Resolution - 2022 - 22-09 - Fy 2023-2027 Capital Plan - 10/11/2022 RESOLUTION No. 22-09 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EAGLE, IDAHO, ADOPTING THE FISCAL YEAR 2023 TO 2027 CAPITAL PLAN DATED OCTOBER 11, 2022; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City of Eagle is a municipal corporation operating under the laws of the state of Idaho; and WHEREAS, the City of Eagle desires to provide the City - citizens, land owners, elected official, and staff - a road map for major investments and maintenance within the City that is transparent, collaborative, and fiscally constrained; and WHEREAS, the City of Eagle has determined that capital investments and maintenance be reviewed,prioritized,and updated annually on a city-wide basis; and WHEREAS, the City of Eagle, recognizes the need to save and set-aside funds across multiple fiscal years to properly fund new improvements, save for maintenance of existing infrastructure, and establishes a fund for emergencies that impact the City's infrastructure; and WHEREAS, The Capital Plan directs and leverages expenditures from the City's Capital Fund, Park Fund, Pathway Fund and Police Impact Fee Fund equaling $22.47 million of the City's Fiscal Year 2022-23 budget; and WHEREAS, the City of Eagle has drafted and developed the prioritized Capital Plan through a series of open public meetings and workshops to guide and prioritize investment for Fiscal Year 2023-2027 as set forth in Exhibit A; and WHEREAS, the City of Eagle brought forward the plan at a public meeting, taking public comment on hereinafter referred to as "Plan" on October 11, 2022; and WHEREAS,the Plan contain the following information: (a) A description of the annual project development process; (b) A detail of the annual increase of in the City's Capital Liability associated with the development and improvement to the City's capital portfolio; (b) A general description of all project requests between Fiscal Year 2023 and Fiscal Year 2027; (c) A detailed funding plan, including available outside funding sources, for capital projects and maintenance in Fiscal Year 2022 through Fiscal Year 2026, (d) A Fiscal Year 2023 capital projects and maintenance list consistent with the City of Eagle FY 2023 Appropriation Ordinance No. 833 1 of 2 k:\council\resolutions\2021\22-09 fy22-26 capital plan.doc (e) A description and prioritization of unfunded capital projects and maintenance for five (5) Fiscal Years (2023-2027) (f) A recognition of the City's existing capital plans associated with impact fees under Idaho Code 67-6802; and WHEREAS, the City Council, after careful consideration, hereby finds and declares that a capital plan to guide City investment and development in capital projects and operation and maintenance of existing City investment is in the best interests of the community, therefore deems it advisable to adopt the Fiscal Year 2023-2027 Capital Plan, NOW, THEREFORE, BE IT RESOLVED BY THE MAYOR AND COUNCIL OF THE CITY OF EAGLE, IDAHO that the "Fiscal Year 2023-2027" dated October 11, 2022, attached hereto as Exhibit A, is hereby adopted by the City. This Resolution will be in full force and effect upon its adoption and approval this 1 1 day of C.ipheAP" , 2022. CITY OF EAGLE, IDAHO on 'ierce, Mayor A TEST: •• %:� Tracy E s orn, City (1Fi1eo ate' Q (SEAL) V'�) `'� . O , % * t',.••' 2 of 2 k:\council\resolutions\2021\22-09 fy22-26 capital plan.doc Page | 1 FI FY 2023-2027 Capital Plan Mayor: Jason Pierce City Council: Charlie Baun Melissa Gindlesperger Brad Pike Helen Russell TABLE OF CONTENTS Section 1: Why We Plan Pg. Overview 3 Goals 5 Capital Planning Process 7 Section 2: FY 2022: Project Status Pg. FY 2022 Capital Maintenance Status 11 FY 2021 Capital Project Status 12 FY 2021 Increased Capital Liability 13 Section 3: FY 2023-2027 Projects Pg. FY 2023-27 Maintenance Projects 15 FY 2023-27 Capital Projects 18 Section 4: Future & Unfunded Pg. Future Projects 28 Unfunded Projects 31 Section 4: Amendments 35 Section 5: Appendix 37 City of Eagle Community Center & City Hall Expansion Adopted Oct. 11, 2022 Res. 22-09 Page | 2 This page was intentionally left blank COVER/FEATURED PROJECT: This year’s featured capital project is the City of Eagle Community Center and City Hall Expansion. The project expanded the City Hall complex by over 10,00 sq. ft. and was completed by Wright Brother Construction, an Eagle based firm. Completed in April of 2022, this project expanded City Hall by 8,000 sq ft better serve our growing city. The addition includes 5 new conference rooms, a kitchen classroom, and 2,250 sq ft community hall. The $3.2 million project was completed over two years utilizing CARES funds and proceeds from the sale of the Eagle Landing. Page | 3 WHY WE PLAN: OVERVIEW This plan is a road map, establishing a process to fund necessary and desired new capital projects and the capital maintenance needs of the City over the next five years. The City’s Council goal in the development of a city-wide capital plan was to: “Provide the City (citizens, elected officials, and staff) a road map for major investments and maintenance within the City that is collaborative and fiscally constrained.” The idea of a City-wide capital plan has been an aspiration of the City since the early 2000’s. Each of the City’s comprehensive plans since 2004 has had a similar goal: “Economic Sustainability: A community focused on the ability for the City to continue to fund, improve and support itself, including infrastructure, parks, and trails without the uses of building permit fees, impact fees and zoning fees.” - Page 1 Eagle is HOME Plan Often capital facilities plan only focus on the construction of new facilities – the leveraging of impact fees, grants, and one-time funds to construct public projects, but neglects to properly detail and plan for the cost of operation, maintenance and replacement of existing infrastructure and facilites over time. One of the key tenants of this plan is to provide the City a complete picture of the cost of both constructing new infrastructure and the cost and necessary savings for the City to properly maintain existing infrastructure as well. This plan relies on annual appropriations through the City’s budget process and a commitment by the acting Mayor and City Council to implement. Up until 2021, the City had funded projects inconsistently through a scatter-shot approach, those wanting funding requested it directly and individually to the Mayor and/or City Council, but projects were never compared against each other to determine which projects were of the most significance to the City, nor was the cost of capital maintenance factored into the decision to construct or as part of the annual City budgeting process. For a few years, the City used a “strategic annual goal” or “capital fund” to set aside funds across multiple years, but this process was not used by all departments nor implemented consistently. Historically, the City has adopted a single-year budget that addressed needs within that fiscal year, relying solely on one-time and general fund dollars to fund capital projects, capital maintenance, and the day-to-day operations of the City. The City’s general fund functions as a clearing house for all city revenue. Some monies pass through the general fund to restrict accounts (impact fees and bonds) while Page | 4 most funds are held in the general fund as a savings account and only transferred out to specific accounts on an as needed basis. At the end of each fiscal year, unspent dollars are swept into the general fund for reallocation in the next budget year. The goal is to limit sweeps and hold dollars for capital separate from the general fund. The Fiscal year 2023 to Fiscal Year 2027 Capital Plan is the City of Eagle’s third year completing a city- wide prioritized fundings plan for capital. Evaluating all requests for capital maintenance and new capital projects against each other to determine the greatest need and benefit for the community. This document, while a great step forward toward the City’s goals, does not meet all the required elements of Idaho Code 67-65: The Local Land Use Planning Act or Idaho 67-8208: Capital Improvements Plan. This document relies on regular updates of the parks, pathways, and police capital plans and impact fee studies. This document is intended to leverage general fund dollars, outside funding/match, and the impact fees collected by the City. To that end the City will in future fiscal years this plan will update as the City’s master planning documents and impact fee capital plans update. The capital fund is one of the largest budgeted funds within the City of Eagle, in FY2023 the fund holds $17.3 million including project specific maintenance, capital projects, and reserves (for future projects). Unlike other accounts funds within the City budget, the capital fund is not swept back into the general fund each year, this allows for the carrying forward of funds allowing the City to save and plan for large projects across multiple years. The movement of funds within the capital plan, fund, and budget require City Council deliberation and approval, the goal is to increase transparency for citizens about plans and opportunities. It is important to note, the City’s Capital Plan does not commit or assure funding in future years, nor does it assure a timeline for completion of a project. The Plan is evaluated yearly based on current needs and opportunities and is intended to serve as a guide to help direct priorities within the City’s annual appropriation approval process. Page | 5 GOALS To better guide and support the City’s planning efforts that City has established the following goals and objectives for capital planning. Goals will be used to guide the annual prioritization and funding process. GOAL 1: PROVIDE TO THE PUBLIC A CLEAR, REALISTIC, AND FISCALLY CONSTRAINED 5-YEAR CAPITAL IMPROVEMENT PLAN. a. Prioritize maintenance and operation of existing infrastructure ahead of system expansion. b. Establish annual fiscal goals for saving/set asides to fund depreciation, replacement, and planned construction. c. Ensure that projects are properly developed through the scoping process- project development, planning, savings, then construction/purchase. GOAL 2: ESTABLISH A PROCESS FOR THE DEVELOPMENT OF PUBLIC FACILITY PLANS THAT ADDRESS EXISTING SERVICES, DEFICIENCIES, AND FUTURE NEEDS. a. Ensure each City service has completed and maintains a facility inventory, 5+ year master facilities plan, and has an adopted level of service. b. Ensure all facilities comply with state and federal service regulations. c. Establish implementable and enforceable level of service standards. d. Ensure development does not degrade the City’s adopted level of service without proper mitigation. GOAL 3: ENHANCE THE QUALITY OF LIFE IN EAGLE THROUGH THE PLANNED PROVISION OF CAPITAL FACILITIES AND PUBLIC SERVICES THAT ARE PROVIDED EITHER DIRECTLY BY THE CITY OR THROUGH COORDINATION WITH OTHER PUBLIC AND PRIVATE ENTITIES. a. Work with the community to determine community needs and desires for services. b. Prioritize maintenance of existing community investment ahead of expansion. GOAL 4: PROVIDE NEEDED CAPITAL FACILITIES IN AN ECONOMIC, EFFICIENT, AND EQUITABLE MANNER. a. Use the capital planning process to identify city needs (project and maintenance), funding opportunities, and partnership opportunities that serve all the citizens of Eagle. b. Projects should be prioritized based on needs ahead of desires. c. Use the City’s fiscal impact tool to help guide changes in land use to ensure both short term and long tern fiscal sustainability (ability to fund infrastructure without the use of one-time fees). Page | 6 GOAL 5: ENSURE THAT ADEQUATE PUBLIC FACILITIES AND SERVICES FOR NEW DEVELOPMENTS ARE AVAILABLE OR CONDITIONED TO BE PROVIDED AT THE TIME OF FINAL LAND USE APPROVAL (FINAL PLAT/BUILDING PERMIT) SUCH THAT SERVICE PROVISION FOR NEW DEVELOPMENTS WILL NOT LOWER EXISTING SERVICE LEVELS. a. Condition development to pay their proportionate share of capital cost and the cost for system expansion. b. Maintain, update, implement the City’s development impact tool to evaluate the cost and benefits of development on the City’s capital plan and operations. c. Educate the public and elected official about the fiscal impact of different types of land uses. d. Work to ensure that development does not degrade the adopted level of service for City provided services- consider mitigation agreements, dedications, and other mechanisms to ensure the equitable and consistent level of service. GOAL 6: COORDINATE TRANSPORTATION IMPROVEMENT PLANS, PROGRAMS, AND PARTNERSHIPS WITH THE EAGLE URBAN RENEWAL AGENCY, ACHD & ITD TO ENSURE THE CITY’S VISION FOR FUTURE AND GROWTH-RELATED ROAD PROJECTS ARE ACHIEVABLE. a. Identify and plan for opportunities for cooperation. b. Work to align goals, policies, and projects with partnering agencies. c. Identify projects that will require a Cost-share agreement and plan appropriately for this contribution. Page | 7 THE CAPITAL PLANNING PROCESS The process used to develop the preliminary capital plan is inclusive of all departments and collaborative. The capital planning process is designed to engage staff, elected officials, appointed officials and the public in the annual process with the goal of recognizing and prioritizing needs annually. All identified projects are placed into one of three categories for project funding. The Capital Plan focuses on two of these categories: Capital Projects and Capital Maintenance: One of the functions of the capital planning process is to provide the City Council and funding partners the best quality and most implementable projects possible. Projects that have been properly scoped and developed tend to be completed on time, on budget, and are more likely to receive outside funding/support. Projects should be scoped and properly thought through to address timeline, participants (staff and public), cost (construction and planning), and the on-going operation and maintenance. Project development within the capital plan is a phased process that starts with the annual project request list and continues through budgeting, construction, and maintenance; each phase builds on the previous providing additional information and specificity to the scope of work. The Capital Plan is developed in three main phases with increasing specificity: project identification, project scoping, and project prioritization. Capital Project: Example Projects/Investments: *New parks, *New trails, *Expansion of existing facilities *Extending water main lines Capital Maintenance Project: Operational Maintenance: New project, facility, or investment that costs more than $20,000 and has a life span of 5 years or more. Customarily these projects are associated with maintaining minimal levels of service associated with growth or the annexation of new lands. These projects often have a dedicated funding source (i.e. development impact fees) or are eligible for outside funding and/or money (i.e. state and federal transportation grants, etc.) The replacement, upgrade, or renovation of an existing capital project, facility, or investment that has a cost of $10,000 or more and has a lifespan of 5-years or more. This does not include ordinary maintenance necessary to ensure continued day-to-day/annual use of the facility. The ordinary maintenance of a City facility and or investment to ensure continued day-to- day/annual use for its intended purpose and function. These funds should be part of the appropriate departments’ budget request. NOTE: This fund is not specific to a project but is establishes a saving for future capital maintenance projects that would be in a future year or that are unexpected expenditures. NOTE: These requests should be part of the annual department budget request. There will be no change to this request process. Example Projects/Investments: Example Projects/Investments: *Computer replacements *Replacement of existing fleet vehicles *Renovation/replacement of specific park *Replacement of flood damaged trails *Upgrade booster pumps in wells *Replacement of lid on reservoir *Painting of buildings *Screen protectors *Sprinkler heads *Printer toner/Ink *Replacement of onsite customer meter equipment *Repair of chlorine equipment *Water sampling Project Prioritization Project Identification Project Scoping Page | 8 Phase 1: Project Identification: Annually each department, the public, and the City’s committees, commissions, and boards will be part of the initial identification of capital projects and maintenance requests. Projects at this phase are conceptual and require a minimal amount of information. Additional information can be added to the project as the project move through the process, but it is important to note a project request must at a minimum include a project scope, timing, and estimated cost of development. Each department will be responsible for developing projects in consultation with their recommending or governing committees, commissions, or board. These projects can be developed year- round but are vetted in the annual capital planning process beginning in October of each year. The City Council will receive a list of requests (capital and maintenance) by department for review. The Council may choose to have a workshop to review the projects request list and provide direction as to which projects move forward into project scoping. Phase 2: Project Scoping: At the project scoping phase, departments will need to address/provide additional project specific information including: • Project need, • Economic benefit, • Annual operation and maintenance costs, • Replacement/depreciation cycle, • Potential for outside funding, and • Phasing or sequencing that is required (or could be considered). Projects should have a 5 to 7-year timeline for construction or replacement, though projects with longer construction timelines, significant development cost or existing infrastructure with planned replacement beyond the 5 to 7-year cycle may be considered and/or calculated into the annual capital maintenance set-aside. In Early December, each department will be asked to score the projects based on the Preliminary Project Request Scorecard. The scorecard evaluates: Long Term Planning: Master Plans are prepared to provide the City with a valuable aid for continuing efforts to meet and exceed goals set forth by City departments, committees, and the citizens at-large. Master Plans include those documents that have been prepared internally to assure consistent adherence to industry best practices, as well as those documents that have been created with the assistance of outside consultants. A component of master planning includes public discussion and/or citizen engagement. Public Health & Safety: Health/public safety includes police service, safe roads, safe drinking water, and flood control. A police station would directly impact the citizens, scoring high in this category. New softball fields may not directly affect the health/public safety of the citizens, therefore scoring low. Infrastructure: This item relates to infrastructure needs for the City of Eagle, including sidewalks, lighting, parking facilities, municipal buildings, and recreational facilities, to name a few. This item Page | 9 also includes partnerships or projects related to streets and highways in which the City is partnering with ACHD or ITD. Leveraged Funding: Capital improvement projects may be funded through sources other than City funds. Grants through various agencies, public private partnerships, and donations can all be sources of external funding for a project. The use of City dedicated funding non-general fund sources may be considered (impact fees, water fund, etc.). Operational Budget: Some projects may impact the operating budget for the next few years or for the life of the facility. A new facility will need to be staffed and supplied, therefore having an impact on the operational budget for the life of the facility. Replacing a streetlight with a more energy efficient model may decrease operational costs. Quality of Life: Quality of life is a characteristic that makes the City a favorable place to live and work. A large park with amenities to satisfy all community members would greatly impact the quality of life. Regional projects that require local funding for a larger regional user group may be considered. Location & Timing: The timing and location of the project is an important attribute of the project. If the project is not needed for many years, it would score low in this category. If the project is close in proximity to many other projects and/or if a project is urgent or may need to be completed before another one can be started, it would score high in this category. Sustainability/Innovation: Projects that move the City towards more sustainable and energy saving, produce solutions to solve new problems, and meet new challenges that come from being a rapidly growing City (i.e., demographic, social, technological, and economic changes) that helps the departments to adapt quickly and embrace change. Phase 3: Project Prioritization: Project prioritization is a fiscally constrained process. For purposes of capital planning, the City will use the following annual funding guidelines for City funds (this does not include dollars carried forward from a previous fiscal year, grants, or funds that pass through the City budget from an outside source): $1.5M for Capital Maintenance Set-Aside $2.0M for Capital Projects (including restricted funds i.e., impact fees) These thresholds may vary year to year based on economic climate and City Council directives. Projects may include engineering and design work, the development of construction plans, savings for future investments, and/or construction of a physical project. The order and prioritization may be influenced by the ability to fund with local dollars, the opportunity to leverage outside funds, emergencies, or other factors that the Council sees as pertinent in a specific fiscal year. The year 1 of the Capital Plan should mirror the next fiscal year’s appropriation but does not guarantee funding in years 2 through 5. When constructing projects that will receive reimbursement post construction, the Council can direct where reimbursements are to be placed within the City’s budget and if they are to be earmarked for Page | 10 maintenance or for another project. The Council, through the Capital Plan, may establish triggers for the commencement of a project. These triggers/conditions may be fiscal or based on the completion of other work/agreements. Once projects have been scoped and scored this information will be taken to the public for