Loading...
Resolution - 2021 - 21-08(2) - Combined Fee Schedule (Entirety) - 04/05/2021 City of Eagle Combined Fee Schedule (Adopted Resolution 21-08, March 23, 2021) Building Department Fees See Building Department Fee Schedule on www.cityofeagle.org Sq Foot Value is from the International Code Council Building Valuation Data dated February 2020 (located at http://www.iccsafe.org/cs/Pages/BVD.aspx) ECC X-Reference Description Fees Development Impact fees Park Impact fees$1,115.72Resolution 17-12 \[5/9/2017\] Pathway Impact fees$330.50Resolution 17-12 \[5/9/2017\] Resolution 20-28 \[12/8/2020\] Police Impact fees - residential per unit$111.00 Police Impact fees - non-residential per sq ft$0.04Resolution 20-19 \[9/22/2020\] Resolution 20-19 \[9/22/2020\] Fire Impact fees - residential per unit$897.00 Resolution 20-19 \[9/22/2020\] Fire Impact fees - non-residential per sq ft$0.36 Electrical FeesFee $45.00 Basic Fee for work not exceeding $200.00 in cost and Small Works not involving a change in service connections. Swimming Pools $195.00 Basic Fee (this covers the 3 required inspections) Cost up to $10,000: Multiply by 2% (0.02) plus $60.00 Cost between $10,001 - $100,000: Subtract $10,000, Multiply Other Installations: Commercial / Industrial / Solar / Renewable Energy by 1% (0.01) plus $260.00 Cost over $100,001: Subtract $100,000, Multiply by .5% (0.005) plus $1,160.00 Mechanical FeesFee New Residential - Single Family Dwelling < = 1500 square feet$130.00 1501 to 2500 square feet$195.00 2501 to 3500 square feet$260.00 3501 to 4500 square feet$325.00 > 4500 square feet$325.00 plus $65.00 per additional 1000 square feet Fireplace (Gas or Electric)$75.00 New Residential: Multi-Family Dwelling (contractors only), Duplex$260.00 New Residential: Multi-Family Dwelling (contractors only), Three or more Multi-Family Units$130.00 per building plus $65.00 per unit Existing Residential (Includes Retro Fits, Additions, etc.) Base Administrative Fee$65.00 HVAC items up to the maximum corresponding square footage of the residential building Base fee plus $10.00 per HVAC item Fireplace Installation (two inspections) $130.00 Hydronic Flooring $65.00 plus $10.00 for each additional manifold Base Administrative fee $65.00 plus $10.00 for each duct, Modular, Manufactured or Mobile Homes fireplace, piece of HVAC equipment or vent up to maximum square footage Gas Line Base Administrative Fee$65.00 Reinspection Fee, Requested Inspections, Technical Service (Consultation)Fee Reinspection Fee$65.00 minimum Reinsertion fee assessed per inspection $65.00 minimum $65.00 per hour or portion thereof in excess of one hour 21-08 Combined Fee Schedule.xlsx Requested Inspections outside the normal inspection process or Technical Service (Consultation) including travel time to and from location City of Eagle Combined Fee Schedule (Adopted Resolution 21-08, March 23, 2021) Commercial / Industrial Fee Schedule - Other InstallationsFee Work not specifically covered by any other fee schedules. Fees based on FAIR MARKET PROJECT VALUE which means total Labor, Materials and Equipment for a complete working system. This value is not reducible due to owner supplied and/or donated materials, labor and/or equipment. Overhead and Profit must be included in value. (These Values WILL NOT include the Base Admin Fee) Cost up to $20,000Multiply by 3% (.03) plus $60 Cost between $20,001 - $100,000Subtract $20,000, multiply by 2% (.02), plus $660 Cost over $100,001Subtract $100,000, multiply by 1% (.01), plus $2,260 Fee Plumbing Permit Fees New Residential - Single Family Dwelling < = 1500 square feet$130.00 1501 to 2500 square feet$195.00 2501 to 3500 square feet$260.00 3501 to 4500 square feet$325.00 > 4500 square feet$325.00 plus $65.00 per additional 1000 square feet Existing Residential Base Fee$65.00 Additional Fixtures Each (Excluding garbage disposals and dishwashers)$10.00 Replacement Fixtures Each$10.00 Sewer Line Installation (base fee not applicable)$65.00 Water Line Installation (base fee not applicable)$65.00 Combination (base fee not applicable)$65.00 Modular, Manufactured, Mobile Homes Sewer and Water Connection$65.00 Water Heater - Water Softener$65.00 Backflow Prevention Device$65.00 Multipurpose Fire Sprinklers and Domestic Water Supply System Inspection Fee for 1-2 family or $65.00 $4 per fire sprinkler head, whichever is greater New Residential: Multi-Family Dwelling (contractors only), Duplex$260.00 New Residential: Multi-Family Dwelling (contractors only), Three or more Multi-Family Units$130.00 per building plus $65.00 per unit Fee Commercial All plumbing permits are calculated from the verified contract price table below. Replacement Fixtures Each$10.00 Sewer and water service lines installed by persons performing work other than the plumbing Use the Verified Contract Price Table Below contractor of the building: fee based on the contract price of the completed installation to be calculated from the verified contract price table below. Commercial coaches - Manufactured buildings: All commercial coaches and manufactured Use the Verified Contract Price Table Below buildings constructed in Idaho, or constructed for use in Idaho, must purchase permits as per residential fee schedule. Lawn Sprinklers: inspection fee (to be calculated from the verified contract price table below) based Use the Verified Contract Price Table Below on the cost of labor and materials needed to complete the installation from the connection to the water system through the backflow prevention device. Mobile home parks and/or RV parks: Sewer and water service lines shall be classed as commercial. Use the Verified Contract Price Table Below Note: This does not include the connection of the mobile home. (Refer to Residential Section). 21-08 Combined Fee Schedule.xlsx City of Eagle Combined Fee Schedule (Adopted Resolution 21-08, March 23, 2021) Installations done with volunteer labor and/or donated materials will be calculated at fair market Use the Verified Contract Price Table Below value. Verified Contract Price Table Commercial / Industrial (Other Installations) - Valuation Table Cost up to $20,000: Multiply by 3% (.03) plus $60 Cost between $20,001 - $100,000: Subtract $20,000, multiply by 2% (.02), $660 Cost over $100,001: Subtract $100,000, multiply by 1% (.01), plus $2,260 Fee Additional / Miscellaneous Requested Inspections $65.00 minimum plus $65.00 per hour or portion thereof in excess of one hour to include travel time to and from location Re-Inspections - Trips to inspect when: Inspection requested and the work is not ready Re-Inspections - Trips to inspect when: Submitter has not accurately identified the work location $65.00 Re-Inspections - Trips to inspect when: The inspector cannot gain access to perform the inspection Re-Inspections - Excessive trips to inspect as a result of submitter improperly responding to a