Findings - DR - 2006 - DR-89-06 - Common Area Landscaping In Lakemoor Subdivision
BEFORE THE EAGLE DESIGN REVIEW BOARD
IN THE MATTER OF AN APPLICATION FOR
A DESIGN REVIEW FOR THE COMMON AREA
LANDSCAPING WITHIN LAKEMOOR )
SUBDIVISION NUMBER 3 FOR BW EAGLE, LLC )
FINDINGS OF FACT AND CONCLUSIONS OF LAW
CASE NUMBER DR-89-06
The above-entitled design review application came before the Eagle Design Review Board for their action
on September 14, 2006. The Design Review Board having heard and taken oral and written testimony,
and having duly considered the matter, makes the following Findings of Fact and Conclusions of Law;
FINDINGS OF FACT:
A. PROJECT SUMMARY:
BW Eagle, LLC, represented by Talena Dovel with The Land Group, Inc., is requesting design
review approval of the common area landscaping within Lakemoor Subdivision No.3. The 11.25-
acre site is located on the east side of Eagle Road approximately 1/4-mile north of Chinden
Boulevard.
B. APPLICATION SUBMITTAL:
The City of Eagle received the application for this item on August 10, 2006.
C. NOTICE OF AGENCIES' REVIEW:
Requests for agencies' reviews were transmitted on August 14, 2006, In accordance with the
requirements of the Eagle City Code.
D. HISTORY OF RELEVANT PREVIOUS ACTIONS:
On May 24, 2005, the Eagle City Council approved a preliminary plat application for Lakemoor
Subdivision (PP-3-05).
On October 18, 2005, the Eagle City Council approved a design review application for the
common area landscaping and clubhouse within Lakemoor Subdivision (DR-69-05).
E. COMPANION APPLICATIONS: None
Page I of 10
K:\Plallllillg LJept\ELlgle Arrli.:atiulIs\Dr\2006\DR-89-06 lam! urf.J'h:
F. COMPREHENSIVE PLAN LAND USE MAP AND ZONING MAP DESIGNATIONS:
COMP PLAN ZONING LAND USE
DESIGNA nON DESIGNA nON
Existing Mixed Use MU-DA (Subsequent to the Rural Residences &
approval of Ordinance #510) Pasture
Proposed No Change No Change Planned Community
consisting of Office,
Commercial, and
Residential
North of site Residential Two (up to RUT (Residential- Ada Proposed Laguna Pointe
two dwelling units per County designation) - Commercial/Residential
acre maximum) & Approved for R-E-DA-PIR-2- Subdivision
approved for Mixed Use DA-PIMU-DA
South of site Residential One (up to R-l (Residential) Single-family residences
one dwelling units per
acre maximum)
East of site Not in Eagle Area of RUT (Residential - Ada Boise City Wastewater
Impact County designation) facility
West of site Residential Two (up to R-2 (Residential) & R-2-P Rural Residences &
two dwelling units per (Residential PUD) Banbury Meadows
acre maximum) Subdivision
G. DESIGN REVIEW OVERLAY DISTRICT: Not in the DDA, TDA, CEDA, or DSDA.
H. EXISTING SITE CHARACTERISTICS: There are existing trees along the north property line of this
site which the applicant is proposing to retain and protect. There are existing streams which the
applicant is proposing to incorporate into the common area landscaping of this development.
1. SITE DESIGN INFORMATION:
Total Acreage of Site - 11.25-acres
Total Number of Lots - 52
Residential - 46
Commercial - 0
Industrial - 0
Common - 6
Total Number of Units - 46
Single-family - 46
Duplex - 0
Multi-family - 0
Total Acreage of Any Out-Parcels - 0
J. GENERAL SITE DESIGN FEATURES:
Number and Uses of Proposed Buildings: N/A
Page 2 of 10
K\Planlling Dt:pt\Eagk Arph':uliolls\Dr\2006\DR-89-06 land Jrf.J,)(;
Height and Number of Stories of Proposed Buildings: N/A
Gross Floor Area of Proposed Buildings: N/A
On and Off-Site Circulation: N/A
K. BUILDING DESIGN FEATURES: N/A
L. LANDSCAPING DESIGN:
Retention of Existing Trees and Preservation Methods: There are numerous trees along the north
property line of this site which the applicant proposed to retain and protect.
Tree Replacement Calculations: N/A
Proposed Tree Mix (Species & Number): To be reviewed by the Design Review Board
Street Trees: The applicant is proposing to install street trees along all roadways within this
development.
Maintenance Provisions and Proposed Irrigation Methods: Automatic irrigation required.
