Loading...
Service Solicited - 2005 - Holladay Engineering Company - Amendment Engineering Services cc (.) pp r-Ov'~ /C)-/R...as STANDARD RA TES FOR SERVICES (for 2006, to be adjusted annually) Holladay Engineering Company representative labor rates for engineering, geology, and related services are as follows: Project Manager III Project Manager II Project Manager I Design Engineer III Design Engineer II Design Engineer I Staff Engineer III Staff Engineer II Staff Engineer I Geologist III Geologist II Geologist I Staff Geologist III Staff Geologist II Staff Geologist I Scientist III Scientist II Scientist I Staff Scientist II Staff Scientist I Construction Manager II Construction Manager I $110.00/hr 105.00 100.00 100.00 95.00 90.00 90.00 85.00 75.00 100.00 95.00 90.00 90.00 85.00 75.00 100.00 95.00 90.00 85.00 75.00 90.00 85.00 Inspector /0 bserver Engineering Aide Surveyor Manager Surveyor Survey Technician II Survey Technician I 3-Man Survey Crew 2-Man Crew with Total Station 1-Man Survey Crew 2-Man GPS Crew 1-Man GPS Crew Planner GIS/Graphics Manager Designer CADD Operator (Drafting) II CADD Operator (Drafting) I Administrative Assistant III Administrative Assistant II Administrative Assistant I 65.00 50.00 95.00 85.00 70.00 40.00 160.00 140.00 110.00 160.00 130.00 85.00 90.00 65.00 55.00 45.00 55.00 40.00 35.00 Other in-house charges: Mileage Over-night stay Expert Testimony CADD Computer $0.40/mile 50.00/night plus expenses 2 X Billing Rate 13.00 Hourly rates include normal costs of business overhead such as long distance phone calls, business supplies, and normal office function costs. If authorized in advance by OWNER, overtime work requiring higher than regular rates shall be allowed for specific work. Direct Project Costs are those project specific costs billed to us by consultants or vendors. Direct Project Costs shall include the amount billed to ENGINEER times a factor of 1.15. H E -\0 ~J o~ + 1'"u:t,.1" 0 , \b'.~ ~J .~j r~ C\"" 2.)/O~ (~ HOLLADAY ENGINEERING COMPANY 32 N. Main Street Payette, 10 83661 (208) 6. nail: hec@holladayengineering.com S' Subdivision / Phase No: Total Subdivision Size - Preliminary Plat (Lot #) Subdivision Phase Size - Final Plat (Lot #) Date: Conduct Final Plat Check-list Review and Si nature Final Plat Corres ondence Base Fee FEE TOTAL $ 175.00 $ $ 50.00 $ $ 200.00 $ 10.00 $ $ 200.00 $ $ 300.00 $ 5.00 $ $ 200.00 $ 5.00 $ $ 100.00 $ 5.00 $ $ 275.00 $ $ 250.00 $ 5.00 $ PRELIMINARY PLAT FEE $ $ $ 150.00 $ $ 130.00 5.00 $ $ FINAL PLAT FEE $ Base Fee $ 175.00 $ 650.00 $ 10.00 $ 250.00 $ 125.00 $ 5.00 $ 125.00 $ 5.00 $ 100.00 $ 5.00 $ 200.00 $ 5.00 DEPOSIT TOTAL $ $ $ $ $ $ $ ENGINEERING PLAN REVIEW DEPOSIT $ < EAGLE MUNICIP AtW A TER~;SERYICE AREAFEE/iIJilii,'L;,jkk!?i>i!?ii, ~",.,y; ~::WdmHtk,';" $ $ 750.00 $ al Water Service Area $ $ 750.00 $ EAGLE MUNICIPAL WATER SERVICE AREA FEE $ (H) Hourly expenses will be billed for the following items TOTAL FEE & DEPOSIT = $ 1 Municipal water system design review (supply, storage, wells, etc.) 2 Water right review / acquisition 3 Flood plain development permit review 4 When additional reviews are required due to incompleteness of submittals or failure to meet conditions of initial review letter. 5 Additional meeting / site observations 6 Any review activity required that is not included in the above fee schedule. /tP--.;:l 3-~ / - c c... ~. Exhibit A - sr ANDARD RA rES FOR SERVICES (for 2001, to be adjusted annually) Holladay Engineering Company representative labor rates for engineering, geology, and related services are as follows: Principal Project Manager Project Engineer Staff Engineer II Staff Engineer I Geologist Staff Geologist Construction Manager II Construction Manager I Surveyor Planner Inspector/Observer Engineering Aide GIS/Graphics Manager Data/Grant Manager CADD Operator (Drafting) Secretary Research Assistant Field Data Collector wrr otal Station 2-Man Crew with Total Station Other in-house charges: Computer Modeling CADD Computer Other Computer time Over-night stay Mileage RECEIVED & FILED CITY OF EAGLE $94.00/hr 86.00 78.00 72.00 65.00 78.00 65.00 86.00 78.00 72.00 70.00 64.00 46.00 72.00 64.00 46.00 36.00 35.00 $100.00/hr. + $6.00 point $130.00/hr. + $6.00 point AUG 0 7 2001 File: Route to: 25.00 12.50 8.50 50.00/night plus expenses 0.35/mile Hourly rates include normal costs of business overhead such as long distance phone calls, business supplies, and normal