correction notice $65.00 minimum plus $65.00 per hour or portion thereof in Plan Checking excess of one hour $65.00 minimum plus $65.00 per hour or portion thereof in Technical Service excess of one hour Working without a permit: Failure to submit and obtain proper permits will, at the direction of the City of Eagle, result in the assessment of a double fee or imposition of civil penalties, or both. 21-08 Combined Fee Schedule.xlsx City of Eagle Combined Fee Schedule (Adopted Resolution 21-08, March 23, 2021) City-Administrative Fees ECC X-Reference Description Fees ECC 3-1-1 General Business License$25.00 Dog Licenses Nonnuetered or Nonspayed Dogs $25.00 Nonnuetered or Nonspayed Dogs (Senior Citizen Fee) $25.00 ECC 4-5-5 Spayed or Neutered Dogs$10.00 Spayed or Neutered Dogs (Senior Citizen Fee 60+ Years Old)$5.00 $5.00 Late Fee - After February 1 Alcohol License Bottled or Canned Beer Off Premises Only $50.00 Beer to be Consumed Off the premises with Validly Issued Catering Permit $200.00 Beer to be Consumed on the Premises Only $200.00 Beer to be Consumed on and off the Premises $250.00 Wine to be Consumed Off the premises Only $125.00 ECC-3-2 Wine to be Consumed Off the Premises with Validly Issued Catering Permit $200.00 Wine to be Consumed on the Premises Only $200.00 Wine to be Consumed on and off the Premises $325.00 Liquor to be consumed on the premises only $562.50 License Transfer Fee$5.00 ECC-3-2D-4 $20.00 Open Container Permit ECC-3-2C-12 $20.00 per day Catering Permit Labor Costs and Copying Documents Black and White Copies - Under 100 PagesFree of Charge Black and White Copies - 100 + Pages$.10 per page Colored Copies - Under 100 PagesFree of Charge Colored Copies - 100 + pages$.25 per page Records from Which Nonpublic Information Must be Deleted Charged at the City's Direct Cost The Actual Labor Associated with Responding to Requests Which Exceeds Two (2) Person HoursCharged at the City's Direct Cost Extraordinary Copies i.e. Maps, Electronic Media, Charged at the City's Direct Cost of Oversized DocumentsDuplication Duplication of Computer Tape, Computer Disc, Charged at the City's Direct Cost of Copying Microfilm, or Analogous Records the information in that form, the City's Cost of Conversion or the Cost of Conversion Charged by a Third Party, if the Existing Electronic Record is Converted to Another Electronic Form $100.00 and Direct costs associated with the ECC-3-4-8 Vendor, Solicitor, Temporary Merchants Permit Background Check ECC-3-4-8 $50.00 Special Event Permit ECC-4-2 Adopted via a separate Resolution Trash Collection 21-08 Combined Fee Schedule.xlsx City of Eagle Combined Fee Schedule (Adopted Resolution 21-08, March 23, 2021) Meeting Room Reservation 1/2 Day (4 Hours) $50.00 per room Full Day (8 Hours) $100.00 per room Additional Fee if Food is to be Served or Consumed$25.00 ECC 4-1-3(H) $150.00 Nuisance Abatement Administrative Fee ECC 4-1-3(E) Nuisance Abatement City Council Appeal Fee$350.00 21-08 Combined Fee Schedule.xlsx City of Eagle Combined Fee Schedule (Adopted Resolution 21-08, March 23, 2021) Library Fees Adopted by the Eagle Public Library Board of Trustees, November 20, 2019 Fee Description Library Use Account, per year, per household $114.00 Non-Resident Account Fines All items except DVDs and Video Games (per day) $0.00 DVDs and Video Games (per day) $0.00 Mobile Hotspots (per day) $5.00 Collection agency charge for lost and damaged items$10.00 Printing & Copying Black and white (per one-sided page)$0.10 Color (per one-sided page)$0.50 Faxing (per one-sided page) $1.00 3D objectsfilament cost / gram Meeting Room Use After hours (per hour) $60.00 Miscellaneous City of Eagle's Cost Baby Changing supplies City of Eagle's Cost Flash Drive LaminatingCity of Eagle's Laminate Cost per linear foot Lost or Damaged Materials Lost or Damaged MaterialsCity of Eagle's Replacement Cost Processing Fee$5.00 RFID Tag$1.00 Barcode$1.00 Materials ContainerCity of Eagle's Replacement Cost 21-08 Combined Fee Schedule.xlsx City of Eagle Combined Fee Schedule (Adopted Resolution 21-08, March 23, 2021) Parks & Recreation General Park Shelter RentalsResident Non-Resident City of Eagle does not reserve this park Arboretum Park $25.00 (4 hours)$50.00 (4 hours) $50.00 (8 hours)$75.00 (8 hours) Friendship Park, Orville Krassen Park, Ada/Eagle Sports Complex $75.00 (Winter 7am-8pm, $100.00 (Winter 7am-8pm, Summer 8am-9pm)Summer 8am-9pm) City of Eagle doesnot reserve this park Heritage Park Per Section:Per Section: $25.00 (4 hours)$50.00 (4 hours) $50.00 (8 hours)$75.00 (8 hours) $75.00 (Winter 7am-8pm, $100.00 (Winter 7am-8pm, Summer 8am-9pm)Summer 8am-9pm) Stephen C Guerber Park and Reid Merrill Park Entire Shelter:Entire Shelter: $75.00 (4 hours)$100.00 (4 hours) $150.00 (8 hours)$175.00 (8 hours) $225.00 (All Day) $250.00 (All Day) Amusement Equipment & Large Canopies No Charge Community Event FeesDescriptionPeriod Fees Application FeeOne Time$100.00 Damage Deposit (Events over 250)Refundable$250.00 Park Sites Stephen C Guerber (A1, A2, B1, B2, Baseball, Daily Sunrise Shelter, Sunset Shelter) $875.00 Stephen C Guerber (A1, A2, B1, B2, Baseball, 4 Hr Time Block (8am-12pm, Sunrise Shelter, Sunset Shelter)12:30pm-4:30pm, 5pm-9pm) $300.00 Stephen C Guerber (Sunrise Shelter, Sunset 4 Hr Time Block (8am-12pm, Shelter)12:30pm-4:30pm, 5pm-9pm) $225.00 Stephen C Guerber (Per Field) (Special Events Daily Only) $75.00 Daily Reid W Merrill (A, B, C Shelter) $550.00 4 Hr Time Block (8am-12pm, 12:30pm-4:30pm, 5pm-9pm) Reid W Merrill (Entire) (A, B, C Shelter)$300.00 4 Hr Time Block (8am-12pm, 12:30pm-4:30pm, 5pm-9pm) Reid W Merrill (Shelter)$75.00 Reid W Merrill (Per Field) (Special Events 4 Hr Time Block (8am-12pm, Only)12:30pm-4:30pm, 5pm-9pm) $75.00 Daily Ada/Eagle Sports Complex (Zone 1)$500.00 Daily Ada/Eagle Sports Complex (Zone 2)$400.00 Daily Ada/Eagle Sports Complex (Zone 3)$350.00 4 Hr Time Block (8am-12pm, 12:30pm-4:30pm, 5pm-9pm) Ada/Eagle Sports Complex (Zone 2)$300.00 21-08 Combined Fee Schedule.xlsx City of Eagle Combined Fee Schedule (Adopted Resolution 21-08, March 23, 2021) 4 Hr Time Block (8am-12pm, 12:30pm-4:30pm, 5pm-9pm) Ada/Eagle Sports Complex (Zone 3)$275.00 4 Hr Time Block (8am-12pm, 12:30pm-4:30pm, 5pm-9pm) Ada/Eagle Sports Complex (Shelter)$25.00 4 Hr Time Block (8am-12pm, 12:30pm-4:30pm, 5pm-9pm) Various Neighborhood Park$75.00 Permits Open Container PermitDaily$20.00 Catering PermitDaily$20.00 Noise Waiver (After 10 PM)DailyNo Charge Sports Field Reservation Fees **DescriptionPeriod Fees Resident / Non-Resident Stephen C Guerber (Per Field A1,A2,B1, B2, Daily$100.00 Baseball) Daily $100.00 Stephen C Guerber Sand Volleyball Court Daily$100.00 Stephen C Guerber Basketball Court Daily $100.00 Reid Merrill (Per Field A, B, C) Daily$100.00 Reid Merrill Sand Volleyball Court Daily$100.00 Reid Merrill Basketball Court Stephen C Guerber (Per Field