Loading...
Electrical - 223474 - 1000 N Arrano Farms Ln - 09/22/2022 City of Eagle Electrical Permit Single Family Residence 660 E. Civic Lane, Eagle, ID 83616 Inspection Line: (208) 939-4462 Permit Number 223474 Issue Date 09/22/2022 Issue Receipt Darryn Coburn ELECTRICIAN POWERHOUSE ELECTRIC INC 420 W Island Ct Nampa,II)83686 208-631-1991 Registration#: ELE-C-32892 PERMIT ADDRESS Property Owner: ESPERANZA FAMILY TRUST Subdivision: ARRANO FARMS SUB Lot 11 Block 01 Address 1000 N ARRANO FARMS LN RESIDENTIAL PERMIT FEES Electrical-New Home $455.00 Electrical-New Home $65.00 Total Fee: $520.00 Job Scope/Notes *Inspection Phone: 939-4462 Contractor's Printed Name emailed Contractor's Signature / ^� City Clerk/Authorized Personnel CITY OF EAGLE - BUILDING DEPARTMENT Permit#(office use only) 660 E Civic Ln Eagle, ID 83616 Phone: 208-489-8760 m Eail: 11:22.1.11.1L11'2Z61:10112eoff41A1 0:11., - Elz Inspection tinei 208.-99-44762' a6i,r4qIII ..„ . ELECTRICAL PERMIT APPLICATION -COMMERCIAL& RESIDENTIAL Electrical Contractor:iPowerhouse Electric.INC Phone: 1,2081 631-1991 Email: 10fficeApowerhelectc.com State Cont.tic#: LE-C-32892 111 .: Date: 1112/31/2022 Fax: 111'208 498-8502 . . Builder or Property Owner:11Park Horse Homes site Subdivision: VArrano Farms „,.,.....„„..„„.„..„......,. . .. .......,.,.,...,..,...... „.,.,..,..,..,.,..,....,......,.,..,..........., '."""."'". im......---------- ,.......„..„„„„„„„„,....„„.„.„...„.................„..„... . Site Street Address: 100()N Arran°Farms Ln B Lot: Block: 111... Project Sq Ft: 1'7348 . , Description of Work(re.uired): Permit Ty.e: 11 C): New Residential I 0 Commercial N ewborne • 0 Remodel I 01 Commercial TI Living Space-Space within a dwelling unit intended for human habitation which may reasonably be utilized for sleeping,eating,cooking, bathing,washing, recreation,and sanitation purposes. An unfinished basement is considered part of the Viving space. New Residential-Sinille Famil:. Dwelling: New Residential-Multi-Family Dwelling(contractors Only)- O Up to 1,500 sq ft $130.00 l 0 Duplex Only $260.00 O 1,501 sq ft to 2,500 sq ft I $195,00 0 Three or more multi-family units O I 2,501,sq f't to 3,500 sq ft $260,00 4 of buildings x$130 1$0.00 11 O 1 3,501,sq ft to 4,500 sq ft $325.00 ------ #of units x$65 $0.00 . Over 4,500 sq ft$325 plus$65 per additional 1000 sq ft $0.00 Base Fee I $325.00 i Modular.Manufactured or Mobile Homes: $4.55,00 ft of Additional 1000 sq ft x$65 II $65 basic fee for each electrical connection+$10 for each add Temporary Construction Services Only circuit. ............ i[___ $65 basic fee,200 amp or less,one location, $65,00 I$om j 1 ll Basic Fee $65.00 ____ . „ . Existin: Residential: #of Electrical Connections x$65 [ $0:00 i $65 basic fee plus$10 for each additional branch circuit up to the 4 of Additional Circuits x$10 „ , $0.00 maximum of the corresponding square footage of the residential' , building. Tem.orar, Amusement-Indust: 1 I Basic Fee $65.00 ' $65 basic fee plus$10 for each ride,concession,or generator, 4 of Additional Branch Circuits x$1.0 1 III,..).0,99.,.,..,.....,.,....,.„III 1 Basic Fee 111 I $65.00 rul Floor Heat Basic Fee $65.00 [ $ 0 I 4 of Rides,Concessions,Generators x$10 I $0LT7[01 °I'llD 4 of Additional Branch Circuits x$10 11Q.QQJ $0.00 Signs and Outline Lighting: ResidentialL,.as Hot Tubs&H dro. L:assa,:e Tubs: 11 Signs-$6.5 for each sign T.--,,,,Li $65 basic fee plus$65 grounding grid where applicable. 4 of Signs x$65 Each additional trip will be charged the$65 basic fee. 1 ' Outline Lighting-$65 per occupancy I l$0.00 lill 1 ,. Basic Fee $65.00 'll ' ..:$0CI 00 Grounding Grid $65.00 [ . Residential Central Systems Heating and/or Cooling ...,..„.., , Swimming POWs: i i $65 basic fee-When NOT part of a new $65.00 , [I $195 Basic fee(this covers the 3 required $195.00 residential permit,or HVAC permit,and no _..... . 