Loading...
Findings - DR - 2016 - DR-45-16 - Construct A Multi-Tenant Office BuildingBEFORE THE EAGLE DESIGN REVIEW BOARD IN THE MATTER OF AN APPLICATION ) FOR A DESIGN REVIEW TO CONSTRUCT A ) MULTI -TENANT OFFICE BUILDING WITHIN ) EAGLE RIVER FOR EAGLE RIVER LLC ) FINDINGS OF FACT AND CONCLUSIONS OF LAW CASE NUMBER DR -45-16 The above -entitled design review application came before the Eagle Design Review Board for their action on August 25, 2016. The Design Review Board having heard and taken oral and written testimony, and having duly considered the matter, makes the following Findings of Fact and Conclusions of Law; FINDINGS OF FACT: A. PROJECT SUMMARY: Eagle River LLC, represented by Cheryl Pearse with Erstad Architects, is requesting design review approval to construct a two story 16,227 -square foot multi -tenant office building. The 1.46 -acre site is generally located southeast of South Bridgeway Place and East Shore Drive on Lot 27, Block 4, Mixed Use Subdivision No. 5 within Eagle River Development. B. APPLICATION SUBMITTAL: The City of Eagle received the application for this item on July 21, 2016. C. NOTICE OF AGENCIES' REVIEW: Requests for agencies' reviews were transmitted on July 27, 2016, in accordance with the requirements of the Eagle City Code. D. HISTORY OF RELEVANT PREVIOUS ACTIONS: On January 25, 2000, the Eagle City Council approved a rezone (RZ-02-98) with a development agreement (including a concept plan) for this site. On April 24, 2001, the Eagle City Council approved a preliminary plat, Mixed Use Subdivision No. 1 (PP -14-00) for this site. On May 8, 2001, the Eagle City Council approved a final plat, Mixed Use Subdivision No. 1 (FP -13- 01) for this site. On November 7, 2001, the Eagle City Council approved a combined preliminary and final plat, Mixed Use Subdivision No. 2 (PP/FP-1-01) for this site. On July 9, 2002, the Eagle City Council approved a combined preliminary and final plat, Mixed Use Subdivision No. 3 (PP/FP-03-02) for this site. On December 17, 2002, the Eagle City Council approved a combined preliminary and final plat, Mixed Use Subdivision No. 4 (PP/FP-04-02) for this site. E. COMPANION APPLICATIONS: DR -46-16 (design review sign application). Page 1 of 11 KAPlanning DeptfEagle ApplicationADA20160R-45-16 Multi -ten Office Bldg ERD P-44 drf.docx F. COMPREHENSIVE PLAN LAND USE MAP AND ZONING MAP DESIGNATIONS: G. DESIGN REVIEW OVERLAY DISTRICT: Not in the DDA, TDA, CEDA, or DSDA. H. EXISTING SITE CHARACTERISTICS: Vacant lot within Mixed Use Subdivision No. 5. I. SITE DATE: SITE DATA COMP PLAN ZONING LAND USE 1.46 -acres (63,443 -square feet) DESIGNATION DESIGNATION 13% (approximately) Existing Mixed Use MU -DA (Mixed Use with Vacant lot within Eagle Number of Parking Spaces 65 -parking spaces developmentagreement) River Development Proposed No change No Change Office building North of site Mixed Use MU -DA (Mixed Use with Office building Side Setback 60 -feet (northeast) development aeement) South of site Mixed Use MU -DA (Mixed Use with Common Area within develo mentagreement) Eagle River Development East of site Mixed Use MU -DA (Mixed Use with Common Area within develo mentagreement) Eagle River Development West of site Mixed Use MU -DA (Mixed Use with Office building development aeement) G. DESIGN REVIEW OVERLAY DISTRICT: Not in the DDA, TDA, CEDA, or DSDA. H. EXISTING SITE CHARACTERISTICS: Vacant lot within Mixed Use Subdivision No. 5. I. SITE DATE: SITE DATA PROPOSED REQUIRED Total Acreage of Site 1.46 -acres (63,443 -square feet) 7,000 -square feet (0.16 -acres) (minimum) Percentage of Site Devoted to Building Coverage 13% (approximately) 50% (maximum) Percentage of Site Devoted to Landscaping 48% (approximately) 10% (minimum) Number of Parking Spaces 65 -parking spaces 65 -parking spaces (minimum) Front Setback 35 -feet (north) 20 -feet (minimum) Rear Setback 54 -feet (south) 20 -feet (minimum) Side Setback 10 -feet (west) 7.5 -feet (minimum) Side Setback 60 -feet (northeast) 7.5 -feet (minimum) J. GENERAL SITE DESIGN FEATURES: Number and Uses of Proposed Buildings: The applicant is proposing to construct one (1) building to be used as an office. Height and Number of Stories of Proposed Buildings: The applicant is proposing an approximately thirty-three and one half foot (33 1/i') high two-story structure. Gross Floor Area of Proposed Buildings: Page 2 of 11 KAPlanning Dept\Eagle ApplicationADA2016OR-45-16 Multi -ten Office Bldg ERD P-44 drf.docx The proposed multi -tenant office building is approximately 16,227 -square feet. First floor = 8,172 -square feet Second floor = 8,055 -square feet On and Off -Site Circulation: An 18,800 -square foot (approximately) paved parking lot provides parking for vehicles using this site. Access to this site is from the west and north from shared access drive aisles that provide access to South Bridgeway Place. K. BUILDING DESIGN FEATURES: Roof: Boral Saxony (Brown Blend Striated) Walls: interstate standard brick (Walnut), Eldorado cut course stone (Oyster), Stucco (Beige) Windows/Doors: