Resolution - 2021 - 21-08(2) - Combined Fee Schedule (Entirety) - 04/05/2021
City of Eagle
Combined Fee Schedule
(Adopted Resolution 21-08, March 23, 2021)
Building Department Fees
See Building Department Fee Schedule on www.cityofeagle.org
Sq Foot Value is from the International Code Council Building Valuation Data dated February 2020
(located at http://www.iccsafe.org/cs/Pages/BVD.aspx)
ECC X-Reference
Description Fees
Development Impact fees
Park Impact fees$1,115.72Resolution 17-12 \[5/9/2017\]
Pathway Impact fees$330.50Resolution 17-12 \[5/9/2017\]
Resolution 20-28 \[12/8/2020\]
Police Impact fees - residential per unit$111.00
Police Impact fees - non-residential per sq ft$0.04Resolution 20-19 \[9/22/2020\]
Resolution 20-19 \[9/22/2020\]
Fire Impact fees - residential per unit$897.00
Resolution 20-19 \[9/22/2020\]
Fire Impact fees - non-residential per sq ft$0.36
Electrical FeesFee
$45.00 Basic Fee for work not exceeding $200.00 in cost and
Small Works
not involving a change in service connections.
Swimming Pools
$195.00 Basic Fee (this covers the 3 required inspections)
Cost up to $10,000: Multiply by 2% (0.02) plus $60.00
Cost between $10,001 - $100,000: Subtract $10,000, Multiply
Other Installations: Commercial / Industrial / Solar / Renewable Energy
by 1% (0.01) plus $260.00
Cost over $100,001: Subtract $100,000, Multiply by .5%
(0.005) plus $1,160.00
Mechanical FeesFee
New Residential - Single Family Dwelling
< = 1500 square feet$130.00
1501 to 2500 square feet$195.00
2501 to 3500 square feet$260.00
3501 to 4500 square feet$325.00
> 4500 square feet$325.00 plus $65.00 per additional 1000 square feet
Fireplace (Gas or Electric)$75.00
New Residential: Multi-Family Dwelling (contractors only), Duplex$260.00
New Residential: Multi-Family Dwelling (contractors only), Three or more Multi-Family Units$130.00 per building plus $65.00 per unit
Existing Residential (Includes Retro Fits, Additions, etc.)
Base Administrative Fee$65.00
HVAC items up to the maximum corresponding square footage of the residential building
Base fee plus $10.00 per HVAC item
Fireplace Installation (two inspections)
$130.00
Hydronic Flooring
$65.00 plus $10.00 for each additional manifold
Base Administrative fee $65.00 plus $10.00 for each duct,
Modular, Manufactured or Mobile Homes
fireplace, piece of HVAC equipment or vent up to maximum
square footage
Gas Line Base Administrative Fee$65.00
Reinspection Fee, Requested Inspections, Technical Service (Consultation)Fee
Reinspection Fee$65.00 minimum
Reinsertion fee assessed per inspection $65.00 minimum
$65.00 per hour or portion thereof in excess of one hour
21-08 Combined Fee Schedule.xlsx
Requested Inspections outside the normal inspection process or Technical Service (Consultation) including travel time to and from location
City of Eagle
Combined Fee Schedule
(Adopted Resolution 21-08, March 23, 2021)
Commercial / Industrial Fee Schedule - Other InstallationsFee
Work not specifically covered by any other fee schedules.
