Code.
27. The City's actions on the application does not grant the applicant any appropriation of water or
interference with existing water rights. The applicant indemnifies and holds the City harmless for any
and all water rights, claims in any way associated with this application.
CONCLUSIONS OF LAW:
1. The Board reviewed the particular facts and circumstances of this proposed design review application
(DR -13-17) with regard to the Eagle City Code Title 8, Chapter 2, Article A, DR Design Review
Page 12 of 13
KAPlanning Dept\Eagle Applications\DA2017\DR-l3-17 Trailhead Parking and Pathway within Pamela Baker Park drfdocz
Overlay District, and based upon the information provided with the conditions required herein,
concludes that the proposed design review application is in accordance with the Eagle City Code and
the Eagle Comprehensive Plan.
2. The Board reviewed the particular facts and circumstances of the proposed design review in terms of
Eagle City Code 8-2A-13, "General Standards For Design Review" and has concluded that the
proposed design review:
A. Will function in conformance with the applicable strategies of the Eagle Comprehensive Plan and
is in accordance with the regulations of this code since there are no inconsistencies with the
comprehensive plan and an office building is permitted with the approval of a design review
application within the MU -DA (Mixed Use with a development agreement in lieu of a PUD) zoning
district;
B. Is of a scale, intensity, and character that is in harmony with existing conforming and planned
development in the vicinity of the site since the community park is designed to complement the
general vicinity;
C. Is designed with adequate off street parking facilities in such a way as to not interfere with
ingress/egress to the site and will serve the intended use so as to not cause conflict with adjacent
uses as anticipated within the zoning district since the site meets the requirement of the
development agreement associated with Pamela Baker Park Subdivision;
D. Will not interfere with the visual character, quality, or appearance of the surrounding area and city,
and where possible, enhance the continuity of thematically common architectural features;
E. Will have facades, features, and other physical improvements that are designed as a whole, when
viewed alone as well as in relationship to surrounding buildings and settings;
F. Will not obstruct views and vistas as they pertain to the urban environment and in relation to artistic
considerations;
G. Will provide safe and convenient access to the property for both vehicles and pedestrians through
patterned traffic circulation and connectivity to abutting development;
H. Is in the interest of public health, safety, and general welfare promoting a pedestrian friendly and
walkable environment in balance with protecting a viable commercial center in the area; and
I. Will have signs, if proposed, that are harmonious with the architectural design of the building and
adjacent buildings, and will not cover or detract from desirable architectural features.
DATED this 25th day of May 2017.
DESIGN REVIEW BOARD
OF THE CITY OF EAGLE
Ada County, rdaho
Robert Grubb, Chairman
ATTUAT:
✓1
Sharon K. oe mann, Eagle City
Page 13 of 13