Other - 07-11-024 - 1173 N Cobblestone Way - 11/19/2007City of Eagle
Zoning/Building Permit
Permit#: 07-11-024 Mechanical#: M-4718 Fees:
Property Owner Jayo Construction Permit Fee $2,645.75
Owner Address 1323 S Five Mile Rd Plan Review $926.01
Owner City State Zip Boise, ID 83709 Development $1,571.27
Issue Date 11/19/2007 Special Fee $0.00
Foundation Only Issue Date IECC Fee $50.00
Builder Name Jayo Construction Inc ACHD Fee $0.00
Builder Address 1323 S Five Mile Road Mechanical -Res $192.00
Builder City State Zip Boise, ID 83709 Mechanical -Com $0.00
Builder Telephone (208) 322-3663 EM2 Fee $0.00
Builder Registration # RCE -2103
Subdivision Clear Creek Crossing
Lot 4 Block 1
Property Address 1173 N Cobblestone Way
Type EXP
Deposit Receipt# 6.002085
Issue Receipt# 6.002152 Foundation Only Receipt#
SqFtLiving 3576 SqFtBmnt 0 SqFtGrg 1362
SqFtPorch 236 Value Of Imprmnt $394,675.00
Eagle Water 2786R EM2 Water 0 Eagle Sewer 071115001
Development D3251-07 ACHD E08-002824
Notes: Builder will be tearing out foundation - Permit Expired - letter sent 8/13/08
Total Fees
Less Deposit
Less Foundation Only
Balance Due
Builders Signature
City Clerk/Authorized Personnel
n3
$5,385.03
$200.00
$0.00
$5,185.03
Said structure and/or use to conform to specifications and plans submitted and must be in full compliance
with ordinances of the City of Eagle subject to inspection permits and fees as required.
Wednesday, August 13, 2008 Page 1 of 1
City of Eagle
Zoning/Building Permit
Permit#: 07-11-024 Mechanical#: M-4718 Fees:
Property Owner Jayo Construction Permit Fee $2,645.75
Owner Address 1323 S Five Mile Rd Plan Review $926.01
Owner City State Zip Boise, ID 83709 Development $1,571.27
Issue Date 11/19/2007 Special Fee $0.00
Foundation Only Issue Date IECC Fee $50.00
Builder Name Jayo Construction Inc ACHD Fee $0.00
Builder Address 1323 S Five Mile Road Mechanical -Res $192.00
Builder City State Zip Boise, ID 83709 Mechanical -Com $0.00
Builder Telephone (208) 322-3663 EM2 Fee $0.00
Builder Registration # RCE -2103
Subdivision Clear Creek Crossing
Lot 4 Block 1
Property Address 1173 N Cobblestone Way
Type NH
Deposit Receipt# 6.002085
Issue Receipt# 6.002152 Foundation Only Receipt#
SqFtLiving 3576 SqFtBmnt 0 SqFtGrg 1362
SqFtPorch 236 Value Of lmprmnt $394,675.00
Eagle Water 2786R EM2 Water 0 Eagle Sewer 071115001
Development 03251-07 ACHD E08-002824
Notes:
Builders Signature
City Clerk/Authorized Personnel
N . )ln a t, (0 c )
u
Total Fees $5,385.03
Less Deposit $200.00
Less Foundation Only $0.00
Balance Due $5,185.03
Said structure and/or use to conform to specifications and plans submitted and must be in full compliance
with ordinances of the City of Eagle subject to inspection permits and fees as required.
