Loading...
Other - 07-11-024 - 1173 N Cobblestone Way - 11/19/2007City of Eagle Zoning/Building Permit Permit#: 07-11-024 Mechanical#: M-4718 Fees: Property Owner Jayo Construction Permit Fee $2,645.75 Owner Address 1323 S Five Mile Rd Plan Review $926.01 Owner City State Zip Boise, ID 83709 Development $1,571.27 Issue Date 11/19/2007 Special Fee $0.00 Foundation Only Issue Date IECC Fee $50.00 Builder Name Jayo Construction Inc ACHD Fee $0.00 Builder Address 1323 S Five Mile Road Mechanical -Res $192.00 Builder City State Zip Boise, ID 83709 Mechanical -Com $0.00 Builder Telephone (208) 322-3663 EM2 Fee $0.00 Builder Registration # RCE -2103 Subdivision Clear Creek Crossing Lot 4 Block 1 Property Address 1173 N Cobblestone Way Type EXP Deposit Receipt# 6.002085 Issue Receipt# 6.002152 Foundation Only Receipt# SqFtLiving 3576 SqFtBmnt 0 SqFtGrg 1362 SqFtPorch 236 Value Of Imprmnt $394,675.00 Eagle Water 2786R EM2 Water 0 Eagle Sewer 071115001 Development D3251-07 ACHD E08-002824 Notes: Builder will be tearing out foundation - Permit Expired - letter sent 8/13/08 Total Fees Less Deposit Less Foundation Only Balance Due Builders Signature City Clerk/Authorized Personnel n3 $5,385.03 $200.00 $0.00 $5,185.03 Said structure and/or use to conform to specifications and plans submitted and must be in full compliance with ordinances of the City of Eagle subject to inspection permits and fees as required. Wednesday, August 13, 2008 Page 1 of 1 City of Eagle Zoning/Building Permit Permit#: 07-11-024 Mechanical#: M-4718 Fees: Property Owner Jayo Construction Permit Fee $2,645.75 Owner Address 1323 S Five Mile Rd Plan Review $926.01 Owner City State Zip Boise, ID 83709 Development $1,571.27 Issue Date 11/19/2007 Special Fee $0.00 Foundation Only Issue Date IECC Fee $50.00 Builder Name Jayo Construction Inc ACHD Fee $0.00 Builder Address 1323 S Five Mile Road Mechanical -Res $192.00 Builder City State Zip Boise, ID 83709 Mechanical -Com $0.00 Builder Telephone (208) 322-3663 EM2 Fee $0.00 Builder Registration # RCE -2103 Subdivision Clear Creek Crossing Lot 4 Block 1 Property Address 1173 N Cobblestone Way Type NH Deposit Receipt# 6.002085 Issue Receipt# 6.002152 Foundation Only Receipt# SqFtLiving 3576 SqFtBmnt 0 SqFtGrg 1362 SqFtPorch 236 Value Of lmprmnt $394,675.00 Eagle Water 2786R EM2 Water 0 Eagle Sewer 071115001 Development 03251-07 ACHD E08-002824 Notes: Builders Signature City Clerk/Authorized Personnel N . )ln a t, (0 c ) u Total Fees $5,385.03 Less Deposit $200.00 Less Foundation Only $0.00 Balance Due $5,185.03 Said structure and/or use to conform to specifications and plans submitted and must be in full compliance with ordinances of the City of Eagle subject to inspection permits and fees as required. Friday, November 16, 2007 Page 1 of 1 Permit Number ELECTRICIAN 1E -ZEE ELECTRIC [PO BOX 190343 City of Eagle Electrical Permit 660 E. Civic Lane, Eagle, ID 83616 (208) 489-8760 07-11-024-E Issue Receipt: 1 6.002140 BOISE, ID 83719-0343 (208) 362-3514 1 Registration #: PERMIT ADDRESS Property Owner: I,Jayo Construction Subdivision (Clear Creek Crossing Lot 14 I Block 1 1 1 Address 11173 N Cobblestone Way PERMIT FEES Temp Construction Fee Single Family Dwelling up to 200 amp service 201 to 400 amp service 400 plus amp service New Residential - MF Dwellings 2 unit apartment 3 or more units Existing Residential Residential spas, hot tubs, etc Swimming Pools Swimming Pool Grid Residential Space Heating/AC Domestic Water Pumps Fractional to 25 HP 26 to 200 HP Over 200 HP Mobile Home Permit Fee oi = 0= 0= 01= 0 * Inspection Phone: 939-4462 Electrician Signature City Clerk/Authorized Personnel 0= 0= 0= 0 = 011 = 0= 0= 0= 0= C-2785 $40.