11$0.00 . - inspections), additional wiring, $0,00 Other Installation-Commercial/Industrial-Solar'Renewable Energy Work not specifically covered by any other fee schedule. Fee to be Residential Pumps(Domestic Water,Irrigation,Sewage). based on the cost of labor,materials and equipment installed: , Up to 25 HP I $65.00 • Up to 510,000 multiply by 2%(.02)plus$60.00 [V°id° II 1, . ' 26-200 HP $95.00 [ „ , 4 1 $10,001-$100,000 subtract$10,000 multiply by 1%N Over$100,001 subtract$100,000 multiply by 5% 1„ 005)plus$1160,00 E (),010.....I 070CT1 Over 200 HP , Irrigation Machine(electrically driven): ___ I $130.00 (.01)plus$260.00 jr $65 for center pivot plus$10 per tower or drive motor. 4 of Pivots x$65 ;OM MI ILL,00....rl .[ I , For all owner-supplied,factory assembled I 4 of Towers or drive motors x$10 equipment installed inspection will be based on I 1 R- :ae:::ed In, :ections-Reins ection-Technical Service of$130 for 1 hour and$65 for each additional .5%(.005)of total cost of equipment or hourly rate . I 1 $65 minimum plus$65 per hour or portion thereof in excess©f hour. *A copy of the bid is required. ** I' one hour including travel time to and from job location, ** * . Minimum fee $65.00 ., 41['`) . 110 l ll l Total Cost of labor arid Materials I IIIiI 0,00 "II I II " #of additional hours x$65 I$0.00 irtvection iegtreste ren4,5f be collect trito the 4rospecttkon request tine at 208439-44162 before 4:00ern to 5chedute on inspection for the next etay,, Ali other relttests$4414 l'e rthethihed the ne,,,htosirress day. Permits will be issued when paid in full via Check,Cash or Credit Card. If mailing payment,please remit payment to: ' 0 Method of Payment City of Eagle Building Department- AU Credit Card payt, eels Ore subject to a [.....o,ii- 0 Pay Online(Link on Homepage) Permitting,PO Box 1500,Eagle,ID 83616 , trtitttdottie '.'ortai itlottnin Fee of 3%plus$2 . Check/Cash 1 Signature: Mara Griffith Date: 09/22/2022 Total Fees Due: 1',,.;1.. AO Katelyn Warner From: • Idaho <NoReply0TC@egov.com> Sent: Thursday, September 22, 2022 11:12 AM To: office@powerhelectric.com Subject: Idaho - Receipt PURCHASE RECEIPT City of Eagle 660 East Civic Lane Eagle ID 83616 (208)939-6813 OTC Local Ref ID: 74684642 9/22/2022 11:11 AM Your credit card or bank statement will show this charge as City Payment. Status: APPROVED Customer Name: Darryn Coburn Type: Visa Credit Card Number: **** **** **** 7549 Items Quantity TPE Order ID Total Amount Electrical Permit 1 53867158 $455.00 Contractor Business Name: Powerhouse electric Customer Name: Darryn Coburn Contact Phone Number: 2086311991 Project Street Address: 1000 N Arrano Farms Ln Total remitted to the City of Eagle $455.00 Access Idaho Fee 1 53867158 $14.65 Total Amount Charged $469.65 To offer the convenience of using your bank card, a service fee of 3% plus $1.00 has been added to your transaction. This fee goes to our third-party provider, Access Idaho. The City does not keep any portion of this fee. 1. .• Katelyn Warner From: Idaho <NoReply0TC@egov.com> Sent: Thursday, September 22, 2022 2:18 PM To: office@powerhelectric.com Subject: Idaho - Receipt PURCHASE RECEIPT City of Eagle 660 East Civic Lane Eagle ID 83616 (208)939-6813 OTC Local Ref ID: 74698970 9/22/2022 02:18 PM Your credit card or bank statement: will show this charge as City Payment. Status: APPROVED Customer Name: Darryn Coburn Type: Visa Credit Card Number: **** **** **** 7549 Items Quantity TPE Order ID Total Amount Electrical Permit 1 53871222 $65.00 Contractor Business Name: Powerhouse electric Customer Name: Darryn Coburn Contact Phone Number: 2086311991 Project Street Address: 100 Arrano Farms Total remitted to the City of Eagle $65.00 Access Idaho Fee 1 53871222 $2.95 Total Amount Charged $67.95 To offer the convenience of using your bank card, a service fee of 3% plus $1.00 has been added to your transaction. This fee goes to our third-party provider, Access Idaho. The City does not keep any portion of this fee.