Loading...
Plumbing - 223129 - 1000 N Arrano Farms Ln - 08/19/2022 City of Eagle Plumbing Permit 660 E. Civic Lane Eagle, ID 83616 Phone: (208) 489-8760 -- Inspection Line: (208) 939-4462 Permit Number 223129 Issue Date 08/19/2022 Issue Receipt Tyler Tuck PLUMBER MOUNTAIN TIME PLUMBING LLC 12037 W Peak View Ct Boise,II)83709 208-993-0717 Registration#: PERMIT ADDRESS Property Owner: ESPERANZA FAMILY TRUST Subdivision: ARRANO FARMS SUB Lot 11 Block 01 Address 1000 N ARRANO FARMS LN RESIDENTIAL PERMIT FEES Plumbing-New Homes $520.00 Total Fee: $520.00 Job Scope/Notes Contractor's Printed Name emailed Contractor's Signature City Clerk/Authorized Personnel CITY OF EAGLE- BUILDING DEPARTMENT Permit# (office use only) 660 E Civic Ln Eagle,ID 83616 Phone: 208-489-8760 Email: bu :dkagcei2:ci ty91(2KLe„9 rt Inspection Line: 708-939-4462 222J zcf, PLUMBING PER'4. , 1.„',P,,, J: „ a i„, - ,I 1..41,A.4....RCIAI' ;,. .. ,...P , t, .4... Plumbing Contractor:h1. cuntain Time Plumbin. LLC 'IPhone:11.208 993-0717 I Email: ' Ier mountaintime iumbin .com I State Cont.Lk Th.21SEIMIMIIIIIIIIIIIIIIIIIIIIII,.-___. .X43 Date:.11/30/2024 IFax:[ 1 ,.....„. Builder or Property Owner:l'''Park Horse Homes LLC 1Site Subdivision:I!:*rrano Farms Site Street Address:E 000 N.Arrano Farms Eaole ID 83616 I Lot:11-1 'Block: ',Project Sq Ft:7348 Description of Work(required): Permit Type: I 11 C) New Residential 0 Commercial , 0 I Remodel 0 I Commercial TI Living Space-Space within a dwelling unit intended for human habitation which may reasonably be utilized for sleepint eating,cooking, bathing,washing, recreation,and sanitation purposes. An unfinished basement is considered part of the Hying space. New New Residential-Single Family Dwelling: , New Residential-Multi-Family Dwelling(Contractors Only): O j Up to 1,500 sq ft $130,00 1 0 Duplex Only $260.00 O 1,501 sq ft to 2,500 sq ft $195.00 0 Three or more multi-family units Enter section O 1 2,501 sq ft to 3,500 sq ft $260.00 #of buildings x$130 $0T0----j Total ____________ - O I 3,501 sq ft to 4,500 sq ft $325.00 Enter Section #of units x$65 Over 4,500 sq ft$325 plus$65 per additional 1000 square feet. Total „.......,..... O I Base fee $325.00 Modular,Manufactured or Mobile Homes: Sectron 1,....., 0 11 It of Additional 1000 sq ft x$65 14,n195.00 ll I I Sewer&Water Connection $65.00 Existing Residential: Residential Sewer and Water , $65 base fee plus$1.0 for each plumbing fixture up to the maximum I 1 Sewer Line Installation $65.00 Enter Section of the corresponding square footage of the residential building. Total I i Water Line Installation $65.00 Base Fee $65,00 r t Combination Sewer&Water Line installation $65.00 _ r---- #of Additional fixtures(excluding garbage --1 j:::n Multipurpose Fire Sprinklers&Domestic Water Supply $0.00 i ''--.--j disposals&dishwashers)x$10 , , TOt41 System 11.,:wcticn IF-1 #of replacement fixtures x$10 , 0,70 -. SU° Fee for 1-2 family or$4 per fire sprinkler head,whichever is Erac, Section _ greater Tana Water Heater/Water Softener/Backflow Prevention Device: LJIFee for 1.-2 Family i $65.00 [$0,00 II.ji Water Heater $65.00 fi,t, 1 ' II U of Fire Sprinkler Heads x$4 I r$1651, ,..