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Electrical Cost Commercial Water Pumps Fractional to 25 HP 26 to 200 HP Over 200 HP Electrically driven irrigation Center Pivot Center Pivot/OTHER Electric signs and outlining Electric Sign Outline Lighting Reinspection Fee Plan check fee Temporary Amusement/Ind Expired Permits > 180 days Requested Inspection Fee Total Fee ,,t,044,e. •-• Issue Date ! 11/15/2007 0 0 0; = = 01 = 0 0: = 01 = 0 $o.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00j $0.00 $0.00- $0.00 $40.00 Permit Number City of Eagle Plumbing Permit 660 E. Civic Lane, Eagle, ID 83616 (208) 489-8760 07-11-024-P 1 PLUMBER JOHN SAWYER EXCAVATION 2700 N EAGLE RD FEAGLE, ID 83616 (208) 941-2882 Issue Receipt: Registration #: PERMIT ADDRESS Property Owner: 1Jayo Construction Subdivision Lot Address 4 Clear Creek Crossing Block PERMIT FEES Residential Base Permit Fee 1 11173 N Cobblestone Way Additional Fixtures Replacement Fixtures Sewer Line Installation Water line Installation Combination Residential spas, hot tubs, etc Mobile Home Water/Sewer Conn Lawn Sprinker Backflow Water Conditioners Multipurpose fire/sprinklers * Inspection Phone: 939-4462 Plumber Signature City Clerk/Authorized Personnel 01 _ 0 = 01 = 0 = 1 = 0 = 0 = 0 = 0 01 = 6923 $30.00 $0.00 $0.00 $0.00 $0.00 $50.00 $0.00 $0.00 $0.00 $0.00 $0.00 6.002177 Total Plumbing Cost Issue Date Existing plumbing inspection Reinspection Fee Bad Direction Fee Plan Check Fee Technical Service Fee Requested Inspection Fee Total Fee \\.`)-k1vk t ,/&),(n,C) 11/29/2007 01 0 01 = 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1 $80.00 Mayor Phil Bandy August 13, 2008 Jayo Construction Attn: Shane 1323 S Five Mile Rd Boise, ID 83709 CITY OF EAGLE P.O. Box 1520 Eagle, Idaho 83616 939-6813 Re: Expiration of Building Permit 07-11-024 at 1173 N Cobblestone Way Dear Jayo Construction, Council: Steve Guerber Michael Huffaker Norm Semanko Al Shoushtarian Building Permit issued for a New Home located on Lot 4 Block 1 in the Clear Creek Crossing Subdivision is deemed expired as of August 13, 2008, under the following Building Code: IBC & IRC sections 105.5 are amended to read as follows: 105.5 Expiration. Every permit issued by the building official under the provisions of this chapter shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 calendar days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 calendar days. The timeframe by which a project shall be deemed to be suspended or abandoned shall be measured from the date of the last major inspection that resulted in an approval to move to the next stage of construction by the city of Eagle or if no inspection has been required then a project shall be deemed to be suspended 180 calendar days from the date the permit was issued. The City of Eagle regrets this project will not move forward. If you have any questions regarding this action, I can be reached at 489-8760. CC: Mayor Bandy City Council Members File Respectfully, Michael Mongelli Building Official K \Building Dept\Expired-Extended-refund letters\Expired Permits \07-11-024 1173 N Cobblestone Way doc