review and comment. For the Fiscal Year 2022 Plan, an on-line fiscal balancing tool allowed the public to make funding recommendations to the council utilizing up to $10M in funding over a 5-year period. With very few new projects being introduced to the Plan for FY 2023 the on-line toll was not used, but new public engagement process will be developed as the plan grows and the drafting process is formalized. The project prioritization process will be led by the City Council but will include the results of the public outreach efforts and the staff scoring process. The Council will utilize a paired comparison process to help develop a prioritization list. The paired comparison process allows the Council to compare and prioritize each project against every other project scoped. The Council may choose to have a workshop to review the projects request list and provide direction as to which projects move forward. The Council has prioritized Capital Maintenance (the general upkeep and maintenance of existing city facilities) over capital projects (new projects, facilities, or purchases). The City Council will annually determine the appropriation of funds for both capital projects and capital maintenance set-aside as part of the municipal budgeting process. The Capital plan is a guide, similar to the comprehensive plan, the goal is to educate and engage our citizens on the fiscal constraints that the City faces while also creating a process for project request and active engagement in the prioritization of projects. Annually, the Council will conduct a public hearing to adopt the capital plan and to allow the public to comment on the final project list before adoption. Adoption of the Capital Plan should be timed to coordinate with the annual budget appropriation each fall. Page | 11 FISCAL YEAR 2022: PROJECT STATUS CAPITAL MAINTENANCE Each year, the Capital Maintenance project list is based on need and the planned replacement schedule of current capital infrastructure, but the capital maintenance set-aside/budget is based on the amount the City needs to set-aside annually to ensure sufficient fundings across the entire capital network, even if a project is not scheduled for that year. The Capital Maintenance set-aside functions as a savings account, allowing the City to address both planned and unplanned maintenance and repairs. Capital Maintenance Projects (CM) identified and funded for Fiscal Year 22 equaled $3.08 million with $1.6 million in incomplete projects from FY21. planned expenditures. At the end of Fiscal Year 2022 the Fund expended $1.89 million in planned expenses Three projects were incomplete at the end of Fiscal Year 2021 and have been carried forward to Fiscal Year 2023 totaling $1.3 million in carry forward to Fiscal Year 2023. Below is the end of year status for capital maintenance in Fiscal Year 2022: FY 2022 Maintenance - FUNDED PROJECT STATUS Project Number Project Name Status TRL CM-2 FEMA Trail Repairs #2 Completed TRL CM-11 FEMA Trail repair #4A Incomplete FY 22 PZ CM-1 Floodway/City Property Protection Completed IT CM-2 City Hall Security Completed IT CM-3 City Hall Backbone Infrastructure Completed LIB CM-5 Server Replacement Completed IT CM-7 Servers - City Hall Completed IT CM-1 Phone System Completed PW CM-1 Heritage Park Renovation Plan Only in FY 22 PW CM -15 Orville Krasen Playground replacement and ADA Ramps Moved to FY23 PW CM-8 Library Interior Paint Completed PW CM-13 Fleet - Vehicle Replacement Completed NEW ATV Replacement Completed PW CM-9 Ada Eagle Parking lot light / Street Light Upgrade Completed Incomplete projects can increase the demand on staff time and capacity, limiting the ability of the City to complete scheduled and planned operation, maintenance, and replacement projects in their proper timing. Incomplete projects should be evaluated to ensure that there is no impact to planned and Page | 12 necessary improvements and to that there is no systemic or chronic issues in the ability to complete the project. CAPITAL PROJECTS Capital projects are new investments, construction, or purchases with a value of $20,000 or more. These projects are ranked by department, evaluated through a public process, and then prioritized by the City Council For Fiscal Year 2023 there were very few “new” projects added the capital projects list and as such there was no new public participation in the prioritization process, the community scores from FY22 were carried forward. The Fiscal Year 2023 funded priorities mirrored in the City’s Fiscal Year 2022-2023 appropriation ordinance and budget. Project funding came from three specific funds: Capital (19 account), Pathway Impact Fees (25 account), and Park Impact Fees (08 account). Capital Projects, including savings from previous fiscal years, for Fiscal Year 2022 equals $15.01 million with $4.68 million being appropriated from the general fund. Additionally, the plan includes $3.3 million in American Recovery Act funding. It is anticipated that $3.2 million will carry forward into future fiscal years (savings for a future fiscal year projects). Below is the status for the capital projects in FY 2022: FY 2022 Capital Projects - FUNDED PROJECT STATUS Project Number Project Name Status TRL CP-1 Phase 2 EISP Trail Deferred to FY 23 TRL CP-2 Phase 3 EISP Trail Design Removed from Plan PW CP-9 Mace Park 50% completed, Carry forward to FY23 P&Z CP-1 State & Eagle Intersection Savings Only PW CP-3 City Hall Expansion COMPLETED PW CP-2 City Owned Shop Savings Only P&Z CP-3 Eagle Road Ped/Bike Bridge Construction in FY23 P&Z CP-1B Downtown Sidewalk Repairs COMPLETED by ACHD P&R CP-2 Regional Sports Park 30% Completed, Carry forward to FY23 P&Z CP-2 Aikens Street Extension Savings Only TRL CP-3 Eagle Island State Park Trail Removed from Plan PW CP-11 Pamela Baker Park - Phase 1 Deferred to FY23 P&Z CP-11 Linder Road SH-44 to FF Deferred by ACHD to FY 26 PW CP-12 Fiber Network/Connectivity (ARPA) On-going P&R CP-11 Parks & Trails Master Plan Deferred to FY23 P&Z CP-4 Grade Separated Crossing SH-44 COMPLETED Page | 13 FY 22 INCREASED CAPITAL LIABILITY As seen above it should be anticipated that each year a portion of the Capital Projects fund will carry forward monies that are earmarked for future year projects. This ability to plan and save for future needs is a benefit of the Capital Plan, it reduces single year demands on the City’s general fund. Additionally, incomplete projects may be a result of partner agency deferring/ un-funding a project, project capacity (too many projects in a year for staff to completed) or other bidding/construction supply challenges. While one of the functions of the Capital Plan is to identify projects and funding, the plan also helps the City understand the increasing capital liability for the City. Capital Liability is the City’s cost/responsibility maintain, improved, or replace a piece of Capital Infrastructure once constructed or dedicated to the City. In 2020, it was estimated that annual set aside to properly maintain the Capital Liability of the City’s existing infrastructure was $1.25 million. That number has increased annually as the City has complete capital projects and maintenance. As part of the annual capital planning process, it was determined these costs need to be accounted for and considered when the City is planning and budgeting for new capital infrastructure. Through the Capital Maintenance planning process, the City estimated the annual cost need to properly save for the current and future upkeep of the City’s capital investment. This annual cost is used to guide the Maintenance Set-aside, a savings program of Capital Maintenance, within the budget. The City uses a rate of $0.03 per dollar annually for each dollar of capital investment/liability the city currently holds. Using this metric, the City’s increases capital liability for Fiscal Year 2022 is $138,933. Plans and projects under control of another jurisdiction do not impact the City’s capital liability. Additionally, the City does not include land costs in the capital maintenance set aside, only improvements to the site. For example, the total cost for the Linder Road Sportsman’s Access was $500,352, the City only accounts for the structure and site improvements as $286,910. CM No. Project Name Project Cost Annual Set- Aside/Project $* Project Specific Annual Increase PW CP-3 City Hall Expansion/Community Center $ 3,200,000 $ 0.03 $ 96,000 PW No #Trolley $ 17,820 $ 0.03 $ 535 PW CM-3 Fleet Expansion 88,104$ $ 0.03 2,643$ PW CP-12 Fiber Equiptment & Fleet 1,325,167$ $ 0.03 39,755$ 138,933$ * This is an estimate cross all projects and liabilities within the City's plan. FY 2023 Capital Maintenance Totals: FY22 INCREASED CAPITAL LIABILITY CAPITAL PROJECTS & MAINTENANCE Page | 14 Capital Liability is an important consideration in the capital planning process. While Capital Projects, new construction, is often off-set by impact fees, grants, and public-private partnerships the City’s Capital Liability is reliant on the City’s General Fund (tax dollars and one-time fees). In Fiscal year 2022 the City’s capital liability increased by 10.6% to $1.4 million. While still within the annual $1.5 million annual funding guideline, see page 9, is important to note that as the City grows and completes projects the City’s capital liability and capital maintenance set aside will grow and eventually outpace the capital projects budget, $2 million annually. Page | 15 FY 2023-27 CAPITAL PLAN FY 2023-27 CAPITAL MAINTENANCE As discussed previously, the Fiscal Year 2022 to Fiscal Year 2026 Capital Plan was the first time the City had established a 5-year prioritized and fiscally constrained plan. The Fiscal Year 2023 will build on the work of the pervious 2 plans refining the prioritization process and helping the Council evaluate project capacity and its impact on implementation. The plan considered the priorities of staff, the public, and the City Council within a fiscally constrained framework, limiting the City Capital Project investment to only $2 million annually and placing Capital Maintenance Projects (operation, maintenance, and repairs of existing investments) as a funding priority ahead of new infrastructure investment. Below are the projects identified and prioritized by the City of Eagle for Fiscal Year 2023 to Fiscal Year 2027. It is important to note that consistent with Idaho Statutes, funding of the Capital Plan is set of annually through the City’s appropriation Ordinance, funding of projects from Fiscal Year 2024 to Fiscal Year 2027 will be subject of the City’s annual prioritization process and the appropriation process and as such are shown as “unfunded”. While most capital plans focus on the funding of construction and investment into new infrastructure often utilizing impact fees, grants, and other one-time funds, they do not address the on-going and annual cost to the City for operation and maintenance. The City’s responsibility to operate, maintain, and replace existing capital infrastructure falls to the City’s operating budget, and is mostly reliant on the general fund. The City of Eagle maintains a significant portfolio of existing capital infrastructure, including municipal buildings, parks, streetlights, a City-owned water system, library, and existing public works equipment. As part of the capital planning process the City Council reviewed the costs associated with the maintenance, upgrade or replacement of existing capital projects, facilities, or investments. Capital Maintenance, if not properly planned for, can quickly and significantly impact the City’s budget. During the recession, many of the City’s capital facilities were placed on deferred maintenance due to limited budgets and reserves, the City was not prepared to fund the existing investments without building permit revenue to bolster the budget. For example, in Fiscal Year 2019 & Fiscal Year 2020 the City expended over $3 million to replace the play equipment and splash pads in just two of the City’s parks that had been impacted by deferred maintenance during the recession. Over the past 5 years, the City has been able to bring most of the existing capital facilities into good repair and has begun the process of inventorying facilities to plan for replacement, renovation, and upgrade. This work, combined with a fiscal strategy to establish a capital maintenance set-aside fund, money specific to maintenance, will help safeguard the city during future economic downturns. Page | 16 Each year the existing City Capital Portfolio will be evaluated for planned, the projects below, and unplanned maintenance. Emergency or critical needs may result in the re-ordering of projects in any given year. A summary of the Capital Maintenance Project in priority order and by fiscal year is listed below. This list provides limited details of the projects- total estimated project cost, impact fee eligibility, type of project and total combined funding currently anticipated for the project. A detailed list including estimated Capital Maintenance Set-Aside and carry forward is available at the end of the document. A map of projects by year is available at the end of the document. Project Name Est. Project Cost (in $100,000) FY 23 General Fund Request Outside Funding Carry Forward From FY 22 TRL CM-2 FEMA Trail Repair #2 $ 676.5 $ - $ - $ 676.5 PW CM-15 OK Park Playground $ 130.0 $ - $ - $ 130.0 IT CM-7 City Hall Server 8.5$ 8.5$ -$ -$ PW CM-15 Jackson House 100.0$ 90.0$ 10.0$ -$ TRL CM-11 FEMA Repair 4A 254.0$ 226.0$ 129.0$ 28.0$ TRL CP-4 N. Channel Bank Repairs 603.9$ 550.0$ -$ 53.9$ PW CM-15 2023 Equipment replacement 2.5$ 2.5$ -$ -$ PW CM-15 Heritage Park Design & Eng.1,584.5$ 613.0$ -$ 971.5$ PW CM-18 Library Air Unit 90.0$ -$ 90.0$ -$ TP CM-1 2023 Floodway Protection 10.0$ 10.0$ -$ $ - PW CM-19 NEW Trolley 15.0$ -$ -$ $ 15.0 3,474.9$ 1,500.0$ 229.0$ 1,198.4$ Total CM PLAN General Fund Request Outside Funding Carry Forward from FY 22 * This project list is reflected in the FY 2022-2023 Budget Appropriation FY 2023 CAPITAL MAINTENANCE FY23 to FY 27 Capital Maintenance Plan FY 2023 Capital Maintenance Totals: Project No. Project Name Est. Cost (in $100,000) FY 24 General Fund Request Outside Funding IT CM-7 City Hall Servers 95.0$ 95.0$ -$ IT CM-3 2024 Backbone Infrastructure 118.0$ 118.0$ -$ PW CM-16 2024 Equipment 1.2$ 1.2$ -$ PW CM-13 2024 Vehicle Replacement 50.0$ 50.0$ -$ IT CM-8 Chamber Recording 80.0$ 80.0$ -$ PW CM-8 Library Roof 400.0$ 400.0$ -$ TP CM-1 2024 Floodway Protection 10.0$ 10.0$ -$ PW CM-6 City Hall Parking 20.0$ 20.0$ -$ PW CM-1 Heritage Park Renovation Construction 1,000.0$ 1,000.0$ -$ PW CM-8 Library Parking 30.0$ 30.0$ -$ 1,804.2$ 1,804.2$ -$ Total CM PLAN General Fund Request Outside Funding FY 2024 CAPITAL MAINTENANCE FY23 to FY27 Capital Maintenance Plan FY 2024 Estimated Capital Maintenance Totals: Page | 17 Project No. Project Name Est. Cost (in $100,000) FY 24 General Fund Request Outside Funding IT CM-3 2025 Backbone Infrastructure 5.0$ 5.0$ -$ PW CM-13 2025 Vehicle Replacement 60.0$ 60.0$ -$ TP CM-1 2025 Floodway Protection 10.0$ 10.0$ -$ PW CM-5 Guerber Parking 50.0$ 50.0$ -$ TRL CM-4 Greenbelt Merrill 180.0$ 180.0$ -$ PW CM-9 Merrill Parking 20.0$ 20.0$ -$ TRL CM-6 Lakemoor Trail 321.0$ 321.0$ -$ PW CM-15 2023 Trail Maintenance 20.0$ 20.0$ -$ TRL CM-5 Greenbelt Lonesome Dove 135.0$ 135.0$ -$ PW CM-4 Friendship Roof 7.5$ 7.5$ -$ PW CM-15 2024 Trail Maintenance 11.0$ 11.0$ -$ PW CM-9 Ada/Eagle Sports Park Parking 100.0$ 100.0$ -$ PW CM-4 Friendship Tennis 60.0$ 60.0$ -$ TRL CM-7 Lonesome Dove Bridge 30.0$ 30.0$ -$ PW CM-4 Friendship Playground 130.0$ 130.0$ -$ Senior Center Parking 20.0$ 20.0$ -$ Senior Center Interior Paint 20.0$ 20.0$ -$ Senior Center Exterior Paint 15.0$ 15.0$ -$ 1,194.5$ 1,194.5$ -$ Total CM PLAN General Fund Request Outside Funding FY23 to FY27 Capital Maintenance Plan FY 2025 CAPITAL MAINTENANCE PW CM-2 FY 2025 Estimated Capital Maintenance Totals: Project No. Project Name Est. Cost (in $100,000) FY 24 General Fund Request Outside Funding IT CM-6 Plotter Replacement 12.0$ 12.0$ -$ IT CM-3 2026 Backbone Infrastructure 16.0$ 16.0$ -$ TRL CM-3 44 Trail Repair 227.0$ 227.0$ -$ TP CM-1 2026 Floodway Protection 10.0$ 10.0$ -$ TRL CM-10 Mace Trail 83.0$ 83.0$ -$ TRL CM-8 Clear Creek Trail 617.0$ 617.0$ -$ PW CM-14 Picnic & Benches 11.0$ 11.0$ -$ PW CM-15 2026 Trail Maintenance 31.0$ 31.0$ -$ PW CM-9 Skate Bowl Replacement 500.0$ 500.0$ -$ 1,507.0$ 1,507.0$ -$ Total CM PLAN General Fund Request Outside Funding FY 2026 Estimated Capital Maintenance Totals: FY23 to FY27 Capital Maintenance Plan FY 2026 CAPITAL MAINTENANCE Page | 18 FY 2023-27 CAPITAL PROJECTS Capital Projects are new projects, facilities, and investments that cost $20,000 or more and have a lifespan of 5-years or more. These projects generally include new parks, trails or projects associated with maintaining or increasing the adopted level of service. These projects often leverage impact fees, grants, and public/private partnerships. This classification includes plans and studies for projects that are would upon construction fall into this category. A summary of the Capital Project in priority order and by fiscal year is listed below. This list provides limited details of the projects- total estimated project cost, impact fee eligibility, type of project and total combined funding currently anticipated for the project. Most Capital Projects leverage multiple funding sources including impact fees, grants, and public private partnerships. These details are available in the detailed list at the end of the document. A map of projects by year is available at the end of the document. Project No. Project Name Est. Cost (in $100,000) FY 24 General Fund Request Outside Funding IT CM-7 City Hall Servers $ 95.0 $ 95.0 $ - PW CM-14 Picnic & Benches $ 11.0 $ 11.0 $ - PW CM-15 2027 Trail Maintenance 8.0$ 8.0$ -$ TP CM-1 2027 Floodway Protection 10.0$ 10.0$ -$ 124.0$ 124.0$ -$ Total CM PLAN General Fund Request Outside Funding FY 2027 Estimated Capital Maintenance Totals: FY23 to FY27 Capital Maintenance Plan FY 2027 CAPITAL MAINTENANCE Page | 19 Project Rank Project No. Project Name Details Total Project Balance (in $100,000) % Funded Status 1 T&P CP-1State & Eagle Intersection Department: LRP&P Staff: Nichoel Baird Spencer $2.013M Requested $1.013 Match from Eagle URA ACHD Cost Share Med-High Public Score High Staff Score REQUESTED CONSTRUCTION: FY 2023 FY 23-27 PLAN YEAR: 2024 1,861$ 92% Saving for construction FY 24 3 PW CP-2City Owned Shop Department: Public Works & Water Dept. Staff: Eric Ziegenfuss & Ken Acuff $2M Requested $600K from Capital Plan $1M from Water Dept. Impact Fee Eligible up to $400K Med-Low Public Score High Staff Score REQUESTED CONSTRUCTION: FY 2025 FY 23-27 PLAN YEAR: 2025 $ 1,025 51% Need to development a detailed project scope and review timeline Construction tentatively FY 25 4 T&P CP-3Eagle Road Ped/Bike Bridge Department: LRP&P Staff: Nichoel Baird Spencer $3.2M Requested up to $2M in Match From Feds Med-High Public Score High Staff Score REQUESTED CONSTRUCTION:FY 2023 FY 23-27 PLAN YEAR: 2022-23D6:D16 4,509$ 141% Construction FY 23 Completion in Apr-23 7 T&P CP-6Olde Park Extension Department: LRP&P Staff: Nichoel Baird Spencer $600K Requested No Match Med-Low Public Score High Staff Score REQUESTED CONSTRUCTION:FY 2024 FY 23-27 PLAN YEAR: FY 2026 DESIGN:FY 22 included in State & Eagle 600$ 100% New Previously unfunded Construction FY 24 8 P&R CP-2Regional Sports Park Department: LRP&P Staff: Eric Ziegenfuss $5.7M Design & Construction Impact Fee Eligible up to $4.9M Med-Low Public Score Med-High Staff Score REQUESTED CONSTRUCTION:FY 2022-26 FY 23-27 PLAN YEAR: 2022-23 2,589$ 53% Construct Phase 1 FY 23 City has expended $2.31M of impact fees to- date: $49K in preliminary design, $262K in engineer design, and $2M in property acquisition 9 P&R CP-8Foothills Shooting Range Department: LRP&P & Public Works Staff: Nichoel Baird Spencer & Eric Ziegenfuss $70,000 Preliminary Design Construction:$1.2M Outside Foundation Match: $1.2 M No Public Score Med-Low Staff Score CONSTRUCITON YEAR: 2023 FY 23-27 PLAN YEAR: Unplanned FY 2022 500$ 42% Design Build/Engineering FY23 $550K allows City to move forward if the Private foundation is delayed or limited 10 T&P CP-2Aikens Street Extension Department: LRP&P Staff: Nichoel Baird Spencer $858K Requested $113K Match from Eagle URA ACHD Cost Share Med-Low Public Score High Staff Score REQUESTED CONSTRUCTION: FY 2023 FY 23-27 PLAN YEAR: 2024 795$ 93% Construction in FY 24. ACHD is wavering on removal of the project. Will need $63K in both FY 23 & 63K in FY 24 10 P&R CP-10Terra View Park Department: LRP&P, Public Works & Planning Staff: Nichoel Baird Spencer, Eric Ziegenfuss, & Mike Williams $4.72 Million Requested Impact Fee Eligible up to $1.4M Med-High Public Priority No Staff score FY 23-27 PLAN YEAR: FY 2024 1,400$ 30% Phase 1 completed by October 2024, Phase 2 to TBD Phase 2 to be constructed by developer No RankTRL CP-1Phase 2 EISP Trail Design Department: Planning Staff: Steve Noyes $324K Requested Delayed Project Requested Year: FY2023 FY 23-27 PLAN YEAR: 2022 370$ 100% Design Only FY 23 PDM money comes back to Capital account for redistribution Project Status FY 23 to FY27 Capital Council Project List FY 23 Capital Project List Page | 20 Project Rank Project No. Project Name Details Total Project Balance (in $100,000) % Funded Status 13 P&R CP-11Parks, Trails & Open Space Master Plan Department: LRP&P Staff: Nichoel Baird Spencer $200K Requested No Match Med-High Public Score Med-High Staff Score COMPLETION: FY2022-2024 FY 23-27 PLAN YEAR: 2023-24 100$ 50% Plan Only FY 23 Project assumes 50K of funding from both Spring Valley and Avimor 14 POL CP-1Police Substation Department: Police Staff: Chief Wilkie & Eric Ziegenfuss $615,000 Requested $350,000 from Impact Fees Partnership with Eagle Fire Med-High Public Score Requested Year: FY 2025 FY 23-27 PLAN YEAR: FY 2025 39$ 12% Saving for construction FY 25 18 PW CP-9Mace Park Department: LRP&P & Public Works Staff: Nichoel Baird Spencer & Eric Ziegenfuss $477K Requested Impact Fee Eligible up to $23.5K Med-Low Public Score Med-High Staff Score Engineering Design: FY2022 CONSTRUCTION YEAR: 2024 FY 23-27 PLAN YEAR: 2024 340$ 71% Saving for Construction in FY 24 Will require $136.8 in FY 24 20 PW CP-11Pamela Baker Park Department: Public Works & LRP&P Staff: Eric Ziegenfuss & Nichoel Baird Spencer $2.2M Requested Private Partnership up to 50% Impact Fee Eligible up to $390K Med-Low Public Score Med-High Staff Score FY 23-27 PLAN YEAR: FY 2023, 24, 25 1,280$ 58% Phase 1 & 2 Construction in FY 23 with no additional work until FY 26 No RankPW CP-14 City Fiber Utility Department: Public Works Staff: Eric Ziegenfuss $3M in