July 7, 2022
Prepared for Cityof Eagle
'•• • 2065 W.Riverstone Dr.Suite 105
w, ••s Coeur d'Alene,ID 83814
•
T(509)344 1008
F(509)344-1009
fat :eta m www.fatbeam.com
Service Order
This Service Order#2 ("Service Order") is for the installation of conduit network ("Service"), as more fully described
below,pursuant to the terms and conditions of the Acceptable Use Policy,Terms,and Master Service Agreement entered
into by and between Fatbeam,LLC("Fatbeam")and City of Eagle Idaho("City")on January 25th 2022("Agreement"),and
is effective as of July 6,2022, (Effective Date").Capitalized terms used but not defined herein shall have the meaning set
forth in the Agreement.
Billing address:660 E Civic Ln,Eagle,ID 83616
Build Details: (Location(s)where Service will be delivered)
Note: Fatbeam will be adhering to Ada County policy that requires all underground dry utilities be placed on the
or side of the road.
A)joint Trench#1-Conduit will travel underground on at and travel to Build
is 11,864 feet. All per foot costs will be calculated at 11,864 feet.
o (2)- 1.25"conduits
o Dirt bore conditions are expected for entire 11,864 feet.
o Vaults-No vaults provided for this project
Item Description Cost Total Feet Extended Cost
Trench Per foot $ 4.00 0 $ -
Bore- Dirt Per foot $ 12.50 11864 $148,300.00
Bore - Cobble Per foot $ 18.25 0 $ -
1.25" Conduit Per foot, per conduit $ 0.75 11864 $ 17,796.00
Total Extended Cost $166,096.00
Start Date: September 2022
Completion Date:December 30th,2022
Fatbeam Internet I Updated 2018 2
B)Joint Trench#2-Conduit will travel underground on starting of and
travel to Build is 2,442 feet,all per foot costs will be calculated at 2,442 feet.
o (2)- 1.25"conduits
o Dirt bore conditions are expected for entire 2,442 feet.
o Vaults-No vaults provided for this project
Item Description Cost Total Feet Extended Cost
Trench Per foot $ 4.00 0 $ -
Bore- Dirt Per foot $ 12.50 2442 $ 30,525.00
Bore- Cobble Per foot $ 18.25 0 $ -
1.25" Conduit Per foot, per conduit $ 0.75 2442 $ 3,663.00
Total Extended Cost $ 34,188.00
Start Date: September 2022
Completion Date: December 30th,2022
C)Joint Trench#3-Conduit will travel underground on starting near traveling
east to near Build is 4,782 feet,all per foot costs will be calculated at 4,782 feet.
o (2)- 1.25"conduits
o Dirt bore conditions are expected for entire 4,782 feet.
o Vaults-No vaults provided for this project
Item Description Cost Total Feet Extended Cost
Trench Per foot $ 4.00 0 $ -
Bore- Dirt Per foot $ 12.50 4782 $ 59,775.00
Bore- Cobble Per foot $ 18.25 0 $ -
1.25" Conduit Per foot, per conduit $ 0.75 4782 $ 7,173.00
Total Extended Cost $ 66,948.00
Start Date:September 2022
Completion Date:December 30th,2022
Fatbeam Internet I Updated 2018 3
D)Joint Trench#4-Conduit will travel underground on ,travel to ,and
then to Build is 1,081 feet,all per foot costs will be calculated at 1081 feet.
o (2)- 1.25"conduits
o Dirt bore conditions are expected for entire 1,081 feet.
o Vaults-No vaults provided for this project
Item Description Cost Total Feet Extended Cost
Trench Per foot $ 4.00 0 $ -
Bore- Dirt Per foot $ 12.50 1081 $ 13,512.50
Bore-Cobble Per foot $ 18.25 0 $ -
1.25" Conduit Per foot, per conduit $ 0.75 1081 $ 1,621.50
Total Extended Cost $ 15,134.00
Start Date:September 2022
Completion Date:December 30th,2022
E) Project- Build from to
1.Summary of Project: Fiber extensions from to
Fatbeam will pull fiber through the existing conduit from located
From that point, Fatbeam will construct underground fiber optic cable to
2. Existing Conduit: Fatbeam will pull a fiber between the and the
located
3. Fiber Optic Electronics: Fatbeam will provide buried conduit with fiber
between the located to
4. Fiber Optic Hardware: Fatbeam will install fiber optic hardware( .
This hardware will provide connectivity from end to end, lighting the fiber.
Cost including construction and equipment.$153,620
4
Fatbeam Internet I Updated 2018
'
-
NRC: (One-time fee for installation) One time charges noted above as detailed per build.
MRC: (Reoccurring monthly fee) $0.00 no MRC for this Service Order
5
Fatbeam Internet I Updated 2018
DocuSign Envelope ID:2F3D72DF-A98C-4F78-BA84-F472110905B9
Ratification: This Service Order is requested by Customer and accurately describes the Service(s) being order and the
terms and conditions which govern the Service Order.Except as specifically set forth in this Service Order,the Agreement
is hereby ratified and affirmed in all respects and all other terms,covenants,and conditions of the Agreement shall remain
unchanged and shall continue in full force and effect. In case of an inconsistency or conflict between this Service Order
and the Agreement,the Agreement shall govern.All Exhibits are attached hereto and are incorporated herein by reference
and made a part of this Service Order.
IN WITNESS WHEREOF,the Parties have executed this document as of the date and year first above written.
IN WITNESS WHEREOF, Fatbeam and the City have each duly executed and delivered this Services
Agreement as of the Effective Date.
Fatbeam: The City:
Fatheam, I,LC City of Eagle
DocuSigned by:
artaw" togzir
24FT: •
:_Graham Tayl or /e�CL
Name: Name:
Title: Di rector of Public Sector Title: M
7/21/2022 I 12:45 PDT
Date: Date: 7//432,) vi-
L%r r)41 0L E •
p��......••. TE •.*
1.
A EST: : 0 • p
ift Lida/ 11/: ' • ° k914SC
• :
racy E �' .orn, City Clerk ,t . .•'t�
� .• o ;
* •�••;•• ,.
Fatbeam Internet I Updated 2018 6