Metal (Champagne) Fascia/Trim: Prefinished metal (Tan) L. LANDSCAPING DESIGN: Retention of Existing Trees and Preservation Methods: There are existing trees within the wetland areas along the north property line of this site. These trees are to be retained and protected. Tree Replacement Calculations: N/A Proposed Tree Mix (Species & Number): To be reviewed by the Design Review Board. Street Trees: Street trees were installed by the developer of Eagle River Development. Maintenance Provisions and Proposed Irrigation Methods: Automatic irrigation required. Transition Zones: N/A Parking Lot Landscaping: a. Perimeter Landscaping: Perimeter landscaping is proposed around the perimeter of the parking lot. b. Interior Landscaping: 10% interior landscaping is required, 11% is proposed. N. TRASH ENCLOSURES: One (1) 336 -square foot trash enclosure is proposed to be located within the northeast area of the parking lot. The enclosure is proposed to be constructed of CMU walls and metal gates; all of which will match the materials and colors used in the construction of the building. O. MECHANICAL UNITS: The applicant is proposing to use roof mounted mechanical units. The roof mounted mechanical units are proposed to be screened by screen walls. No ground mounted mechanical units are proposed and none are approved. O. OUTDOOR LIGHTING: A site and parking lot light plan showing location, height, and wattage is required to be reviewed and approved by the Zoning Administrator prior to issuance of any building permits. P. SIGNAGE: No signs are proposed with this application. A separate design review application (DR -46-16) has been submitted for the approval of a master sign plan for this building. Page 3 of 11 KAPlanning Dept\Eagle ApplicationADA2016\DR-45-16 Multi -ten Office Bldg ERD P-44 drf.docx Q. PUBLIC SERVICES AVAILABLE: Preliminary approval letters from Eagle Fire Department and Eagle Sewer District have been received by the City. A water service approval has not been received to date. Approval of the water company having jurisdiction will be required prior to issuance of a building permit. R. PUBLIC USES PROPOSED: None. S. PUBLIC USES SHOWN ON FUTURE ACQUISITIONS MAP: No map currently exists. T. SPECIAL ON-SITE FEATURES: Areas of Critical Environmental Concern - Yes, Boise River Floodplain Note: all floodplain and floodway concerns were addressed by the applicant as a part of the Eagle River Preliminary Plat application, the Mixed Use Subdivision No. 1 final plat application, and associated floodplain development permit application. Evidence of Erosion - no Fish Habitat - no Floodplain - Yes, entire site is located within the Boise River floodplain (see comments under Areas of Critical Environmental Concern above). Mature Trees - no Riparian Vegetation - no Steep Slopes - no Stream/Creek - no Unique Animal Life - no Unique Plant Life - no Unstable Soils - no Wildlife Habitat - no U. SUMMARY OF REVIEW OF ENVIRONMENTAL ASSESSMENT PLAN (IF REQUIRED): Not required. V. AGENCY RESPONSES: The following agencies have responded and their correspondence is attached to the staff report. Comments, which appear to be of special concern, are noted below: Ada County Highway District Department of Environmental Quality Eagle Fire Department Eagle Sewer District Idaho Transportation Department Tesoro Logistics NW Pipeline W. LETTERS FROM THE PUBLIC: None received to date. STAFF ANALYSIS PROVIDED WITHIN THE STAFF REPORT: A. COMPREHENSIVE PLAN PROVISIONS WHICH ARE OF SPECIAL CONCERN REGARDING THIS PROPOSAL: • The Comprehensive Plan Land Use Map designates this site as Mixed Use. Page 4 of 11 VAPlanning Dept\Eagle ApplicationADr\2016MR-45-16 Multi -ten Office Bldg ERD P-44 drf.docx B. ZONING CODE PROVISIONS WHICH ARE OF SPECIAL CONCERN REGARDING THIS PROPOSAL: • Eagle City Code Section 8-2A-6(A)(5)(b) The location and design of transformers, pad mount and roof mounted mechanicals and electrical equipment shall be reviewed and approved by the design review board. All roof mounted mechanicals shall be completely screened from view through the use of a parapet wall when utilizing a flat roof design or shall be enclosed within the building when utilizing a roof design other than a flat roof. "Screened from view" shall mean "not visible" at the same level or elevation of the parapet wall (e.g., the perspective generally as shown on an elevation plan); C. DISCUSSION: • The applicant is requesting design review approval to construct a 16,227 -square foot, two story multi -tenant office building with Eagle River Development. Per the applicant's justification letter, date stamped by the City on July 21, 2016, the design features of the building and the materials proposed to be used on the exterior of the building complement those used on the adjacent buildings. The site plan, date stamped by the City on July 21, 2016, shows a 4 -foot wide compacted gravel pathway to be located on the south side of the parking area and wrapping around the east end of the parking area and running between the wetland area and