FY 22 $2M FY 23 ARPA Funded Council Added Project FY 23-27 PLAN YEAR: 2022 3,319$ 100% Continued system expansion and development- moved to enterprise fund in FY 23 will be separate plan in FY 24 22 T&P CP-12Linder Road (SH-44 to FF) Department: LRP&P Staff: Nichoel Baird Spencer $1.2M Requested ACHD Cost Share Med-Low Public Score High Staff Score Requested Year: 2022 DESIGN: FY2022 FY 23-27 PLAN YEAR: FY 2026 40$ 100% Current budget is for Baer Design contract . ACHD schedule: Design FY 23, ROW 24, Construction in FY 26 FY 24 is saving for project construction. No RankPW- CP-15Public Works Equipment (SV Sport Park Mower) Department: Public Works Staff: Eric Ziegenfuss $100K Requested ARPA Funded New Project Requested Year: FY 2023 FY 23-27 PLAN YEAR: UNPLANNED $ 125 100% Purchase in FY 23 add to PW Equipment in CM program No RankPW- CP-17Public Works Vehicles Department: Public Works Staff: Eric Ziegenfuss $100K Requested ARPA Eligible New Project Requested Year: FY 2023 FY 23-27 PLAN YEAR: UNPLANNED 100$ 100% Moved from CM to CP as City is expanding the fleet No RankGEN CP-2ARPA General Funding Unallocated Funding American Recovery Act Allocations 934$ 100% Decreasing fund of American Recovery Act Allocations No RankGEN CP-1General Capital Projects General Projects 100$ 100% Three Cities River Crossing 20,026.2$ 14,431.6$ 9,483.0$ Total FY 23 Capital Projects FY 22 Capital Construction Costs City Share of Construction /Implementation * This project list is reflected in the FY 2022-2023 Budget Appropriation FY 23 Capital Project List Continued Project Status Page | 21 Project Rank Project No. Project Name Details Total Project Balance (in $100,000) % Funded Status 1 T&P CP-1State & Eagle Intersection Department: LRP&P Staff: Nichoel Baird Spencer $2.013M Requested $1.013 Match from Eagle URA ACHD Cost Share Med-High Public Score High Staff Score REQUESTED CONSTRUCTION: FY 2023 FY 23-27 PLAN YEAR: 2024 2,011$ 100% Construction FY 24 3 PW CP-2City Owned Shop Department: Public Works & Water Dept. Staff: Eric Ziegenfuss & Ken Acuff $2M Requested $600K from Capital Plan $1M from Water Dept. Impact Fee Eligible up to $400K Med-Low Public Score High Staff Score REQUESTED CONSTRUCTION: FY 2025 FY 23-27 PLAN YEAR: 2025 $ 1,150 58% Need to development a detailed project scope and review timeline Construction tentatively FY 25 5 TRL CP-19Linder Road Underpass @ N. Channel Department: LRP&P & Planning Staff: Nichoel Baird Spencer & Steve Noyes $15K Design Only ACHD Cost Share Med-High Public Score Med-High Staff Score REQUESTED COMPLETION: FY 2024 FY 23-27 PLAN YEAR: FY 2025 $ 15 100% Eng./Design Only FY 24 7 T&P CP-6Olde Park Extension Department: LRP&P Staff: Nichoel Baird Spencer $600K Requested No Match Med-Low Public Score High Staff Score REQUESTED CONSTRUCTION:FY 2024 FY 23-27 PLAN YEAR: FY 2026 DESIGN:FY 22 included in State & Eagle 600$ 100% Construction in FY24 8 P&R CP-2Regional Sports Park Department: LRP&P Staff: Eric Ziegenfuss $5.7M Design & Construction Impact Fee Eligible up to $4.9M Med-Low Public Score Med-High Staff Score REQUESTED CONSTRUCTION:FY 2022-26 FY 23-27 PLAN YEAR: 2022-23 2,589$ 53% Construct Phase 1 FY 23 City has expended $2.31M of impact fees to date: $49K in preliminary design, $262K in engineer design, and $2M in property acquisition 9 P&R CP-8Foothills Shooting Range Department: LRP&P & Public Works Staff: Nichoel Baird Spencer & Eric Ziegenfuss $70,000 Preliminary Design Construction:$1.2M Outside Foundation Match: $1.2 M No Public Score Med-Low Staff Score CONSTRUCITON YEAR: 2023 FY 23-27 PLAN YEAR: Unplanned FY 2023-24 1,200$ 100% Design Build/Engineering FY23 Construction FY 24 10 T&P CP-2Aikens Street Extension Department: LRP&P Staff: Nichoel Baird Spencer $858K Requested $113K Match from Eagle URA ACHD Cost Share Med-Low Public Score High Staff Score REQUESTED CONSTRUCTION: FY 2023 FY 23-27 PLAN YEAR: 2024 858$ 100% Construction in FY 24. 10 P&R CP-10Terra View Park Department: LRP&P, Public Works & Planning Staff: Nichoel Baird Spencer, Eric Ziegenfuss, & Mike Williams $4.72 Million Requested Impact Fee Eligible up to $1.4M Med-High Public Priority No Staff score COFY 23-27 PLAN YEAR: 2024 1,400$ 100% Phase 1 completed by October 2024, Phase 2 to TBD Phase 2 to be constructed by developer FY 23 to 27 Capital Preliminary Project List Project Status FY 24 Capital Preliminary Project List Page | 22 Project Rank Project No. Project Name Details Total Project Balance (in $100,000) % Funded Status 14 POL CP-1Police Substation Department: Police Staff: Chief Wilkie & Eric Ziegenfuss $615,000 Requested $350,000 from Impact Fees Partnership with Eagle Fire Med-High Public Score Requested Year: FY 2025 FY 23-27 PLAN YEAR: FY 2025 78$ 13% Saving for construction FY 25 16 ED CP-31st Street Festival Street Department: Economic Development Staff: Robin Collins $1.147M Requested No Match Med-Low Public Score High Staff Score Requested Year: FY 2024 FY 23-27 PLAN YEAR: FY 2026 382$ 33% Saving for construction FY 26 17 PW CP-13City Hall Safety Measures Department: Public Works Staff: Eric Ziegenfuss $100K Requested No Match Low Public Score Med-Low Staff Score Requested Year: FY 2024 FY 23-27 PLAN YEAR: FY 2024 100$ 100% Construction FY 24 18 PW CP-9Mace Park Department: LRP&P & Public Works Staff: Nichoel Baird Spencer & Eric Ziegenfuss $477K Requested Impact Fee Eligible up to $23.5K Med-Low Public Score Med-High Staff Score Engineering Design: FY2022 CONSTRUCTION YEAR: 2024 FY 23-27 PLAN YEAR: 2024 477$ 100% Construction in FY 24 22 T&P CP-12Linder Road (SH-44 to FF & RAB) Department: LRP&P Staff: Nichoel Baird Spencer $1.2M Requested ACHD Cost Share Med-Low Public Score High Staff Score Requested Year: 2022 DESIGN: FY2022 FY 23-27 PLAN YEAR: FY 2024 400$ TBD Design FY 23, ROW 24, Construction in FY 26 saving for project construction. No RankGEN CP-2ARPA General Funding Unallocated Funding American Recovery Act Allocations TBD TBD Decreasing fund of American Recovery Act Allocations -Deadline for project commitments No RankGEN CP-1General Capital Projects General Projects 100$ 100% TBD 11,360.6$ 9,350.5$ 7,268.4$ Total FY 24 Capital Projects FY 24 Capital Construction Costs City Share of Construction /Implementation *FY 24 Draft CP is over programmed by $47K FY 24 Capital Preliminary Project List Continued Project Status Page | 23 Project Rank Project No. Project Name Details Total Project Balance (in $100,000) % Funded Status 3 PW CP-2City Owned Shop Department: Public Works & Water Dept. Staff: Eric Ziegenfuss & Ken Acuff $2M Requested $600K from Capital Plan $1M from Water Dept. Impact Fee Eligible up to $400K Med-Low Public Score High Staff Score REQUESTED CONSTRUCTION: FY 2025 FY 23-27 PLAN YEAR: 2025 $ 1,150 58% Need to development a detailed project scope and review timeline Saving for construction 5 TRL CP-19Linder Road Underpass @ N. Channel Department: LRP&P & Planning Staff: Nichoel Baird Spencer & Steve Noyes Construction: TBD Cost TBD ACHD Cost Share Med-High Public Score Med-High Staff Score REQUESTED COMPLETION: FY 2024 FY 23-27 PLAN YEAR: FY 2025 $ 200 TBD Cost and timeline to be determined 8 P&R CP-2Regional Sports Park Department: LRP&P Staff: Eric Ziegenfuss $5.7M Design & Construction Impact Fee Eligible up to $4.9M Med-Low Public Score Med-High Staff Score REQUESTED CONSTRUCTION:FY 2022-26 FY 23-27 PLAN YEAR: 2022-23 3,089.0$ 54% Construct Phase 1 FY 23 City has expended $2.31M of impact fees to date: $49K in preliminary design, $262K in engineer design, and $2M in property acquisition 10 P&R CP-10Terra View Park Department: LRP&P, Public Works & Planning Staff: Nichoel Baird Spencer, Eric Ziegenfuss, & Mike Williams $4.72 Million Requested Impact Fee Eligible up to $1.4M Med-High Public Priority No Staff score FY 23-27 PLAN YEAR: FY 2024 656.0$ 20% Phase 2 to TBD Phase 2 to be constructed by developer 14 POL CP-1Police Substation Department: Police Staff: Chief Wilkie & Eric Ziegenfuss $615,000 Requested $350,000 from Impact Fees Partnership with Eagle Fire Med-High Public Score Requested Year: FY 2025 FY 23-27 PLAN YEAR: FY 2025 116.7$ 19% Saving for construction 16 ED CP-31st Street Festival Street Department: Economic Development Staff: TBD $1.147M Requested No Match Med-Low Public Score High Staff Score Requested Year: FY 2024 FY 23-27 PLAN YEAR: FY 2026 764.6$ 67% Saving for construction FY 26 21 ED CP-5Idaho Street Streetscape Improvements Department: Economic Development Staff: TBD $600K Requested No Match Med-Low Public Score Med-High Staff Score Requested Year: 2027 FY 23-27 PLAN YEAR: FY 2027 200.0$ 33% Savings in FY 25, 26 & 27 Construction FY 27 22 T&P CP-12Linder Road (SH-44 to FF) Department: LRP&P Staff: Nichoel Baird Spencer $1.2M Requested ACHD Cost Share Med-Low Public Score High Staff Score Requested Year: 2022 DESIGN: FY2022 FY 23-27 PLAN YEAR: FY 2026 800.0$ 67% Study Completion in FY 23 Construction in FY 26- need to save for project construction. FY 23 to 27 Capital Preliminary Project List FY 25 Capital Preliminary Project List Project Status Page | 24 Project Rank Project No. Project Name Details Total Project Balance (in $100,000) % Funded Status 23 P&R CP-7Charlie Wood Park Department: LRP&P & Public Works Staff: Nichoel Baird Spencer & Eric Ziegenfuss $500K Requested Private Partnership up to 50% Impact Fee Eligible up to $1.4M Med-Low Public Score Med-High Staff Score Preliminary Design Completed in FY21 FY 23-27 PLAN YEAR: FY 2027 200.0$ 40% Engineering FY 25 Savings FY 26, 27 24 T&P CP-8Floating Feather Ped/Bike Study Department: LRP&P Staff: Nichoel Baird Spencer $100K survey only No Match Med-Low Public Score Med-High Staff Score FY 23-27 PLAN YEAR: FY 2027 100.0$ 100% Survey only FY 25 25 ED CP-6Excess ROW Department: Economic Development Staff: TBD $30K Study Only No Match Med-Low Public Score High Staff Score FY 23-27 PLAN YEAR: FY 2025 30.0$ 100% Study only FY 25 No RankGEN CP-2ARPA General Funding Unallocated Funding American Recovery Act Allocations TBD TBD Decreasing fund of American Recovery Act Allocations No RankGEN CP-1General Capital Projects General Projects 100.0$ 100% TBD 7,406.3$ 3,975.0$ 3,975.0$ Total FY 25 Capital Projects FY 25 Capital Construction Costs City Share of Construction /Implementation *This draft program over by $12.3 K FY 25 Capital Preliminary Project List Project Status Page | 25 Project Rank Project No. Project Name Details Total Project Balance (in $100,000) % Funded Status 3 PW CP-2City Owned Shop Department: Public Works & Water Dept. Staff: Eric Ziegenfuss & Ken Acuff $2M Requested $600K from Capital Plan $1M from Water Dept. Impact Fee Eligible up to $400K Med-Low Public Score High Staff Score REQUESTED CONSTRUCTION: FY 2025 FY 23-27 PLAN YEAR: 2025 $ 1,250 63% Need to development a detailed project scope and review timeline Saving for construction 5 TRL CP-19Linder Road Underpass @ N. Channel Department: LRP&P & Planning Staff: Nichoel Baird Spencer & Steve Noyes Construction: TBD Cost TBD ACHD Cost Share Med-High Public Score Med-High Staff Score REQUESTED COMPLETION: FY 2024 FY 23-27 PLAN YEAR: FY 2025 $ 400.0 TBD Savings for construction Cost and timeline to be determined 8 P&R CP-2Regional Sports Park Department: LRP&P Staff: Eric Ziegenfuss $5.7M Design & Construction Impact Fee Eligible up to $4.9M Med-Low Public Score Med-High Staff Score REQUESTED CONSTRUCTION:FY 2022-26 FY 23-27 PLAN YEAR: 2022-23 3,589.0$ 100% Construct Phase 1 FY 23 City has expended $2.31M of impact fees to date: $49K in preliminary design, $262K in engineer design, and $2M in property acquisition 10 P&R CP-10Terra View Park Department: LRP&P, Public Works & Planning Staff: Nichoel Baird Spencer, Eric Ziegenfuss, & Mike Williams $4.72 Million Requested Impact Fee Eligible up to $1.4M Med-High Public Priority No Staff score FY 23-27 PLAN YEAR: FY 2024/TBD Developer Funded 100% Phase 2 to TBD Phase 2 to be constructed by developer 14 POL CP-1Police Substation Department: Police Staff: Chief Wilkie & Eric Ziegenfuss $615,000 Requested $350,000 from Impact Fees Partnership with Eagle Fire Med-High Public Score Requested Year: FY 2025 FY 23-27 PLAN YEAR: FY 2025 154.9$ 25% Saving for construction 16 ED CP-31st Street Festival Street Department: Economic Development Staff: TBD $1.147M Requested No Match Med-Low Public Score High Staff Score Requested Year: FY 2024 FY 23-27 PLAN YEAR: FY 2026 1,146.9$ 100% Construction FY 26 21 ED CP-5Idaho Street Streetscape Improvements Department: Economic Development Staff: TBD $600K Requested No Match Med-Low Public Score Med-High Staff Score Requested Year: 2027 FY 23-27 PLAN YEAR: FY 2027 400.0$ 67% Savings in FY 25, 26 & 27 Construction FY 27 22 T&P CP-12Linder Road (SH-44 to FF) Department: LRP&P Staff: Nichoel Baird Spencer $1.2M Requested ACHD Cost Share Med-Low Public Score High Staff Score Requested Year: 2022 DESIGN: FY2022 FY 23-27 PLAN YEAR: FY 2026 1,200.0$ 100% Study Completion in FY 23 Construction in FY 26- need to save for project construction. FY 23 to 27 Capital Preliminary Project List FY 26 Capital Preliminary Project List Project Status Page | 26 Project Rank Project No. Project Name Details Total Project Balance (in $100,000) % Funded Status 23 P&R CP-7Charlie Wood Park Department: LRP&P & Public Works Staff: Nichoel Baird Spencer & Eric Ziegenfuss $500K Requested Private Partnership up to 50% Impact Fee Eligible up to $1.4M Med-Low Public Score Med-High Staff Score Preliminary Design Completed in FY21 FY 23-27 PLAN YEAR: FY 2027 400.0$ 80% Engineering FY 25 Savings FY 26,27 27 ED CP-7 Downtown Façade Improvements Department: Economic Development Staff: TBD $50K Annually Requested URA Funding $75K in FY 23 Med-Low Public Score High Staff Score FY 23-27 PLAN YEAR: $50K/year starting in FY4 26 50.0$ 100% Annual Program No RankGEN CP-2ARPA General Funding Unallocated Funding ARPA General Funding Unallocated Funding TBD TBD Decreasing fund of American Recovery Act Allocations -LAST YEAR No RankGEN CP-1General Capital Projects General Projects 100.0$ 0% TBD 8,691$ 6,085.9$ 6,085.9$ Total FY 26 Capital Projects FY 26 Capital Construction Costs City Share of Construction /Implementation *FY 26 Draft Capital Plan is over programmed by $57.2K FY 26 Capital Preliminary Project List Project Status Page | 27 Project Rank Project No. Project Name Details Total Project Balance (in $100,000) % Funded Status 3 PW CP-2City Owned Shop Department: Public Works & Water Dept. Staff: Eric Ziegenfuss $2M Requested $600K from Capital Plan $1M from Water Dept. Impact Fee Eligible up to $400K Med-Low Public Score High Staff Score REQUESTED CONSTRUCTION: FY 2025 FY 23-27 PLAN YEAR: 2025 $ 1,350 68% Need to development a detailed project scope and review timeline Saving for construction 5 TRL CP-19Linder Road Underpass @ N. Channel Department: LRP&P & Planning Staff: Nichoel Baird Spencer & Steve Noyes Construction: TBD Cost TBD ACHD Cost Share Med-High Public Score Med-High Staff Score REQUESTED COMPLETION: FY 2024 FY 23-27 PLAN YEAR: FY 2025 $ 400.0 TBD Savings for construction Cost and timeline to be determined 8 P&R CP-2Regional Sports Park Department: LRP&P Staff: Eric Ziegenfuss $5.7M Design & Construction Impact Fee Eligible up to $4.9M Med-Low Public Score Med-High Staff Score REQUESTED CONSTRUCTION:FY 2022-26 FY 23-27 PLAN YEAR: 2022-23 3,589$ 100% Construct Phase 1 FY 23 City has expended $2.31M of impact fees todate: $49K in preliminary design, $262K in engineer design, and $2M in property aquistion 10 P&R CP-10Terra View Park Department: LRP&P, Public Works & Planning Staff: Nichoel Baird Spencer, Eric Ziegenfuss, & Mike Williams $4.72 Million Requested Impact Fee Eligible up to $1.4M Med-High Public Priority No Staff score FY 23-27 PLAN YEAR: FY 2024/TBD Developer Funded 100% Phase 2 to TBD Phase 2 to be constructed by developer 14 POL CP-1Police Substation Department: Police Staff: Chief Wilkie & Eric Ziegenfuss $615,000 Requested $350,000 from Impact Fees Partnership with Eagle Fire Med-High Public Score Requested Year: FY 2025 FY 23-27 PLAN YEAR: FY 2025 193.8$ 32%Saving for construction 27 ED CP-7 Downtown Façade Improvements Department: Economic Development Staff: TBD $50K Annually Requested URA Funding $75K in FY 23 Med-Low Public Score High Staff Score FY 23-27 PLAN YEAR: $50K/year starting in FY4 26 50.0$ 100% Annual Program 28 P&R CP-1Community/ Performing Arts Study Department: Recreation Staff: Brian Allen $50K Study only No Match Med-Low Public Score Med-Low Staff Score COMPLETION: FY 2027 FY 23-27 PLAN YEAR: FY 2025-26 Study only 100.0$ 100%Study Only FY 27 No RankGEN CP-1TBD General Projects 100.0$ 100%TBD 5,782.8$ 3,839.0$ 3,839.0$ Total FY 27 Capital Projects FY 27 Capital Construction Costs City Share of Construction /Implementation FY 23 to 27 Capital Preliminary Project List FY 27 Capital Preliminary Project List Project Status Page | 28 Page | 29 FUTURE & UNFUNDED PROJECTS FUTURE PROJECTS As the City’s Capital Plan is a 5-year fiscally constrained document based on assumed funding levels and limitations, each year there will be projects that are 1) incomplete (not completed within the planning horizon), 2) not ready to be funded (need additional details or a partner agency), or 3) ranked low enough overall that the City is unable to fund. Generally, projects ranked in the top 28 received funding and were prioritized in the Fiscal Year 2023-2027 Plan. In The Fiscal Year 2023-2027 Capital Plan there are 17 projects that have some funding in the current plan but have additional work or funding implications in the development of future plans. While not guaranteed to be fully funded, these projects have a portion of their work funded in this plan or are on- going annual project/priorities. These projects will be included in future prioritization and include: FY 22 Rank Project No.Details Project Name Description 3 PW CP-2Department: Public Works & Water Dept. Staff: Eric Ziegenfuss $2M Requested $600K from Capital Plan $1M from Water Dept. Impact Fee Eligible up to $400K Med-Low Public Score High Staff Score REQUESTED CONSTRUCTION: FY 2025 FY 23-27 PLAN YEAR: 2025-2027 City Owned Shop Need to acquire property or determine a location. This is a joint project with the Eagle Water Department. The project originally requested $2M, that is not sufficient to acquire land and construct. This project without additional funding will go past FY 27. 5 TRL CP-19Department: LRP&P & Planning Staff: Nichoel Baird Spencer & Steve Noyes $15K Design Only ACHD Cost Share Med-High Public Score Med-High Staff Score REQUESTED COMPLETION: FY 2024 FY 23-27 PLAN YEAR: FY 2025 Linder Road Underpass @ N. Channel Advanced to correspond with ACHD's design year of FY 2025. ACHD has not released a construction year for the project. 8 P&R CP-2Department: LRP&P Staff: Eric Ziegenfuss $5.7M Design & Construction Impact Fee Eligible up to $4.9M Med-Low Public Score Med-High Staff Score REQUESTED CONSTRUCTION:FY 2022-26 FY 23-27 PLAN YEAR: 2022-23 Regional Sports Park Preliminary Engineering being completed in FY 22 with Park Impact fees to prepare for purchase and improvement in FY 23. Until preliminary engineering is complete it is hard to determine the phasing and timing of construction. FY 23-27 Capital Projects FUTURE PROJECTS Page | 30 FY 22 Rank Project No.Details Project Name Description 10 T&P CP-2Department: LRP&P Staff: Nichoel Baird Spencer $858K Requested $113K Match from Eagle URA ACHD Cost Share Med-Low Public Score High Staff Score REQUESTED CONSTRUCTION: FY 2023 FY 23-27 PLAN YEAR: 2024 Aikens Street Extension ACHD has removed the project from their FY23 budget and FY24 draft budget. City needs to coordinate with ACHD and the EURA to determine feasibility and timeline for construction. 10 P&R CP-10Department: LRP&P, Public Works & Planning Staff: Nichoel Baird Spencer, Eric Ziegenfuss, & Mike Williams $5 Million Requested Impact Fee Eligible up to $3.25M Med-High Public Priority No Staff score FY 23-27 PLAN YEAR: FY 2024 Terra View Park Merge with West Side Park with Terra View, update based on CC approval . Phase 1 to be completed in October of 2024 paid for with $1.4 M of impact fees. Phase 2 to be completed with construction of the 275th home with impact fee reimbursement for the development only. City has been requested to collect and reimburse impact fees, there is not clear timeline for completion of the park. No RankTRL CP-1Department: Planning Staff: Steve Noyes $324K Requested Delayed Project Requested Year: FY 2023 FY 23-27 PLAN YEAR: : 2023 to hold Phase 2 EISP Trail Design Project cost have increased significantly need additional funding. Project was active before the City began the Capital Plan process, has been carried forward since FY2020. Due to struggles with acquiring the easements needed this project will be placed on hold until a funding parameter or developer comes forward. 14 POL CP-1Department: Police Staff: Chief Wilkie & Eric Ziegenfuss $615,000 Requested $350,000 from Impact Fees Partnership with Eagle Fire Med-High Public Score Requested Year: FY 2025 FY 23-27 PLAN YEAR: FY 2023-27 Police Substation Location needs to be determine- Terra View potential location. These are impact fees that require expenditure within 7-years. There will not be sufficient funds collected through FY27 to construct, city will need to consider alternatives or phased investment beyond the current plan. 20 PW CP-11Department: Public Works & LRP&P Staff: Eric Ziegenfuss & Nichoel Baird Spencer $2.2M Requested Private Partnership up to 50% Impact Fee Eligible up to $390K Med-Low Public Score Med-High Staff Score FY 22-26 PLAN YEAR: FY 2023 Pamela Baker Park Request to combine FY 22 (Phase 2) with FY 23 (Phase 3) increasing project cost to $1.28M. City Cost $640K ($413K in impact fees & $227K in GF). Will use all available Impact fees for project and defer Phase 4 to at least FY 25 or FY26. Full development of the park will goes past FY27. 24 T&P CP-8Department: LRP&P Staff: Nichoel Baird Spencer $100K survey only No Match Med-Low Public Score Med-High Staff Score FY 23-27 PLAN YEAR: FY 2025 Floating Feather Ped/Bike Study Will work with ACHD to fill gaps in the IFYWP studies. The study will identify alternatives and projects for consideration in future fiscal years. 25 ED CP-6Department: Economic Development Staff: TBD $30K Study Only No Match Med-Low Public Score High Staff Score FY 23-27 PLAN YEAR: FY 2025 Excess ROW ACHD has expressed interest in participating in this study, their participation will not be available until 2025. The study will identify alternatives and projects for consideration in future fiscal years. FUTURE PROJECTS Continued Page | 31 FY 22 Rank Project No.Details Project Name Description 27 ED CP-7 Department: Economic Development Staff: Robin Collins $50K Annually Requested URA Funding $75K in FY 23 Med-Low Public Score High Staff Score FY 23-27 PLAN YEAR: $50K/year starting in FY 26 Downtown Façade Improvements EURA has funded $75K to start this program in FY 23. This will be an annual request. 