Fees based on FAIR MARKET PROJECT VALUE which means total Labor, Materials and Equipment for a complete working system. This value is not reducible
due to owner supplied and/or donated materials, labor and/or equipment. Overhead and Profit must be included in value. (These Values WILL NOT include the Base
Admin Fee)
Cost up to $20,000Multiply by 3% (.03) plus $60
Cost between $20,001 - $100,000Subtract $20,000, multiply by 2% (.02), plus $660
Cost over $100,001Subtract $100,000, multiply by 1% (.01), plus $2,260
Fee
Plumbing Permit Fees
New Residential - Single Family Dwelling
< = 1500 square feet$130.00
1501 to 2500 square feet$195.00
2501 to 3500 square feet$260.00
3501 to 4500 square feet$325.00
> 4500 square feet$325.00 plus $65.00 per additional 1000 square feet
Existing Residential Base Fee$65.00
Additional Fixtures Each (Excluding garbage disposals and dishwashers)$10.00
Replacement Fixtures Each$10.00
Sewer Line Installation (base fee not applicable)$65.00
Water Line Installation (base fee not applicable)$65.00
Combination (base fee not applicable)$65.00
Modular, Manufactured, Mobile Homes Sewer and Water Connection$65.00
Water Heater - Water Softener$65.00
Backflow Prevention Device$65.00
Multipurpose Fire Sprinklers and Domestic Water Supply System Inspection Fee for 1-2 family or
$65.00
$4 per fire sprinkler head, whichever is greater
New Residential: Multi-Family Dwelling (contractors only), Duplex$260.00
New Residential: Multi-Family Dwelling (contractors only), Three or more Multi-Family Units$130.00 per building plus $65.00 per unit
Fee
Commercial
All plumbing permits are calculated from the verified contract price table below.
Replacement Fixtures Each$10.00
Sewer and water service lines installed by persons performing work other than the plumbing
Use the Verified Contract Price Table Below
contractor of the building: fee based on the contract price of the completed installation to be
calculated from the verified contract price table below.
Commercial coaches - Manufactured buildings: All commercial coaches and manufactured
Use the Verified Contract Price Table Below
buildings constructed in Idaho, or constructed for use in Idaho, must purchase permits as per
residential fee schedule.
Lawn Sprinklers: inspection fee (to be calculated from the verified contract price table below) based
Use the Verified Contract Price Table Below
on the cost of labor and materials needed to complete the installation from the connection to the
water system through the backflow prevention device.
Mobile home parks and/or RV parks: Sewer and water service lines shall be classed as commercial.
Use the Verified Contract Price Table Below
Note: This does not include the connection of the mobile home. (Refer to Residential Section).
21-08 Combined Fee Schedule.xlsx
City of Eagle
Combined Fee Schedule
(Adopted Resolution 21-08, March 23, 2021)
Installations done with volunteer labor and/or donated materials will be calculated at fair market
Use the Verified Contract Price Table Below
value.
Verified Contract Price Table
Commercial / Industrial (Other Installations) - Valuation Table
Cost up to $20,000: Multiply by 3% (.03) plus $60
Cost between $20,001 - $100,000: Subtract $20,000, multiply by 2% (.02), $660
Cost over $100,001: Subtract $100,000, multiply by 1% (.01), plus $2,260
Fee
Additional / Miscellaneous
Requested Inspections
$65.00 minimum plus $65.00 per hour or portion thereof in
excess of one hour to include travel time to and from location
Re-Inspections - Trips to inspect when: Inspection requested and the work is not ready
Re-Inspections - Trips to inspect when: Submitter has not accurately identified the work location
$65.00
Re-Inspections - Trips to inspect when: The inspector cannot gain access to perform the inspection
Re-Inspections - Excessive trips to inspect as a result of submitter improperly responding to a
correction notice
$65.00 minimum plus $65.00 per hour or portion thereof in
Plan Checking
excess of one hour
$65.00 minimum plus $65.00 per hour or portion thereof in
Technical Service
excess of one hour
Working without a permit: Failure to submit and obtain proper permits will, at the direction of the City of Eagle, result in the assessment of a double fee or imposition
of civil penalties, or both.
