Loading...
Mechanical - 15-02-118 - 3692 W Gold Fork Dr - 02/27/2015Permit Number 15-02-118-M HVAC CONTRACTOR City of Eagle Mechanical Permit 660 E. Civic Lane Eagle, ID 83616 Inspection Line: (208) 939-4462 Issue Date I 2/27/2015 Issue Receipt Advanced Heating & Cooling 721 N Ralstin Meridian ID 83642 (208) 846-9100 PERMIT ADDRESS Subdivision Henrys Fork #2 Lot ` 21 Address Block 1 /692 W Gold Fork Dr 3 RESIDENTIAL PERMIT FEES Permit Fee Supplemental Permit Fee $50.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 = $0.00 Furnace Up To 100,000 Furnace Over 100,000 Unit Heaters / Mini Split System Heat Pump Air Conditioners Up To 3 Ton Air Conditioners Over 3 Ton Air Handlers Up To 10,000 CFM Air Handlers Over 10,000 CFM Duct Work Only Builders Signature 0 .0 0 0 0 0 0 $0.00 $0.00 $0.00 $0.00 City Clerk/Authorized Personnel Notes: 13.002058 COMMERCIAL PERMIT FEES Job Scope / Notes Commercial Bid: $0.00 Permit Fee (Bid < $500K) Permit Fee (Bid $500K to $1M) Permit Fee (Bid over $1M) Gas line to outdoor fire pit only. 0 0 0 Bath and Laundry Dryer Vent Range Hood Water Heater Vent Fireplaces Vent Gas Piping Outlet Each Additional Outlet Reinspection Fee 0 0 0 0 0 1 0 Residential Fee: .1AXe-n ULIVO/A (Ala_ Fees Adopted by City Council on February 18, 2003 - Resolution 03-04 $0.00 $0.00 $0.00 $0.00 $0.00 $10.00 $0.00 $0.00 $60.00