Service Solicited - 2020 - Idaho Power Company - Idaho Power Customer Cost QuotePOWER. An DACOR' Cornmy CUSTOMER COST QUOTE IDAHO Customer or Project Name: CITY OF EAGLE - SINGLE PHASE LINE EXTENSION FOR NEW SERVICE. Construction Costs Line Installation Costs 1. Line Installation/Upgrade Charge $4,639 2. Customer Credits (Betterment, Metering, Salvage) $0 3. Customer Performed Construction Work Credit $0 4. Net Line Installation Cost $4,639 Unusual Conditions 5. Unusual Conditions $29,722 6. Unusual Conditions Bank Letter of Credit (Only for over $10,000) $0 7. Net Unusual Conditions $29,722 Terminal Facilities Costs 8. Terminal Facilities $2,507 9. Terminal Facilities Allowances $(2,412) 10. Terminal Facilities Salvage $0 11. Net Terminal Facilities Cost $95 12. Underground Service and Attachment Charges $0 13. Engineering Charge $1,216 14. Permits $0 15. Relocation or Removal $83 16. Miscellaneous Charges/Adjustments $0 17. Net Construction Costs (Line Items 4, 7, 11, 12, 13, 14, 15, 16) $35,755 18. Prepaid Charges (Engineering, Permits & Right -of -Way) $0 19. Vested Interest Charge SO 20. Customer Payment Due Prior to Construction Scheduling $35,755 This cost may not include all construction costs, see page 3 if additional service charges apply. Notes: AMOUNT P41a:S 1 A COUNY t w13 - J 5 Notice: This Customer Cost Quote shall be binding on both Idaho Power Company ("Idaho Power") and Customer for a period of 60 days from the quoted date indicated below, subject to changes in information provided by the Customer or changes in Idaho Power's ability to obtain satisfactory rights -of -way or to comply with governmental regulations, including but not limited to the rules, regulations, and tariffs of the Idaho Public Utilities Commission ("IPUC") and the Public Utility Commission of Oregon ("OPUC"). Customer must make payment of the quoted amount not less than (30) days prior to the start of the construction work set forth in this agreement ("Work"). However, Idaho Power does not represent or warrant that the Work will commence within 30 days of receipt of payment. The start of the Work is subject to Idaho Power's ability to obtain the necessary labor, materials and equipment. Service Request Number. 00460220 Internal use Page 1 of 3 Work Order Number: Design Number. Version: 27563398 0000145346 002 By Initialing below, Customer acknowledges and agrees to the following: k Custorrier initials Customer initials unstoti mer initials Customer ;ni[ials Charges for relocation, transfer or removal of non -Idaho Power equipment attached to Idaho Power facilities are not included in this Customer Cost Quote. It is the Customer's responsibility to coordinate this work with the affected utility. All charges associated with this work are the responsibility of the Customer. For utility contact information, please call 208-388-2886. The Customer has received the Underground Residential Conduit Installation brochure/packet or will access the information available online at https://does.idahopower.cowlpols15erviceB[ilinglcustomerservice!newConstruction/UGResConduitlnstall.pdf Final Grade: Customer understands that as of the above -named project will be ready for facilities to be installed by Idaho Power. All roadways and cable routes must have all grading and sub grading completed by this date. The project must be properly referenced and have grade stakes installed at all Idaho Power device locations and as might be necessary to establish proper elevations and burial depths Idaho Power facilities. The Customer will be responsible for the total cost of damage to Idaho Power facilities resulting from any subsequent changes in property, any needed relocation, repair, or lines, lot lines, elevations, grades, excavations, or profiles causing improper locations or burial depths of above -ground equipment, below -ground equipment, cable, or conduit. Unusual Conditions: As defined in Idaho Power's line installation tariff, Rule H, Unusual Conditions are construction conditions not normally encountered, but which Idaho Power may encounter during construction which impose additional, project -specific costs. These conditions include, but are not limited to: frost, landscape replacement, road compaction, pavement replacement, chip -sealing, rock digging/trenching, boring, nonstandard facilities or construction practices, and other than available voltage requirements. The total cost for all Unusual Conditions, in connection with the work as set forth on this Customer Cost Quote will be based on the actual costs incurred by Idaho Power related to the conditions encountered during performance of the Work. Upon completion of all Work, Idaho Power will refund to Customer any Unusual Conditions amount set forth on this Customer Cost Quote sheet but, not incurred by Idaho Power. Prior to commencement of the work, Customer shall identify for Idaho Power the location of all underground pipes, lines, and other facilities (collectively, the "Underground Lines") that may be on Customer's property where Idaho Power is working. Customer agrees to be responsible for identification and location of all Underground Lines and shall indemnify, defend, reimburse and hold harmless Idaho Power and its successors and their respective directors, officers, members, employees, representatives and agents for, from, and against any and all