office function costs. If authorized in advance by OWNER, overtime work requiring higher than regular rates shall be allowed for specific work. Direct Project Costs are those project specific costs billed to us by consultants or vendors. Direct Project Costs shall include the amount billed to ENGINEER times a factor of 1.15. H HOLLADAY ENGINEERING COMPANY E 32 N. Main Street P.O. Box 235 Payette, 1083661 (208) 642-3304 Fax: (208)642-2159 email: holladay@srvinet.com AMENDMENT NO.1 TO THE PROFESSIONAL ENGINEERING SERVICES AGREEMENT BETWEEN HOLLADAY ENGINEERING CO. AND CITY OF EAGLE, IDAHO FOR ENGINEERING SERVICES, PROJECT NO. 060996 This original AGREEMENT entered into on May 28, 1997, between HOLLADAY ENGINEERING CO. and the CITY OF EAGLE, IDAHO, for professional engineering service~ shall be amended as follows: The contract time is extended to remain open. Either party may terminate this contract by providing 30 days written notice to the other party. All other conditions of the original agreement shall remain in full force and effect. IN WITNESS WHEREOF, the parties hereto each herewith subscribe the same in duplicate. Date For City of Eagle. Idaho By: By: It:; J Vemon E. Brewer Printed Name Printed Name City of Eagle A municipal corporation P.o. Box 477 Eagle, Idaho 83616 (208) 939-6813 Fax: (208) 939-6827 Holladay Engineering Co. P.O. Box 235 Payette,ID 8361 (208) 642-3304 Fax: (208) 642-2159 HOLLADAY ENGINEERING COMPANY PROFESSIONAL SERVICES AGREEMENT This is an Agreement made effective as of the date of signature between the person or organization as identified by authorized representative's signature, hereinafter called OWNER and Holladay Engineering Company, of Payette, Idaho, hereinafter called CONSULTANT. PROJECT TITLE City of Eagle. Idaho. a municipal corporation SCOPE OF WORK DESCRIPTION OF REQUIRED WORK As City Engineer, Consultant will provide customary civil engineering services to assist the Owner. Services may include the following: · Perform review and comment on lot line adjustments, lot splits, and preliminary and final subdivision plats; sign lot line adjustment, lot split and final plat mylars; · Perform review and comment on submitted plans and specifications involving engineering related issues; perform review and comment on City and agency studies involving engineering related issues; · Suggest, and comment on, engineering related ordinance changes; · Advise the Mayor and Council on issues affecting the City including specific project proposals, infrastructure expansion, floodplain modifications, storm water and erosion control, ground water studies, and GIS mapping; · and other professional engineering related tasks as may be assigned by the Mayor and Council. To ensure duplicate file contents are maintained in the Consultant's and Owner's offices, a procedure has been established to send and/or ensure that a "Client File Copy" of all related information for each projecUtask made known to the Consultant will be distributed to the Owner. This Agreement shall have a period of 365 calendar days including holidays and weekends and shall begin upon the date of signatures contained herein. OWNER shall pay CONSULTANT according to the following: -rE Current Time and Materials Fee Schedule-Exhibit A o Fixed Fee as defined in Scope of Work Schedule By: 6 o Other as Defined in Scope of Work Schedule q1 Date By: Holladay Engineering Co. Person or Organization Represented: City of Eagle, Idaho a municipal corporation P.O. Box 477 Eagle,ID 83616 HECO Job Number: 060996EG H E HOLLADAY ENGINEERING CO. P.O. Box 235, Payette, ID 83661 Telephone 208-642-3304 -.. .. FAX 208-642-2159 Exhibit A STANDARD RATES FOR SERVICES Holladay Engineering Co. representative labor rates for engineering, geology, and related services are as follows: Principal Project Manager Project Engineer Staff Engineer Geologist Hydrogeologist Engineering Planner Engineering Aide GIS/Graphics Manager Data Management Cadd Operator (Drafting) Secretary Research $80.00/hr 75.00 70.00 60.00 70.00 60.00 60.00 40.00 55.00 50.00 40.00 30.00 35.00 Other in-house charges: Computer Modeling Cadd Computer Other Computer time Over-night stay Mileage 25.00 12.50 8.50 50.00/night plus expenses 0.32/mile Monthly billings shall include a brief description of work performed for each amount billed including the staff person, job title, and date. Hourly rates include normal costs of business overhead