28 P&R CP-1Department: Recreation Staff: Brian Allen $50K Study only No Match Med-Low Public Score Med-Low Staff Score COMPLETION: FY 2026 FY 23-27 PLAN YEAR: FY 2027 Study only Community/ Performing Arts Study The study will identify alternatives and projects for consideration in future fiscal years. 29 P&Z CP-4Department: LRP&P Staff: Nichoel Baird Spencer $50K Study 2022 Construction: $7-11M No Match Med-Low Public Score High Staff Score Construction: FY 2030 FY 23-27 PLAN YEAR: Unfunded Grade Separated Crossing SH-44 September 2022, City Council selected the no build alternative and directed staff to scope anew study at Edgewood Lane and SH-44. 31 T&P CP-10Department: LRP&P Staff: Nichoel Baird Spencer $100K Study Only ITD/COMPASS Partnership Med-Low Public Score Med-Low Staff Score Requesting Year: 2023, 2024, 2025 FY 23-27 PLAN YEAR: 2023 Three Cities River Crossing Project was originally unprogrammed as it needed support of ITD. ITD agreed to endorse and the City needs to work to establish a plan for review of merits before FY 2027.Staff request $50K in FY 2023 to begin scoping and preliminary origin & designation studies. Funded under GEN CP-1: General Projects for FY2023. The City has sought out a 5-year partnership with ITD and COMPASS To evaluate the benefit of the bridge crossing. City will need to fund in FY 24-28. No RankPW- CP-15Department: Public Works Staff: Eric Ziegenfuss $100K Requested ARPA Eligible New Project Requested Year: FY 2023 FY 23-27 PLAN YEAR: Annual Program Public Works Equipment While individual pieces of equipment don't equal a capital project the continued expansion and replacement of tools does warrant annual and on-going funding. This will be an annual request. No RankPW- CP-17Department: Public Works Staff: Eric Ziegenfuss $100K Requested ARPA Eligible New Project Requested Year: FY 2023 FY 23-27 PLAN YEAR: 2023 Public Works Vehicles Due to growth the City has not be replacing vehicles. The city is purchasing new and repurposing old vehicles. Due to growth a fleet management program needs to be developed.No RankGEN CP-1Department: LRP&P Staff: Nichoel Baird Spencer $100K Requested FY 23-27 PLAN YEAR: 2023-27 General Capital Projects Fund for emergency and discretionary projects, FY 2023 earmarked for Three Cities River Crossing. This will be an annual request. FUTURE PROJECTS Continued Page | 32 UNFUNDED PROJECTS For the Fiscal Year 2023 to 2027 plan, generally projects that were rank below 28 were not funded. The number of funded projects was based on a combination of prioritization scores (staff, the public, and the City Council) and the fiscal constraints detailed on page 9 of this plan. In the Fiscal Year 23-27 plan this list includes 23 projects. The lack of funding and prioritization does ot mean these projects are not worthy of consideration or that that are no longer being considered. These projects are retained in the plan as “opportunity” projects that with the right partner, funding, or additional development could be funded in a future year. FY 22 Rank Project No.Details Project Name Status No RankTRL CP-2Department: Planning Staff: Steve Noyes $60K Requested Delayed Project Requested Year: FY 2024 FY 23-27 PLAN YEAR: : Removed Phase 3 EISP Trail Design Project is having issues acquiring the necessary easements to move forward. City wait for development to provide access & trail easement 12 TRL CP-3Department: Planning Staff: Steve Noyes $1.86M Requested Impact Fee Eligible up to $38.6K Med-High Public Score High Staff Score REQUESTED CONSTRUCTION: FY 2025 FY 23-27 PLAN YEAR: Removed Eagle Island State Park Trail Project is having issues acquiring the necessary easements to move forward. City wait for development to provide access & trail easement 15 PW CP-12Department: Public Works Staff: Eric Ziegenfuss $150K Requested No Match Med-Low Public Score Med-High Staff Score Requested Year: FY 2023 FY 22-26 PLAN YEAR: Removed Senior Center Remodel On-hold until a fiscal partner is found TRL CP-14Department: Planning Staff: Steve Noyes $100K Preliminary Design Only Impact Fee Eligible Med-Low Public Score High Staff Score Requested Year: FY 2025 FY 23-27 PLAN YEAR: Unfunded S. Channel Bridge Need to pursue project development grants from COMPASS similar to the Eagle Road Ped/Bike Bridge TRL CP-15Department: Planning Staff: Steve Noyes $100K Preliminary Design Only Impact Fee Eligible up to $714K Med-Low Public Score Med-High Staff Score Requested Year: FY 2025 FY 23-27 PLAN YEAR: Unfunded S. Channel Underpass Boise River Need to pursue project development grants from COMPASS similar to the Eagle Road Ped/Bike Bridge FY 23-27 Capital Projects UNFUNDED Combined 26& 34 Page | 33 FY 22 Rank Project No.Details Project Name Status 29 P&Z CP-4Department: LRP&P Staff: Nichoel Baird Spencer $50K Study 2022 Construction: $7-11M No Match Med-Low Public Score High Staff Score Construction: FY 2030 FY 23-27 PLAN YEAR: Unfunded Grade Separated Crossing SH-44 September 2022, City Council selected the no build alternative and directed staff to scope anew study at Edgewood Lane and SH-44 31 ED CP-1Department: Economic Development Staff: TBD $750K Requested No Match Med-Low Public Score Med-High Staff Score FY 23-27 PLAN YEAR: Unfunded Downtown Parking May be adjusted downward to address land lease versus property acquisition 33 TRL CP-6Department: Public Works Staff: Eric Ziegenfuss $120K Material Donations Med-Low Public Score Med-High Staff Score FY 23-27 PLAN YEAR: UNFUNDED All Weather Trail Ada Sports Park Project underway with material donations only. If those stopped would need $ to complete 35 PW CP-7Department: Public Works Staff: Eric Ziegenfuss $10K (Study Only) Requested $390k Construction No Match Med-Low Public Score Med-Low Staff Score FY 23-27 PLAN YEAR: Unfunded Entry Sign Plan 36 TRL CP-16Department: Planning Staff: Steve Noyes $100K (Design Only)Requested Impact fee eligible up to $1.02M Med-Low Public Score Med-Low Staff Score Requesting Year: 2026 COMPLETION: Unplanned FY 23-27 PLAN YEAR: Unfunded N. Channel Dry Creek Bridge 37 TRL CP-7Department: Public Works Staff: Eric Ziegenfuss $72K Requested Private Partnership up to 50% Med-Low Public Score Med-High Staff Score Requesting Year: 2026 FY 23-27 PLAN YEAR: Unfunded Bike Skills Park - Ada Sports Complex 37 TRL CP-8Department: Planning Staff: Steve Noyes $20K Requested No Match Med-Low Public Score High Staff Score Requesting Year: 2024 FY 23-27 PLAN YEAR: Unfunded Trails Wayfinding & Branding Capital Projects UNFUNDED Continued Page | 34 FY 22 Rank Project No.Details Project Name Status 39 T&P CP-9Department: LRP&P Staff: Nichoel Baird Spencer $100K (Study Only) Requested No Match Med-Low Public Score Med-Low Staff Score FY 23-27 PLAN YEAR: Unfunded Beacon Light Ped/Bike Gap Study Will work with ACHD to fill gaps in the IFYWP studies 40 TRL CP-17Department: Planning Staff: Steve Noyes $30K (Design Only) Requested No Match Med-Low Public Score Med-Low Staff Score Requesting Year: 2025 FY 23-27 PLAN YEAR: Unfunded Dry Creek & Dry Creek Canal 41 LIB CP-2Department: Library Staff: Steve Bumgarner $250K No Match Low Public Score Med-Low Staff Score FY 23-27 PLAN YEAR: Unfunded Bookmobile Move to Library Budget as a Capital Plan Goal 42 TRL CP-9Department: Planning & Public Works Staff: Steve Noyes & Eric Ziegenfuss $150K Requited No Match Med-Low Public Score Med-High Staff Score FY 23-27 PLAN YEAR: Unfunded Trailhead Amenities - Ada Sports Complex Ability to place tables at location for low cost temporary fix 43 LIB CP-3Department: Library & Public Works Staff: Steve Bumgarner& Eric Ziegenfuss $30K (Study Only) Requested No Match Med-Low Public Score Low Staff Score CONSTRUCTION: FY 2022/2023 FY 23-27 PLAN YEAR: Unfunded Library Book pick up Library is reviewing funds to see if they can fund improvement in FY22 within their existing budget 44 TRL CP-20Department: Planning Staff: Steve Noyes $100K (Study Only) Requested No Match Low Public Score Med-Low Staff Score Requested Year: FY 2025 FY 23-27 PLAN YEAR: Unfunded Williamson River Ranch Bridge 45 T&P CP-11Department: Public Works Staff: Eric Ziegenfuss $250K Requested No Match Med-Low Public Score Med-Low Staff Score Requested CONSTRUCTION: FY 2024 FY 23-27 PLAN YEAR: Unfunded Eagle Road Arch Expansion If the State and Eagle project impacts the arch the City will need to change the project year or remove the arch Capital Projects UNFUNDED Continued Page | 35 FY 22 Rank Project No.Details Project Name Status 46 P&R CP-6Department: Recreation & Public Works Staff: Brian Allen & Eric Ziegenfuss $40K (Study Only) Requested No Match Low Public Score Med-Low Staff Score COMPLETION: FY 2026 FY 23-27 PLAN YEAR: Unfunded Motocross Study 46 TRL CP-11Department: Public Works & Planning Staff: Eric Ziegenfuss & Steve Noyes $30K (Design Only) Requested $350K CONSTRUCTION No Match Low Public Score Med-Low Staff Score Requested Year: FY 2027 FY 23-27 PLAN YEAR: Unfunded The Shores Sportsman's Access 48 TRL CP-12Department: Public Works, Planning, & Recreation Staff: Eric Ziegenfuss, Steve Noyes, & Brian Allen $30K (Study Only) Requested No Match Med-Low Public Score Med-High Staff Score Requested Year: 2025 FY 23-27 PLAN YEAR: Unfunded Water Trail Study 49 TRL CP-13Trails Staff: Eric Ziegenfuss $30K Study only No Match Low Public Score Med-Low Staff Score COMPLETION: FY 2024 FY 23-27 PLAN YEAR: Unfunded Equestrian Trailhead Study Staff requested project be removed No RankTRL CP-21Department: Planning Staff: Steve Noyes $30K Requested New Project Requested Year: FY 2027 FY 23-27 PLAN YEAR: Unfunded Laguna Point Trail Project is lacking scope or project worksheet Capital Projects UNFUNDED Continued Page | 36 Page | 37 PLAN AMENDMENTS One of the goals in adopting a capital plan was to provide the City Council a list of funding priorities for both new capital projects and the ability to address and fund maintenance needs, both planned and unplanned, within the City. Grants are a great funding tool to offset the fiscal burden of the City with public and private dollars, but many grant applications require the City to commit or recognize the required City match at the time of application. Under Idaho Code an existing Council cannot bind a future Council, so all decisions about future-year funding needs to be formally recognized and reversable if not in the current fiscal year. The intent of the process is to establish who, how, and when grants and alternative funding are applied for, and to ensure that the Mayor and Council are aware of the financial commitments being made or potentially required for the City. Additionally, this process allows the City to evaluate: 1) The importance of a project, considering other capital projects/needs within the City; 2) Understand the staffing and/or financial resources that the application places on the City; and 3) The totality of the commitment that the City is committing. To evaluate alternative funding and grants within the capital planning process, the following process should be used for the evaluation of a potential grant application when presented outside of the annual capital planning process. 1) Funding Identification: Each department should continually work to identify potential, existing, and future outside funding sources to help develop capital projects and maintain the City’s existing investment and operations, thus removing or decreasing the taxpayer’s burden. 2) Funding Evaluation: When a funding source is identified, staff should evaluate and prepare a memo addressing the following: a. Is this project/improvement identified within a City’s adopted plan? Which plan? b. Is the project/improvement in the current Capital Plan? c. Will this offset future City resources/expenditures as identified in the Capital Plan? What fiscal year is the benefit realized? d. Does the grant require up-front funding by the City? If yes, what is the timeline for reimbursements? What is the rate of reimbursement? e. If the City moves forward with this application, does it need to be included in the current budget or can it be included in a future year budget? f. What is the cost to prepare the application (staff and monetary)? Page | 38 3) Direction to Apply: There are three (3) processes to receive direction to undertake an application: a. If the application requires less than a $5,000 City match and/or offsets a budgeted expense within the current fiscal year, staff should brief the Mayor and seek his direction to move forward into a formal application process. b. If the application requires over $5,000 City match but is in a future fiscal year, staff should: i. Brief the Mayor about the application; ii. Work with the Treasurer to identify City funding needs (both for completion of the application and for construction); iii. Integrate the project into the department budget request or work with staff to integrate into the capital projects fund for consideration during the regular budgeting workshop and hearings. c. If the application has over $5,000 City match and is in the current fiscal year, staff should: i. Brief the Mayor; ii. Work with the Treasurer and capital projects manager to identify City funding needs, sources, and project timelines (both for completion of the application and for construction); iii. Agendize item for City Council approval. The Council should be provided the following to guide their decision: 1. Grant evaluation information (from Section 2 above); 2. Identified funding needs, funding sources, where the City required match will be budgeted from and a summary of how that request impacts other funding sources within the City (from Treasurer/capital projects manager); 3. Timeline for the application & project construction; 4. Identified fund for project reimbursement (if applicable). d. Upon review, the Mayor and/or City Council can direct staff whether to move forward with an application and/or amend the capital plan. 4) Funding Acceptance: Upon notice of an award, the formal award should be brought back to the City Council for acceptance during a public meeting. The acceptance process should address the final status of the following: a. Total award amount – including the City’s required match; b. Identified funding sources - where the City-required match will be budgeted from (a budget amendment, if deemed necessary) and a summary of how that request impacts other accounts/funds within the City (from Treasurer/Capital Projects manager); c. Timeline for project construction; d. Timeline for City reimbursement; e. If directed by the Council, an amendment to the capital plan. Page | 39 APPENDIX Page | 40 FY 22 RankProject No. Details Project Name Changes/UpdatesFY 22 Carry Forward FY 23 GF Allocation TOTAL FY 23 Project Balance ARPA Funding General ARPA Funding Fiber Parks Pathways PoliceMatch/Funding Source Description Total Project Balance % Funded Status 1T&P CP‐1Department:  LRP&P                                                Staff:  Nichoel Baird Spencer                                 $2.013M Requested$1.013 Match from Eagle URA                                ACHD Cost Share Med‐High Public Score                                              High Staff Score REQUESTED CONSTRUCTION:  FY 2023                FY 22‐26 PLAN YEAR:  2024     State & Eagle IntersectionProject deferred to FY 2024 by ACHD.  City expended $2.9K in engineering and design from this fund for Olde Park Place Extension in FY 22                                                                                    19‐0466‐09‐00840$                        11$                          851$                         ‐$                          ‐$                         N/A N/A N/A 1,010$                     Eagle URA         50/50 Match  1,861$                    92%Construction        FY 24 3PW CP‐2Department: Public Works & Water Dept.        Staff:  Eric Ziegenfuss  & Ken Acuff                        $2M Requested                                                          $600K  from Capital Plan                                          $1M  from Water Dept.                                            Impact Fee Eligible up to $400K       Med‐Low Public Score                                               High Staff Score                                                          REQUESTED CONSTRUCTION:  FY 2025                FY 22‐26 PLAN YEAR:  2025    City Owned ShopRequest to expend $30K in renovation to the Shop Space provided in Spring Valley in FY 22.  This can be captured in the Capital plan or just in the department budget as a off set of the current rental fees.                                                                                  19‐0469‐09‐00 $                        250 100$                        350$                         ‐$                          ‐$                         400$                        N/A N/A 275$                         Water Department       50/50 Match up to $1M 1,025$                    51%Construction        FY254T&P CP‐3Department:  LRP&P                                                Staff:  Nichoel Baird Spencer                                  $3.2M Requestedup to $2M in Match From Feds                               Med‐High Public Score                                              High Staff ScoreREQUESTED CONSTRUCTION:FY 2023                  FY 22‐26 PLAN YEAR: 2022‐23Eagle Road Ped/Bike Bridge Advanced by City Council to FY 22‐23. Project completion scheduled for Spring 2023.  City has $900k in General Fund and $800K in impact fees that can be redistributed once project is completed                                                                                                  19‐0466‐05‐00733$                         ‐$                         733$                         ‐$                          ‐$                         N/A 800$                        N/A 2,976$                     TAP TMA, TAP Statewide, Redistribution  4,509$                    141%Construction        FY 23               Completion in       Apr‐237T&P CP‐6Department: LRP&P                                                 Staff:  Nichoel Baird Spencer                                 $600K RequestedNo MatchMed‐Low Public Score                                               High Staff Score                                                          REQUESTED CONSTRUCTION:FY 2024                  FY 22‐26 PLAN YEAR:  FY 2026                               DESIGN:FY 22 included in State & Eagle Olde Park ExtensionAdvanced to correspond with ACHD Plans for Eagle & State.  City Expended $2.9K in & design from State and Eagle Project to complete engineering design.                                 19‐0465‐08‐00                                                                                                                 ‐$                         600$                        600$                         ‐$                          ‐$                          ‐$                          ‐$                          ‐$                          ‐$                         600$                        100%New Previously unfunded Construction        FY 248P&R CP‐2Department:  LRP&P                                                Staff:  Eric Ziegenfuss                                  $5.7M  Design & Construction                               Impact Fee Eligible up to $4.9M                             Med‐Low Public Score                                               Med‐High Staff Score                                    REQUESTED CONSTRUCTION:FY 2022‐26            FY 22‐26 PLAN YEAR: 2022‐23Regional Sports Park City has expended $2.31M of impact fees to date: $49K in preliminary design, $262K in engineer design, and $1.975M in property acquisition, $25K in TIS.  FY 23 will be phase 1 with construction of 4 baseball fields and access.  Costs will adjust per final engineering.                                                                              08‐0438‐37‐00‐$                          ‐$                          ‐$                          ‐$                          ‐$                         2,589$                     ‐$                          ‐$                          ‐$                          ‐$                         2,589$                    100%Construct         Phase 1 FY 23       City has expended $2.31M of impact fees to date: $49K in preliminary design, $262K in engineer design, and $2M in property acquisition 9P&R CP‐8Department: LRP&P & Public Works                   Staff:  Nichoel Baird Spencer & Eric Ziegenfuss  $70,000 Preliminary Design                                     Construction:$1.2M                                                  Outside Foundation Match: $1.2 M                       No Public Score                                                           Med‐Low Staff Score  CONSTRUCITON YEAR: 2023                               FY 22‐26 PLAN YEAR: Unplanned  FY 2022         Foothills Shooting Range Advanced to work with potential funding partners and dedication of land work funded through Heritage Park project. Expended $39K from Heritage Park CM project($14K for TIS, $10K environmental, and $15Kfor noise).                                          19‐0465‐08‐00                                                                                          ‐$                         500$                        500$                         ‐$                          ‐$                         N/A N/A N/A 500$                        42%Design Build/Engineering FY23                $550K allows City to move forward if the Private foundation is delayed or limited10T&P CP‐2Department: LRP&P                                                 Staff:  Nichoel Baird Spencer                                $858K Requested$113K Match from Eagle URA                                 ACHD Cost Share Med‐Low Public Score                                               High Staff Score                                                          REQUESTED CONSTRUCTION: FY 2023                 FY 22‐26 PLAN YEAR:  2024  Aikens Street Extension Signals from ACHD this will not be in budget                                    19‐0466‐03‐00617$                        63$                          680$                         ‐$                          ‐$                         N/A N/A N/A 115$                        Eagle URA Match 795.0$                    93%Construction in FY 24.                 