A1,A2,B1, B2, Hourly$33.25 Baseball) Hourly$33.25 Stephen C Guerber Sand Volleyball Court Hourly$33.25 Stephen C Guerber Basketball Court Hourly$33.25 Reid Merrill (Per Field A, B, C) Hourly$33.25 Reid Merrill Sand Volleyball Court Hourly$33.25 Reid Merrill Basketball Court Daily$100.00 Ada/Eagle Sport Complex Hockey Rink Hourly$33.25 Ada/Eagle Sport Complex Hockey Rink Daily$100.00 Ada/Eagle Sport Complex Basketball Court Hourly$33.25 Ada/Eagle Sport Complex Basketball Court Friendship Park Tennis/Pickleball Court (Per Daily$100.00 Court) Friendship Park Tennis/Pickleball Court (Per Hourly$33.25 Court) 21-08 Combined Fee Schedule.xlsx City of Eagle Combined Fee Schedule (Adopted Resolution 21-08, March 23, 2021) Recreation Classes & ProgramsResident FeesNon-Resident Fees Not to exceed $100/class or $10 fee will be added to class Active Older Adults (50+) activity or program fee $10 fee will be added to class Not to exceed $200/class or Adult Art (13+) or program fee activity $10 fee will be added to class Not to exceed $120/class or Adult Fitness (13+) or program fee activity $10 fee will be added to class Adult Team Sports (16+) Not to exceed $200/team or program fee $10 fee will be added to class Not to exceed $30/class or Fun Run (All Ages) or program fee activity $10 fee will be added to class Not to exceed $275/class or Pre-School (Baby-5) or program fee activity $10 fee will be added to class Not to exceed $50/class or Special Events (All Ages) or program fee activity $10 fee will be added to class Vendors Not to exceed $75/vendor or program fee $10 fee will be added to class Not to exceed $280/class or Youth Art (5-12) or program fee activity $10 fee will be added to class Not to exceed $320/class or Youth Camps (5-12) or program fee activity $10 fee will be added to class Not to exceed $200/class or Youth Sports (2-12) or program fee activity 21-08 Combined Fee Schedule.xlsx City of Eagle Combined Fee Schedule (Adopted Resolution 21-08, March 23, 2021) Planning Fee & Deposit Schedule Pursuant to ECC Title 8, 9, 10, & 11 65 ApplicationPlanning Fee Legal Fee Deposit Engineering Fee $300.00 Accessory Use 6 See Footnote $125.00 Administrative Modification Annexation up to 5 acres $250.00 See Zoning Ordinance 5.01 acres up to 10 acres$500.00 Amendment-Map (Rezone) 10.01 acres or larger$1,100.00 $500 + notification costs 500.00 Appeal(per ECC 8-7) Comprehensive Plan Amendments Less than 250 acres: See Map $2,000.00 6 Text $1,500.00Footnote 250 2 $1,200 + $10/unit above 10 Conditional Use Design Review Appeal (per ECC 8-2A-14)$500.00 $850 + $10 per unit or 1,000 sq. ft. (per Building/Site Plan structure) Subdivision Landscape Plan $650 + $20 for each additional acre Subdivision Monument Sign $350.00 Modification (Board Level)$400.00 Modification (Administrative)$200.00 Minor Modification (paint, lights or windows Drainage Plan Review: 6 $100.00 See Footnote changes) $500 +$250/bldg. $450.00 Master Sign Plan $350.00 Master Sign Plan Modification (Board Level) $200.00 Master Sign Plan Modification (Administrative) $125.00 Single Sign w/in MSP $450.00 Single Tenant Sign No MSP $25.00 Temporary/Portable Sign $450.00 Master Sign Plan, Community (Spring Valley) 2 Development Agreement Original Drafting $800.00 + $20/acre See Zoning Ordinance Amendment-Map (Rezone) $800.00 Development Agreement Modification 6 $350.00 Extension of Time See Footnote 21-08 Combined Fee Schedule.xlsx City of Eagle Combined