Loading...
Mou/Moa - 2012 - Orthophotography Project For Updated Photos Of Ada County Caldwell And Nampa MOA 2013-01 - 10/1/2012 MEMORANDUM OF AGREEMENT (MOA 2013-01) 2013 Orthophotography Project For the purpose of jointly funding an updated set of orthophotos for Ada County,Caldwell, and Nampa (UPWP Program 861) Project Purpose The purpose of the project is to acquire 2013 six-inch resolution natural color digital orthophotos covering parts of Ada County,and selected areas in and around Caldwell,and Nampa(shown as Urban in Exhibit A),and one-foot resolution natural-color orthophotos covering the rural areas of the same area of interest(shown as Rural in Exhibit A)as identified by the U.S. Geological Survey for Homeland Security activities. WHEREAS,the parties to this agreement, indicated below in §4,hereafter referred to as"the Parties" and the Community Planning Association of Southwest Idaho,hereafter referred to as"COMPASS," desire to cooperate in funding an update to the 2010 orthophotos; WHEREAS,the Parties have determined that a comprehensive set of high resolution orthophotos is of mutual benefit to their respective planning activities and programs; WHEREAS,the United States Geological Survey hereafter referred to as"USGS,"is responding to a Department of Defense(DOD)request for high-resolution image and geospatial data in support of Homeland Security. The National Geospatial-Intelligence Agency(NGA)has identified Boise as an area for which imagery is required.NGA data requirements call for one-foot or better resolution natural-color, leaf-off, orthorectified digital imagery. To address this need,USGS has offered funding in the amount of$50,000 for the purpose of creating a set of updated orthophotos; WHEREAS,COMPASS coordinated the 2000, 2003,2007, and 2010 orthophoto acquisitions on behalf of its participating members and has found a comprehensive set of orthophotos of benefit to its work in transportation,and regional planning; NOW THEREFORE BE IT RESOLVED the Parties agree to the following: 1. COMPASS agrees to obtain the deliverables from the selected consultant. Deliverables include: a. Spring 2013 orthophotos taken prior to leaf-out of trees for the area covered in Exhibit A. Only digital imagery will be provided as part of this agreement. b. Said photos to be compatible with the orthophotos taken in years past and meeting the technical specifications listed in Exhibit B. 2. COMPASS must meet applicable state and federal procurement requirements and its own procurement process. 3. COMPASS will make available all products for USGS and Earth Resources Observation and Science archives.Any and all sales of Orthophotography will solely be handled by COMPASS and any funds generated will go into the Orthophotography fund for future orthophotography acquisitions. C:\Documents and Settings\bvaughan\Local Settings\Temporary Internet 1 riles\Content.Outlook\TL095L741MOA 2013orthophoto_Eagle (2).docx 4. Agreed upon estimates of contributions from each participating agency(Parties). The contact person listed below is the technical liaison for each agency: Contribution Parties-Contact Person Not to Exceed ;Ada County-Anne Kawalec $80,0001 (Ada County Highway District-Chuck Spencer $80,0001 Bench Sewer District-Michael Comeskey $1,8001 (City ofBoise-Jim Hetherington $25,000 (City of Caldwell-Dave Marston $12,000 (City of Garden City-Missy Harris $2,2001 (City of Eagle-Bill Vaughn 1 $3,2221 (City ofKuna-Mike Borrick $8,0001 (City of Meridian-Robin Jack $10,0001 (COMPASS-Eric Adolfson $12,0001 City of Nampa- Craig Tarter $20,0001 1 Idaho Military Division-Nick Nydegger $10,0001 (United States Geological Survey-Scott VanHoff $50,0001 (United Water- Shane Limm $10,0001 TOTAL ESTIMATED PROJECT COST $3101001 5. COMPASS will invoice City of Eagle for their share of the project cost when the final contract is signed with the selected consultant,not to exceed$3,222 if all parties provide funding.In the event that the Parties cannot provide sufficient funding,the project will not proceed as proposed. The project will be cancelled or the scope changed, and the amount committed above will be revisited. 6. COMPASS will distribute the imagery to the Parties by copying the files onto hard drives furnished by the Parties. 7. The Parties hereby agree to the provisions of this agreement,and commitment to costs for each participating agency,to be billable on the date approved. APPROVED this / day of DCrbbe./- 2012. k. W Authorized SS gnr Matthew J. Stoll,Executive Director Community Planning Association of SW Idaho G d4' iaik Agency C:\Documents and Settings\bvaughan\Local Settings\Temporary Internet 2 Files\Content.Outlook\TL095L74\MOA 2013orthophoto_Eagle(2).docx Exhibit A Sections Covered in 2013 Orthophoto Update a :.. ` r - a . ra . • CL -1. ,I, I • t i 47 ® . NJi J ; CD 411 ET 1.... ..,,. t • .� L s ! 0 CI .0 --1" ? Q --.7 ink s - -«.• .: . . r• 3(`to • ...,"a t 1 O .17 Yi ...-..... ... 0 i a� i .• /,,,,M u, ► i NI s Q ' 3 r;. r: ':, . . ���... J I. r 1 4 ': s• .t I -2.f .4 . z ., , f.... .a i ®a _1 I 3 Exhibit B Technical Specifications for 2013 Orthophoto Update Aerial Photographs 1. Aerial type: Digital-True Color 2. Date(s)of photography: Spring 2013 3. Sun angle above the horizon: No more than 30 degrees,between 9:00 a.m. and 3:00 p.m. Mountain Daylight Time 4. Vegetation condition: Leaf off 5. Photo coverage: Section-centered single exposure 6. Photography scale: Applicable to acquire 6"and 1' resolution photography Digital Orthophotos 1. Physical formats: TIFF and MrSID 2. File extent: 885 Tiles at 1500m x 1500m uncompressed TIFF (0.15m and .3m) 3. Uncompressed data: Yes 4. Photo source: Ada/Caldwell 2010 orthophoto project 5. Number of bands: RGB true color 6. File organization: TIFF 7. Coordinate system: For Ada County,Modified State Plane Coordinate System;for USGS, UTM -NAD83,for Caldwell, Standard State Plane Coordinate System 8. Orientation of image pixels: Row major 9. Scanning aperture: 12 microns 10. Ground/pixel resolution: 0.1 Sm and 0.3m 11.Positional accuracy for well defined test points: +2 ft(95%confidence level,NSSDA for 1.0' ORD 12. Corner ties embedded: No 13. Image overedges beyond outermost corner ties: Not applicable 14. Source of elevation data used for the orthophoto rectification: Digital Terrain Model(DTM) derived from Ada County and Caldwell Orthophoto Project—2010 15.Nampa requires DTM and creation of planimetric features which will be paid for separately outside of the contributions specified above. 16.Description of ground control design and aerotriangulation procedures used in preparing orthophotos: All ground control and aerotriangulation will be performed under the direct supervision of an Idaho professional land surveyor. It will be based on the DTM from the 2010 Ada County aerial acquisition process. 17.USGS or other header provided: No (Georeferencing files only—TIFF World,SID World) 18. Federal Geographic Data Committee—(FGDC)compliant metadata will be provided. C:IDocuments and SettingslhvaughannLocal Settings\Temporary Internet 4 Files\Content.Outlook\TL095L741MOA 2013orthophoto_Eagle(2).docx