21-08 Combined Fee Schedule.xlsx
City of Eagle
Combined Fee Schedule
(Adopted Resolution 21-08, March 23, 2021)
City-Administrative Fees
ECC X-Reference
Description Fees
ECC 3-1-1
General Business License$25.00
Dog Licenses
Nonnuetered or Nonspayed Dogs
$25.00
Nonnuetered or Nonspayed Dogs (Senior Citizen
Fee)
$25.00
ECC 4-5-5
Spayed or Neutered Dogs$10.00
Spayed or Neutered Dogs
(Senior Citizen Fee 60+ Years Old)$5.00
$5.00
Late Fee - After February 1
Alcohol License
Bottled or Canned Beer Off Premises Only
$50.00
Beer to be Consumed Off the premises with Validly
Issued Catering Permit
$200.00
Beer to be Consumed on the Premises Only
$200.00
Beer to be Consumed on and off the Premises
$250.00
Wine to be Consumed Off the premises Only
$125.00
ECC-3-2
Wine to be Consumed Off the Premises with Validly
Issued Catering Permit
$200.00
Wine to be Consumed on the Premises Only
$200.00
Wine to be Consumed on and off the Premises
$325.00
Liquor to be consumed on the premises only
$562.50
License Transfer Fee$5.00
ECC-3-2D-4
$20.00
Open Container Permit
ECC-3-2C-12
$20.00 per day
Catering Permit
Labor Costs and Copying Documents
Black and White Copies - Under 100 PagesFree of Charge
Black and White Copies - 100 + Pages$.10 per page
Colored Copies - Under 100 PagesFree of Charge
Colored Copies - 100 + pages$.25 per page
Records from Which Nonpublic Information Must
be Deleted
Charged at the City's Direct Cost
The Actual Labor Associated with Responding to
Requests Which Exceeds Two (2) Person HoursCharged at the City's Direct Cost
Extraordinary Copies i.e. Maps, Electronic Media, Charged at the City's Direct Cost of
Oversized DocumentsDuplication
Duplication of Computer Tape, Computer Disc,
Charged at the City's Direct Cost of Copying
Microfilm, or Analogous Records
the information in that form, the City's Cost of
Conversion or the Cost of Conversion Charged
by a Third Party, if the Existing Electronic
Record is Converted to Another Electronic
Form
$100.00 and Direct costs associated with the
ECC-3-4-8
Vendor, Solicitor, Temporary Merchants Permit
Background Check
ECC-3-4-8
$50.00
Special Event Permit
ECC-4-2
Adopted via a separate Resolution
Trash Collection
21-08 Combined Fee Schedule.xlsx
City of Eagle
Combined Fee Schedule
(Adopted Resolution 21-08, March 23, 2021)
Meeting Room Reservation
1/2 Day (4 Hours)
$50.00 per room
Full Day (8 Hours)
$100.00 per room
Additional Fee if Food is to be Served or Consumed$25.00
ECC 4-1-3(H)
$150.00
Nuisance Abatement Administrative Fee
ECC 4-1-3(E)
Nuisance Abatement City Council Appeal Fee$350.00
21-08 Combined Fee Schedule.xlsx
City of Eagle
Combined Fee Schedule
(Adopted Resolution 21-08, March 23, 2021)
Library Fees
Adopted by the Eagle Public Library Board of Trustees, November 20, 2019
Fee
Description
Library Use Account, per year, per household
$114.00
Non-Resident Account
Fines
All items except DVDs and Video Games (per day)
$0.00
DVDs and Video Games (per day)
$0.00
Mobile Hotspots (per day)
$5.00
Collection agency charge for lost and damaged items$10.00
Printing & Copying
Black and white (per one-sided page)$0.10
Color (per one-sided page)$0.50
