Electrical - 223597 - 3579 W Bolton St - 10/04/2022 City of Eagle
Electrical Permit
Addition
660 E. Civic Lane, Eagle, ID 83616
Inspection Line: (208) 939-4462
Permit Number 223597 Issue Date 10/04/2022 Issue Receipt 29.000162
...................
ELECTRICIAN
M�R Electric LLC
575 N Joy Ave
Meridian, ID 83646
208-989-4243 Registration ELE-C-39648
PER MIT ADDRESS
L�r�rpetly
Owner: MITCHELL,JOHN
t)d i v i s i o n: Ashbury Sub No 04
)t 02 Block 12
'Address 3579 W Bolton St
RESIDENTIAL PERMIT FEES
Electrical-Existing Residential $155.00
Total Fee: $t55.00
Job Scope/Notes
Branch Circuits(9)
Inspection Plione:939-4462
Contractor's Printed Name
..........
Contractor's Signature
4
City Clerk/Authorized Personnel
CITY OF EAGLE — BUILDING DEPARTMENT Permit#(office use only)
I' : lv lit 660 E Civic L.n
Eagle, ID 83616
Phone: 208-489-8760
Email: i),LiiIIiiiiIliei)c,itY.,ciffig„LiL,Lii,LE,
Inspection Line: 208-939-4462 a3Sci4
ELECTRICAL PERMIT APPLICATION - COMMERCIAL& RESIDENTIAL
Electrical Contractor: Phone; 111111111Email: .
State Cont.Lic#: 111111WISMIMIIIIIIIIIIIIIIIKExp Date: I 'Fax:
Builder or Property Owner: 111lMIIIIIIIIIIIIIIIIIIIIIIIIIIIISite Subdivision:
Site Street Address: '->''''-; i 9 V:,/ R,„-,,t„'7,,t,-, Lot: ilMBlock: 'WM Project Sq Ft:
1 ,
Description of Work(required): I Permit Type:
'''':::l'. L (,;,,,:„.)1 iir .,,,;'',•A er-k'l, ---i- 7\'' 8 ','•,•) ,,,,,,, / 0 1
, New Residential 0 l Commercial
1/4--„,,, 0 Remodel I 01 Commercial Ti
,— ,—
Living Space-Space within a dweliing unit intended for human habitation which may reasonably be utilized for sleeping,eating,cooking,
1 bathing,washing, recreation,and sanitation purposes. An unfinished basement is considered part of the living space.
New Residential-Single Family Dwelling: New Residential 7 Multi-Family Dwelling(Contractors Only ;
O Up to 1,500 sq ft $130.00 0 Duplex Only $260„00
O 1,501 sq ft to 2,500 sq ft $195.00 0 Three or more multi-family units
O 2,501 sq ft to 3,500 sq ft $260.00 I #of buildings x$1.30 I$0.00 I
0 3,501 sq ft to 4,500 sq ft $325.00
f $
Over 4,500 sq ft 5325 plus$65 per additional 1000 sq ft #o units x 65 00 v $0.00
Base Fee $325.00 'II Modular'Manufactured or Mobile Homes:' ' ..
' #of Additional 1000 sq ft x$65 I$°:°° l $65 basic fee for each electrical connection+$10 for each add '
Temporary Construction Services Ord,. 1 circuit,
$65 basic fee,200 amp or Oess,one location $65,00 [Fv.,, V Livvvi Basic Fee $65.00
Existin:,Residential: #of Electrical Connections x$65
,.. 1
$65 basic fee plus$10 for each additional branch circuit up to the :`vv #of Additional Circuits x$10 Pia-T1 1$0,00
.....
maximum of the corresponding square footage of the residential
p u i I Orrig. , Temporary Amusement-Industry
...
f
Basic Fee $65 ,.00 ,':;,,:' $65 basic fee plus$10 for each ride,concession,or generator,
ILL, ,
#of Additional Branch Circuits a$10 vsov, f 1 Basic Fee, $65,00
0 1 Floor Heat Basic Fee $65.00 -
1 if of it.Vdes,Concessions,Generators x$10 $0,00 0$000
01....
