Loading...
Minutes - 2021 - Design Review - 03/11/2021 - Regular DESIGN REVIEW BOARD MINUTES The Design Review Board met in regular session March 11, 2021 Chairman Grubb presiding. 1. CALL TO ORDER: Grubb calls the meeting to order at 6:00 p.m. 2. ROLL CALL: The following members were present: GRUBB, SAYER, BAER, LINDGREN. Via Webex: GERMANO, DUPERAULT ABSENT: A quorum is present. 3. CONSENT AGENDA: • Consent Agenda items are considered to be routine and are acted on with one motion. There will be no separate discussion on these items unless a Design Review Board member, City Staff, or a citizen requests an item to be removed from the Consent Agenda for discussion. Items removed from the Consent Agenda will be placed on the Regular Agenda in a sequence determined by the Rules of Order. • Any item on the Consent Agenda that contains written recommendations from the City of Eagle shall be adopted as part of the Design Review's Consent Agenda approval motion unless specifically stated otherwise. A. Minutes of February 25, 2021. B. Findings of Fact and Conclusions of Law for the approval of DR-02-21 — Common Area Landscaping within Brush Creek Subdivision — Tyler Frazier: Tyler Frazier with Altitude Development is requesting design review approval of the common area landscaping within Brush Creek Subdivision. The 10-acre site is located on the west side of North park Lane approximately 2, 221-feet south of West Beacon Light Road at 2055 North Park Lane. (BAW) Sayer moves to approve the consent agenda. Seconded by Baer. ALL AYE... MOTION CARRIES. 4. UNFINISHED BUSINESS: None 5. NEW BUSINESS: A. ACTION ITEM: DR-04-21 —Eagle Holistic Health Monument Sign—Julie McCallson: Julie McCallson, represented by Chantel Wiles, is requesting design review approval to change the face of an existing monument sign for Eagle Holistic Health. The 0.16-acre site is generally located on the southwest corner of South Academy Lane and East State Street at 367 South Academy Lane (Lot 3, Block 1, Larkin Village Subdivision). (BAW) Chantel Wiles 795 W. Steeple View Dr. Eagle, ID 83616 reviews the application. City Planner B. Williams reviews the application. Board discussion. Grubb moves to approve DR-04-21 —Eagle Holistic Health Monument Sign with the site specific and standard conditions of approval as written. Seconded by Baer. ALL AYE...MOTION CARRIES K:\DESI_REV\MINUTES\Temporary Minutes Work Area\DR-03-11-2IMIN.doc B. ACTION ITEM: DR-05-21 —Office (Business and Professional) Building—Boise Hunter Homes: Boise Hunter Homes, represented by Amanda Bidwell with neUdesign Architecture, is requesting design review approval for a 19,472-square foot, two-story office (business and professional) building. The 1.56-acre site is located on the northwest corner of East Riverside Drive and South Ancona Avenue at 1113 and 1107 South Ancona Avenue (Lots 4 and 6, Block 1, Ancona Park). (ERG) Lindgren discloses on record he previously worked with Boise Hunter Homes on this site temporarily. Lundgren stated he does not see a conflict of interest. Amanda Bidwell with neUDesign Architecture: 725 E. Second St. Meridian, ID, 83642- reviews application. Board discussion with applicant. City Planner E. Gero reviews application. Board discussion. Staff questions. Board discussion. Grubb moves to approve- DR-05-21-Office (Business and Professional) Building-Boise Hunter Homes with standard conditions of approval as written and the site specific conditions as written with the following modifications to the site specifics: Site specific condition #3: In first sentence, scratch the word "a total" and insert "room" for 3 bicycle racks. Site specific condition #14: Provide revised elevations showing gutters and downspouts to be approved by staff and one member of the DR Board. Site specific condition #15: Provide revised elevations showing the depth of the canopies to be approximately 3 or 4 feet to be approved by staff and one member of the DR Board. Site specific condition #16: Provide revised landscaping plan showing the existing trees and how they are incorporated in the landscaping plan to be approved by staff and one member of the Design Review Board. Site specific condition #17: Provide revised elevations emphasizing the entry to be approved by staff and one member of the Design Review Board. Site specific condition #18: Provide revised details of the elevations showing a increased planer change at the entry/overbuild elements that currently show 8 inches to increase that 8 inches to be approved by staff and one member of the Design Review Board. Comments: Board is in favor of leaving existing attached sidewalk built in 2003 with the main consideration of leaving the tree canopies. Comment: Applicant should verify the distance for fire lanes. Comment: Applicant can possibly look at the change from stucco to the wood banding possibility for architectural interest. Seconded by Baer. Comment made by Duperault regarding Site specific condition #3- the word at issue is "racks" Duperault stated "what we are after is spaces." Duperault stated "We need to show there is room for 3 bicycles." K:\DESI_REV\MINUTES\Temporary Minutes Work Area\DR-03-11-21MIN.doc Germano comments-entrance needs to be modified in some way to draw attention to itself. Grubb stated that was the reason why he added Site specific condition 17. Grubb moves to amend Site Specific Condition #3-remove word "racks" insert "room" for three bicycles, and amends Site Specific Condition #5 the first line "in consistency with other sheets." Second Baer concurs...ALL AYE...MOTION CARRIES. C. ACTION ITEM: DR-06-21 —Building Wall and Monument Signage for Boise Hunter Homes—Boise Hunter Homes: Boise Hunter Homes, represented by Amanda Bidwell with neUdesign Architecture, is requesting design review approval for three halo illuminated building wall signs and one halo illuminated monument sign. The 1.56-acre site is located on the northwest corner of East Riverside Drive and South Ancona Avenue at 1113 and 1107 South Ancona Avenue (Lots 4 and 6, Block 1, Ancona Park). (ERG) Amanda Bidwell with NeUDesign Architecture: 725 E. Second St. Meridian, ID, 83642- reviews application. Board discussion with applicant. City Planner E. Gero reviews application. Staff questions. Board discussion. Grubb moves to approve-DR-06-21 —Building Wall and Monument Signage for Boise Hunter Homes—with standard conditions of approval as written and the site specifics with the additional site specifics: Site specific condition #4: Provide revised drawings showing proper color and callouts for building lighting/signage to be approved by staff and one member of Design Review Board. Site specific condition #5: Provide a revised drawing of the monument sign showing provide more architectural interest- to not make it as cabinet looking. To be approved staff and one member of Design Review Board. Seconded by Baer. ALL AYE...MOTION CARRIES. 6. REPORTS: A. Design Review Board: None B. Staff: City Planner B. Williams gives report regarding Master Sign plan for Crunch Fitness Building and Dovetail Condos. Nancy Merrill will be at the next Design Review Board meeting as a new member. City Planner B. Williams informs the Board the City is still looking for a landscape architect asked the board members recommendations of anyone the board members think would be interested in serving on the Design Review Board. 7. ADJOURNMENT: Baer moves to adjourn at 7:21 p.m. Seconded by Grubb. ALL AYE...MOTION CARRIES. K:\DESI_REV\MINUTES\Temporary Minutes Work Area\DR-03-11-21MIN.doc RESPECTFULLY SUBMITTED: r , 1,/l/W)CC-1- CS?‘C-1- . ANNRETA PALO ADMINISTRATIVE CLERK APPRO D: ROBERT GRUBB, CHAIRMAN AN AUDIO RECORDING OF THIS MEETING IS AVAILABLE FOR DOWNLOAD AT WWW.CITYOFEAGLE.ORG K:\DESI_REV\MINUTES\Temporary Minutes Work Area\DR-03-11-21MIN.doc