Loading...
Void - 04-09-023 - 1801 N Emerald Bay Avenue - 09/20/2004 City of Eagle Zoning/Building Permit Permit#: 04-09-023 Mechanical#: M-2803 Fees: Property Owner Burk Permit Fee $318.00 Owner Address 1801 N Emerald Bay Avenue Plan Review $95.00 Owner City State Zip Eagle, ID 83616 Development $0.00 Issue Date 9/20/2004 Special Fee $0.00 Foundation Only Issue Date IECC Fee $50.00 Builder Name Northwest Pools Inc ACHD Fee $0.00 Builder Address 2017 S Ash Park Lane Mechanical-Res $48.00 Builder City State Zip Boise, ID 83709 Mechanical-Com $0.00 Builder Telephone (208) 378-0066 EM2 Fee $0.00 Builder Registration# RCE-4359 Total Fees $511.00 Subdivision Tahoe Ridge Less Deposit $0.00 Lot 5 Block 1 Less Foundation Only $0.00 Property Address 1801 N Emerald Bay Avenue Type EXP Balance Due $511.00 Deposit Receipt# 0 Issue Receipt# 1.000635 Foundation Only Receipt# SqFtLiving SqFtBmnt 0 SgFtGrg 0 SqFtPorch 0 Value Of lmprmnt $25,000.00 Eagle Water 0 EM2 Water 0 Eagle Sewer 0 Development 0 ACHD 0 Notes: 20'x 40'Swimming Pool -Permit Expired -letter sent 4/16/08 FM4, s - Builders Signature C ) c ,, City Clerk/Authorized Personnel l� �X t A 1 C) . C.--.....) Said structure and/or use to conform to specifications and plans submitted and must be in full compliance with ordinances of the City of Eagle subject to inspection permits and fees as required. Wednesday,July 16,2008 Page 1 of 1 City of Eagle Zoning/Building Permit Permit#: 04-09-023 Mechanical#: M-2803 Fees: Property Owner Burk Permit Fee $318.00 Owner Address 1801 N Emerald Bay Avenue Plan Review $95.00 Owner City State Zip Eagle, ID 83616 Development $0.00 Issue Date 9/2012004 Special Fee $0.00 Foundation Only Issue Date IECC Fee $50.00 Builder Name Northwest Pools Inc ACHD Fee $0.00 Builder Address 2017 S Ash Park Lane Mechanical-Res $48.00 Builder City State Zip Boise, ID 83709 Mechanical-Com $0.00 Builder Telephone (208) 378-0066 EM2 Fee $0.00 Subdivision Tahoe Ridge Block 1 Lot 5 Total Fees $511.00 Less Deposit $0.00 Property Address 1801 N Emerald Bay Avenue Less Foundation Only $0.00 Type PL Balance Due $511.00 Deposit Receipt# 0 Foundation Only Receipt# Issue Receipt# 1.000635 SqFtLiving SqFtBmnt 0 SgFtGrg 0 SqFtPorch 0 Value Of Imprmnt $25,000.00 Eagle Water 0 EM2 Water 0 Eagle Sewer 0 Development 0 ACHD 0 Notes: 20' x 40' Swimming Pool 11111 Builders Signature City Clerk/Authorized Personnel - vl Said structure and/or use to conform to specifications and plans submitted and must be in full compliance with ordinances of the City of Eagle subject to inspection permits and fees as required. Monday,September 20,2004 Page 1 of 1 St j t zM .'1� �1, Mayor Phil Bandy CITY OF EAGLE Council: Steve Guerber P.O. Box 1520 Michael Huffaker Eagle, Idaho 83616 Norm Semanko 939-6813 Al Shoushtarian April 16, 2008 Northwest Pools 2017 S Ash Park Lane Boise, ID 83709 Re: Expiration of Pool Building Permit 04-09-023 Dear Northwest Pools, Building Permit issued for the Swimming Pool located at 1801 N Emerald Bay, Eagle,ID will be deemed expired as of May 16, 2008 under the Building Code stated below. The Pool only received the Rebar/Footing inspection from the City of Eagle and the Electrical permit issued from the Idaho Division of Building Safety, Electrical Bureau has `Expired'. To finalize this project and receive a`Certificate of Completion',you must perform the following steps before the expiration date above: - Apply for New Electrical Permit through the City of Eagle - Receive Final Electrical Inspection - Receive Final Mechanical Inspection—if pool is equipped with a heater - Apply for Plumbing Permit& get Final Plumbing Inspection—if using dedicated potable water fixture - Obtain Final Building Inspection !BC & IRC sections 105.5 are amended to read as follows: 105.5 Expiration. Every permit issued by the building official under the provisions of this chapter shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 calendar days from the date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 calendar days. The timeframe by which a project shall be deemed to be suspended or abandoned shall be measured from the date of the last major inspection that resulted in an approval to move to the next stage of construction by the city of Eagle or if no inspection has been required then a project shall be deemed to be suspended 180 calendar days from the date the permit was issued. The City of Eagle regrets this project was never finalized. If you have any questions regarding this action, please contact the Building Department at 489-8760. Respectfully, .MPallb Michael Mongelli Building Official CC:Current Residence Mayor Bandy/City Council Members File K\Building Dept\Expncd-Extcoded-refund letters\Expired Permits\Expirauon Pool doc