Agenda - 2019 - Design Review - 12/12/2019 - Regular THE CITY OF EAGLE
DESIGN REVIEW BOARD AGENDA
„b."
Eagle City Hall, 660 E. Civic Lane
•
December 12, 2019 6:00 P.M.
1. CALL TO ORDER:
2. ROLL CALL: GRUBB, BRASHER, SAYER, BAER, GERMANO, KOCI,
DUPERAULT
3. ALL CONSENT ITEMS ARE ACTION ITEMS. CONSENT AGENDA:
• Consent Agenda items are considered to be routine and are acted on with one motion.
There will be no separate discussion on these items unless a Design Review Board
member or City Staff requests an item to be removed from the Consent Agenda for
discussion. Items removed from the Consent Agenda will be placed on the Regular
Agenda in a sequence determined by the Rules of Order.
• Any item on the Consent Agenda that contains written recommendations from the City of
Eagle shall be adopted as part of the Design Review's Consent Agenda approval motion
unless specifically stated otherwise.
A. Minutes of November 14, 2019.
B. Finding of Fact and Conclusions of Law for DR-58-19—Lift Station for the Eagle
Sewer District—Eagle Sewer District: The Eagle Sewer District, represented by Ryan
Wagner with Keller Associates, is requesting design review approval to construct a 530-
square foot sewer lift station facility. The 0.39-acre site is located on the south side of
West Old Valley Road approximately 450-feet west of South Linder Road within
Compton Andrews Tract (northwest corner of Lot 14).
C. Finding of Fact and Conclusions of Law for DR-69-19—Multi-Tenant Office
Building—C&O Development: C&O Development, represented by James Marsh with
CSHQA, is requesting design review approval to construct a 49,968-square foot multi-
tenant office building (1st Floor= 16,609-square feet, 2nd Floor= 16,858-square feet, and
3rd Floor= 16,501-square feet). The 3.8-acre site is located on the east side of South
Eagle Road approximately 290-feet south of East Eagles Gate Drive within the proposed
Lakemoor Subdivision No. 8.
4. UNFINISHED BUSINESS: None.
5. NEW BUSINESS:
A. ACTION ITEM' DR-11-16 MOD2—Modification to the Common Area, Amenities,
and Pool House within Stillwater Subdivision—Corey Elitharp: Corey Elitharp,
represented by Rodney Evans with RE+P, is requesting design review approval to modify
the common area landscaping, amenities, and pool house within Stillwater Subdivision.
The 39.7-acre site is located on the south side of State Highway 44 at the intersection of
State Highway 44 and West State Street.
B. ACTION ITEM' DR-75-19—Multi-Tenant Office/Retail/Restaurant Building within
Stillwater Subdivision—Corey Elitharp: Corey Elitharp, represented by Rodney Evans
with RE+P, is requesting design review approval fora 8,576-square foot office/retail/
restaurant building. The 1.06-acre site is located on the northeast corner of West Copper
Silo Street and South Urban Gate Avenue at 2300 and 2340 West Copper Silo Street
(Lots 4 and 5, Block 6, Stillwater Subdivision No. 1).
C. ACTION ITEM' DR-76-19—Master Sign Plan for a Multi-Tenant
Office/Retail/Restaurant Building in Stillwater Subdivision No. 1 —RSI
Construction: RSI Construction, represented by Rodney Evans with RE+P, PLLC, is
requesting design review approval for the master sign plan for a multi-tenant
office/retail/restaurant building. The 1.06-acre site is located on the north side of West
Copper Silo Street approximately 250-feet south of the intersection of State Highway 44
and South Urban Gate Drive at 2300 and 2340 West Copper Silo Street (Lots 4 and 5,
Block 6, Stillwater Subdivision No. 1).
D. ACTION ITEM: DR-77-19—Two Live/Work Townhome Buildings (12-units) and
Site Landscaping—Corey Elitharp: Corey Elitharp, represented by Rodney Evans
with Rodney Evans + Partners, is requesting design review approval to construct two (2)
live/work townhome buildings (12-units) and site landscaping. The 0.77-acre site is
located on the south side of West Copper Silo Street between South Steel Farm Avenue
and South Carbon Rivet Avenue on Lots 1-13, Block 5, of Stillwater Subdivision No. 1.
E. ACTION ITEM: DR-78-19—Master Sign Plan for Two Live/Work Townhome
Buildings in Stillwater Subdivision No. 1 —RSI Construction: RSI Construction,
represented by Rodney Evans with Rodney Evans + Partners, is requesting design review
approval for the master sign plan for two live/work townhome buildings within Stillwater
Subdivision No. 1. The 0.77-acre site is located on the south side of West Copper Silo
Street between South Steel Farm Avenue and South Carbon Rivet Avenue on Lots 1-13,
Block 5, of Stillwater Subdivision No. 1.
F. ACTION ITEM: DR-79-19—Two Townhome Buildings (12-units) and Site
Landscaping—Corey Elitharp: Corey Elitharp, represented by Rodney Evans with
Rodney Evans+ Partners, is requesting design review approval to construct two (2)
townhome buildings (12-units) and site landscaping. The 0.76-acre site is located on the
north side of West Iron Coop Street between South Steel Farm Avenue and South Carbon
Rivet Avenue on Lots 1-13, Block 4, of Stillwater Subdivision No.1.
6. REPORTS:
A. Design Review Board:
B. Staff:
7. ADJOURNMENT:
The City will make reasonable accommodations for anyone attending this meeting who require special assistance for hearing,physical or
other impairments. Please contact the City Clerk's Office at(208)939-6813 at least 24 hours in advance of the meeting date and time.