the parking lot. A 5 -foot wide asphalt pathway is proposed along the south side of the building connecting the existing pathway to the west to the sidewalk proposed along the west side of the parking lot. A 10 -foot wide gravel pathway is shown to be constructed from the south corner of the parking area to the greenbelt pathway located approximately 200 -feet south of this property. Pursuant to the Eagle River Master Pathway Plan, date stamped by the City on July 8, 2004, a 10 -foot wide asphalt pathway is required to be constructed between the parking lot of this site and the greenbelt pathway located approximately 200 -feet south of the south property line. The applicant should be required to provide a revised site and landscape plan showing a 10 -foot wide asphalt pathway to be constructed from the south of the parking lot to the greenbelt pathway located approximately 200 - feet south of the south property line. The revised site and landscape plans should be reviewed and approved by staff prior to the issuance of a zoning certificate. The site and landscape plan, date stamped by the City on July 21, 2016, shows landscaping to extend to the south property line of this site. The aerial showing this site and the common lot located adjacent to the south property line of this site, shows a large gravel area between the pond and the wetland area. There are a couple storage pods that are located within this area as well. Staff recognizes that this gravel area is not located on this site; however, it is staffs understanding that this area has been left undeveloped until the subject site was developed. The applicant should be required to provide a revised landscape plan showing the area between the pond and wetland area to be planted/seeded to complement the plantings already located in the area. The revised landscape plan should be reviewed and approved by staff and one member of the Design Review Board prior to the issuance of a zoning certificate. The storage pods should be removed prior to the issuance of an occupancy permit. • Staff defers comment regarding building design and colors to the Design Review Board. STAFF RECOMMENDATION PROVIDED WITHIN THE REPORT: Based upon the information provided to staff to date, staff recommends approval with the site specific conditions of approval and the standard conditions of approval provided within the staff report. Page 5 of 11 KAPlanning Dept\Eagle ApplicationADA2016113R-45-16 Multi -ten Office Bldg ERD P-44 drf.docx PUBLIC MEETING OF THE BOARD: A. A meeting to consider the application was held before the Design Review Board on August 25, 2016, at which time the Board made their decision. B. Oral testimony in opposition to this proposal was presented to the Design Review Board by no one. C. Oral testimony in favor of this proposal was presented to the Design Review Board by no one (not including the applicant/representative). BOARD DECISION: The Board voted 6 to 0 (Sayer absent) to approve DR -45-16 for a design review application to construct a multi -tenant office building for Eagle River LLC, with the following staff recommended site specific conditions of approval and standard conditions of approval. SITE SPECIFIC CONDITIONS OF APPROVAL: 1. Comply with all conditions within the development agreement for rezone application RZ-02-98. 2. Comply with all conditions of PP -14-00 (Eagle River Subdivision). 3. Provide a revised site and landscape plan showing a 10 -foot wide asphalt pathway to be constructed from the south of the parking lot to the greenbelt pathway located approximately 200 -feet south of the south property line. The revised site and landscape plans shall be reviewed and approved by staff prior to the issuance of a zoning certificate. 4. Provide a revised landscape plan showing the area between the pond and wetland area to be planted/seeded to complement the plantings already located in the area. The revised landscape plan shall be reviewed and approved by staff and one member of the Design Review Board prior to the issuance of a zoning certificate. The storage pods shall be removed prior to the issuance of an occupancy permit. 5. All ground mounted transformers, cable, and phone boxes shall be screened by landscaping per Eagle City Code. 6. Submit payment to the City, at the time of building permit submittal, for all Engineering fees incurred for reviewing this project. 7. The applicant shall be required to comply with any applicable conditions placed on this application by the City Engineer. 8. Submit payment to the City for the Planning and Zoning plan review at the time of building permit submittal. 9. No ground mounted mechanical units are proposed with this application and none are approved. 10. Paint all electrical meters, phone boxes, etc. located on the building to match the color of the building. 