ACHD is wavering on removal of the project. Will need $63K in both FY 23 & 63K in FY 24Project Status FY 23 Capital Council Approved Project List City General Fund Impact Fee Funds Outside Funding FY 22 RankProject No. Details Project Name Changes/UpdatesFY 22 Carry Forward FY 23 GF Allocation TOTAL FY 23 Project Balance ARPA Funding General ARPA Funding Fiber Parks Pathways PoliceMatch/Funding Source Description Total Project Balance % Funded Status 10P&R CP‐10Department: LRP&P, Public Works & Planning                                                                       Staff:  Nichoel Baird Spencer, Eric Ziegenfuss, & Mike Williams                                  $4.72 Million Requested Impact Fee Eligible up to $1.4MMed‐High Public Priority                                          No Staff score CONSTRUCTION: FY 2024Terra View Park Merged with West Side Park with Terra View, update based on CC approval .  Phase 1 to be completed in FY 23 paid for with $1.4 M of impact fees.  Phase 2 to be completed with construction of the 275th home with impact fee reimbursement for the development only.                                        08‐0438‐36‐00‐$                          ‐$                          ‐$                          ‐$                          ‐$                         1,400$                     ‐$                          ‐$                         2,644$                     Developer constructed  & Impact fee reimbursement up to $1.4M.  City to reimburse up to $656K from impacts fee collected from development balance is the developer contribution  1,400.0$                 30%Phase 1 completed in FY 23,            Phase 2 to TBDNo RankTRL CP‐1Department: Planning                                             Staff:  Steve Noyes                                                $324K  Requested                                                     Delayed Project                                                       Requested Year: FY 2021   2023                             FY 22‐26 Plan Year: 2022Phase 2  EISP Trail Design Project cost have increased significantly need additional funding. Project was active before the City began the Capital Plan process, has been carried forward since FY2020.                    19‐0473‐03‐00370$                        370$                         ‐$                          ‐$                         N/A N/A N/A 175$                         FEMA PDM (not budgeted into FY 23)  370.0$                    100%Design Only FY 23   PDM money comes back to Capital account for redistribution 13P&R CP‐11Department:  LRP&P                                                Staff:  Nichoel Baird Spencer                               $200K RequestedNo Match Med‐High Public Score                                              Med‐High Staff Score                                                COMPLETION: FY2022‐2024                                    FY 22‐26 PLAN YEAR: 2023‐24Parks, Trails  & Open Space  Master Plan Project was unable to be completed in FY 22 need better inventory information                                                                             19‐0467‐02‐00100$                         ‐$                         100$                         ‐$                         N/A N/A N/A 100$                         Foothills Reimbursement Agreements Avimor & SV 100.0$                    50%Plan Only FY 23 Project assumes 50K of funding from both Spring Valley and Avimor14POL CP‐1Department: Police                                                  Staff:  Chief Wilkie & Eric Ziegenfuss                     $615,000 Requested $350,000 from Impact Fees Partnership with Eagle Fire                                      Med‐High Public Score                                Requested Year: FY 2025FY 22‐26 PLAN YEAR: FY 2025Police Substation Location needs to be determine‐ Terra View potential location   27‐0438‐01‐00‐$                          ‐$                          ‐$                          ‐$                          ‐$                         N/A N/A 39$                           ‐$                         38.9$                       6%Saving for construction FY 2518PW CP‐9Department: LRP&P & Public Works                   Staff:  Nichoel Baird Spencer & Eric Ziegenfuss  $477K  Requested                                                     Impact Fee Eligible up to $23.5K            Med‐Low Public Score                                               Med‐High Staff Score                                                Engineering Design: FY2022                              CONSTRUCTION YEAR: 2024                                   FY 22‐26 PLAN YEAR: 2024Mace ParkHECO to complete engineering in FY22 in the amount of $24.6K.    Deferred construction to keep project separate from the Ped/Bike Bridge.  Looking to construct in FY 24                         08‐0438‐37‐00‐$                         137$                        137$                         ‐$                          ‐$                         24$                          180$                        N/A‐$                         340.25$                  71%Saving for Construction in FY 24 Will require $136.8 in FY 2420PW CP‐11Department: Public Works  & LRP&P                  Staff:  Eric Ziegenfuss & Nichoel Baird Spencer  $1.6M    $2.2M  Requested                                     Private Partnership up to 50%                                Impact Fee Eligible up to $390K                             Med‐Low Public Score                                               Med‐High Staff Score                                                FY 22‐26 PLAN YEAR:  FY 2023, 24, 25Pamela Baker Park Request to combine Phase 1 from FY 22 with Phase 2 from FY 23  increasing project cost to $1.28M. City Cost $640K ($413K in impact fees & $227K in GF).  Will use all available Impact fees for project and defer Phase 3 to at least FY 25 to allow plant materials to establish                                                                    08‐0438‐37‐00227$                        227$                        413$                        N/A N/A 640$                         Developer, pass through not income  1,280.0$                 58%Phase 1& 2 Construction in      FY 23               with no additional work until FY 26No RankPW CP‐14 Department:  Public Works                                    Staff:  Eric Ziegenfuss                                                $3M in FY 22                                                               $2M FY 23                                                                  ARPA Funded/Eligible                                               Council Added Project                                               FY 22‐26 Plan Year: 2022                                         City Fiber Utility Approx. $1.319M Remaining, without FY 23 funding.  deducted FY22 outstanding expenditures:  $350K in Fat beam contract, $15.5k in tech hut, $115k in misc. contracts.  Mayor is requesting an additional $2M from ARPA for FY 23.   FY 23‐ Street Sweeper $75K, Air Compressor $40K.  Forklift, payment to PW for used vehicle.                                                                           19‐0486‐02‐00‐$                          ‐$                         3,319$                    N/A N/A N/A‐$                         3,319$                    100% Continued system expansion and development‐ moved to enterprise fund in FY 23 will be separate plan in   FY 24  22T&P  CP‐12Department: LRP&P                                                 Staff:  Nichoel Baird Spencer                                  $1.2M RequestedACHD Cost Share Med‐Low Public Score                                               High Staff Score                                       Requested Year: 2022                                               DESIGN: FY2022                                                         FY 22‐26 PLAN YEAR: FY 2024Linder Road             (SH‐44 to FF)Preliminary Design in underway for medians and roundabout in FY 22 for $28K.   Once completed need to save for City's augmentations to the design.                                                                19‐0466‐10‐0040$                           ‐$                         40$                           ‐$                          ‐$                         N/A N/A N/A‐$                         40$                          100% Current budget is for Baer Design contract .           ACHD schedule:     Design FY 23,       ROW 24,            Construction in      FY 26.                    FY 24 is saving for project construction.   FY 22 RankProject No. Details Project Name Changes/UpdatesFY 22 Carry Forward FY 23 GF Allocation TOTAL FY 23 Project Balance ARPA Funding General ARPA Funding Fiber Parks Pathways PoliceMatch/Funding Source Description Total Project Balance % Funded Status No RankPW‐ CP‐15Department: Public Works                                     Staff:  Eric Ziegenfuss                                                $100K  Requested                                                     ARPA Eligible                                                          New Project                                                      Requested Year: FY 2023                                          FY 22‐26 Plan Year: UNPLANNED                          Public Works Equipment (Mower)  Having issues hiring enough seasonal staff. Efficiency of staff, less staff more mowing.                                                                          19‐0486‐01‐00‐$                          ‐$                          ‐$                         125$                        N/A N/A N/A‐$                         125$                        100%Purchase in FY 23 add to PW Equipment in CM program No RankPW‐ CP‐17Department: Public Works                                     Staff:  Eric Ziegenfuss                                                $100K Requested                                                      ARPA Eligible                                                          New Project                                                      Requested Year: FY 2023                                          FY 22‐26 Plan Year: UNPLANNED                          Public Works Vehicles  Due to growth the City has not be replacing vehicles.  The city is purchasing new and repurposing old vehicles.  In FY 23 it has been identified that there is a need for a new landscape vehicle at $100K and a vehicle will be transferred to the Fiber Network.                                                                                                     19‐0486‐01‐00‐$                          ‐$                          ‐$                         100$                        N/A N/A N/A‐$                         100$                        100%Purchase in FY 22 add to Fleet inventory in CM Program No RankGEN CP‐2ARPA General Funding                           Unallocated Funding                 TBDTBD                                                                                              19‐0486‐01‐00934$                        934$                        100% Decreasing fund of American Recovery Act Allocations  No RankGEN CP‐1General Capital Projects TBDTBD                                                                                              19‐0465‐05‐00100$                         ‐$                         100$                         ‐$                          ‐$                          ‐$                          ‐$                          ‐$                          ‐$                          ‐$                         100$                        100% Three Cities River Crossing  3,050$                    1,638$                    4,688$                    1,159$                    3,319$                    4,826$                    980$                        39$                          7,935$                    FY 22 Carry Forward FY 23 NEW GF Allocation FY 23 Capital Projects Balance ARPA General ARPA FiberParks Impact FeesPathways Impact FeesPolice Impact Fees Outside Funding/Match 4,688$                    4,478$                    5,844$                    7,935$                    22,945$                  TOTAL CITY GENERAL FUND CAPITAL PROJECTS:TOTAL IMPACT FEES LEVERAGED: TOTAL OUTSIDE FUNDING LEVERAGED: FUND TOTAL WITH ALL FUNDING SOURCES:ARPA FUNDING * This project list is reflected in the FY 2022‐2023 Budget Appropriation   RankProject No. Details Project Name Changes/UpdatesFY 23 Carry Forward FY 24 GF Allocation TOTAL FY 24 Project Balance ARPA Funding General ARPA Funding Fiber Parks Pathways PoliceMatch/Funding Source Description Total Project Balance % Funded Status 1T&P CP‐1Department:  LRP&P                                               Staff:  Nichoel Baird Spencer                                 $2.013M Requested$1.013 Match from Eagle URA                               ACHD Cost Share Med‐High Public Score                                            High Staff Score REQUESTED CONSTRUCTION:  FY 2023                FY 23‐27 PLAN YEAR:  2024     State & Eagle IntersectionProject deferred to FY 2024 by ACHD.  City expended $2.9K in engineering and design from this fund for Olde Park Place Extension in FY 22                                                                                 19‐0466‐09‐00851$                        150$                        1,001$                     ‐$                          ‐$                         N/A N/A N/A 1,010$                     Eagle URA        50/50 Match  2,011$                    100%Construction        FY 24 3PW CP‐2Department: Public Works & Water Dept.        Staff:  Eric Ziegenfuss  & Ken Acuff                       $2M Requested                                                        $600K  from Capital Plan                                        $1M  from Water Dept.                                          Impact Fee Eligible up to $400K       Med‐Low Public Score                                             High Staff Score                                                        REQUESTED CONSTRUCTION:  FY 2025                FY 23‐27 PLAN YEAR:  2025    City Owned ShopRequest to expend $30K in renovation to the Shop Space provided in Spring Valley in FY 22.  This can be captured in the Capital plan or just in the department budget as a off set of the current rental fees.                                                                               19‐0469‐09‐00 $                        350 100$                        450$                         ‐$                          ‐$                         400$                        N/A N/A 300$                         Water Department       50/50 Match up to $1M 1,150$                    58%Construction        FY255TRL CP‐19Department: LRP&P  & Planning                          Staff:  Nichoel Baird Spencer & Steve Noyes       $15K  Design Only                                                    ACHD Cost Share          Med‐High Public Score                                            Med‐High Staff Score                                              REQUESTED COMPLETION: FY 2024                     FY 23‐27 PLAN YEAR: FY 2025Linder Road Underpass @ N. ChannelAdvanced to correspond with ACHD's design year of FY 2025     TBD $                           ‐   15$                          15$                           ‐$                          ‐$                          ‐$                          ‐$                          ‐$                         15$                          100% Eng./Design FY 247T&P CP‐6Department: LRP&P                                                Staff:  Nichoel Baird Spencer                                 $600K RequestedNo MatchMed‐Low Public Score                                             High Staff Score                                                        REQUESTED CONSTRUCTION:FY 2024                  FY 23‐27 PLAN YEAR:  FY 2026                              DESIGN:FY 22 included in State & Eagle Olde Park ExtensionAdvanced to correspond with ACHD Plans for Eagle & State.  City Expended $2.9K in & design from State and Eagle Project to complete engineering design.                                                        19‐0456‐08‐00                                                                                       600$                         ‐$                         600$                         ‐$                          ‐$                          ‐$                          ‐$                          ‐$                          ‐$                         600$                        100%Construction in FY248P&R CP‐2Department:  LRP&P                                               Staff:  Eric Ziegenfuss                                  $5.7M  Design & Construction                              Impact Fee Eligible up to $4.9M                            Med‐Low Public Score                                             Med‐High Staff Score                                    REQUESTED CONSTRUCTION:FY 2022‐26            FY 23‐27 PLAN YEAR: 2022‐23Regional Sports Park City has expended $2.31M of impact fees to date: $49K in preliminary design, $262K in engineer design, and $1.975M in property acquisition, $25K in TIS.  FY 23 will be phase 1 with construction of 4 baseball fields and access.  Costs will adjust per final engineering.                                                                            08‐0438‐37‐00‐$                          ‐$                          ‐$                          ‐$                          ‐$                         2,589.0$                  ‐$                          ‐$                          ‐$                          ‐$                         2,589$                    100%Construct         Phase 1 FY 23       City has expended $2.31M of impact fees to date: $49K in preliminary design, $262K in engineer design, and $2M in property acquisition 9P&R CP‐8Department: LRP&P & Public Works                   Staff:  Nichoel Baird Spencer & Eric Ziegenfuss  $70,000 Preliminary Design                                   Construction:$1.2M                                                Outside Foundation Match: $1.2 M                      No Public Score                                                         Med‐Low Staff Score  CONSTRUCITON YEAR: 2023                               FY 23‐27 PLAN YEAR:   FY 2022                             Foothills Shooting Range Advanced to work with potential funding partners and dedication of land work funded through Heritage Park project. Expended $39K from Heritage Park CM project($14K for TIS, $10K environmental, and $15Kfor noise).                                        19‐0465‐08‐00                                                                                       500$                        700$                        1,200$                     ‐$                          ‐$                         N/A N/A N/A 1,200$                    100%Design Build/Engineering FY23               Construction FY 24 10T&P CP‐2Department: LRP&P                                                Staff:  Nichoel Baird Spencer                                $858K Requested$113K Match from Eagle URA                                ACHD Cost Share Med‐Low Public Score                                             High Staff Score                                                        REQUESTED CONSTRUCTION: FY 2023                 FY 23‐27 PLAN YEAR:  2024  Aikens Street Extension Signals from ACHD this will not be in budget                                   19‐0466‐03‐00680$                        63$                          743$                         ‐$                          ‐$                         N/A N/A N/A 115.0$                    Eagle URA Match 858.0$                    100%Construction in FY 24.                FY 24 Capital Preliminary Project List City General Fund Impact Fee Funds Outside Funding Project Status   RankProject No. Details Project Name Changes/UpdatesFY 23 Carry Forward FY 24 GF Allocation TOTAL FY 24 Project Balance ARPA Funding General ARPA Funding Fiber Parks Pathways PoliceMatch/Funding Source Description Total Project Balance % Funded Status 10P&R CP‐10Department: LRP&P, Public Works & Planning                                                                     Staff:  Nichoel Baird Spencer, Eric Ziegenfuss, & Mike Williams                                  $4.72 Million Requested Impact Fee Eligible up to $1.4MMed‐High Public Priority                                         No Staff score FY 23‐27 PLAN YEAR: FY 2024Terra View Park Merged with West Side Park with Terra View, update based on CC approval .  Phase 1 to be completed in FY 23 paid for with $1.4 M of impact fees.  Phase 2 to be completed with construction of the 275th home with impact fee reimbursement for the development only.                                      08‐0438‐36‐00‐$                          ‐$                          ‐$                          ‐$                          ‐$                         656$                         ‐$                          ‐$                           City to reimburse up to $656K from impacts fee collected from development balance is the developer contribution  1,400$                    100% Phase 1 completed by October 2024,    Phase 2 to TBD      Phase 2 to be constructed by developer  14POL CP‐1Department: Police                                                  Staff:  Chief Wilkie & Eric Ziegenfuss                    $615,000 Requested $350,000 from Impact Fees Partnership with Eagle Fire                                    Med‐High Public Score                                Requested Year: FY 2025FY 23‐27 PLAN YEAR: FY 2025Police Substation Location needs to be determine‐ Terra View potential location  27‐0438‐01‐00‐$                          ‐$                          ‐$                          ‐$                          ‐$                          ‐$                          ‐$                         77.8$                        ‐$                         78$                          13% Saving for construction         FY 25 16ED CP‐3Department: Economic Development                Staff:  Robin Collins                                $1.147M RequestedNo Match Med‐Low Public Score                                             High Staff Score                                             Requested Year: FY 2024                                        FY 23‐27 PLAN YEAR: FY 20261st Street Festival StreetProject delayed due to EURA match for the final survey work tocomplete design                                                                                 19‐0465‐08‐00  ‐$                         382$                        382$                         ‐$                          ‐$                          ‐$                          ‐$                          ‐$                           $                           ‐    Potential EURA Match  382.3$                    33%Saving for construction FY 2617PW CP‐13Department: Public Works                                    Staff:  Eric Ziegenfuss                                  $100K  Requested                                                    No Match                          Low Public Score                                                      Med‐Low Staff Score                               Requested Year: FY 2024                                        FY 22‐26 PLAN YEAR: FY 2024City Hall Safety MeasuresStand alone project from CH expansion                                       19‐0465‐08‐00  ‐$                         100$                        100$                         ‐$                          ‐$                          ‐$                          ‐$                          ‐$                           $                           ‐   100.0$                    100%Construction        FY 2418PW CP‐9Department: LRP&P & Public Works                   Staff:  Nichoel Baird Spencer & Eric Ziegenfuss  $477K  Requested                                                    Impact Fee Eligible up to $23.5K            Med‐Low Public Score                                             Med‐High Staff Score                                              Engineering Design: FY2022                              CONSTRUCTION YEAR: 2024                                  FY 23‐27 PLAN YEAR: 2024Mace ParkHECO to complete engineering in FY22 in the amount of $24.6K.    