Loading...
Findings - CC - 2022 - FPUD-03-22 & FP-03-22 - Final Development Plan And Final Plat For Molinari Park Subdivision No. 2 BEFORE THE EAGLE CITY COUNCIL IN THE MATTER OF AN APPLICATION FOR ) A FINAL DEVELOPMENT PLAN AND FINAL ) PLAT FOR MOLINARI PARK SUBDIVISION NO.2 ) FOR MOLINARI PARK DEVELOPMENT LLC. ) FINDINGS OF FACT AND CONCLUSIONS OF LAW CASE NUMBER FPUD-03-22& FP-03-22 The above-entitled final development plan and final plat applications came before the Eagle City Council for their action on June 28, 2022. The Council having heard and taken oral and written testimony, and having duly considered the matter,makes the following Findings of Fact and Conclusions of Law; FINDINGS OF FACT: A. PROJECT SUMMARY: Molinari Park Development, LLC, represented by KM Engineering, LLP, is requesting final planned unit development and final plat approvals for Molinari Park Subdivision No.2, a 71-lot(59-buildable, 12-common), mixed-use subdivision. The 6.5-acre site is located at the south side of East Plaza Drive approximately 300-feet east of the intersection of South 2nd Street and East Plaza Drive. B. APPLICATION SUBMITTAL: The applications for this item were received by the City of Eagle on February 9,2022. C. HISTORY OF REVELANT PREVIOUS ACTIONS: On March 12, 2019, the Eagle City Council approved a rezone from CBD (Central Business District) to CBD-DA-P (Central Business District with a development agreement — PUD), conditional use permit, preliminary development plan, and preliminary plat for Molinari Park Subdivision (RZ-07- 18/CU-03-18/PPUD-02-18/PP-06-18). On October 27,2020,the Eagle City Council approved a design review application for the a subdivision entry monument sign for Molinari Park Subdivision(DR-53-20). On December 8, 2020, the Eagle City Council approved a design review application for the common area landscaping within Molinari Park Subdivision(DR-18-20). On February 4, 2021, the Eagle City Council approved final development plan and final plat applications for Molinari Park Subdivision No. 1 (FPUD-04-20& FP-04-20). D. PRELIMINARY PUD/PLAT FINDINGS: City Council Findings of Fact and Conclusions of Law dated June 25,2019,are incorporated herein by reference. E. FINDINGS OF FACT REQUIRED BY EAGLE CITY CODE SECTION 8-6-6-3 (B): The Council shall find that the facts submitted with the application and presented to them establish that: 1. The ordinance and standards used in evaluating the application; 2. The facts submitted with the application and presented to them establish that: a. The proposed development can be initiated within one year of the date of approval; b. Each individual phase of the development, as well as the total development, can exist as an independent phase capable of creating an environment of sustained desirability and stability or Page 1 of 4 KAPImning Dept\Fagle Applications\SUBS\2022\Molinari Sub Not FPUD-FP\Working Docs\Molinari Park 2 fp&fpud ccf docx that adequate assurance will be provided that such objective will be attained and the uses proposed will not be detrimental to present and potential surrounding uses, but will have a beneficial effect which would not be achieved under standard district regulations; c. The streets and thoroughfares proposed are suitable and adequate to carry anticipated traffic, and increased densities will not generate traffic in such amounts as to overload the street network outside the PUD; d. Any proposed commercial development can be justified at the locations proposed; e. Any exception from standard district requirements is warranted by the design and other amenities incorporated in the final development plan, in accordance with the PUD and the adopted policy of the council; f. The area surrounding said development can be planned and zoned in coordination and substantial compatibility with the proposed development; g. The PUD is in general conformance with the comprehensive plan; and h. The existing and proposed utility services are adequate for the population densities and nonresidential uses proposed; 3. The actions, if any,that the applicant could take to obtain a permit. THE CITY COUNCIL RECEIVED AND REVIEWED THE FOLLOWING STAFF ANALYSIS PROVIDED WITHIN THE STAFF REPORT AND ADOPTS THE STAFF REPORT AS PART OF THE CITY COUNCIL'S FINDINGS OF FACT: (based on the final development plan and final plat received by the City on June 9, 2022): The City Engineer and Planning staff have reviewed the final development plan and final plat. The final development plan and final plat show that there have been no significant changes from the preliminary development plan and preliminary plat. It is staffs opinion that the final development plan and final plat are in substantial compliance with the preliminary development plan and preliminary plat with the conditions recommended herein. REVIEW BY THE COUNCIL: A review by the City Council was completed on June 28, 2022. The Council made their decision at that time. The minutes are incorporated herein by reference. COUNCIL DECISION: The Council voted 4 to 0 to approve FPUD-03-22 & FP-03-22 for a final development plan and final plat for Molinari Park Subdivision No. 2 for Molinari Park Development LLC,with the following site specific conditions of approval: SITE SPECIFIC CONDITIONS OF APPROVAL: 1. Comply with all requirements of the City Engineer. 2. Comply with all applicable requirements of RZ-07-18/CU-03-18/PPUD-02-18/PP-06-18. 3. Comply with the conditions of DR-18-20. 4. The applicant shall submit payment to the City for all engineering and legal fees incurred for reviewing this project, prior to the City Clerk signing the final plat and/or upon receipt of an invoice by the City, whichever occurs first. 