Fee Schedule (Adopted Resolution 21-08, March 23, 2021) Engineering Plan Review Overall plan review (irrigation, storm, layout, etc.) $2,250+$15/lot Water System Distribution Plan $600+$5/lot Review/QLPE/Completion Check 6 City Well Design 750.00 See Footnote City Well House Design 900.00 6 $1,000+$0.75/linear foot Additional Review 111 Fiscal Impact Analysis $350.00 + See FootnoteSee Footnote See Footnote Floodplain Floodplain Determination Letter $100.00 Overall Development size: <1 acre:$500 1-10 acres:$1250 6 See Footnote 10.01-40 acres:$1,875 1 $500.00 Permit Over 40 acres:$2,500 Phased Permit(each phase after 1): $500 Hydraulic Modeling Review:$1,875 1 6 $500.00 See Footnote Habitat/ Environmental Review Preliminary Grading Plan, Reports with Pre-plat: 1 6 $500.00 $800+$12/lot Final See Footnote Hillside Review Grading Plan with Final Plat: $300+$6/lot Mass Grading Plan (Disturbed Acres): $2750 + Hillside and Grading Permit (Spring $20/acre Final 6 $1,000.00 See Footnote 1 Grading Plan (# of lots in Valley) grading area): $2750 + $10/lot Inspections $100.00 General/Tenant Improvement/Reinspection $150.00 each DR Landscape/Building 6 Streetlight Inspection $50.00 for 1st + $20.00 for each additional See Footnote 21-08 Combined Fee Schedule.xlsx City of Eagle Combined Fee Schedule (Adopted Resolution 21-08, March 23, 2021) 8 $50.00 Misc./Other Fees & Permits Negotiable 2 Planned Unit Development Less than 250 acres: See 6 Footnote $1200.00 + $20.00/lot Preliminary Development Plan 250 acres to 1,000 acres: $500 7 1,001+ acres: Negotiable 6 Final Development Plan$600.00 + $20.00/lot See Footnote PUMP Review: 7 $1,200.00 + $25.00/acre Planning Unit Master Plan Negotiable $800+$8/acre Plats Plat Check: $3,700+$26/lot $2,050.00 + $40.00/lot Combined Preliminary/Final Water System Compliance w/Master Plan: $400+$4/lot $500.001,000.00 Condominium 6 Final Plat Check: See Footnote Final$600.00 + $20.00/lot $900+$6/Lot Parcel Division Review: $750 Lot $450.00 Lot Line Adjustment/Lot Split Line Adjustment: Two Lots: $700 More than 2 lots: $700+$200/lot over 2 Plat Check: $2,800+$20/lot Water Less than 250 acres: System Compliance 6 See Footnote w/Master Plan: $400+$4/lot Preliminary $1,450.00 + $20.00/lot 250 acres to 1,000 acres: Preliminary Floodplain $500 Review (storage, reports): 7 1,001+ acres: Negotiable $750 Private Streets: $500 $500.00 Pressurized Irrigation Waiver Review 6 $1,200.00 + $0.35/Linear Foot Private Road See Footnote $200.00 Property Status Report $25.00/day beginning 3 days after the hearing Public Hearing Sign Removal Penalty Public Hearing Mailing (cost per each $1.50 mailed notice) 8 1st session paid by the requesting party; subsequent 4 sessions and mediation Request for Mediation summary paid proportionately by City and requesting parties 21-08 Combined Fee Schedule.xlsx City of Eagle Combined Fee Schedule (Adopted Resolution 21-08, March 23, 2021) $450.00 + notification costs250.00 Request for Reconsideration Surety Fee Initiation$250.00 6 Renewal $200.00 See Footnote Partial Release $200.00 Conifers: $60.00/vertical foot Tree Fund (in-lieu of fee) Deciduous: $175.00/caliper inch 6 $400.00 + $8.00 /property w/in 300 ft. Vacation (Easement/ROW, etc.) See Footnote 6 $800.00 Variance See Footnote $600.00$250.00 Waiver Waiver, Accessory Structure Setback 6 $600.00 See Footnote (per ECC 8-2-4(a)(5)) $1,200.00$250.00 Waiver, Home Occupation Zoning Ordinance Amendment Less