Deferred construction to keep project separate from the Ped/Bike Bridge.  Looking to construct in FY 24                       08‐0438‐37‐00137$                        137$                        274$                         ‐$                          ‐$                         23.5$                       180.0$                    N/A‐$                         477.05$                  100% Construction in FY 24 22T&P  CP‐12Department: LRP&P                                                Staff:  Nichoel Baird Spencer                                  $1.2M RequestedACHD Cost Share Med‐Low Public Score                                             High Staff Score                                       Requested Year: 2022                                             DESIGN: FY2022                                                       FY 23‐27 PLAN YEAR: FY 2024Linder Road                      (SH‐44 to FF including roundabout)Design completed in FY23, Construction cost across FY 24 & FY 25                                                                                                             19‐0466‐10‐00400$                        400$                         ‐$                          ‐$                         N/A N/A N/A‐$                         400.0$                    100% ACHD schedule Design FY 23,       ROW 24,           Construction in FY 26                 saving for project construction.  No RankGEN CP‐2ARPA General Funding                           Unallocated Funding                 TBDTBD                                                                                                           19‐0486‐01‐00TBDTBD TBD Decreasing fund of American Recovery Act Allocations ‐FY 24 is Deadline for project commitments No RankGEN CP‐1General Capital Projects TBDTBD                                                                                                           19‐0465‐05‐00100$                         ‐$                         100$                         ‐$                          ‐$                          ‐$                          ‐$                          ‐$                          ‐$                          ‐$                         100.0$                    100% TBD  RankProject No. Details Project Name Changes/UpdatesFY 23 Carry Forward FY 24 GF Allocation TOTAL FY 24 Project Balance ARPA Funding General ARPA Funding Fiber Parks Pathways PoliceMatch/Funding Source Description Total Project Balance % Funded Status 3,218.2$                 2,047.1$                 5,265.3$                  ‐$                          ‐$                         3,668.5$                 180.0$                    77.8$                       1,425.0$                 FY 23 Carry Forward FY 24 NEW GF Allocation FY 24 Capital Projects Balance ARPA General ARPA FiberParks Impact FeesPathways Impact FeesPolice Impact Fees Outside Funding/Match *FY 24 Draft Capital Plan is over programmed by $47K5,265.3$                 TBD3,926.3$                 1,425.0$                 10,616.6$              TOTAL CITY GENERAL FUND CAPITAL PROJECTS:ARPA FUNDING:FUND TOTAL WITH ALL FUNDING SOURCES:TOTAL IMPACT FEES LEVERAGED: TOTAL OUTSIDE FUNDING LEVERAGED:  RankProject No. Details Project Name Changes/UpdatesFY 24 Carry Forward FY 25 GF Allocation TOTAL FY 25 Project Balance ARPA Funding General ARPA Funding Fiber Parks Pathways PoliceMatch/Funding Source Description Total Project Balance % Funded Status 3PW CP‐2Department: Public Works & Water Dept.        Staff:  Eric Ziegenfuss  & Ken Acuff                       $2M Requested                                                        $600K  from Capital Plan                                        $1M  from Water Dept.                                          Impact Fee Eligible up to $400K       Med‐Low Public Score                                             High Staff Score                                                        REQUESTED CONSTRUCTION:  FY 2025                FY 23‐27 PLAN YEAR:    2025    City Owned ShopRequest to expend $30K in renovation to the Shop Space provided in Spring Valley in FY 22.  This can be captured in the Capital plan or just in the department budget as a off set of the current rental fees.                                                                               19‐0469‐09‐00 $                        450 450$                         ‐$                          ‐$                         400$                        N/A N/A 300$                         Water Department       50/50 Match up to $1M 1,150$                    58% Need to development a detailed project scope and review timeline            Saving for construction  5TRL CP‐19Department: LRP&P  & Planning                          Staff:  Nichoel Baird Spencer & Steve Noyes       Construction: TBD                                             Cost TBD                                                                     ACHD Cost Share          Med‐High Public Score                                            Med‐High Staff Score                                              REQUESTED COMPLETION: FY 2024                     FY 23‐27 PLAN YEAR:   FY 2025Linder Road Underpass @ N. ChannelEngineering/deign completed in FY 24, Transition to saving for construction cost share  $                           ‐   200$                        200.0$                     ‐$                          ‐$                          ‐$                          ‐$                          ‐$                         200$                        TBDCost and timeline to be determined 8P&R CP‐2Department:  LRP&P                                               Staff:  Eric Ziegenfuss                                  $5.7M  Design & Construction                              Impact Fee Eligible up to $4.9M                            Med‐Low Public Score                                             Med‐High Staff Score                                    REQUESTED CONSTRUCTION:FY 2022‐26            FY 23‐27 PLAN YEAR:   2022‐23Regional Sports Park City has expended $2.31M of impact fees to date: $49K in preliminary design, $262K in engineer design, and $1.975M in property acquisition, $25K in TIS.  FY 23 will be phase 1 with construction of 4 baseball fields and access.  Costs will adjust per final engineering.                                                                            08‐0438‐37‐00‐$                         500.0$                    500.0$                     ‐$                          ‐$                         2,589.0$                  ‐$                          ‐$                          ‐$                          ‐$                         3,089$                    100%Construct         Phase 1 FY 23       City has expended $2.31M of impact fees to date: $49K in preliminary design, $262K in engineer design, and $2M in property acquisition 10P&R CP‐10Department: LRP&P, Public Works & Planning                                                                     Staff:  Nichoel Baird Spencer, Eric Ziegenfuss, & Mike Williams                                  $4.72 Million Requested Impact Fee Eligible up to $1.4MMed‐High Public Priority                                         No Staff score FY 23‐27 PLAN YEAR:  FY 2024Terra View Park Merged with West Side Park with Terra View, update based on CC approval .  Phase 1 to be completed in FY 23 paid for with $1.4 M of impact fees.  Phase 2 to be completed with construction of the 275th home with impact fee reimbursement for the development only.                                      08‐0438‐36‐00‐$                          ‐$                          ‐$                          ‐$                          ‐$                         656$                         ‐$                          ‐$                           City to reimburse up to $656K from impacts fee collected from development balance is the developer contribution  656.0$                    20% Phase 2 timing  TBD               Phase 2 to be constructed by developer  14POL CP‐1Department: Police                                                  Staff:  Chief Wilkie & Eric Ziegenfuss                    $615,000 Requested $350,000 from Impact Fees Partnership with Eagle Fire                                    Med‐High Public Score                                Requested Year: FY 2025FY 23‐27 PLAN YEAR:   FY 2025Police Substation Location needs to be determine‐ Terra View potential location  27‐0438‐01‐00‐$                          ‐$                          ‐$                          ‐$                          ‐$                         N/A N/A 116.7$                     ‐$                         116.7$                    19%Saving for construction16ED CP‐3Department: Economic Development                Staff: TBD                               $1.147M RequestedNo Match Med‐Low Public Score                                             High Staff Score                                             Requested Year: FY 2024                                        FY 23‐27 PLAN YEAR:  FY20261st Street Festival StreetProject delayed due to EURA match for the final survey work tocomplete design382.3$                    382.3$                    764.6$                     ‐$                          ‐$                          ‐$                          ‐$                          ‐$                           TBD  Potential EURA Match  764.6$                    67%Saving for construction FY 2621ED CP‐5Department: Economic Development                Staff:  TBD                                   $600K Requested                                                     No Match              Med‐Low Public Score                                             Med‐High Staff Score                                              Requested Year: 2027                                             FY 23‐27 PLAN YEAR:   FY 2027Idaho Street Streetscape Improvements‐$                         200.0$                    200.0$                     ‐$                          ‐$                          ‐$                          ‐$                          ‐$                           TBD  Potential EURA Match  200.0$                    33%Savings in FY 25, 26 & 27 Construction FY 27FY 25 Capital Preliminary Project List City General Fund Impact Fee Funds Outside Funding Project Status RankProject No. Details Project Name Changes/UpdatesFY 24 Carry Forward FY 25 GF Allocation TOTAL FY 25 Project Balance ARPA Funding General ARPA Funding Fiber Parks Pathways PoliceMatch/Funding Source Description Total Project Balance % Funded Status 22T&P  CP‐12Department: LRP&P                                                Staff:  Nichoel Baird Spencer                                  $1.2M RequestedACHD Cost Share Med‐Low Public Score                                             High Staff Score                                       Requested Year: 2022                                             DESIGN: FY2022                                                       FY 23‐27 PLAN YEAR: FY 2024Linder Road (SH-44 to FF)Design completed in FY23, Construction cost across FY 24 & FY 25                                                                                                             19‐0466‐10‐00400.0$                    400.0$                    800.0$                     ‐$                          ‐$                         N/A N/A N/A‐$                         800.0$                    67%Study Completion in FY 23            Construction in FY 26‐ need to save for project construction. 23P&R CP‐7Department: LRP&P & Public Works                   Staff:  Nichoel Baird Spencer & Eric Ziegenfuss  $500K  Requested                                                    Private Partnership up to 50%                               Impact Fee Eligible up to $1.4M                            Med‐Low Public Score                                             Med‐High Staff Score                                              Preliminary Design Completed in FY21                FY 23‐27 PLAN YEAR:   FY 2027Charlie Wood Park Preliminary concept study completed in FY 21.  Eng./Design In FY 25 then save for construction ‐$                         200.0$                    200.0$                     ‐$                          ‐$                          ‐$                          ‐$                          ‐$                           $                           ‐   200.0$                    40%Eng. FY 25      Savings FY 26,2724T&P CP‐8Department: LRP&P                                                Staff:  Nichoel Baird Spencer                             $100K survey only                                                    No Match                                                 Med‐Low Public Score                                             Med‐High Staff Score                                              FY 23‐27 PLAN YEAR:   FY 2027Floating Feather Ped/Bike StudyACHD will be completing design between Linder and Palmer‐ potential to expand study area through a cooperative agreement ‐$                         100.0$                    100.0$                     ‐$                          ‐$                          ‐$                          ‐$                          ‐$                           $                           ‐   100.0$                    100%Survey only FY 2525ED CP‐6Department: Economic Development                Staff:  Robin Collins                                 $30K  Study Only                                                     No Match                                                 Med‐Low Public Score                                             High Staff Score                                                        FY 23‐27 PLAN YEAR:   FY 2025Excess ROW ACHD has expressed interest in participating in this study, their participation will not be available until 2025 ‐$                         30.0$                       30.0$                        ‐$                          ‐$                          ‐$                          ‐$                          ‐$                           TBD  Possible ACHD  30.0$                       100%Study only FY 25No RankGEN CP‐2ARPA General Funding                           Unallocated Funding                 TBDTBD                                                                                              19‐0486‐01‐00TBDTBD TBD Decreasing fund of American Recovery Act Allocations No RankGEN CP‐1General Projects TBDTBD                                                                                              19‐0465‐05‐00100.0$                     ‐$                          ‐$                          ‐$                          ‐$                          ‐$                          ‐$                          ‐$                          ‐$                          ‐$                         100.0$                    100%1,332.3$                 2,012.3$                 3,244.6$                  ‐$                          ‐$                         3,645.0$                  ‐$                         116.7$                    300.0$                    FY 24 Carry Forward FY 25 NEW GF Allocation FY 25 Capital Projects Balance ARPA General ARPA FiberParks Impact FeesPathways Impact FeesPolice Impact Fees Outside Funding/Match 3,244.6$                 TBD3,645.0$                 300.0$                    7,189.6$                 TOTAL IMPACT FEES LEVERAGED: TOTAL OUTSIDE FUNDING LEVERAGED: FUND TOTAL WITH ALL FUNDING SOURCES:*FY 25 Draft Capital Plan is over programmed by $12.3KTOTAL CITY GENERAL FUND CAPITAL PROJECTS:ARPA FUNDING: RankCP# Details Project Name Changes/UpdatesFY 25 Carry Forward FY 26 GF Allocation TOTAL FY 26 Project Balance ARPA Funding General ARPA Funding Fiber Parks Pathways PoliceMatch/Funding Source Description Total Project Balance % Funded Status 3PW CP‐2Department: Public Works & Water Dept.          Staff:  Eric Ziegenfuss  & Ken Acuff                         $2M Requested                                                         $600K  from Capital Plan                                          $1M  from Water Dept.                                            Impact Fee Eligible up to $400K       Med‐Low Public Score                                               High Staff Score                                                          REQUESTED CONSTRUCTION:  FY 2025                 FY 23‐27 PLAN YEAR:  2025    City Owned ShopRequest to expend $30K in renovation to the Shop Space provided in Spring Valley in FY 22.  This can be captured in the Capital plan or just in the department budget as a off set of the current rental fees.                                                                               19‐0469‐09‐00 $                        450 100$                        550.0$                     ‐$                          ‐$                         400$                        N/A N/A 300$                         Water Department       50/50 Match up to $1M 1,250$                    63% Need to development a detailed project scope and review timeline            Saving for construction  5TRL CP‐19Department: LRP&P  & Planning                            Staff:  Nichoel Baird Spencer & Steve Noyes        Construction: TBD                                             Cost TBD                                                                     ACHD Cost Share          Med‐High Public Score                                              Med‐High Staff Score                                                REQUESTED COMPLETION: FY 2024                       FY 23‐27 PLAN YEAR: FY 2025Linder Road Underpass @ N. ChannelEngineering/deign completed in FY 24, Transition to saving for construction cost share                                            19‐0465‐08‐00 $                        200 200$                        400.0$                     ‐$                          ‐$                          ‐$                          ‐$                          ‐$                         400$                        TBDSavings for construction Cost and timeline to be determined 8P&R CP‐2Department:  LRP&P                                                 Staff:  Eric Ziegenfuss                                  $5.7M  Design & Construction                                Impact Fee Eligible up to $4.9M                              Med‐Low Public Score                                               Med‐High Staff Score                                    REQUESTED CONSTRUCTION:FY 2022‐26              FY 23‐27 PLAN YEAR: 2022‐23Regional Sports Park City has expended $2.31M of impact fees to date: $49K in preliminary design, $262K in engineer design, and $1.975M in property acquisition, $25K in TIS.  FY 23 will be phase 1 with construction of 4 baseball fields and access.  Costs will adjust per final engineering.                                                                            08‐0438‐37‐00500.0$                    500.0$                    1,000.0$                  ‐$                          ‐$                         2,589.0$                  ‐$                          ‐$                          ‐$                          ‐$                         3,589$                    100%Construct         Phase 1 FY 23      City has expended $2.31M of impact fees to date: $49K in preliminary design, $262K in engineer design, and $2M in property acquisition 10P&R CP‐10Department: LRP&P, Public Works & Planning  Staff:  Nichoel Baird Spencer, Eric Ziegenfuss, & Mike Williams                                  $4.72 Million Requested Impact Fee Eligible up to $1.4MMed‐High Public Priority                                           No Staff score FY 23‐27 PLAN YEAR: FY 2024/TBDTerra View Park Merged with West Side Park with Terra View, update based on CC approval .  Phase 1 to be completed in FY 23 paid for with $1.4 M of impact fees.  