such as long distance phone calls, business supplies, and normal office function costs. One-way travel time and mileage to the project site shall be charged. If authorized in advance by OWNER, overtime work requiring higher than regular rates shall be allowed for specific work. Direct Project Costs are those specific project costs billed to us by consultants or vendors. Direct Project Costs shall include the amount billed to ENGINEER times a factor of 1.10. f:\he\eg\rates_96.97 May 22, 1997 HOLLADAY ENGINEERING COMPANY Administrative Office Policy for Professional Engineering March, 1997 This policy applies to all written communications including review of other firms work products and duties as a Professional of Record. I. WRITTEN COMMUNICATIONS In general, written communications include the following classes of documents and the standard review and signature policy for each. A. Construction plans and specifications Plans, and specification sections written especially for the project, shall be given a "red-and-yellow" check by the Project Engineer (a P.E.): each detail, the dimensions of major views, and each note shall be marked with yellow highlighter by the checker if not corrected in red. Each paragraph of special specifications (written for the individual project), the Advertisement for Bids, the Itemized Bid and any other project-specific page in the Specifications shall be similarly marked. When the Project Engineer finds that the project is complete, the plans and specifications shall be reviewed by another P.E. on the HECD staff. The Project Engineer's seal is to be used on each sheet of plans designed or supervised, if designed by an intern. Spaces for listing drafter and designer initials shall be provided on the nameplate of each sheet this nameplate listing is the vehicle for giving credit to drafters and to engineers-in-training performing design. If another P.E. designs a specific part (for instance, a Structural Engineer designing a small bridge included in a highway project), that P.E.'s seal shall be used on that part of the plans. The Project Engineer's seal shall appear on the title sheet of the specifications. The seal of the Principal Engineer in responsible charge shall appear on the title sheet of the plans, per requirements of Idaho Code 54-1215. 1 8. Formal reports of engineering and geological investigations C. Reports of planning projects and planning/zoning review letters D. Maps (cartographic projects) E. Proposals to do work, Scope of Work letters, and Professional Service Agreements Formal reports shall be internally reviewed, and the author's name and professional seal shall appear on the title sheet. Any formal report prepared by an engineer- in-training shall be co-authored by a PE and the names of all co-authors shall appear on the title sheet, with the seals of the registered co-authors. Reports and letters shall be reviewed internally. If engineering design considerations as well as planning considerations are discussed, they shall be co-authored by a PE and issued with dual signatures by the composing author and the Engineer of Record. If the content is restricted to planning questions, only the signature of the composing author is needed. Maps are distinct from other documents prepared by HECO because they are generally compiled from diverse data sources, often of varying degrees of precision, for specific purposes as agreed upon with the clients. If signatures are required, the Professional Services Agreement (PSA) for the project will define the requirement. The HECO copyright statement shall appear on all maps compiled by the company. Where applicable, a disclaimer statement explaining that the data that is plotted has been supplied by other sources and that HECO cannot assume responsibility for errors or omissions will also be required. Other contents, and the question of whether the name of Holladay Engineering Company is to be prominently shown, depend on the PSA. All maps shall be reviewed internally and review copies initialed by the reviewer prior to issuance. Documents offering or creating business commitments for the company (especially proposals, Scope of Work letters, and Professional Service Agreements) shall be reviewed and initialed by a corporate officer and signed by another corporate officer. 