than 250 acres: See 6 Footnote 250 Up to 100 acres: $1100.00 Plus: $40.00 for Map (rezone) acres to 1,000 acres: $5,000 each 10 acres above 100 acres 1,001+ acres: 7 Negotiable Text $1,300.00$500.00 Zoning Permit/Certificate 3a $50.00 New Building/Building Modifications $50.00 Residential/Tenant Improvement $150.00 Multi-family/Office/Commercial/Industrial $50.00 Business license review/Home Occupation 6 Home Occupation Class C$1,200.00 See Footnote 3b $150.00 Existing Structure (change in use) $25.00 Fence (front yard & street side) Temporary Use/ Temporary Construction $85.00 Trailer/Alcohol Letters/ Others $50.00 Dwelling Rebuild Letter Footnotes: 1: All applications are subject to ECC 1-7-4: any direct costs incurred by the City in obtaining a review of the application by attorneys, architects, engineers or other professionals necessary to enable the City to approve or disapprove the application shall be paid for by the applicant. 2: When using a DA in lieu of a PUD the PUD fees still apply. 3: a) Zoning Permit is applied for at time of building permit application; b) Zoning Permit is required prior to the submittal of a building permit or a business license. 4: A request for mediation is not guaranteed and must be agreed to by the City Council. 5: Engineering review fees herein are non-refundable retainers. Review time that exceeds the retainer fee shall be paid at the engineer's contracted hourly rate in accordance with ECC 1-7-4. 6: Legal Fees shall be paid pursuant to ECC 1-7-4-B-1. 7: Negotiable means a deposit established by the City Council prior to the submittal of the application. 8: "Session" is defined as a meeting or meetings held on the same day in the same location. 21-08 Combined Fee Schedule.xlsx City of Eagle Combined Fee Schedule (Adopted Resolution 21-08, March 23, 2021) Water Department Rates & Fees (Pursuant to ECC 6-5) ERU Based Fees Base Fee (3/4 " Meter) * ERU Multiplier 1" meter = 1.78 $1,010.00 Hook Up Fees For meter sizes larger than a 3/4 1.5 " meter = 4.0 $2,100.00 Storage and Trunk Line Fees (STL) inch meter, please use the ERU $400.00 2" meter = 7.11 Water Construction Equivalency Fees (WCE) multiplier (to the right) times the associated rate or fee in the Base Monthly Fee (increase approved Res 17-31)3" meter = 16.0 $19.45 previous column (to the left) to 4" meter = 28.44 $100.00 Service Deposits find the appropriate fee. System Enhancement Fee (DEQ Funds)6" meter = 64.20 $10.93 Consumption Rate per 100 cubic feet$1.41 $0.34 Water Safety Fee (DEQ pass-thru fee) Service Application Fee$10.00 $13.00 Delinquent Fee Reconnection fees for collections$25.00 $80.00 After hours reconnection fees After hours connection fees$50.00 $20.00 Returned check fee Unoccupied dwelling rate Base Rate + System Enhancement Fee $1.73 Bulk rate ( IE, dust abatement) per 100 cubic feet Late penalties for bulk users$13.00 $100.00 Hydrant Meter Deposit Automatic Checking Withdrawal Fee (ACH)$0.50 $50.00 Additional trip charges Unauthorized access to meter, tampering$250.00plus labor & materials Jumpers/Bridges placed in meter pitplus labor and materials $500.00 Footnotes: 1. ERU = Equivalent Residential Units 2. Example of ERU Calculation: 1" meter = $1010 X 1.78 = $1,797.80; 1" base monthly fee = $19.45 X 1.78 = $34.62 3. A complete calculation of the ERU items can be found on the City of Eagle's Water Department website, www.cityofeagle.org/water 21-08 Combined Fee Schedule.xlsx