Friday, November 16, 2007 Page 1 of 1
Permit Number
ELECTRICIAN
1E -ZEE ELECTRIC
[PO BOX 190343
City of Eagle
Electrical Permit
660 E. Civic Lane, Eagle, ID 83616
(208) 489-8760
07-11-024-E
Issue Receipt: 1 6.002140
BOISE, ID 83719-0343
(208) 362-3514 1 Registration #:
PERMIT ADDRESS
Property Owner: I,Jayo Construction
Subdivision (Clear Creek Crossing
Lot 14 I Block 1 1 1
Address 11173 N Cobblestone Way
PERMIT FEES
Temp Construction Fee
Single Family Dwelling
up to 200 amp service
201 to 400 amp service
400 plus amp service
New Residential - MF Dwellings
2 unit apartment
3 or more units
Existing Residential
Residential spas, hot tubs, etc
Swimming Pools
Swimming Pool Grid
Residential Space Heating/AC
Domestic Water Pumps
Fractional to 25 HP
26 to 200 HP
Over 200 HP
Mobile Home Permit Fee
oi =
0=
0=
01=
0
* Inspection Phone: 939-4462
Electrician Signature
City Clerk/Authorized Personnel
0=
0=
0=
0 =
011 =
0=
0=
0=
0=
C-2785
$40.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Total Electrical Cost
Commercial Water Pumps
Fractional to 25 HP
26 to 200 HP
Over 200 HP
Electrically driven irrigation
Center Pivot
Center Pivot/OTHER
Electric signs and outlining
Electric Sign
Outline Lighting
Reinspection Fee
Plan check fee
Temporary Amusement/Ind
Expired Permits > 180 days
Requested Inspection Fee
Total Fee
,,t,044,e. •-•
Issue Date ! 11/15/2007
0
0
0; =
=
01 =
0
0: =
01 =
0
$o.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00j
$0.00
$0.00-
$0.00
$40.00
Permit Number
City of Eagle
Plumbing Permit
660 E. Civic Lane, Eagle, ID 83616
(208) 489-8760
07-11-024-P 1
PLUMBER
JOHN SAWYER EXCAVATION
2700 N EAGLE RD
FEAGLE, ID 83616
(208) 941-2882
Issue Receipt:
Registration #:
PERMIT ADDRESS
Property Owner: 1Jayo Construction
Subdivision
Lot
Address
4
Clear Creek Crossing
Block
PERMIT FEES
Residential
Base Permit Fee
1
11173 N Cobblestone Way
Additional Fixtures
Replacement Fixtures
Sewer Line Installation
Water line Installation
Combination
Residential spas, hot tubs, etc
Mobile Home Water/Sewer Conn
Lawn Sprinker Backflow
Water Conditioners
Multipurpose fire/sprinklers
* Inspection Phone: 939-4462
Plumber Signature
City Clerk/Authorized Personnel
01 _
0 =
01 =
0 =
1 =
0 =
0 =
0 =
0
01 =
6923
$30.00
$0.00
$0.00
$0.00
$0.00
$50.00
$0.00
$0.00
$0.00
$0.00
$0.00
6.002177
Total Plumbing Cost
Issue Date
Existing plumbing inspection
Reinspection Fee
Bad Direction Fee
Plan Check Fee
Technical Service Fee
Requested Inspection Fee
Total Fee
\\.`)-k1vk t ,/&),(n,C)
11/29/2007
01
0
01 =
0
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00 1
$80.00
Mayor Phil Bandy
August 13, 2008
Jayo Construction
Attn: Shane
1323 S Five Mile Rd
Boise, ID 83709
CITY OF EAGLE
P.O. Box 1520
Eagle, Idaho 83616
939-6813
Re: Expiration of Building Permit 07-11-024 at 1173 N Cobblestone Way
Dear Jayo Construction,
Council: Steve Guerber
Michael Huffaker
Norm Semanko
Al Shoushtarian
Building Permit issued for a New Home located on Lot 4 Block 1 in the Clear Creek Crossing
Subdivision is deemed expired as of August 13, 2008, under the following Building Code:
IBC & IRC sections 105.5 are amended to read as follows:
105.5 Expiration. Every permit issued by the building official under the provisions of this chapter shall expire by
limitation and become null and void if the building or work authorized by such permit is not commenced within 180
calendar days from the date of such permit, or if the building or work authorized by such permit is suspended or
abandoned at any time after the work is commenced for a period of 180 calendar days.
The timeframe by which a project shall be deemed to be suspended or abandoned shall be measured from the
date of the last major inspection that resulted in an approval to move to the next stage of construction by the city
of Eagle or if no inspection has been required then a project shall be deemed to be suspended 180 calendar days
from the date the permit was issued.
The City of Eagle regrets this project will not move forward. If you have any questions regarding this
action, I can be reached at 489-8760.
CC: Mayor Bandy
City Council Members
File
Respectfully,
Michael Mongelli
Building Official
K \Building Dept\Expired-Extended-refund letters\Expired Permits \07-11-024 1173 N Cobblestone Way doc