11. No signs are proposed with this application. A separate design review application (DR -46-16) has been submitted for the approval of a master sign plan for this building. The sign plan shall be reviewed and approved prior to the City issuing a zoning certificate. NOTE: In the event a Standard Condition of Approval conflicts with a Site Specific Condition of Approval contained herein the Site Specific Condition of Approval shall control. STANDARD CONDITIONS OF APPROVAL: 1. The applicant shall comply with all requirements of the Ada County Highway District and/or the Idaho Transportation Department, including but not limited to approval of the drainage system, curbs, gutters, streets and sidewalks. A letter of approval from the highway district having jurisdiction shall Page 6 of 11 KAPlanning DepAEagle ApplicationADA2016= 45-16 Multi -ten Office Bldg ERD P-44 drf.docx be submitted to the City prior to issuance of a Zoning Certificate for this site. 2. Idaho Department of Health & Welfare approval of the sewer and water facilities is required prior issuance of any building permits or Certificate of Occupancy, whichever occurs first. 3. All permits from Central District Health, Eagle Sewer District & Eagle Fire District shall be secured prior to issuance of building permit or Certificate of Occupancy, whichever occurs first. 4. Written approval of all well water for any shared or commercial well shall be obtained from the Idaho Department of Water Resources and shall be submitted to the City prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. 5. Unless septic tanks are permitted, wet line sewers will be required and the applicant will be required to furnish the City Engineer with a letter from the sewer entity serving the property, accepting the project for service, prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. 6. The applicant shall submit a letter from the appropriate drainage entity approving the drainage system and/or accepting said drainage; or submit a letter from a registered professional engineer certifying that all drainage shall be retained on-site prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. A copy of the construction drawing(s) shall be submitted with the letter. 7. The applicant shall submit plans and calculations prepared by a registered professional engineer to handle the satisfactory disposal of all storm drainage on the applicant's site. Drainage system plans shall be submitted to the City Engineer for review and approval prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. The plans shall show how swales, or drain piping, will be developed in the drainage easements. The approved drainage system shall be constructed, or a performance bond shall be submitted to the City Clerk, prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. The lot shall be so graded that all runoff runs either over the curb, or to the drainage easement and no runoff shall cross any lot line onto another lot except within a drainage easement. All design and calculations shall meet the requirements of Ada County Highway District. Construction of the storm drain disposal system shall be complete before an occupancy permit is issued. No ditch, pipe or other structure or canal, for irrigation water or irrigation waste water owned by an organized irrigation district, canal company, ditch association, or other irrigation entity, shall be obstructed, routed, covered or changed in any way unless such obstruction, rerouting, covering or changing has first been approved in writing by the entity. A Registered Engineer shall certify that any ditch rerouting, piping, covering or otherwise changing the existing irrigation or waste ditch (1) has been made in such a manner that the flow of water will not be impeded or increased beyond carrying capacity of the downstream ditch; (2) will not otherwise injure any person or persons using or interested in such ditch or their property; and (3) satisfied the Idaho Standards for Public Works Construction. A copy of such written approval and certification shall be filed with the construction drawing and submitted to the City prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. 9. Encroachments including, but not limited to, landscaping, fencing, lighting, and/or pathways shall not be located within any easement or right-of-way for any ditch, pipe or other structure, or canal used for irrigation water or irrigation waste water without the express written approval of the organized irrigation district, canal company, ditch association, or other irrigation entity associated with such ditch, pipe or other structure, or canal. The applicant shall submit a copy of the written approval from the irrigation entity prior to the City Clerk signing the final plat. Page 7 of 11 KAPlanning Dept\Eagle ApplicationADA2016MR-45-16 Multi -ten Office Bldg ERD P-44 dd.docx 10. Street light plans shall be submitted and approved as to the location, height and wattage to the City Engineer (if applicable) prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. All construction shall comply with the City's specifications and standards. The applicant shall provide a recorded easement, acceptable to the City Engineer, for the purpose of installing and maintaining street light fixtures, conduit and wiring lying outside any dedicated public right-of-way, prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. The applicant shall pay applicable street light inspection fees prior to issuance of any Certificate of Occupancy. 