Loading...
Service Solicited - 2021 - Harris Mountain West - HVAC Network Maintenance Lam HARRIS Eagle, Idaho Service Agreement For Automation Services For Eagle City Hall Jan 2022- December 2022 • .3 — - _ _ 4 yy • Table of Contents Executive Summary 2 Program Implementation 3 Terms and Conditions 5 Signature Page 6 List of Maintained Equipment 7 Executive Summary Harris Mountain West appreciates the opportunity to partner with the City of Eagle to provide superior service for the life of the Eagle's City Hall in downtown Eagle. Harris Mountain West contains the support tools and personnel to accommodate the needs of Southern Idaho. Harris Mountain West will also be a valuable resource for helping your facility with cost effective building solutions that will be delivered on-time and on-budget. You will be ensured of customized solution, personal attention, and fast response times of a local operation. This proposal offers the services that are necessary to ensure that the building automation system and controlled devices at the Eagle City Hall is operating at peak efficiency to ensure maximum energy savings and occupant comfort. This Service Agreement features the following services: 4 visits per for work described below: • Quarterly Automation Visits for System Loop Tuning, System Optimization. 8 hours per visit. • Any programming, graphic or trending modifications need to be made • Complete Local Support A key ingredient in controlling future costs is to maintain the equipment so that it is running at peak efficiency. Harris Mountain West Service Agreement program will benefit the City of Eagle in the following areas: • Optimized Comfort Conditions • Operator Efficiency • Extended Equipment life • Optimized Energy Savings Harris Mountain West is dedicated to total customer satisfaction. Our commitment to total quality encompasses two ideals: quality is customer driven and improvement is continuous. Every employee is chartered with the task of contributing to customer satisfaction through understandingcustomer requirements and consistentlymeetingor exceedingthose q requirements. We will focus on identifying and improving processes that affect the Eagle City Hall. This level of commitment and partnering is necessary to foster an atmosphere that strives toward the goal of superior building performance in the Controls system. Harris Mountain West is dedicated to helping City of Eagle's staff meet their goals for the facilities automation controls. Program Implementation Automation System Maintenance We will perform four(4)onsite visits per year. Each visit will consist of a tech being on site(6)hours. It is critical that this time be dedicated to improving the operation of the Building Automation System. All other service request will be billed as T&M. Scope of work as follows. • System optimization- Control system optimization includes but is not limited to the following: Running trends to make sure set point values are being met according to design specifications. Identifying and documenting any control and or mechanical system that are discovered to be out of design variance. List of design variance from tending logs will be used for system loop tuning. • Control Loop Tuning • Software and Firmware Analysis • Onsite Database Backups • Alarms • Go Through Alarm Log and Investigate Why Alarm was Recorded • Verify Each Alarm Works Properly and Have Been Logged • Verify Wire Terminals Are Tight on Control Panels • Check Reports for Bus Communication Problems • Sensor Calibration as required • Verification of Damper Operation Corrective Maintenance and Component Replacement;Labor and Material Costs. This contract does not include parts. We will report to City Building Facility Staff(Eric Ziegenfuss)any need for repair or replacement of failed or worn components.This will help to minimize obsolescence and to maintain your system in peak operating condition. Components that are suspected of being faulty will be reported and recommended by Harris Mountain West that they be repaired or replaced in advance to prevent system failure. Emergency Services Response Window-24 hours-7 days.We will provide emergency service, between scheduled preventive maintenance calls,Onsite Response(24 hours-7 days, 2 hours)to minimize downtime. Emergencies will be determined by the Eagle City Building Facility Staff(Eric Ziegenfuss)and Harris Mountain West. On-Site Response Time Within 2 Hours. We will be on-site to provide emergency service within two hours. Non-emergency calls,as determined by City Building Facility Staff(Eric Ziegenfuss)and Harris Mountain West,will be incorporated into the next scheduled preventive maintenance visit. Labor and Material Rates Outside of Service Agreement Technician Labor Rate=$120 an hour Material Rates=Cost plus 25% Documentation and quality Assurance Documentation of All Service Provided. We will document each on-line and on-site service call and furnish you with a copy showing time,date,and a brief description of activity. Work orders for on-site system preventive maintenance will list the inspection date, individual to report to,equipment identification,equipment location,work to be performed,and any special instructions. Terms and Conditions The following pages comprise the Terms and Conditions section which further defines the scope of this Service Agreement. General Terms&Conditions This proposal is only for the work stated. If any other deficiencies are found during this work or after start up, that is not a part of this quotation,they will be brought to your attention for action and approval, prior to any additional work being performed. Our quotation is based on the prevailing cost of labor and materials and is subject to revision sixty(60)days from this date unless it is bonded by a purchase order or signed agreement. The customer agrees to pay for any reasonable attorney fees and costs of collection incurred by Harris Mountain West to enforce the provisions of this agreement. Any controversy or claim arising out of or relating to this Agreement shall be resolved by binding arbitration by a single arbitrator under the rules of the American Arbitration Association. In the event that a dispute arises with respect to this Agreement which results in arbitration or litigation,the prevailing party shall be entitled to an award of reasonable attorney's fees,expert fees,and costs. In no event shall Harris Mountain West be liable to customer or any other person or entity for the cost of substitute goods, or any special, consequential, incidental, indirect, exemplary or punitive damages, however caused, whether for breach of contract. Tort, negligence, strict product liability or otherwise (including, without limitation, damages based on loss of profits, data or business opportunity), and whether or not customer has been advised of the possibility of such damages. This limitation shall apply notwithstanding any failure of essential purpose of any limited remedy provided herein. Harris Mountain West' maximum aggregate liability for damages and losses arising out or relating to this agreement shall be limited to [the total payments made by customer to Harris Mountain West hereunder during the twelve(12)month period immediately preceding the imposing of such liability. INITIAL Harris Mountain West Service Agreement Proposal By and Between: City of Eagle Harris Mountain West Services shall be provided at the following location: JOB ADDRESS: 660 East Civic Lane Eagle, Idaho 83616 Harris Mountain West, will provide the services as outlined in the attached proposal dated 09/10/21. Duration: This agreement shall remain in effect for a term of one year beginning0l/01/2022 and ending onl2/3/2022. Annual Sum: $4500.00 The annual sum shall be invoiced quarterly and payable in advance in four equal portions of Rrdibtilsect elttu et h*ris proposal are firm for 90dawssal submitted by: Brandon Hofhines City of Eagle Harris Mountain West Signature Date Signature Date iforp bi iti(OW at all 1-1 Approved for Harris Mountain West by: Todd Petersen, BA GM 1 Digitally signed by Edward Rebman DN:C=US, Edward Rebrl1an E=erebman@harriscompany.com, CN=Edward Rebman Date:2021.12.20 09:31:38-07'00' Signature Date List of Maintained Equipment EQUIPMENT MANUF. MODEL 1 N4 Jace Honeywell Mechanical Room 10 Spyder Controllers Honeywell Associated Roof Top Units