2 E. Letters of professional comment Letters of professional comment, including presentation of design-related information or technical discussion to regulatory agency personnel, letters reporting findings of reviews of designs by other engineers performed by HECO staff in the capacity of City or County Engineer, and review of material submittals by vendors offering "equivalents" for construction projects, shall be reviewed for content by a qualified professional other than the author. If the letter includes any statement of rejection of all or part of another engineer's design, or any controversy with a regulator, it should also be reviewed and cleared by an officer of the corporation. Letters in this category shall bear the signature of a registered professional of the appropriate discipline. If the letter was authored by an intern, it shall bear both signatures (intern and the Engineer or Geologist of Record). G. Memoranda and informal information Memoranda and other informal and non-controversial documents, including communications restricted to statements of meeting schedules, meeting agendas, and general memoranda to other employees, should bear the author's name, but do not require formal internal review. II. GENERAL POLICIES A. Internal identification job number and computer file number should be listed on every document to facilitate filing and retrieval. 8. It is important that internal reviews of other employee's work be given high priority. f\he\he\adminpol.wpd 3 I , HOLLADAY ENGINEERING ~ CO. ~ ~ ~ ! .., s 0 .E. ~ ! .., 110 32 N. Main St., Payette, ID 83661 .~ =a Iii .~ .S 11 .s Po. .. 0 " i i ! i 1l .. .., :a ~ e t i g E ~ .. d' .. f 208-M2-3304 1ib ~ ~ .., ~ ~ "6 I .. ~ ~ ~ ~ 0 0 0 Z Po. 0 i 0 ... ... 'S ... 'S ... ... ... 'S 'S 'S ... 'S .. 0 s 0 8 i .13 Municipal I Public 0 0 0 0 0 0 0 J .. g .~ .~ .~ B .~ .~ .~ .~ .~ .~ "~ .~ "~ .. 5' ~. oj EnsdneerinS! Services 0 0 0 0 0 0 0 0 0 0 0 0 0 ;g 0 ... ~ Attend CouncilICommission Meetings ./ ./ ./ ./ ./ ./ ./ Attend Meetings As Required ./ ./ ./ ./ ./ ./ ./ ./ -/.: ./ ./ ./ ./ ./ ./ ./ ./ Assist in Negotiations with rm ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ Assist in Negotiations with DEQ ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ Assist in Negotiations with Hwy. District ./ ./ ./ ./ ./ ./ ./ Assist in Negotiations with Water Districts Assist in Negotiations with Sewer Districts ./ Assist in Negotiations with Industries ./ ./ Review Monthly Wastewater Reports ./ ./ ./ ./ ./ ./ ./ Review Monthly Wtt. Production Reports ./ ./ ./ ./ ./ Environmeota1 Site Assessments ./ ./ ./ ./ ./ Comprehensive Plan ReviselUpdate ./ ./ ./ ./ ./ ./ ./ ./ ./ Zoning & Subd. Ordinance ReviselUpdate ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ Comm.lResidentiaI Subd. Dev. Review ./ ./ ./ ./ ./ ./ ./ ./. ./ ./ ./ ./ ./ ~ ./ ./ Annex., Area of Impact, Flood Plain Dev. ./ ./ ./ ./ ./ ./ Local Improvement Districts (LID) ./ ./ ./ ./ ./ City Utilities Mapping ./ ./ ./ ./ ./ ./ ./ Zoning Mapping ./ ./ ./ ./ ./ Water System Master Planning ./ ./ ./ ./ ./ ./ ./ Water Distribution Modeling ./ ./ ./ ./ ./ ./ ./ Water Treatment Improvement Design ./ ./ ./ ./ ./ ./ ./ ./ Water Distribution Design ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ Groundwater Quality & Quantity Eval. ./ ./ ./ ./ ./ ./ Municipal Well Design ./ ./ ./ ./ ./ ./ ./ ./ Water Rights Pemritting & Beneficial Use ./ ./ ./ ./ ./ ./ ./ ./ Groundwater Monitoring ./ ./ ./ ./ ./ ./ ./ Wastewater System Master Planning ./ ./ ./ ./ ./ " Wastewater Treatment Improve. Design ./ ./ ./ ./ ./ ./ ./ Wastewater Collection Design ./ ./ ./ ./ ./ ./ ./ ./ Federal and State GraDtILoan Assistance ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ NPDES Permits ./ ./ ./ ./ ./ ./ ./ Biosolids Land Application Permitting ./ ./ ./ ./ ./ ./ Traffic Evaluation & Master Planning ./ ./ ./ ./ ROW IEasement Evaluation It, Acquisition ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ Street Improvement Design ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ Railroad Crossing Design ./ ./ ./ ./ Pavement Design ./ ./ ./ ./ ./ Stmctural Evaluations ./ ./ ./ ./ ./ ./ ./ ./ Bridge Inspection ./ ./ ./ ./ ./ ./ Bridge Design ./ ./ ./ ./ ./ ./ ./ ./ ./ Geotechnical Evaluation ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ ./ Sanitary Landfill Design and Permitting ./ ./ ./ ./ ./ ./ ./ ./ Landfill Financial Assurance ./ ./ ./ ./ ./ ./ ./ Hydrogeologic Characterization & Modeling ./ ./ ./ ./ ./ ./ ./ ./ Landfill Closure Plans ./ ./ ./ ./ ./ ./ ./ ./