Service Solicited - 2021 - Baer Design Group - Task Order 19-03 Change Order No. 2 State & Eagle Intersection CHANGE ORDER No.2
THE CITY OF
Date of Request 4/23/2021
Date of Contract 4/27/21
Task Order 19-03: State & Eagle Intersection
Notice: This contract was approved with an approved scope of work and a negotiated fixed Price Total of$24,075.00. The Eagle City
Council did not approve contingencies to this contact, all changes in program, materials, timeline and cost must be approved by the
Eagle City Council. Staff does not have authority to approve changes. All Change order requests must be submitted in writing including
this form for approval by the City of Eagle. Eagle City Council meets the 2nd and 4th Tuesdays of each month,change orders must be
received no later than the Wednesday prior to the meeting.
The contract documents are modified as follows upon execution of this change order:
1) Request to extend the project timeline through September 30, 2023 to allow the consulatnat to complete
the construction adminstation work with ACHD as detailed int he orginal task order.
2) Expand the scope of work to include: The design and prepare construction drawing for the inclusion in the
ACHD plan set for construction in 2023 of 3-2" and 1-3" conduit sleeves for City utilities including but not
limited to fiber optics within the paver section of the sidewalk. The design work should include both the north
and south side of Eagle Road running east/west with the terminus of the project consistent with the proposed
ACHD sidewalk improvements or another logical boundary. The design work should also include stubs at all
road crossings and junction boxes at the shared corners of all property lines. The project should include an
estimate for construction and post construction survey of the exact location of the conduit,junction boxes
and stubs.
Contract prices are hereby amended as follows:
Item Description QTY Units Unit Price Extension
Electrical engineering work to Provide Low-Voltage
conduits to light pole bases for future utility by others
(fiber). $ 1,600.00
Co#_2_ Total Net Change $ 1,600.00
Changes to Final Completion Date: YES NO
CHANGES TO CONTRACT PRICE: CHANGES IN CONTRACT TIMES:
Original Contract Timeline: Completion by
Original Contract Price: 9/30/2020
$24,075.00
Start of Construction: N/A
Increase from previously
approved change orders no._1_to_1_ Final Completion: 9/30/2020
$0.00
Contract price Prior to this Change Order: (Increase) (Decrease)from previously approved
$24,075.00 change orders no. to
Final Completion:
Ready for final Payment :
Increase from this change:
$1,600.00
Increase from this Change Order:
Final Completion: 9/30/2023
Contract Price including this Change Order: Ready for final Payment :
$25,675.00
Contract Times with all approvals:
Final Completion: 9/30/2023
Ready for final payment :
Contractor Requesting uestin Change: Staff Review:
By: �� c� By:
Date: e/l /Z� Z ( Date: ,, .7.2'71
City Approval:
By:
Date: i/027k
April 23, 2021
.e + Baer Design Group
/
f\t. \Jr. 539 S. Fitness Place, Suite 120
Eagle, Idaho 83616
�.�...,� ATT: Greg Baer
RE: ADDITIONAL ENGINEERING SERVICES CONTRACT
MUSGROVE PROJECT— Eagle Road & State Street Lighting project
ENGINEERING,P.A.
Bill A.Carter,P.E.—Principal Dear Greg,
Todd D.Nelson,P.E.—Principal
Kurt E.Lechtenberg.P.E.—Principal The following additional engineering services have been requested for the above
Jason Rice,P.E.—Principal
Thad S..Mason,P.E.—Principal These servicespartoriginal project. were not a of the on inal fee, and will be
Matthew N.Bradley,P.E.-Principal billed as an extra service as noted.
Scope of Additional Services:
Provide Low-Voltage conduits to light pole bases for future utility
by others (fiber).
Engineering Fee for Additional Services:
Fixed Fee $1600.00
Services provided on an hourly basis shall be at the following hourly rates for 2021.
Services provided beyond 2021 shall be at the rates in effect at the time of service.
Principal $170.00/hour
Commissioning Agent $140.00/hour
Energy Modeling $140.00/hour
Senior Project Engineer $140.00/hour
Project Manager $120.00/hour
Project Engineer $100.00/hour
Senior Project Designer $100.00/hour
Project Designer $ 90.00/hour
CADD Operator $ 80.00/hour
Administrative Assistant $ 80.00/hour
Expenses (mileage, printing, travel, deliveries) Billed at Cost
I sincerely appreciate the opportunity to work with you on this project, Greg. If this
proposal meets with your approval, please sign in the appropriate space below and
return to me retaining the second copy for your records.
BOISE OFFICE:
234 S.Whisperwood Way
Boise,Idaho 83709
208-384-0585
IDAHO FALLS OFFICE:
645 W.25TH Street
Idaho Falls,Idaho 83402
208-523-2862
Respectfully,
Greg Bartholomew
GB/eby
Additional Engineering Services—
Client:
Approved this day of 2021.
By
(Please Print Name & Title) (Signature)
Billing Reference No.#
Note: We cannot begin our work on these additional services without receipt of a
signed contract. Payment for services is due after completion of services — whether
or not the project proceeds into construction.