Loading...
Resolution - 2003 - 04 - Establishement Of Mechanical Permits - 02/18/2003 ORIGINAL RESOULTION No. 03-04 A RESOLUTION ADOPTING A FEE SCHEDULE PURSUANT TO SECTION 7-1B-3 OF THE EAGLE CITY CODE, TO PROVIDE FOR THE ESTABLISHIMENT BY RESOLUTION OF FEES FOR MECHANICAL PERMITS REFERENCED IN SECTION 106.5.2 OF THE INTERNATIONAL MECHANICAL CODE; AND PROVIDING FOR EFFECTIVE DATE. WHEREAS, public notice for a public hearing for these fees has been published in the Valley News as required by Idaho Code; WHEAREAS, the City Council has approved amending and updating the City's fee schedule for mechanical permits by this resolution; NOW THEREFORE, BE IT RESOLVED BY THE MAYOR AND CITY COUNCIL OF THE CITY OF EAGLE, IDAHO: Section 1: that said schedule attached hereto as Exhibit A and incorporated herein by this reference, is hereby approved; Section 2: that the Mayor and City Council are hereby authorized to execute said schedule for and on behalf of the City of Eagle; Section 3: that this Resolution shall be in full force and effect immediately upon its adoption and approval. ADOPTED by the Eagle City Council, Eagle Idaho. This 18th day of Februarv, 2003 APPROVED: ~~. ST A BASTI N COUNCIL PRESIDENT ATTEST: ...........,.. .,- ..... ",. ~ OF B-40...... I~~<~ -, v ~'OR.-t)>~ \ ,.9 ~J.- . "" *- : * ...... 5 - ... . \ ~ SEAL$ 0 I il! "(\0 .A~ . .. 'f}>~ ..fI'OR1'>'\... ~" "~.,~ ....... 'Q ~ .... "#.#. l'E OF): ",.... .............,,' K:\COUNCIL\ResoIutions\2003\Resolution No 03-04.doc Exhibit A Mechanical Permit Fees Permit Issuance I. For the issuance of each permit........................ ...... '" ...... ... '" ............... .................. ... ...... $ 24.00 2. For issuing each supplemental permit for which the original permit has not expired or been cancelled or finaled... .................. ... ...... '" ...... ... ...... ... ....................................... ...... ... .................... ..8.00 Unit Fee Schedule Note: the following do not include permit-issuing fees. 1. Furnaces For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 BtuIh (29.3 kW).................. ..15.00 For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance over 100,000 BtuIh (29.3 kW)...................................... .19.00 For the installation or relocation of each floor furnace, including vent........................................ ....15.00 For the installation or relocation of each suspended heater, recessed wall heater or floor mounted unit heater............................................................................................. ...15.00 2. Appliance Vents For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit................................................ ... ... ...... ... ...... ... ......................... .. ...8.00 3. Repairs or Additions For the repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code... ... ... ... ... ... ... ... .. .... ... ...... ... . .. . .. ..... ....... ..14.00 4. Boilers, Compressors and Absorption Systems For the installation or relocation of each boiler or compressor to and including three (3) horsepower, or each absorption system to and including 100,000 BtuIh (29.3 kW).......................... ............ ...... ..15.00 For the installation or relocation of each boiler or compressor over three (3) horsepower (2.24 kW) to and including 15 horsepower (11.19 kW), or each absorption system over 100,000 Btu/h (29.3 kW) and including 500,000 BtuIh (146.48 kW)................................... .......... ..28.00 For the installation or relocation of each boiler or compressor over 15 horsepower (11.19 kW) to and including thirty (30) horsepower (22.37 kW), or each absorption system over 500,000 BtuIh (146.48 kW) to and including 1,000,000 Btu/h (29.3 kW)...... ............ ............ ...... .................... ...38.00 For the installation or relocation of each boiler or compressor over thirty (30) horsepower (22.37 kW) to and including fifty (50) horsepower (37.3 kW), or for each absorption system over 1,000,000 Btu/h (292.95 kW) to and including 1,750,000 Btu/h (512.66 kW)........................ ... ...... ... .......... ........ ..56.00 For the installation or relocation of each boiler or compressor over fifty (50) horsepower (37.3 kW), or each absorption system over 1,750,000 Btu/h (512.66 k W).. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. 93.00 5. Air Handlers For each air-handling unit to and including 10,000 din (4.72 m'/S), including ducts attached thereto... ....11.00 Note: This fee shall not apply to an air-handling unit which is a portion of a factory-assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this code. Page 1 of2 K:\COUNCILIResolutions\2003IResolution 03-04 exhibit A.doc 6. Evaporative Coolers For each air-handling unit over 10,000 din (4.72 m' IS)......... ... ... ...... '" ...... ... ...... .................... ..19.00 For each evaporative cooler other than portable type..................................................... .......... ..11.00 7. Ventilation and Exhaust For each ventilation fan connected to a single duct................................................................... .8.00 For each ventilation system which is not a portion of any heating or air conditioning system authorized by a permit.. . .. . .. . .. . .. . .. . .. . .. . .. . .. . .. . .. . .. . .. . .. .. .. . .. . .. .. .. .. . .. . .. .. . .. . .. .. .. .. . .. . . .. .. . .. . .. . .. ..11.00 For the installation of each hood which is served by mechanical exhaust, including the ducts for such hood... ... ... ... ... '" . ..... ... ...... ... ...... . .. ... ... ... ... ... ... ... ... '" '" .. . ... ... ...... ... ... ... ... ........ .11.00 8. Incinerators For the installation or relocation of each domestic-type incinerator......... ......... ...... '" ......... ........... .19.00 For the installation or relocation of each commercial or industrial-type incinerator....................... .......27.00 9. Miscellaneous For each appliance or piece of equipment regulated by this code, but not classed in other appliance categories, or for which no other fee is listed in this table... ... '" ... ... ......... ...... ... ...... ...... ..11.00 10. Permit Fees for fuel gas piping shall be as follows: For each gas piping system of one to five outlets.............................. ............ ...... .................... ...5.00 For each additional gas piping system, per outlet....................................... ... ...... ... ................. ..1.00 11. Process Piping: For each hazardous process piping system (HPP) of one to four outlets...... ................................. ..5.00 For each HPP piping system of five or more outlets, per outlet...... ........................................... ..1.00 For each nonhazardous process piping system (NPP) of one to four outlets......... ...... '" ...... ......... ....5.00 For each NPP piping system of five or more outlets, per outlet..... ..................................... ...... . ..1.00 Other Inspections and Fees I. Inspections outside of normal business hours, per hour (minimum charge - two hours).. ....... .........50.00* 2. Reinspection fees assessed - per inspection...... ... ... ... ... '" '" '" ... ... ... ... ...... '" ...... '" '" .........51.00* 3. Inspections for which no fee is specifically indicated, per hour (minimum charge - one-halfhour)....5O'OO* 4. Additional plan review required by changes, additions or revisions to plans or to plans for which an initial review has been completed, per hour (minimum charge - one-halfhour)... ... ... .50.00* * Or the total hourly cost to the jurisdiction, whichever is the greatest. The cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. Commercial Fee Schedule Note: the following do not include permit-issuing fees. Under $500,000... ... ... ... ... ... '" '" '" ...... ...... ... ...... ... ...... ... ... ...... '" '" '" ....... ...Base fee _ 2.07% of job value $500,000 to $1,000,000................................................. ....$10,350.00 plus 1.55% of job value over $500,000 Over $1,000,000......... ...... '" ...... ... ...... ... ...... ... ..............$18,112.50 plus 1.03% of job value over $1,000,000 Page 2 of2 K:\COUNCILIResolutions\2003IResolution 03-04 exhibit A.doc