Faxing (per one-sided page) $1.00
3D objectsfilament cost / gram
Meeting Room Use
After hours (per hour) $60.00
Miscellaneous
City of Eagle's Cost
Baby Changing supplies
City of Eagle's Cost
Flash Drive
LaminatingCity of Eagle's Laminate Cost per linear foot
Lost or Damaged Materials
Lost or Damaged MaterialsCity of Eagle's Replacement Cost
Processing Fee$5.00
RFID Tag$1.00
Barcode$1.00
Materials ContainerCity of Eagle's Replacement Cost
21-08 Combined Fee Schedule.xlsx
City of Eagle
Combined Fee Schedule
(Adopted Resolution 21-08, March 23, 2021)
Parks & Recreation
General Park Shelter RentalsResident Non-Resident
City of Eagle does not reserve this park
Arboretum Park
$25.00 (4 hours)$50.00 (4 hours)
$50.00 (8 hours)$75.00 (8 hours)
Friendship Park, Orville Krassen Park, Ada/Eagle Sports Complex
$75.00 (Winter 7am-8pm, $100.00 (Winter 7am-8pm,
Summer 8am-9pm)Summer 8am-9pm)
City of Eagle doesnot reserve this park
Heritage Park
Per Section:Per Section:
$25.00 (4 hours)$50.00 (4 hours)
$50.00 (8 hours)$75.00 (8 hours)
$75.00 (Winter 7am-8pm, $100.00 (Winter 7am-8pm,
Summer 8am-9pm)Summer 8am-9pm)
Stephen C Guerber Park and Reid Merrill Park
Entire Shelter:Entire Shelter:
$75.00 (4 hours)$100.00 (4 hours)
$150.00 (8 hours)$175.00 (8 hours)
$225.00 (All Day) $250.00 (All Day)
Amusement Equipment & Large Canopies
No Charge
Community Event FeesDescriptionPeriod Fees
Application FeeOne Time$100.00
Damage Deposit (Events over 250)Refundable$250.00
Park Sites
Stephen C Guerber (A1, A2, B1, B2, Baseball,
Daily
Sunrise Shelter, Sunset Shelter)
$875.00
Stephen C Guerber (A1, A2, B1, B2, Baseball, 4 Hr Time Block (8am-12pm,
Sunrise Shelter, Sunset Shelter)12:30pm-4:30pm, 5pm-9pm)
$300.00
Stephen C Guerber (Sunrise Shelter, Sunset 4 Hr Time Block (8am-12pm,
Shelter)12:30pm-4:30pm, 5pm-9pm)
$225.00
Stephen C Guerber (Per Field) (Special Events
Daily
Only)
$75.00
Daily
Reid W Merrill (A, B, C Shelter) $550.00
4 Hr Time Block (8am-12pm,
12:30pm-4:30pm, 5pm-9pm)
Reid W Merrill (Entire) (A, B, C Shelter)$300.00
4 Hr Time Block (8am-12pm,
12:30pm-4:30pm, 5pm-9pm)
Reid W Merrill (Shelter)$75.00
Reid W Merrill (Per Field) (Special Events 4 Hr Time Block (8am-12pm,
Only)12:30pm-4:30pm, 5pm-9pm)
$75.00
Daily
Ada/Eagle Sports Complex (Zone 1)$500.00
Daily
Ada/Eagle Sports Complex (Zone 2)$400.00
Daily
Ada/Eagle Sports Complex (Zone 3)$350.00
4 Hr Time Block (8am-12pm,
12:30pm-4:30pm, 5pm-9pm)
Ada/Eagle Sports Complex (Zone 2)$300.00
21-08 Combined Fee Schedule.xlsx
City of Eagle
Combined Fee Schedule
(Adopted Resolution 21-08, March 23, 2021)
4 Hr Time Block (8am-12pm,
12:30pm-4:30pm, 5pm-9pm)
Ada/Eagle Sports Complex (Zone 3)$275.00
4 Hr Time Block (8am-12pm,
12:30pm-4:30pm, 5pm-9pm)
Ada/Eagle Sports Complex (Shelter)$25.00
4 Hr Time Block (8am-12pm,
12:30pm-4:30pm, 5pm-9pm)
Various Neighborhood Park$75.00
Permits
Open Container PermitDaily$20.00
Catering PermitDaily$20.00
Noise Waiver (After 10 PM)DailyNo Charge
Sports Field Reservation Fees **DescriptionPeriod Fees
Resident / Non-Resident
Stephen C Guerber (Per Field A1,A2,B1, B2,
Daily$100.00
Baseball)
Daily $100.00
Stephen C Guerber Sand Volleyball Court
Daily$100.00