11. Parking lot light plan shall be submitted and approved as to the location, height and wattage by the City Engineer. All construction shall comply with the City's specifications and standards. Lighting is required in the parking area and shall be properly illuminated to avoid accidents. Any lights used to illuminate the parking lot shall be so arranged as to reflect the light away from the adjoining property. 12. The parking area shall be paved and shall be maintained in good condition without holes and free of all dust, trash, weeds and other debris. 13. One set of building plans, for any non single-family residential use, shall be submitted to the Eagle Fire Department for approval. An approval letter from the Eagle Fire Department shall be submitted to the City prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. The letter shall include the following comments and minimum requirements, and any other items of concern as may be determined by the Eagle Fire Department officials: a. "The applicant has made arrangements to comply with all requirements of the Fire Department." b. The fire hydrant locations shall be reviewed and be approved in writing by the Eagle Fire Department prior to the City Engineer signing the final plat. c. Minimum flow per hydrant shall be 1,000 gallons per minute for one and two family dwellings, 1,500 gallons per minute for dwellings having a fire area in excess of 3,600 -square feet, and 1,500 gallons per minute for non-residential uses (i.e.; Commercial, Industrial, Schools, etc.). Flow rates shall be inspected in accordance with all agencies having jurisdiction, and shall be verified in writing by the Eagle Fire Department prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. d. The proposed fire protection system shall be reviewed and approved by the Eagle Fire Department prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first. 14. Any recreation area, greenbelt area or pathway area along the Boise River, Dry Creek or any other area designated by the City Council or Eagle City Park and Pathway Development Committee for a path or walkway shall be approved in writing by the Eagle City Park and Pathway Development Committee prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first. 15. Conservation, recreation and river access easements (if applicable) shall be approved by the Eagle City Park and Pathway Development Committee and shall be shown on the final plat prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first. 16. The applicant shall comply with the provisions of the Eagle City Code, pertaining to floodplain and river protection regulations (if applicable) prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first. 17. The applicant shall obtain written approval of the development relative to the effects of the Boise River Flood Plain (if applicable) from the Corps. of Engineers prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first. Page 8 of 11 KAPlanning Dept\Eagle ApplicationsOA20161DR-45-16 Multi -ten Office Bldg ERD P-44 drEdocx 18. The applicant shall obtain approval of the development relative to its effects on wetlands or other natural waterways (if applicable) from the Corps. of Engineers and the Idaho Department of Water Resources and/or any other agency having jurisdiction prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first. 19. Basements in the flood plain are prohibited. 20. The Americans with Disabilities Act, Uniform Building Code, Eagle City Code, and all applicable County, State and Federal Codes and Regulations shall be complied with. All design and construction shall be in accordance with all applicable City of Eagle Codes unless specifically approved by the City Council. 21. New plans, which incorporate any required changes, shall be submitted for staff approval. Staff may elect to take those plans to the Design Review Board and the City Council for review and approval. 22. Any changes to the plans and specifications upon which this approval is based, other than those required by the above conditions, will require submittal of an application for modification and approval of that application prior to commencing any change. 23. Any modification of the approved design review plans, including, but not limited to building design, location and details, landscaping, parking, and circulation, must be approved prior to construction/ installation of such changes. Failure to do so may result in the requirement to modify the project to comply with the approved design review and/or result in the inability to issue a final approval for occupancy of this project. 24. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the City of Eagle of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. 