5. All common area improvements within Molinari Park Subdivision No. 2 as specified on the approved landscape plan(DR-18-20) shall be completed or a surety shall be provided as required by Eagle City Code prior to the City Clerk signing the final plat. Page 2 of 4 KAPlannmg Dept\Fagle App1ications\SUBS\2022\Mo1inari Sub No.2 FPUD-FP\Working DocsNolinari Park 2 fp&fpud ccf docx 6. The developer shall provide 2-inch minimum caliper shade-class trees as shown on the approved landscape plan. Prior to the City Clerk signing the final plat, the applicant shall either install the required trees, sod, and irrigation or provide the City with a letter of credit for 150%of the cost of the installation of all landscape and irrigation improvements. Trees shall be installed prior to obtaining any occupancy permits for the homes. A temporary occupancy may be issued if weather does not permit landscaping. Partial reduction of the surety may be permitted for any portion of the development that is completed, including street trees that have been installed. On-going surety for street trees for all undeveloped portions of the development will be required through project completion. 7. At the time of providing surety information the applicant shall provide a schedule that depicts the timing for completion of the required improvements. 8. The applicant shall not construct any required improvements, including, storm drainage or roadway facilities, until the City has received a copy of the ACHD stamped and approved final engineering construction drawings. Upon receipt of the ACHD approved construction drawings and confirmation by the City Engineer that they comply with the City approved construction drawings,the City will issue a"notice to proceed with construction" letter to the applicant's designated representative. 9. The applicant shall take care to locate and protect from damage existing utilities,pipelines and similar structures. Documentation indicating that "Digline" has performed an inspection of the site shall be submitted prior to the issuance of any building permits for the site. 10. The applicant shall install at the entrances to Molinari Park Subdivision No.2,4'x 4' plywood or other hard surface signs (mounted on two 4"x 4" posts with the bottom of the signs being a minimum of 3- feet above the ground)noticing the contractors to clean up daily,no loud music,and no dogs off leash. 11. Any stub street which is expected to be extended in the future shall be provided with a sign generally stating that, "This Street is to be extended in the future". 12. Provide an approval letter for completion of sewer improvements from Eagle Sewer District, prior to the City Clerk signing the final plat. 13. Provide an approval letter for the requirements of all drainage districts and irrigation districts prior to the City Clerk signing the final plat. 14. Provide a copy of the recorded CC&Rs for the subdivision,two(2)full size copies of the recorded final plat, and an 8 1/2" x I I" recorded copy of the final plat of Molinari Park Subdivision, prior to the issuance of any building permits. 15. All fencing located adjacent to open space, or in any required front or street side yard areas shall be open-style such as wrought iron or extruded aluminum (looks identical to wrought iron). All other fencing(i.e. dog-ear type cedar fencing, vinyl, chainlink) shall be prohibited. Fencing in any required front yard area shall be open-style and limited to four-feet(4')in height. CONCLUSIONS OF LAW: A. In accordance Eagle City Code Section 8-6-6-3(B),the Council finds that the facts submitted with the application and presented to the Council, with the conditions herein, establish that: 1. This development will be initiated within one year of the date of approval; 2. Each individual unit of the development, as well as the total development, will exist as an independent unit capable of creating an environment of sustained desirability and stability or that adequate assurance can be provided that such objective will be attained and the uses will not be detrimental to present and potential surrounding uses,but will have a beneficial effect which would not be achieved under standard district regulations because of the conditions placed on this development; Page 3 of 4 KAPlanning Dept\Bagle App1ications\SUBS\2022\Mo1inari Sub No.2 FPUD-FP\Working DocsNolman Park 2 fp&fpud ccf docx 3. The streets and thoroughfares to be constructed are suitable and adequate to carry anticipated traffic, and increased densities will not generate traffic in such amounts as to overload the street network outside the PUD; 4. The commercial development proposed is justified based on the close proximity to the downtown core; 5. Any exception from standard district requirements is warranted by the design and other amenities incorporated in the final development plan, in accordance with the PUD and the adopted policy of the Council because the varied lot sizes,setbacks and uses as specifically approved by the City will allow for a mix of housing types and uses in accordance with the Comprehensive Plan; 6. The area surrounding said development can be planned and zoned in coordination and substantial compatibility with the proposed development; 7. The PUD is in general conformance with the Comprehensive Plan; and 8. The existing and required utility services are adequate for the population densities as noted by the agencies that will serve the development. DATED this 12t'day of July 2022. CITY COUNCIL OF THE CITY OF EAGLE Ada County,Idaho JarTe,Mayor .. '0 +� �■■.,■+` ATTEST: �'•r�pOR� � ti ■ *:,,SEAL;t* Tracy L sborn, Eagle City Clerk ' J),9N 18 ?' OF VD Page 4 of 4 K\Planning DeptTagle Applications\SUBS\2022\Mo1inari Sub Not FPUD-FP\Working Docs\Molinari Park 2 fp&fpud ccf docx