Stephen C Guerber Basketball Court
Daily $100.00
Reid Merrill (Per Field A, B, C)
Daily$100.00
Reid Merrill Sand Volleyball Court
Daily$100.00
Reid Merrill Basketball Court
Stephen C Guerber (Per Field A1,A2,B1, B2,
Hourly$33.25
Baseball)
Hourly$33.25
Stephen C Guerber Sand Volleyball Court
Hourly$33.25
Stephen C Guerber Basketball Court
Hourly$33.25
Reid Merrill (Per Field A, B, C)
Hourly$33.25
Reid Merrill Sand Volleyball Court
Hourly$33.25
Reid Merrill Basketball Court
Daily$100.00
Ada/Eagle Sport Complex Hockey Rink
Hourly$33.25
Ada/Eagle Sport Complex Hockey Rink
Daily$100.00
Ada/Eagle Sport Complex Basketball Court
Hourly$33.25
Ada/Eagle Sport Complex Basketball Court
Friendship Park Tennis/Pickleball Court (Per
Daily$100.00
Court)
Friendship Park Tennis/Pickleball Court (Per
Hourly$33.25
Court)
21-08 Combined Fee Schedule.xlsx
City of Eagle
Combined Fee Schedule
(Adopted Resolution 21-08, March 23, 2021)
Recreation Classes & ProgramsResident FeesNon-Resident Fees
Not to exceed $100/class or $10 fee will be added to class
Active Older Adults (50+)
activity or program fee
$10 fee will be added to class
Not to exceed $200/class or
Adult Art (13+)
or program fee
activity
$10 fee will be added to class
Not to exceed $120/class or
Adult Fitness (13+)
or program fee
activity
$10 fee will be added to class
Adult Team Sports (16+)
Not to exceed $200/team
or program fee
$10 fee will be added to class
Not to exceed $30/class or
Fun Run (All Ages)
or program fee
activity
$10 fee will be added to class
Not to exceed $275/class or
Pre-School (Baby-5)
or program fee
activity
$10 fee will be added to class
Not to exceed $50/class or
Special Events (All Ages)
or program fee
activity
$10 fee will be added to class
Vendors
Not to exceed $75/vendor
or program fee
$10 fee will be added to class
Not to exceed $280/class or
Youth Art (5-12)
or program fee
activity
$10 fee will be added to class
Not to exceed $320/class or
Youth Camps (5-12)
or program fee
activity
$10 fee will be added to class
Not to exceed $200/class or
Youth Sports (2-12)
or program fee
activity
21-08 Combined Fee Schedule.xlsx
City of Eagle
Combined Fee Schedule
(Adopted Resolution 21-08, March 23, 2021)
Planning Fee & Deposit Schedule
Pursuant to ECC Title 8, 9, 10, & 11
65
ApplicationPlanning Fee
Legal Fee Deposit Engineering Fee
$300.00
Accessory Use
6
See Footnote
$125.00
Administrative Modification
Annexation
up to 5 acres
$250.00
See Zoning Ordinance
5.01 acres up to 10 acres$500.00
Amendment-Map (Rezone)
10.01 acres or larger$1,100.00
$500 + notification costs
500.00
Appeal(per ECC 8-7)
Comprehensive Plan Amendments
Less than 250 acres: See
Map $2,000.00
6
Text $1,500.00Footnote 250
2
$1,200 + $10/unit above 10
Conditional Use
Design Review
Appeal (per ECC 8-2A-14)$500.00
$850 + $10 per unit or 1,000 sq. ft. (per
Building/Site Plan
structure)
Subdivision Landscape Plan
$650 + $20 for each additional acre
Subdivision Monument Sign
$350.00
Modification (Board Level)$400.00
Modification (Administrative)$200.00
Minor Modification (paint, lights or windows Drainage Plan Review:
6
$100.00
See Footnote
changes) $500 +$250/bldg.