25. Approval of any Design Review shall expire without notice to the applicant on the date of expiration of the Design Review if construction has not started prior to that date, as stipulated in Eagle City Code (one year from the City Council approval date). 26. All ground -mounted accent lighting fixtures and monument sign lighting fixtures shall be screened from view with the use of landscaping (top of the fixture shall be no higher than the surrounding landscaping). The light source itself shall otherwise be screened as provided for within Eagle City Code. 27. The City's actions on the application does not grant the applicant any appropriation of water or interference with existing water rights. The applicant indemnifies and holds the City harmless for any and all water rights, claims in any way associated with this application. CONCLUSIONS OF LAW: 1. The Board reviewed the particular facts and circumstances of this proposed design review application (DR -45-16) with regard to the Eagle City Code Title 8, Chapter 2, Article A, DR Design Review Overlay District, and based upon the information provided with the conditions required herein, concludes that the proposed design review application is in accordance with the Eagle City Code and the Eagle Comprehensive Plan. 2. The Board reviewed the particular facts and circumstances of the proposed design review in terms of Eagle City Code 8-2A-13, "General Standards For Design Review" and has concluded that the proposed design review: Page 9 of 11 KAPlanning Dept\Eagle ApplicationADA2016OR-45-16 Multi -ten Office Bldg ERD P-44 drf.docx A. Will function in conformance with the applicable strategies of the Eagle Comprehensive Plan and is in accordance with the regulations of this code since there are no inconsistencies with the comprehensive plan and an office building is permitted with the approval of a design review application within the MU (Mixed Use) zoning district; B. Is of a scale, intensity, and character that is in harmony with existing conforming and planned development in the vicinity of the site since the building is designed to complement the general vicinity and provide aesthetically pleasing architecture to enhance the character of the area; C. Is designed with adequate off street parking facilities in such a way as to not interfere with ingress/egress to the site and will serve the intended use so as to not cause conflict with adjacent uses as anticipated within the zoning district since the site meets the required parking for an office and the drive aisles have been design in conformance with Eagle City Code 8-4-5; D. Will not interfere with the visual character, quality, or appearance of the surrounding area and city, and where possible, enhance the continuity of thematically common architectural features since the proposed building has been designed with quality materials and similar features utilized on other buildings within the development and will enhance the character of the area; E. Will have facades, features, and other physical improvements that are designed as a whole, when viewed alone as well as in relationship to surrounding buildings and settings since the proposed building has been designed with quality materials and similar features utilized on other buildings within the development and is in conformance with the Eagle Site and Architecture Design manual; F. Will not obstruct views and vistas as they pertain to the urban environment and in relation to artistic considerations since the proposed building is in conformance with the required setbacks and height restrictions; G. Will provide safe and convenient access to the property for both vehicles and pedestrians through patterned traffic circulation and connectivity to abutting development since the applicant has complied with the Eagle River Master Pathway Plan with regard to pedestrian circulation and the parking lot has been design with connectivity to the adjacent sites; H. Is in the interest of public health, safety, and general welfare promoting a pedestrian friendly and walkable environment in balance with protecting a viable commercial center in the area since the site has been designed in compliance with the Eagle River Master Pathway Plan; and I. Will have signs, if proposed, that are harmonious with the architectural design of the building and adjacent buildings, and will not cover or detract from desirable architectural features since the signage is designed in conformance with the master sign plan associated with the subject building and the Eagle River development agreement. DATED this 8`' day of September 2016. DESIGN REVIEW OARI OF TH O E} GLE Ada CwAd l Grubb, Chairman Page 10 of 11 KAPlanning Dept\Eagle ApplicationADA2016\1311-45-16 Multi -ten Office Bldg ERD P-44 drf docz ATTEST: SEAL —4-V- Sharon K. Bergmann, Eagle City Clerk Regulatory Taking Notice: Applicant has the right, pursuant to section 67-8003, Idaho Code, to request a regulatory taking analysis Page 11 of 11 KAPlanning Dept\Eagle ApplicationADA2016MR• 45.16 Multi -ten Office Bldg ERD P-44 dd.docx