if of Additional Branch Circuits x$10 [§.okp_....._j I sa.00 I Sins and Outline Li,-„htin::
„„„,„, • - '
idential Spa,s,Hot Tubs&HydraMassage Tubs: l[ j Signs-$65 for each sign 1
Li $65 basic fee pllus$65 grounding grid where applicable, I #of Signs x$65
Each additional trip will be charged the$65 basic fee. Outline Lighting-$65 per occupancy 5°:°° -
... _
LIVIv J Basic Fee I $65.00 __
Grounding Grid V $65.00 '$000 Residential Central S,stems Heatin:and or Cecilia:
Swimming Pools: 1 I $65 basic fee-When NOT part of a new $65.00
1 . vl 1,$195 Basic fee(this covers the 3 required $19500 residential permit,or HVAC permit,and no
inspections). I$0.00 additional wiring.
Other Installation-Commercial/Industrial-Solar Renewable Ener:4 , SO„00
..„
Work not specifically covered by any other fee schedule. Fee to be 1 Residential Punt.s.Domestic Water,Orri:ation Sewa,,e
based on the cost of labor, materials and equipment installed: 111 1 Up to 25 HP $65.00
,..........._____
0 Up to$10,000 multiply by 2%(.02)plus$60.00 00$0,00 0 1 0 26-200 HP $95.00
0• $10,001-$100,000 subtract$10,000 multiply by 1% ' I••••••••••0 Over 200 HP $130.00 $0.00
(.01)plus$260.00 '$0,00 ) Irrigation Machine felectricaliy driven):
0• Over$100,001 subtract$100,000 multiply by.5% nil $65 for center pivot plus$10 per tower or drive motor„
(,005)plus 51160,00 Pi0:61ii ........
if of Pivots x$65 0 I.!9:..,C.9
I 1 For all owner-supplied,factory assembled #of Towers or drive motors x$10 0 $0. :I:: '$0,00
equipment installed inspection will be based on
Re,iuested Inspections-Reinspection-Technical Service 1
.5%(.005)of total cost of equipment or hourly rate
i 0 $65 minimum plus$65 per hour or portion thereof in excess of
of$130 for 1 hour and$65 for each additional
one hour including travel time to and from job location, 1
hour. ***A copy of the bid is required.''**
[ iO , Minimum fee
„................ .
1 0 Total Cost of labor and Materials 1$,0,00 I 0$0,00 •••, fi of additional hours x$65 $0.00 1$0-00
PUt$ ectfon requests must be called into the inspection request line of 208-935-4462 before,Itn'ntnom to schedule an inspection for the next'day, r'lll other
L redtifeaF will Ire scheduler the nerrt business'clay. Permits will be issued when paid in full via Check,Cash or Credit Card. 1
if mailing payment,please remit payment to: 0 Method of Payment
City of Eagle Building Department- 1011 Credit C,,!nref„!*oyalle,ints are subject to a non-
o Pay Online(Link on Homepage)
Permitting,PO Box 1500,,Eagle, ID 83616 , ref, on ndabte Porto,/Admen Fee of,3%Mos$1 ..._.
Check/Cash
. 1
EMEIIIIIIIIIIIIIIIIIIIIMIIUIIIIIIIOOPIIINIIIIIIIIIINIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Date: 1-';' Z
, \ Total Oees Due: ,$0.00„„
CITY OF EAGLE
660 E. Civic Lane
PO BOX 1520
EAGLE ID 83616 (208) 939-6813
Receipt No: 29 . 000162 Oct 4 , 2022
M.P. Electrical LLC
Previous Balance: . 00
BUILDING PERMITS
ELECTRICAL PERMIT FEES - 155 . 00
223597
Total : 155 . 00
CHECK
Check No: 5258 155 . 00
Payor:
M. P. Electrical LLC
Total Applied: 155 . 00
Change Tendered: . 00
Duplicate Copy
10/04/2022 2 : 44 PM