Phase 2 to be completed with construction of the 275th home with impact fee reimbursement for the development only.                                      08‐0438‐36‐00‐$                          ‐$                          ‐$                          ‐$                          ‐$                         656$                         ‐$                          ‐$                           City to reimburse up to $656K from impacts fee collected from development balance is the developer contribution   Developer Funded 100% Phase 2 to TBD     Phase 2 to be constructed by developer  14POL CP‐1Department: Police                                                  Staff:  Chief Wilkie & Eric Ziegenfuss                      $615,000 Requested $350,000 from Impact Fees Partnership with Eagle Fire                                      Med‐High Public Score                                Requested Year: FY 2025FY 23‐27 PLAN YEAR: FY 2025Police Substation Location needs to be determine‐ Terra View potential location  27‐0438‐01‐00‐$                          ‐$                          ‐$                          ‐$                          ‐$                         N/A N/A 154.9$                     ‐$                         154.9$                    25%Saving for construction 16ED CP‐3Department: Economic Development                  Staff:  TBD                            $1.147M RequestedNo Match Med‐Low Public Score                                               High Staff Score                                             Requested Year: FY 2024                                          FY 23‐27 PLAN YEAR: FY 20261st Street Festival StreetProject delayed due to EURA match for the final survey work tocomplete design764.6$                    382.3$                    1,146.9$                  ‐$                          ‐$                          ‐$                          ‐$                          ‐$                           TBD  Potential EURA Match  1,146.9$                 100% Construction FY 2621ED CP‐5Department: Economic Development                  Staff:  TBD                                  $600K Requested                                                      No Match              Med‐Low Public Score                                               Med‐High Staff Score                                              Requested Year: 2027                                               FY 23‐27 PLAN YEAR: FY 2027Idaho Street Streetscape Improvements200.0$                    200.0$                    400.0$                     ‐$                          ‐$                          ‐$                          ‐$                          ‐$                           TBD  Potential EURA Match  400.0$                    67%Savings in FY 25, 26 & 27 Construction FY 27FY 26 Capital Preliminary Project List City General Fund Impact Fee Funds Outside Funding Project Status RankCP# Details Project Name Changes/UpdatesFY 25 Carry Forward FY 26 GF Allocation TOTAL FY 26 Project Balance ARPA Funding General ARPA Funding Fiber Parks Pathways PoliceMatch/Funding Source Description Total Project Balance % Funded Status 22T&P  CP‐12Department: LRP&P                                                  Staff:  Nichoel Baird Spencer                                  $1.2M RequestedACHD Cost Share Med‐Low Public Score                                               High Staff Score                                       RequestedYear: 2022                                                                   DESIGN: FY2022                                                         FY 23‐27 PLAN YEAR: FY 2026Linder Road (SH-44 to FF)Design completed in FY23, Construction cost across FY 24 & FY 25                                                                                                             19‐0466‐10‐00800.0$                    400.0$                    1,200.0$                  ‐$                          ‐$                         N/A N/A N/A‐$                         1,200,000.0$         100%Study Completion in FY 23            Construction in FY 26‐ need to save for project construction. 23P&R CP‐7Department: LRP&P & Public Works                    Staff:  Nichoel Baird Spencer & Eric Ziegenfuss    $500K  Requested                                                     Private Partnership up to 50%                                 Impact Fee Eligible up to $1.4M                              Med‐Low Public Score                                               Med‐High Staff Score                                                Preliminary Design Completed in FY21                  FY 23‐27 PLAN YEAR: FY 2027Charlie Wood Park Preliminary concept study completed in FY 21.  Eng./Design In FY 25 then save for construction 200.0$                    200.0$                    400.0$                     ‐$                          ‐$                          ‐$                          ‐$                          ‐$                           $                           ‐   400.0$                    80%Eng. FY 25      Savings FY 26,2727ED CP‐7 Department: Economic Development                  Staff:  TBD                            $50K Annually Requested                                       URA Funding $75K  in FY 23          Med‐Low Public Score                                               High Staff Score                                                          FY 23‐27 PLAN YEAR: $50K/year  starting in FY4 26Downtown Façade ImprovementsEURA has funded $75K to start this program in FY 23 50.0$                        ‐$                         50.0$                        ‐$                          ‐$                          ‐$                          ‐$                          ‐$                           TBD  Potential EURA Match  50.0$                       100% Annual Program No RankGEN CP‐2ARPA General Funding                           Unallocated Funding                 TBDTBD                                                                                              19‐0486‐01‐00TBDTBD TBD Decreasing fund of American Recovery Act Allocations‐ LAST YEAR   No RankGEN CP‐1General Projects TBDTBD                                                                                              19‐0465‐05‐00100.0$                     ‐$                          ‐$                          ‐$                          ‐$                          ‐$                          ‐$                          ‐$                          ‐$                          ‐$                         100.0$                    100% TBD 3,264.6$                 1,982.3$                 5,146.9$                  ‐$                          ‐$                         3,645.0$                  ‐$                         154.9$                    300.0$                    FY 25 Carry Forward FY 26 NEW GF Allocation FY 26 Capital Projects Balance ARPA General ARPA FiberParks Impact FeesPathways Impact FeesPolice Impact Fees Outside Funding/Match 5,146.9$                 TBD3,645.0$                 300.0$                    7,189.6$                 *FY 26 Draft Capital Plan is over programmed by $57.2KFUND TOTAL WITH ALL FUNDING SOURCES:TOTAL IMPACT FEES LEVERAGED: TOTAL OUTSIDE FUNDING LEVERAGED: TOTAL CITY GENERAL FUND CAPITAL PROJECTS:ARPA FUNDING: RankCP# Details Project Name Changes/UpdatesFY 26 Carry Forward FY 27 GF Allocation TOTAL FY 27 Project Balance ARPA Funding General ARPA Funding Fiber Parks Pathways PoliceMatch/Funding Source Description Total Project Balance % Funded Status 3PW CP‐2Department: Public Works & Water Dept.          Staff:  Eric Ziegenfuss                                  $2M Requested                                                         $600K  from Capital Plan                                          $1M  from Water Dept.                                            Impact Fee Eligible up to $400K       Med‐Low Public Score                                               High Staff Score                                                          REQUESTED CONSTRUCTION:  FY 2025                 FY 23‐27 PLAN YEAR:  2025    City Owned ShopRequest to expend $30K in renovation to the Shop Space provided in Spring Valley in FY 22.  This can be captured in the Capital plan or just in the department budget as a off set of the current rental fees.                                                                               19‐0469‐09‐00 $                        550 100$                        650.0$                     ‐$                          ‐$                         400$                        N/A N/A 300$                         Water Department       50/50 Match up to $1M 1,350$                    68% Need to development a detailed project scope and review timeline            Saving for construction  5TRL CP‐19Department: LRP&P  & Planning                            Staff:  Nichoel Baird Spencer & Steve Noyes        Construction: TBD                                             Cost TBD                                                                     ACHD Cost Share          Med‐High Public Score                                              Med‐High Staff Score                                                REQUESTED COMPLETION: FY 2024                       FY 23‐27 PLAN YEAR: FY 2025Linder Road Underpass @ N. ChannelEngineering/deign completed in FY 24, Transition to saving for construction cost share                                            19‐0465‐08‐00 $                        400 200$                        600.0$                     ‐$                          ‐$                          ‐$                          ‐$                          ‐$                         600$                        TBDSavings for construction Cost and timeline to be determined 8P&R CP‐2Department:  LRP&P                                                 Staff:  Eric Ziegenfuss                                  $5.7M  Design & Construction                                Impact Fee Eligible up to $4.9M                              Med‐Low Public Score                                               Med‐High Staff Score                                    REQUESTED CONSTRUCTION:FY 2022‐26              FY 23‐27 PLAN YEAR:  2022‐23Regional Sports Park City has expended $2.31M of impact fees to date: $49K in preliminary design, $262K in engineer design, and $1.975M in property acquisition, $25K in TIS.  FY 23 will be phase 1 with construction of 4 baseball fields and access.  Costs will adjust per final engineering.                                                                            08‐0438‐37‐001,000.0$                  ‐$                         1,000.0$                  ‐$                          ‐$                         2,589.0$                  ‐$                          ‐$                          ‐$                          ‐$                         3,589$                    100% Construct Phase 1 FY 23         City has expended $2.31M of impact fees to date: $49K in preliminary design, $262K in engineer design, and $2M in property acquisition  10P&R CP‐10Department: LRP&P, Public Works & Planning  Staff:  Nichoel Baird Spencer, Eric Ziegenfuss, & Mike Williams                                  $4.72 Million Requested Impact Fee Eligible up to $1.4MMed‐High Public Priority                                           No Staff score FY 23‐27 PLAN YEAR:  FY 2024/TBDTerra View Park Merged with West Side Park with Terra View, update based on CC approval .  Phase 1 to be completed in FY 23 paid for with $1.4 M of impact fees.  Phase 2 to be completed with construction of the 275th home with impact fee reimbursement for the development only.                                      08‐0438‐36‐00‐$                          ‐$                          ‐$                          ‐$                          ‐$                         656$                         ‐$                          ‐$                           City to reimburse up to $656K from impacts fee collected from development balance is the developer contribution  Developer Funded 100% Phase 2 to TBD     Phase 2 to be constructed by developer  14POL CP‐1Department: Police                                                  Staff:  Chief Wilkie & Eric Ziegenfuss                      $615,000 Requested $350,000 from Impact Fees Partnership with Eagle Fire                                      Med‐High Public Score                                Requested Year: FY 2025FY 23‐27 PLAN YEAR:  FY 2025Police Substation Location needs to be determine‐ Terra View potential location  27‐0438‐01‐00‐$                          ‐$                          ‐$                          ‐$                          ‐$                         N/A N/A 193.8$                     ‐$                         193.8$                    32%Saving for construction 27ED CP‐7 Department: Economic Development                  Staff:  TBD                            $50K Annually Requested                                       URA Funding $75K  in FY 23          Med‐Low Public Score                                               High Staff Score                                                          FY 23‐27 PLAN YEAR: $50K/year  starting in FY4 26Downtown Façade ImprovementsEURA has funded $75K to start this program in FY 23 50.0$                        ‐$                         50.0$                        ‐$                          ‐$                          ‐$                          ‐$                          ‐$                           TBD  Potential EURA Match  50.0$                       100% Annual Program 28P&R CP‐1Department: Recreation                                          Staff: Brian Allen                          $50K Study only                                                         No Match                          Med‐Low Public Score                                               Med‐Low Staff Score                                                 COMPLETION: FY 2027                                             FY 23‐27 PLAN YEAR:  FY 2025‐26 Study onlyCommunity/ Performing Arts Study19‐0456‐08‐00‐$                         100.0$                    100.0$                     ‐$                          ‐$                          ‐$                          ‐$                          ‐$                           $                           ‐     $                           ‐   100.0$                    100% Study Only FY 27 FY 27 Capital Preliminary Project List City General Fund Impact Fee Funds Outside Funding Project Status RankCP# Details Project Name Changes/UpdatesFY 26 Carry Forward FY 27 GF Allocation TOTAL FY 27 Project Balance ARPA Funding General ARPA Funding Fiber Parks Pathways PoliceMatch/Funding Source Description Total Project Balance % Funded Status No RankGEN CP‐1General Capital Projects TBDTBD                                                                                              19‐0465‐05‐00100.0$                     ‐$                         100.0$                     ‐$                          ‐$                          ‐$                          ‐$                          ‐$                          ‐$                          ‐$                         100.0$                    0% TBD2,100.0$                 400.0$                    2,500.0$                  ‐$                          ‐$                         3,645.0$                  ‐$                         193.8$                    300.0$                    FY 26 Carry Forward FY 27 NEW GF Allocation FY 27 Capital Projects Balance ARPA General ARPA FiberParks Impact FeesPathways Impact FeesPolice Impact Fees Outside Funding/Match 2,500.0$                 ‐$                         3,838.8$                 300.0$                    6,638.8$                 TOTAL IMPACT FEES LEVERAGED: TOTAL OUTSIDE FUNDING LEVERAGED: FUND TOTAL WITH ALL FUNDING SOURCES:TOTAL CITY GENERAL FUND CAPITAL PROJECTS:ARPA FUNDING: FY 22  Rank Project  No.Details Project Name Changes/Updates FY 23 FY 24 FY 25 FY 26 FY 27 Un‐ funded 1 T&P CP‐1Department:  LRP&P                                              Staff:  Nichoel Baird Spencer                                 $1.013M Requested $1.013 Match from Eagle URA                              ACHD Cost Share  Med‐High Public Score                                            High Staff Score  REQUESTED CONSTRUCTION:  FY 2023               FY 23‐27 PLAN YEAR:  2024      State & Eagle  Intersection Project deferred to FY 2024 by ACHD.  XXX 3 PW CP‐2Department: Public Works & Water Dept.        Staff:  Eric Ziegenfuss                                   $2M Requested                                                       $600K  from Capital Plan                                        $1M  from Water Dept.                                          Impact Fee Eligible up to $400K        Med‐Low Public Score                                            High Staff Score                                                        REQUESTED CONSTRUCTION:  FY 2025               FY 23‐27 PLAN YEAR:   2025‐2027     City Owned Shop Need to acquire property or determine a location  X XXXX 4 T&P CP‐3Department:  LRP&P                                              Staff:  Nichoel Baird Spencer                                 $3.2M Requested up to $2M in Match From Feds                             Med‐High Public Score                                            High Staff Score REQUESTED CONSTRUCTION:FY 2023                 FY 23‐27 PLAN YEAR   2022‐23 Eagle Road Ped/Bike  Bridge  Advanced by City Council to FY 22‐23. Project completion  scheduled for Spring 2023.  City has $900k in General Fund  and $800K in impact fees that can be redistributed once  project is completed x 5 TRL CP‐19Department: LRP&P  & Planning                         Staff:  Nichoel Baird Spencer & Steve Noyes      $15K  Design Only                                                   ACHD Cost Share           Med‐High Public Score                                            Med‐High Staff Score                                              REQUESTED COMPLETION: FY 2024                     FY 23‐27 PLAN YEAR: FY 2025 Linder Road  Underpass @ N.  Channel Advanced to correspond with ACHD's design year of FY 2025 XXXX 7 T&P CP‐6Department: LRP&P                                               Staff:  Nichoel Baird Spencer                                 $600K Requested No Match Med‐Low Public Score                                            High Staff Score                                                        REQUESTED CONSTRUCTION:FY 2024                 FY 23‐27 PLAN YEAR:  FY 2026                              DESIGN:FY 22 included in State & Eagle  Olde Park Extension Advanced to correspond with ACHD Plans for Eagle & State XX 8 P&R CP‐2Department:  LRP&P                                              Staff:  Eric Ziegenfuss                                   $5.7M  Design & Construction                             Impact Fee Eligible up to $4.9M                           Med‐Low Public Score                                            Med‐High Staff Score                                     REQUESTED CONSTRUCTION:FY 2022‐26           FY 23‐27 PLAN YEAR:  2022‐23 Regional Sports Park  Preliminary Engineering being completed in FY 22 with Park  Impact fees to prepare for purchase and improvement in FY  23.   XXXXX 9 P&R CP‐8Department: LRP&P & Public Works                  Staff:  Nichoel Baird Spencer & Eric  Ziegenfuss                                   $70,000 Preliminary Design                                   Construction:$1.2M                                                Outside Foundation Match: $1.2 M                     No Public Score                                                        Med‐Low Staff Score   CONSTRUCITON YEAR: 2023                                  FY 23‐27 PLAN YEAR: Unplanned  FY 2022        Foothills Shooting  Range  Advanced to work with potential funding partners and  dedication of land work funded through Heritage Park project XX 10 T&P CP‐2Department: LRP&P                                               Staff:  Nichoel Baird Spencer                                 $858K Requested $113K Match from Eagle URA                               ACHD Cost Share  Med‐Low Public Score                                            High Staff Score                                                        REQUESTED CONSTRUCTION: FY 2023                FY 23‐27 PLAN YEAR:  2024   Aikens Street  Extension Signals from ACHD this will not be in budget XX 10 P&R CP‐10Department: LRP&P, Public Works &  Planning                                                                    Staff:  Nichoel Baird Spencer, Eric Ziegenfuss,  & Mike Williams                                   $5 Million Requested  Impact Fee Eligible up to $3.25M Med‐High Public Priority                                        No Staff score    FY 23‐27 PLAN YEAR:  FY 2024 Terra View Park  Merge with West Side Park with Terra View, update based on  CC approval .  Phase 1 to be completed in FY 23 paid for with  $1.4 M of impact fees.  Phase 2 to be completed with  construction of the 275th home with impact fee  reimbursement for the development only.  XXXXX No RankTRL CP‐1Department: Planning                                            Staff:  Steve Noyes                                                $324K  Requested                                                   Delayed Project                                                        Requested Year: FY 2023                                        FY 23‐27 PLAN YEAR: : 2023 to hold Phase 2  EISP Trail  Design  Project cost have increased significantly need additional  funding. Project was active before the City began the Capital  Plan process, has been carried forward since FY2020.   X FY 23-27 Capital Projects Priority Status  PROJECT  COMPLETE  PROJECT COMPLETE PROJECT COMPLETE PROJECT COMPLETE PROJECT COMPLETE  PROJECT ON‐HOLD AFTER  DESIGN  FY 22  Rank Project  No.Details Project Name Changes/Updates FY 23 FY 24 FY 25 FY 26 FY 27 Un‐ funded No RankTRL CP‐2Department: Planning                                            Staff:  Steve Noyes                                                $60K Requested                                                      Delayed Project                                                        Requested Year: FY  2024                                       FY 23‐27 PLAN YEAR: : Removed                         Phase 3  EISP Trail  Design  Project is having issues acquiring the necessary easements to  move forward. City wait for development to provide access &  trail easement X 12 TRL CP‐3Department: Planning                                            Staff:  Steve Noyes                                  $1.86M Requested                                                  Impact Fee Eligible up to $38.6K                           Med‐High Public Score                                            High Staff Score REQUESTED CONSTRUCTION: FY  2025               FY 23‐27 PLAN YEAR:   Removed Eagle Island State Park  Trail Project is having issues acquiring the necessary easements to  move forward. City wait for development to provide access &  trail easement X 13 P&R New Department:  LRP&P                                              Staff:  Nichoel Baird Spencer                                $200K Requested No Match  Med‐High Public Score                                            Med‐High Staff Score                                              COMPLETION: FY2022‐2024                                  FY 23‐27 PLAN YEAR: 2023‐24 Parks, Trails  & Open  Space  Master Plan  Project was unable to be completed in FY 22 need better  inventory information X 14 POL CP‐1Department: Police                                                 Staff:  Chief Wilkie & Eric Ziegenfuss                    $615,000 Requested  $350,000 from Impact Fees  Partnership with Eagle Fire                                    Med‐High Public Score                                 Requested Year: FY 2025 FY 23‐27 PLAN YEAR:  FY 2023‐27 Police Substation Location needs to be determine‐ Terra View potential  location XXXXX 15 PW CP‐12Department: Public Works                                    Staff:  Eric Ziegenfuss                                   $150K Requested                                                    No Match                                   Med‐Low Public Score                                            Med‐High Staff Score                                 Requested Year: FY 2023                                        FY 22‐26 PLAN YEAR: Removed Senior Center  Remodel On‐hold until a fiscal partner is found X 16 ED CP‐3Department: Economic Development                Staff:  Robin Collins                                 $1.147M Requested No Match  Med‐Low Public Score                                            High Staff Score                                              Requested Year: FY 2024                                        FY 23‐27 PLAN YEAR:  FY 2024‐27 1st Street Festival  Street Project delayed due to EURA match for the final survey work  to complete design XXX 17 PW CP‐13Department: Public Works                                    Staff:  Eric Ziegenfuss                                   $100K  Requested                                                   No Match                           Low Public Score                                                      Med‐Low Staff Score                                Requested Year: FY 2024                                        FY 23‐27 PLAN YEAR: FY 2024 City Hall Safety  Measures Stand alone project from CH expansion X 18 PW CP‐9Department: LRP&P & Public Works                  Staff:  Nichoel Baird Spencer & Eric  Ziegenfuss                                   $477K  Requested                                                   Impact Fee Eligible up to $23.5K             Med‐Low Public Score                                            Med‐High Staff Score                                              Engineering Design: FY2022                               CONSTRUCTION YEAR: 2024                                  FY 23‐27 PLAN YEAR:  2023‐24 Mace Park HECO to complete engineering in FY22.  