Loading...
Agenda - 2019 - Design Review - 12/12/2019 - Regular THE CITY OF EAGLE DESIGN REVIEW BOARD AGENDA „b." Eagle City Hall, 660 E. Civic Lane • December 12, 2019 6:00 P.M. 1. CALL TO ORDER: 2. ROLL CALL: GRUBB, BRASHER, SAYER, BAER, GERMANO, KOCI, DUPERAULT 3. ALL CONSENT ITEMS ARE ACTION ITEMS. CONSENT AGENDA: • Consent Agenda items are considered to be routine and are acted on with one motion. There will be no separate discussion on these items unless a Design Review Board member or City Staff requests an item to be removed from the Consent Agenda for discussion. Items removed from the Consent Agenda will be placed on the Regular Agenda in a sequence determined by the Rules of Order. • Any item on the Consent Agenda that contains written recommendations from the City of Eagle shall be adopted as part of the Design Review's Consent Agenda approval motion unless specifically stated otherwise. A. Minutes of November 14, 2019. B. Finding of Fact and Conclusions of Law for DR-58-19—Lift Station for the Eagle Sewer District—Eagle Sewer District: The Eagle Sewer District, represented by Ryan Wagner with Keller Associates, is requesting design review approval to construct a 530- square foot sewer lift station facility. The 0.39-acre site is located on the south side of West Old Valley Road approximately 450-feet west of South Linder Road within Compton Andrews Tract (northwest corner of Lot 14). C. Finding of Fact and Conclusions of Law for DR-69-19—Multi-Tenant Office Building—C&O Development: C&O Development, represented by James Marsh with CSHQA, is requesting design review approval to construct a 49,968-square foot multi- tenant office building (1st Floor= 16,609-square feet, 2nd Floor= 16,858-square feet, and 3rd Floor= 16,501-square feet). The 3.8-acre site is located on the east side of South Eagle Road approximately 290-feet south of East Eagles Gate Drive within the proposed Lakemoor Subdivision No. 8. 4. UNFINISHED BUSINESS: None. 5. NEW BUSINESS: A. ACTION ITEM' DR-11-16 MOD2—Modification to the Common Area, Amenities, and Pool House within Stillwater Subdivision—Corey Elitharp: Corey Elitharp, represented by Rodney Evans with RE+P, is requesting design review approval to modify the common area landscaping, amenities, and pool house within Stillwater Subdivision. The 39.7-acre site is located on the south side of State Highway 44 at the intersection of State Highway 44 and West State Street. B. ACTION ITEM' DR-75-19—Multi-Tenant Office/Retail/Restaurant Building within Stillwater Subdivision—Corey Elitharp: Corey Elitharp, represented by Rodney Evans with RE+P, is requesting design review approval fora 8,576-square foot office/retail/ restaurant building. The 1.06-acre site is located on the northeast corner of West Copper Silo Street and South Urban Gate Avenue at 2300 and 2340 West Copper Silo Street (Lots 4 and 5, Block 6, Stillwater Subdivision No. 1). C. ACTION ITEM' DR-76-19—Master Sign Plan for a Multi-Tenant Office/Retail/Restaurant Building in Stillwater Subdivision No. 1 —RSI Construction: RSI Construction, represented by Rodney Evans with RE+P, PLLC, is requesting design review approval for the master sign plan for a multi-tenant office/retail/restaurant building. The 1.06-acre site is located on the north side of West Copper Silo Street approximately 250-feet south of the intersection of State Highway 44 and South Urban Gate Drive at 2300 and 2340 West Copper Silo Street (Lots 4 and 5, Block 6, Stillwater Subdivision No. 1). D. ACTION ITEM: DR-77-19—Two Live/Work Townhome Buildings (12-units) and Site Landscaping—Corey Elitharp: Corey Elitharp, represented by Rodney Evans with Rodney Evans + Partners, is requesting design review approval to construct two (2) live/work townhome buildings (12-units) and site landscaping. The 0.77-acre site is located on the south side of West Copper Silo Street between South Steel Farm Avenue and South Carbon Rivet Avenue on Lots 1-13, Block 5, of Stillwater Subdivision No. 1. E. ACTION ITEM: DR-78-19—Master Sign Plan for Two Live/Work Townhome Buildings in Stillwater Subdivision No. 1 —RSI Construction: RSI Construction, represented by Rodney Evans with Rodney Evans + Partners, is requesting design review approval for the master sign plan for two live/work townhome buildings within Stillwater Subdivision No. 1. The 0.77-acre site is located on the south side of West Copper Silo Street between South Steel Farm Avenue and South Carbon Rivet Avenue on Lots 1-13, Block 5, of Stillwater Subdivision No. 1. F. ACTION ITEM: DR-79-19—Two Townhome Buildings (12-units) and Site Landscaping—Corey Elitharp: Corey Elitharp, represented by Rodney Evans with Rodney Evans+ Partners, is requesting design review approval to construct two (2) townhome buildings (12-units) and site landscaping. The 0.76-acre site is located on the north side of West Iron Coop Street between South Steel Farm Avenue and South Carbon Rivet Avenue on Lots 1-13, Block 4, of Stillwater Subdivision No.1. 6. REPORTS: A. Design Review Board: B. Staff: 7. ADJOURNMENT: The City will make reasonable accommodations for anyone attending this meeting who require special assistance for hearing,physical or other impairments. Please contact the City Clerk's Office at(208)939-6813 at least 24 hours in advance of the meeting date and time.