$450.00
Master Sign Plan
$350.00
Master Sign Plan Modification (Board Level)
$200.00
Master Sign Plan Modification (Administrative)
$125.00
Single Sign w/in MSP
$450.00
Single Tenant Sign No MSP
$25.00
Temporary/Portable Sign
$450.00
Master Sign Plan, Community (Spring Valley)
2
Development Agreement
Original Drafting $800.00 + $20/acre
See Zoning Ordinance
Amendment-Map (Rezone)
$800.00
Development Agreement Modification
6
$350.00
Extension of Time
See Footnote
21-08 Combined Fee Schedule.xlsx
City of Eagle
Combined Fee Schedule
(Adopted Resolution 21-08, March 23, 2021)
Engineering Plan Review
Overall plan review (irrigation, storm, layout, etc.) $2,250+$15/lot
Water System Distribution Plan
$600+$5/lot
Review/QLPE/Completion Check
6
City Well Design 750.00
See Footnote
City Well House Design 900.00
6
$1,000+$0.75/linear foot
Additional Review
111
Fiscal Impact Analysis
$350.00 + See FootnoteSee Footnote See Footnote
Floodplain
Floodplain Determination Letter $100.00
Overall Development
size:
<1 acre:$500
1-10 acres:$1250
6
See Footnote
10.01-40 acres:$1,875
1
$500.00
Permit
Over 40 acres:$2,500
Phased Permit(each
phase after 1): $500
Hydraulic Modeling
Review:$1,875
1
6
$500.00
See Footnote
Habitat/ Environmental Review
Preliminary Grading Plan,
Reports with Pre-plat:
1
6
$500.00
$800+$12/lot Final
See Footnote
Hillside Review
Grading Plan with Final
Plat: $300+$6/lot
Mass Grading Plan
(Disturbed Acres): $2750 +
Hillside and Grading Permit (Spring
$20/acre Final
6
$1,000.00
See Footnote
1
Grading Plan (# of lots in
Valley)
grading area): $2750 +
$10/lot
Inspections
$100.00
General/Tenant Improvement/Reinspection
$150.00 each
DR Landscape/Building
6
Streetlight Inspection $50.00 for 1st + $20.00 for each additional
See Footnote
21-08 Combined Fee Schedule.xlsx
City of Eagle
Combined Fee Schedule
(Adopted Resolution 21-08, March 23, 2021)
8
$50.00
Misc./Other Fees & Permits
Negotiable
2
Planned Unit Development
Less than 250 acres: See
6
Footnote
$1200.00 + $20.00/lot
Preliminary Development Plan
250 acres to 1,000 acres: $500
7
1,001+ acres: Negotiable
6
Final Development Plan$600.00 + $20.00/lot
See Footnote
PUMP Review:
7
$1,200.00 + $25.00/acre
Planning Unit Master Plan
Negotiable
$800+$8/acre
Plats
Plat Check:
$3,700+$26/lot
$2,050.00 + $40.00/lot
Combined Preliminary/Final
Water System Compliance
w/Master Plan:
$400+$4/lot
$500.001,000.00
Condominium
6
Final Plat Check:
See Footnote
Final$600.00 + $20.00/lot
$900+$6/Lot
Parcel Division Review:
$750 Lot
$450.00
Lot Line Adjustment/Lot Split Line Adjustment: Two
Lots: $700 More than
2 lots: $700+$200/lot over 2
Plat Check:
$2,800+$20/lot Water
Less than 250 acres:
System Compliance
6
See Footnote
w/Master Plan: $400+$4/lot
Preliminary $1,450.00 + $20.00/lot
250 acres to 1,000 acres:
Preliminary Floodplain
$500
Review (storage, reports):
7
1,001+ acres: Negotiable
$750 Private Streets:
$500
$500.00
Pressurized Irrigation Waiver Review
6
$1,200.00 + $0.35/Linear Foot
Private Road
See Footnote
$200.00
Property Status Report
$25.00/day beginning 3 days after the hearing
Public Hearing Sign Removal Penalty
Public Hearing Mailing (cost per each
$1.50
mailed notice)
8
1st session paid by the
requesting party; subsequent
4
sessions and mediation
Request for Mediation
summary paid proportionately
by City and requesting parties
21-08 Combined Fee Schedule.xlsx
City of Eagle
Combined Fee Schedule
(Adopted Resolution 21-08, March 23, 2021)
$450.00 + notification costs250.00
Request for Reconsideration
Surety Fee
Initiation$250.00
6
Renewal $200.00
See Footnote
Partial Release $200.00
Conifers: $60.00/vertical foot
Tree Fund (in-lieu of fee)
Deciduous: $175.00/caliper inch
6
$400.00 + $8.00 /property w/in 300 ft.
Vacation (Easement/ROW, etc.)