„---,---4 LI; d Water Softener $65.00 senior,Total 10,q9..9,_ F.,entn,5pection n-Reinspectio, r-rz,^ '1---", Backflow Prevention Device $65.00 r$0,00 $65 minimum plus$65 per hour or portion thereof in excess '1"-- ' of one hour including travel time to and from location. 1 Commercial/Industrial(Other Installations) I II '1 Inspection minimum fee $65.00 ..... Enter Work not specifically covered by any other fee schedule„ Fee to be 1[-I Inspection#of additional hours x$65 Section 1[0.707/171 .,Zotal_, based on the cost of labor,materials and equipment installed: 0 I Up to$20,000 multiply by 3%(.03)plus$60.00 111$0,,00 I 1 El Reinspection fee $65.00 [$0,00 i I 0 $20,001-$100,000 subtract$20,000 multiply by $0.00 Plan Checking-Technical Service 2%(.02)plus$660.00 Over$100,001 subtract$100,000 multiply by.1% $65 minimum plus$65 per hour or portion thereof in excess 0 $0,00 (.01)plus$2260,00 of one hour "--7 For allowner-supplied,factory assembled f l i$0„00 0 I Plan Checking Minimum Fee $65.00 ............r equipment installed inspection will be based on.5% ' .. iiii ..... . i i iiiiii il 1 (.005)of total cost of equipment or hourly rate of Plan checking,f4 of add hours x$65 , $130 for 1 hour and$65 for each additional hour. section I, 1 -technical Service Minimum Fee $65,00 Total il I 1 7 - ' - Section***A copy of the bid is required.*** 1$1 Technical Services#of add hours x$65 0.00 Minimum fee ,$6 5.00 - ;70-0"-- , i.,,,,,,.1 ill II le) #of Replacement fixtures x$10 1...g ,, 1.11 III . Imo #of additional hours x$65 i 1 I 1 'inspection req“,etstr„most be coiled into the inspection requev(me of 2:1',8-93gon4,621,teloee 1:00pm rim'schedule on incpection fan the next day, ,411 I a irequests witi be,,w,l'i,elt,tlelor the next knie Ins Iloy,. Permits will be issued when paid in full via Check,Cash or Credit Card. If mailing payment,please remit payment to: Method of Payment City of Eagle Building Department-Permitting, AU"C redit Cord poymeints tire Subiere In a neer,reloolrolore ® I Pay Online(link on Homepage) 11 PO Box 1500,Eagle,ID 83616 Portot Atimin It of 3%phos SI 410 1 Check/Cash I , I ' ' =11). 11 ylt lirk . C.1t7i 48/19/2022 Total Fees Due: ',520.00 Katelyn Warner From: Idaho <NoReplyOTC@egov.com> Sent: Friday, August 19, 2022 12:15 PM To: Tyler@rnountaintimeplumbing.com Subject: Idaho - Receipt PURCHASE RECEIPT City of Eagle 660 East Civic Lane Eagle ID 83616 (208)939-6813 OTC Local Ref ID: 73622406 8/1.9/2022 12:14 PM Your credit card.or bank statement will show this charge as City Payment. Status: APPROVED Customer Name: Tyler 3 Tuck Type: Visa Credit Card Number: **** **** **** 9947 Items Quantity TPE Order ID Total Amount Plumbing Permit 1 53354960 $520.00 Contractor Business Name: Mountain Time Plumbing LLC Customer Name: Tyler Tuck Contact Phone Number: 208-993-0717 Project Street Address: 1000 N. Arrano Farms Lane Eagle, ID 63616 Total remitted to the City of Eagle $520.00 Access Idaho Fee 1 53354960 $16.60 Total Arnount Charged $536.60 To offer the convenience of using your bank card, a service fee of 3% plus s1.00 has been added to your transaction. This fee goes to our third-party provider, Access Idaho. The City does not keep any portion of this fee.