Deferred  construction to keep project separate from the Ped/Bike  Bridge  XX 20 PW CP‐11Department: Public Works  & LRP&P                 Staff:  Eric Ziegenfuss & Nichoel Baird  Spencer                                   $2.2M  Requested                                                   Private Partnership up to 50%                               Impact Fee Eligible up to $390K                            Med‐Low Public Score                                            Med‐High Staff Score                                              FY 22‐26 PLAN YEAR:  FY 2023 Pamela Baker Park  Request to combine FY 22 (Phase 2) with FY 23 (Phase 3)   increasing project cost to $1.28M. City Cost $640K ($413K in  impact fees & $227K in GF).  Will use all available Impact fees  for project and defer Phase 4 to at least FY 25 X 21 ED CP‐5Department: Economic Development                Staff:  TBD                                   $600K Requested                                                    No Match               Med‐Low Public Score                                            Med‐High Staff Score                                              Requested Year: 2027                                             FY 23‐27 PLAN YEAR:  FY 2025‐26 Idaho Street  Streetscape  Improvements XX PROJECT  COMPLETE  REMOVED FROM PROGRAM REMOVED FROM PROGRAM PROJECT COMPLETE  REMOVED FROM PROGRAM  PARTNER NEEDED   PROJECT  COMPLETE  PROJECT COMPLETE PROJECT COMPLETE  NEEDS REPROGRAMMED FOR  FUTURE YEARS  FY 22  Rank Project  No.Details Project Name Changes/Updates FY 23 FY 24 FY 25 FY 26 FY 27 Un‐ funded 22 T&P  CP‐12Department: LRP&P                                               Staff:  Nichoel Baird Spencer                                 $1.2M Requested ACHD Cost Share  Med‐Low Public Score                                            High Staff Score                                        Requested Year: 2022                                             DESIGN: FY2022                                                       FY 23‐27 PLAN YEAR:  FY 2023‐26 Linder Road             (SH‐ 44 to FF) Preliminary Design in underway for medians and roundabout  in FY 22 for $28K.   Once completed need to save for City's  augmentations to the design.  XXXX 23 P&R CP‐7Department: LRP&P & Public Works                  Staff:  Nichoel Baird Spencer & Eric  Ziegenfuss                                   $500K  Requested                                                   Private Partnership up to 50%                               Impact Fee Eligible up to $1.4M                           Med‐Low Public Score                                            Med‐High Staff Score                                              Preliminary Design Completed in FY21                FY 23‐27 PLAN YEAR: FY 2025‐26 Charlie Wood Park Preliminary concept study completed in FY 21.  Project is  waiting to be prioritized for engineering and design work XX 24 T&P CP‐8Department: LRP&P                                               Staff:  Nichoel Baird Spencer                              $100K survey only                                                   No Match                                                  Med‐Low Public Score                                            Med‐High Staff Score                                              FY 23‐27 PLAN YEAR: FY 2025 Floating Feather  Ped/Bike Study Will work with ACHD to fill gaps in the IFYWP studies X 25 ED CP‐6Department: Economic Development                Staff:  TBD                                 $30K  Study Only                                                     No Match                                                  Med‐Low Public Score                                            High Staff Score                                                        FY 23‐27 PLAN YEAR: FY 2025 Excess ROW ACHD has expressed interest in participating in this study,  their participation will not be available until 2025 X TRL CP‐14Department: Planning                                            Staff: Steve Noyes                                   $100K Preliminary Design Only                            Impact Fee Eligible                Med‐Low Public Score                                            High Staff Score                                        Requested Year: FY  2025                                       FY 23‐27 PLAN YEAR:  Unfunded S. Channel Bridge Need to pursue project development grants from COMPASS  similar to the Eagle Road Ped/Bike Bridge X TRL CP‐15Department: Planning                                            Staff: Steve Noyes                                $100K  Preliminary Design Only                           Impact Fee Eligible up to $714K                            Med‐Low Public Score                                            Med‐High Staff Score                                          Requested Year: FY 2025                                        FY 23‐27 PLAN YEAR:  Unfunded S. Channel Underpass  Boise River  Need to pursue project development grants from COMPASS  similar to the Eagle Road Ped/Bike Bridge X 27 ED CP‐7 Department: Economic Development                Staff:  Robin Collins                               $50K Annually Requested                                     URA Funding $75K  in FY 23           Med‐Low Public Score                                            High Staff Score                                                        FY 23‐27 PLAN YEAR:  $50K/year  starting in  FY 26 Downtown Façade  Improvements EURA has funded $75K to start this program in FY 23 XX 28 P&R CP‐1Department: Recreation                                        Staff: Brian Allen                           $50K Study only                                                       No Match                           Med‐Low Public Score                                            Med‐Low Staff Score                                               COMPLETION: FY 2026                                           FY 23‐27 PLAN YEAR:  FY 2027 Study only Community/  Performing Arts Study X 29 P&Z CP‐4Department: LRP&P                                               Staff: Nichoel Baird Spencer                                  $50K  Study 2022                                                     Construction:  $7‐11M                                            No Match           Med‐Low Public Score                                            High Staff Score                                                        Construction: FY 2030                                            FY 23‐27 PLAN YEAR:  Unfunded                         Grade Separated  Crossing SH‐44 September 2022, City Council selected the no build  alternative and directed staff to scope anew study at  Edgewood Lane and SH‐44 30 TRL CP‐4Department: LRP&P , Public Works,  Planning                                                     Staff:   Nichoel Baird Spencer, Eric Ziegenfuss, Mike  Williams                                                           $550K Requested                                                    FCD#10, Land Owner                                              Med‐Low Public Score                                            High Staff Score                                                        Trail repair post emergency bank repair             Engineering: FY 2022                                         Construction: FY 2023                                           FY 23‐27 PLAN YEAR: 2023  N. Channel Center  Trail Emergency bank repairs‐ cooperation with land owner and  FCD#10.  City expended $ 10K from Capital Maintenance &  CC approved on 2/15/22 to expend $50K from SH‐44 trial to  cover bank stabilization engineering and initial construction.   This work will not be completed until FY 23.   This project is  the design, engineering, and reconstruction of the trail.  That  needs to be completed at the same time as bank  stabilization.   SEEK COMPASS PD GRANT  SEEK COMPASS PD GRANT  REMOVED FROM PROGRAM‐ RESCOPE MOVED TO CAPITAL MAINTENANCE  PROJECT  COMPLETE   PROJECT  COMPLETE   STUDY COMPLETE   STUDY COMPLETE Combined 26& 34 FY 22  Rank Project  No.Details Project Name Changes/Updates FY 23 FY 24 FY 25 FY 26 FY 27 Un‐ funded 31 ED CP‐1Department: Economic Development                Staff:  TBD                                    $750K  Requested                                                   No Match                                                  Med‐Low Public Score                                            Med‐High Staff Score                                              FY 23‐27 PLAN YEAR:  Unfunded Downtown Parking May be adjusted downward  to address land lease versus  property acquisition X 31 T&P CP‐10Department: LRP&P                                               Staff:  Nichoel Baird Spencer                              $100K Study Only                                                    ITD/COMPASS Partnership                        Med‐Low Public Score                                            Med‐Low Staff Score                                    Requesting Year: 2023, 2024, 2025                      FY 23‐27 PLAN YEAR:  2023 Three Cities River  Crossing Project was originally unprogrammed as it needed support of  ITD.  ITD agreed to endorse and the City needs to work to  establish a plan for review of merits before FY 2027.Staff  request $50K in FY 2023 to begin scoping and preliminary  origin & designation studies.                                                              Funded under GEN CP‐1: General Projects for FY2023 X 33 TRL CP‐6Department:  Public Works                                   Staff:  Eric Ziegenfuss                                   $120K                                                                         Material Donations                                                 Med‐Low Public Score                                            Med‐High Staff Score                                              FY 23‐27 PLAN YEAR: UNFUNDED All Weather Trail Ada  Sports Park Project underway with material donations only.  If those  stopped would need $ to complete X 35 PW CP‐7Department:  Public Works                                   Staff:  Eric Ziegenfuss                                   $10K (Study Only) Requested                               $390k Construction                                                 No Match                           Med‐Low Public Score                                            Med‐Low Staff Score                                               FY 23‐27 PLAN YEAR:  Unfunded  Entry Sign Plan X 36 TRL CP‐16Department: Planning                                            Staff:  Steve Noyes                                   $100K  (Design Only)Requested                           Impact fee eligible up to $1.02M                         Med‐Low Public Score                                            Med‐Low Staff Score                                          Requesting Year: 2026                                            COMPLETION: Unplanned                                     FY 23‐27 PLAN YEAR:  Unfunded N. Channel Dry Creek  Bridge X 37 TRL CP‐7Department: Public Works                                    Staff:  Eric Ziegenfuss                                   $72K  Requested                                                     Private Partnership up to 50%                               Med‐Low Public Score                                            Med‐High Staff Score                                             Requesting Year: 2026                                            FY 23‐27 PLAN YEAR:  Unfunded        Bike Skills Park ‐ Ada  Sports Complex X 37 TRL CP‐8Department: Planning                                            Staff:  Steve Noyes                                  $20K Requested                                                      No Match                                                  Med‐Low Public Score                                            High Staff Score                                            Requesting Year: 2024                                            FY 23‐27 PLAN YEAR:  Unfunded        Trails Wayfinding &  Branding X 39 T&P CP‐9Department: LRP&P                                               Staff: Nichoel Baird Spencer                              $100K (Study Only) Requested                            No Match                           Med‐Low Public Score                                            Med‐Low Staff Score                                               FY 23‐27 PLAN YEAR:  Unfunded        Beacon Light Ped/Bike  Gap Study Will work with ACHD to fill gaps in the IFYWP studies X 40 TRL CP‐17Department: Planning                                            Staff:  Steve Noyes   $30K (Design Only) Requested                             No Match                           Med‐Low Public Score                                            Med‐Low Staff Score                                            Requesting Year: 2025                                            FY 23‐27 PLAN YEAR:  Unfunded        Dry Creek & Dry Creek  Canal X 41 LIB CP‐2Department: Library                                               Staff:  Steve Bumgarner                                   $250K                                                                         No Match                           Low Public Score                                                      Med‐Low Staff Score                                               FY 23‐27 PLAN YEAR:  Unfunded        Bookmobile Move to Library Budget as a Capital Plan Goal X 42 TRL CP‐9Department: Planning & Public Works               Staff:  Steve Noyes & Eric Ziegenfuss                   $150K Requested                                                    No Match                                 Med‐Low Public Score                                            Med‐High Staff Score                                              FY 23‐27 PLAN YEAR:  Unfunded        Trailhead Amenities ‐  Ada Sports Complex Ability to place tables at location for low cost temporary fix X PRIVATE PARTNERSHIP  REMOVED FROM PROGRAM  GOES TO LIBRARY BUDGET  FY 22  Rank Project  No.Details Project Name Changes/Updates FY 23 FY 24 FY 25 FY 26 FY 27 Un‐ funded 43 LIB CP‐3Department:  Library & Public Works                 Staff:  Steve Bumgarner& Eric Ziegenfuss           $30K (Study Only) Requested                               No Match                           Med‐Low Public Score                                            Low Staff Score                            CONSTRUCTION: FY 2022/2023                            FY 23‐27 PLAN YEAR:  Unfunded        Library Book pick up Library is reviewing funds to see if they can fund  improvement in FY22 within their existing budget X 44 TRL CP‐20Department: Planning                                            Staff:  Steve Noyes                                  $100K (Study Only) Requested                            No Match                           Low Public Score                                                 Med‐Low Staff Score                                   Requested Year: FY 2025                                        FY 23‐27 PLAN YEAR:  Unfunded          Williamson River  Ranch Bridge X 45 T&P CP‐11Department: Public Works                                    Staff:  Eric Ziegenfuss                                   $250K  Requested                                                   No Match                           Med‐Low Public Score                                       Med‐Low Staff Score                                             Requested CONSTRUCTION: FY 2024                   FY 23‐27 PLAN YEAR:  Unfunded        Eagle Road Arch    Expansion  If the State and Eagle project impacts the arch the City will  need to change the project year or remove the arch X 46 P&R CP‐6Department: Recreation & Public Works           Staff:  Brian Allen & Eric Ziegenfuss                     $40K (Study Only) Requested No Match  Low Public Score                                                   Med‐Low Staff Score                         COMPLETION: FY 2026                                           FY 23‐27 PLAN YEAR:  Unfunded        Motocross Study X 46 TRL CP‐11Department: Public Works & Planning               Staff:  Eric Ziegenfuss & Steve Noyes                   $30K (Design Only) Requested                             $350K CONSTRUCTION                                           No Match                           Low Public Score                                                   Med‐Low Staff Score                                               Requested Year: FY 2027                                        FY 23‐27 PLAN YEAR:  Unfunded        The Shores  Sportsman's Access X 48 TRL CP‐12Department: Public Works, Planning, &  Recreation                                                                Staff:  Eric Ziegenfuss, Steve Noyes, & Brian  Allen                                      $30K (Study Only) Requested                               No Match                           Med‐Low Public Score                                            Med‐High Staff Score                                      Requested Year: 2025                                           FY 23‐27 PLAN YEAR:  Unfunded        Water Trail Study X 49 TRL CP‐13Trails                                                                       Staff:  Eric Ziegenfuss                                             $30K Study only                                                       No Match                           Low Public Score                                                      Med‐Low Staff Score                                               COMPLETION: FY 2024                                           Equestrian Trailhead  Study Staff requested project be removed X No RankPW CP‐14 Department:  Public Works                                   Staff:  Eric Ziegenfuss                                              $3M in FY 22                                                             $2M FY 23                                                                 ARPA Funded/Eligible                                             Council Added Project                                            FY 23‐27 PLAN YEAR:  2023                                   City Fiber Utility  Approx. $1.26M Remaining, with approx.. $350K in Fatbeam  contract in FY 22.  Mayor is requesting an additional $2M  from ARPA for FY 23.   FY 23‐ Street Sweeper $75K, Air  Compressor $40K.  Forklift, payment to PW for used vehicle  X No RankPW‐ CP‐15Department: Public Works                                    Staff:  Eric Ziegenfuss                                              $100K  Requested                                                   ARPA Eligible                                                           New Project                                                       Requested Year: FY 2023                                        FY 23‐27 PLAN YEAR:  Annual Program              Public Works  Equipment   Having issues hiring enough seasonal staff. Efficiency of staff,  less staff more mowing. XXXXX No RankPW‐ CP‐17Department: Public Works                                    Staff:  Eric Ziegenfuss                                              $100K Requested                                                    ARPA Eligible                                                           New Project                                                       Requested Year: FY 2023                                        FY 23‐27 PLAN YEAR:  2023                                   Public Works Vehicles   Due to growth the City has not be replacing vehicles.  The city  is purchasing new and repurposing old vehicles.  Due to  growth a fleet management program needs to be developed X No RankTRL CP‐21Department: Planning                                            Staff:  Steve Noyes                                                $30K  Requested                                                     New Project                                                       Requested Year: FY 2027                                        FY 23‐27 PLAN YEAR:  Unfunded                         Laguna Point Trail Project is lacking scope or project worksheet X REMOVED FROM PROGRAM  IN FY 24 WILL BE A SEPARATE  PROGRAM   NEED TO DEVELOP A FLEET  MANAGEMENT PROGRAM    REMOVED FROM PROGRAM  GOES TO LIBRARY BUDGET  FY 22  Rank Project  No.Details Project Name Changes/Updates FY 23 FY 24 FY 25 FY 26 FY 27 Un‐ funded No RankGEN CP‐1Department: LRP&P                                              Staff: Nichoel Baird Spencer                               $100K Requested                                                   FY 23‐27 PLAN YEAR:  2023‐27  General Capital  Projects Fund for emergency and discretionary projects, FY 2023  earmarked for Three Cities River Crossing XXXXX