See Footnote
6
$800.00
Variance
See Footnote
$600.00$250.00
Waiver
Waiver, Accessory Structure Setback
6
$600.00
See Footnote
(per ECC 8-2-4(a)(5))
$1,200.00$250.00
Waiver, Home Occupation
Zoning Ordinance Amendment
Less than 250 acres: See
6
Footnote 250
Up to 100 acres: $1100.00 Plus: $40.00 for
Map (rezone)
acres to 1,000 acres: $5,000
each 10 acres above 100 acres
1,001+ acres:
7
Negotiable
Text $1,300.00$500.00
Zoning Permit/Certificate
3a
$50.00
New Building/Building Modifications
$50.00
Residential/Tenant Improvement
$150.00
Multi-family/Office/Commercial/Industrial
$50.00
Business license review/Home Occupation
6
Home Occupation Class C$1,200.00
See Footnote
3b
$150.00
Existing Structure (change in use)
$25.00
Fence (front yard & street side)
Temporary Use/ Temporary Construction
$85.00
Trailer/Alcohol Letters/ Others
$50.00
Dwelling Rebuild Letter
Footnotes:
1: All applications are subject to ECC 1-7-4: any direct costs incurred by the City in obtaining a review of the application by attorneys, architects, engineers or other professionals
necessary to enable the City to approve or disapprove the application shall be paid for by the applicant.
2: When using a DA in lieu of a PUD the PUD fees still apply.
3: a) Zoning Permit is applied for at time of building permit application; b) Zoning Permit is required prior to the submittal of a building permit or a business license.
4: A request for mediation is not guaranteed and must be agreed to by the City Council.
5: Engineering review fees herein are non-refundable retainers. Review time that exceeds the retainer fee shall be paid at the engineer's contracted hourly rate in accordance with
ECC 1-7-4.
6: Legal Fees shall be paid pursuant to ECC 1-7-4-B-1.
7: Negotiable means a deposit established by the City Council prior to the submittal of the application.
8: "Session" is defined as a meeting or meetings held on the same day in the same location.
21-08 Combined Fee Schedule.xlsx
City of Eagle
Combined Fee Schedule
(Adopted Resolution 21-08, March 23, 2021)
Water Department Rates & Fees
(Pursuant to ECC 6-5)
ERU Based Fees Base Fee (3/4 " Meter)
* ERU Multiplier
1" meter = 1.78
$1,010.00
Hook Up Fees
For meter sizes larger than a 3/4
1.5 " meter = 4.0
$2,100.00
Storage and Trunk Line Fees (STL)
inch meter, please use the ERU
$400.00 2" meter = 7.11
Water Construction Equivalency Fees (WCE)
multiplier (to the right) times the
associated rate or fee in the
Base Monthly Fee (increase approved Res 17-31)3" meter = 16.0
$19.45
previous column (to the left) to
4" meter = 28.44
$100.00
Service Deposits
find the appropriate fee.
System Enhancement Fee (DEQ Funds)6" meter = 64.20
$10.93
Consumption Rate per 100 cubic feet$1.41
$0.34
Water Safety Fee (DEQ pass-thru fee)
Service Application Fee$10.00
$13.00
Delinquent Fee
Reconnection fees for collections$25.00
$80.00
After hours reconnection fees
After hours connection fees$50.00
$20.00
Returned check fee
Unoccupied dwelling rate
Base Rate + System Enhancement Fee
$1.73
Bulk rate ( IE, dust abatement) per 100 cubic feet
Late penalties for bulk users$13.00
$100.00
Hydrant Meter Deposit
Automatic Checking Withdrawal Fee (ACH)$0.50
$50.00
Additional trip charges
Unauthorized access to meter, tampering$250.00plus labor & materials
Jumpers/Bridges placed in meter pitplus labor and materials
$500.00
Footnotes:
1. ERU = Equivalent Residential Units
2. Example of ERU Calculation: 1" meter = $1010 X 1.78 = $1,797.80; 1" base monthly fee = $19.45 X 1.78 = $34.62
3. A complete calculation of the ERU items can be found on the City of Eagle's Water Department website, www.cityofeagle.org/water
21-08 Combined Fee Schedule.xlsx