Loading...
Agenda - 2020 - Design Review - 01/09/2020 - Regular THE CITY OF EAGLE H. TM, DESIGN REVIEW BOARD AGENDA ,�._ ;:„. • Eagle City Hall, 660 E. Civic Lane January 9, 2020 6:00 P.M. 1. CALL TO ORDER: 2. ROLL CALL: GRUBB, BRASHER, SAYER,BAER, GERMANO, KOCI, DUPERAULT 3. ALL CONSENT ITEMS ARE ACTION ITEMS. CONSENT AGENDA: • Consent Agenda items are considered to be routine and are acted on with one motion. There will be no separate discussion on these items unless a Design Review Board member or City Staff requests an item to be removed from the Consent Agenda for discussion. Items removed from the Consent Agenda will be placed on the Regular Agenda in a sequence determined by the Rules of Order. • Any item on the Consent Agenda that contains written recommendations from the City of Eagle shall be adopted as part of the Design Review's Consent Agenda approval motion unless specifically stated otherwise. A. Minutes of December 12, 2019. B. Finding of Fact and Conclusions of Law for DR-11-16 MOD2—Modification to the Common Area, Amenities, and Pool House within Stillwater Subdivision—Corey Elitharp: Corey Elitharp, represented by Rodney Evans with RE+P, is requesting design review approval to modify the common area landscaping, amenities, and pool house within Stillwater Subdivision. The 39.7-acre site is located on the south side of State Highway 44 at the intersection of State Highway 44 and West State Street. C. Finding of Fact and Conclusions of Law for DR-75-19—Multi-Tenant Office/Retail/Restaurant Building within Stillwater Subdivision—Corey Elitharp: Corey Elitharp, represented by Rodney Evans with RE+P, is requesting design review approval fora 8,576-square foot office/retail/restaurant building. The 1.06-acre site is located on the northeast corner of West Copper Silo Street and South Urban Gate Avenue at 2300 and 2340 West Copper Silo Street (Lots 4 and 5, Block 6, Stillwater Subdivision No. 1). D. Finding of Fact and Conclusions of Law for DR-76-19—Master Sign Plan for a Multi-Tenant Office/Retail/Restaurant Building in Stillwater Subdivision No. 1 — RSI Construction: RSI Construction, represented by Rodney Evans with RE+P, PLLC, is requesting design review approval for the master sign plan for a multi-tenant office/retail/restaurant building. The 1.06-acre site is located on the north side of West Copper Silo Street approximately 250-feet south of the intersection of State Highway 44 and South Urban Gate Drive at 2300 and 2340 West Copper Silo Street (Lots 4 and 5, Block 6, Stillwater Subdivision No. 1). E. Finding of Fact and Conclusions of Law for DR-77-19—Two Live/Work Townhome Buildings (12-units) and Site Landscaping—Corey Elitharp: Corey Elitharp, represented by Rodney Evans with Rodney Evans Partners, is requesting design review approval to construct two (2) live/work townhome buildings (12-units) and site landscaping. The 0.77-acre site is located on the south side of West Copper Silo Street between South Steel Farm Avenue and South Carbon Rivet Avenue on Lots 1-13, Block 5, of Stillwater Subdivision No. 1. F. Finding of Fact and Conclusions of Law for DR-78-19—Master Sign Plan for Two Live/Work Townhome Buildings in Stillwater Subdivision No. 1 —RSI Construction: RSI Construction, represented by Rodney Evans with Rodney Evans + Partners, is requesting design review approval for the master sign plan for two live/work townhome buildings within Stillwater Subdivision No. 1. The 0.77-acre site is located on the south side of West Copper Silo Street between South Steel Farm Avenue and South Carbon Rivet Avenue on Lots 1-13, Block 5, of Stillwater Subdivision No. 1. G. Finding of Fact and Conclusions of Law for DR-79-19—Two Townhome Buildings (12-units) and Site Landscaping—Corey Elitharp: Corey Elitharp, represented by Rodney Evans with Rodney Evans + Partners, is requesting design review approval to construct two (2) townhome buildings (12-units) and site landscaping. The 0.76-acre site is located on the north side of West Iron Coop Street between South Steel Farm Avenue and South Carbon Rivet Avenue on Lots 1-13, Block 4, of Stillwater Subdivision No.1. 4. UNFINISHED BUSINESS: None. S. NEW BUSINESS: A. ACTION ITEM: DR-64-19—Common Area Landscaping within Snoqualmie River Subdivision Nos. 4 and 5 and Pool House within Snoqualmie River Subdivision No. 1 —North Corridor, LLC: North Corridor, LLC, represented by Jaime Snyder with T- O Engineers, is requesting design review approval of the common area landscaping within Snoqualmie River Subdivision Nos. 4 and 5 and pool house within Snoqualmie River Subdivision No. 1. The 37.56-acre site is located on the west side of North Palmer Lane approximately 800-feet south of West Floating Feather and north of Snoqualmie River Subdivision Nos. 1 and 2. B. ACTION ITEM: DR-83-19—Common Area Landscaping, Pavilion,Pool, and Pool House within Lanewood North Subdivision—SCS Brighton, LLC: SCS Brighton, Inc., represented by Kody Daffer, is requesting design review approval of the common area landscaping, pavilion (416-square feet), pool, and pool house (924-square feet) within Lanewood North Subdivision. The 81.16-acre site is located between North Lanewood Road and North Linder Road approximately 1,100-feet south of West Beacon Light Road at 2810 North Lanewood Road and 2553 North Linder Road. C. ACTION ITEM: DR-84-19—Two Subdivision Entry Monument Signs for Lanewood North Subdivision—SCS Brighton, LLC: SCS Brighton, Inc., represented by Kody Daffer, is requesting design review approval of two (2) subdivision entry monument signs for Lanewood North Subdivision. The 81.16-acre site is located between North Lanewood Road and North Linder Road approximately 1,100-feet south of West Beacon Light Road at 2810 North Lanewood Road and 2553 North Linder Road. D. ACTION ITEM: DR-14-95 MOD2—Change of Use from Commercial Wholesaling/Warehousing and Storage to Office—James R. McCauley: James R. McCauley represented by James Gipson with James Gipson Architecture, is requesting design review approval to change the use of a portion of the existing building from commercial wholesaling/warehousing and storage to office. The 2.94-acre site is located on the south of East State Street approximately 50-feet east of the intersection of South Academy Avenue and East State Street at 1341 and 1345 East State Street. 6. REPORTS: A. Design Review Board: B. Staff: 7. ADJOURNMENT: The City will make reasonable accommodations for anyone attending this meeting who require special assistance for hearing,physical or other impairments. Please contact the City Clerk's Office at(208)939-6813 at least 24 hours in advance of the meeting date and time.