claims, liabilities, losses, damages, expenses, suits, actions, proceedings, judgement and costs of any kind (collectively, "Damages"), whether actual or merely alleged and whether directly incurred or from a third party, arising out of or relating to Customer's failure to properly or adequately identify and locate the Underground Lines, except to the extent finally determined by a court of law that such Damages resulted from the gross negligence or willful misconduct of Idaho Power, its agents, subcontractors, employees, officers or directors. Service Request Number 00460220 Internal use Page 2 of 3 Work Order Number Design Number. Version: 27563398 0000145346 002 The Customer acknowledges Idaho Power's Rule C (Service and Limitations), Section 7 (Right of Way) on file with the IPUC OPUC: "The Customer shall, without cost to Idaho Power, grant Idaho Power a right-of-way for Idaho Power's lines and apparatus across and upon the property owned or controlled by the Customer, necessary or incidental to the supplying of Electric Service and shall permit access thereto by Idaho Power's employees at all reasonable hours." By signing this Customer Cost Quote, Customer grants to Idaho Power a perpetual right-of-way over the Customer's property for the installation, operation, replacement and maintenance of power facilities to provide electrical service to the Customer and any future owners of the Customer's property. Construction Costs available for refund (Vested Interest limited to 5 years or 4 additional applicants) budt&tiLir initials Customer Payment Due Prior to Scheduling Construction $33,433 $35,755 Underground Service Attachment Charges to be billed separately The Customer understands that Underground Service Attachment Charges will be billed separately on the first month's power bill after service installation has been completed. In addition, the Customer has reviewed and acknowledges their responsibility for these costs. Idaho and Oregon cost information are available online at: ID: https://docs.idahopower.corn/pdfs/ServiceBilling/customerservice/newConstruction/IdahoCostInfo.pdf OR: https:/✓docs.idahopower.com/pdfs/ServiceBillingfcustomerservicelnewConstruction/OregonCostlnfo.pdf Please sign and return all relevant forms along with the amount stated on the Customer Cost Quote to: IDAHO POWER COMPANY 10790 Franklin Rd Boise, ID 83709 Customer Signature Idaho Power Representative `r Date Quote Data Service Request Number. 00460220 Internal use Page 3 of 3 Work Order Number: Design Number. Version: 27563398 0000145346 002 IDAHO An IOACORP Company Idaho Power Company Service Request Service Request Number: 00460220 CITY OF EAGLE - SINGLE PHASE LINE EXTENSION FOR NEW SERVICE. Feeder: EAGLI2A Service Location: 660 CIVIC LN EAGLE, ID 83616 Required in Service Date: 10/29/2020 Planning Center/Team: EAGLE Work Order Number: 27563398 Eng Hours: 00016 Request Type: CS Eng Fee Amount(Att98): 1,216.00 Rate Sch.: 7 Eng Fee Amount(Att16): Reply By: Eng Fee Service Agreement No: Eng Fee Service Agreement Date: Customer No: Contact Detail: CUST ERIC ZIENGENFUSS PO BOX 1520, EAGLE ID 83616 IPCO ERIC CLAMPITT 10790 Franklin Rd, BOISE ID 83709 RFND ERIC ZIENGENFUSS PO BOX 1520, EAGLE ID 83616 Attribute Information RES/COM Service Voltage 1ZUI14U Number of Phases 1 KW Motor Load: Largest Motor 1 Phase KW Demand 3 Phase KW Demand Vested Int. Connected Load Commercial Deposit Amount SIC Number Description SINGLE PHASE LINE EXTENSION FOR NEW SERVICE. INSTALLING 4" PRIMARY CONDUIT FOR FUTURE 3 PHASE SERVICE. 208-949-4390 208-388-2799 208-949-4390 No. Of Meters 2 Meter Location Ct Loc Primary OH/UG UG Service OH/UG UG Sry Owner IPCO Panel Amp Size 400 Service Pole Riscr Paem 1 Datc: 11/19/2020 Any changes to the project including but not limited to increases in load, timing of load schedule, location of service, and requested voltage may >ult ' na e� and/or delay of service. It is necessary to emu to changes as soon as possible. Z _ '` : 1/- / — 2 7- Client Signaire Date Idaho Power Representative Signatite Date ; —Z—r1 1 4 z 2" AND 4" BORES No Avian Protection Restriction POINT NUMBER 1 FROM CH2 TO CE-179 OF EACT,E r r . 2" AND 4" BORES CET 79 50 A iF9171L GENERAL NOTES: — EASEMENT UNDER RULE —PRIMARY CONDUIT TO BE 4" FOR FUTURE 3 PHASE SERVICE — 3" STUB FOR SERVICE — 400AMP PANEL —2 BORES, 4" AND 2" — 400AMP PANEL GISO# 4501161 r K CIVIC LN HIS WORK ORDER DOES NOT INCLUDE YOUR UNDERGROUND SERVICE CHARGES. YOUR ACCOUNT WILL BE BILLED SEPARATELY ACCORDING TO THE "UNDERGROUND RESIDENTIAL CONDUIT INSTALLATION EOUIREMENTS" ONCE THE SERVICE WORK HAS BEEN COMPLETED. I CONDUCTOR CU DC910 UNDERGROUND CABLE NOTES CABLE SIZE 1/0 A CABLE LENG1H 472 TRFN,^.I I-[1di� H CONDUIT I CONDUIT CONDUIT CU SIZE LENGTH DD62 4 20 Cuetamur 1 _ Job Tine: CITY OF EAGLE - SINGLE PHASE LINE EXTENSION FOR NEW SERVICE. Additional Description: Additional Description: LAT: 43.696137 LON:-116.346050 Feeder Map File Name: EAGL1 21 Oua Twn Rng I Sec Mer 1 04N 101 E 9 I BM State County ID Ada Surveyed or GPS: i1=,5 !Joint Use Attachment: NO Pre -Buda Date: ---- BuiTt as Designed: --- Construction Date: ---- Operating Voltage: 1 2.5kV IDAHO POWER Co. WORK ORDER MAP FDR By: -- Date. ---- ArcFM 8y: — Date: -- SCALE: 1" = 50 COMPACTION LENGTH I 10 SWPP: BORE LENGTM 453 Date J L d•" e ' Designer: ETC7510 Design No: 0000145346 Work Order No: 27563398 Sheet 1 Of 1