Transition Zones: N/ A
Parking Lot Landscaping: N/A
M. TRASH ENCLOSURES: N/A
N. MECHANICAL UNITS: N/A
O. OUTDOOR LIGHTING:
A site and parking lot light plan showing location, height, and wattage is required to be reviewed
and approved by the Zoning Administrator prior to issuance of any building permits.
P. SIGNAGE:
No signs are proposed with this application. A separate design review application is required for
the approval of any signs.
Q. PUBLIC SERVICES A V AILABLE:
A preliminary approval letter from the Eagle Fire Department has been received by the City. A
water service approval has not been received to date. Approval of the water company having
jurisdiction will be required prior to issuance of a building permit.
R. PUBLIC USES PROPOSED: None
S. PUBLIC USES SHOWN ON FUTURE ACQUISITIONS MAP: No map currently exists
Page 3 of 10
K:\Plallllillg lJepl\Eaglc Applil.'ati"lls\Dr\2()(}tJ\DR.89.061.lllu JrfJ"o,;
T. SPECIAL ON-SITE FEATURES:
Areas of Critical Environmental Concern - The Boise River Floodplain is designated a Hazard
Area and Special Area in the Comprehensive Plan.
The Plan specifies additional development criteria
and calls for special consideration relating to any
proposed development within the Boise River
Floodplain.
Evidence of Erosion - none specifically noted in the EAP
Fish - no
Floodplain - 100 and 500-year
Floodway - no
Mature Trees - yes
Riparian Vegetation - yes
Steep Slopes - none shown to exist
Stream/Creek - yes
Unique Animal Life - unknown
Unique Plant Life - unknown
Unstable Soils - none shown to exist as noted in the EAP
Wildlife - yes
U. SUMMARY OF REVIEW OF ENVIRONMENTAL ASSESSMENT PLAN (IF REQUIRED):
An EAP report was previously submitted with the Comprehensive Plan Amendment and
Annexation and Rezone applications (CPA-4-02/A-3-02/RZ-5-02).
V. AGENCY RESPONSES:
The following agencies have responded and their correspondence is incorporated herein by
reference and attached to the staff report. Comments, which appear to be of special concern, are
noted below:
Division of Environmental Quality
Eagle Fire Department
Idaho Power Company
W. LETTERS FROM THE PUBLIC:
Memo from Julie Lafferty, City Forester (incorporated herein by reference and attached to the staff
report).
STAFF ANALYSIS PROVIDED WITHIN THE STAFF REPORT:
A. COMPREHENSIVE PLAN PROVISIONS, WHICH ARE OF SPECIAL CONCERN REGARDING
THIS PROPOSAL:
. The Comprehensive Plan Land Use Map designates this site as Mixed Use.
B. PRELIMINARY PLAT PROVISIONS, WHICH ARE OF SPECIAL CONCERN REGARDING THIS
PROPOSAL:
. Design Review Board approval for the landscaping of the entire site (including useable common
area amenities, subdivision signage, street trees, existing trees, pathways, buffer areas, perimeter
fencing, etc.) is required prior to the approval of a final plat. Design Review Board approval for
the landscaping for each commercial pad site is required prior to the issuance of any building
permit for construction on that pad site. Individual lots within this subdivision will be required to
have a minimum of 10% landscaping each.
Page 4 of 10
K:\PlulIlling D!:pt\Eugle Arrhl.:atiulls\Dr\1006\DR-89.06 ].lIlJ urfJUl,;
. The developer shall provide 3-inch minimum caliper shade-class trees (landscape plan to be
reviewed and approved by the Design Review Board) along both sides of all streets within the
development. Trees shall be placed at the front of each lot generally at each side property line, or
as approved by the Design Review Board. The trees shall be located within the landscape strip
between the concrete sidewalk and back of curb abutting all interior streets. Prior to the City Clerk
signing the final plat for each phase, the applicant shall either install the required trees, sod, and
irrigation or provide the City with a letter of credit for 150% of the cost of the installation of all
landscape and irrigation improvements. Trees shall be installed prior to obtaining any occupancy
permits for the homes. A temporary occupancy may be issued if weather does not permit
landscaping.
. All healthy trees (as determined by the City Forester) that are to be preserved and integrated into
the open space design for the development shall be shown on a landscape plan and submitted for
Design Review Board approval prior to the submittal of a final plat.
. The applicant shall have an on-site meeting with the City Forester to survey all existing trees.
Subsequent to the on-site meeting, construction fencing shall be installed (pursuant to the City
Forester's direction) to protect all trees that are to be preserved, prior to the commencement of any
construction on the site.
C. ZONING CODE PROVISIONS, WHICH ARE OF SPECIAL CONCERN REGARDING THIS
PROPOSAL:
. Eagle City Code Section 8-2A-7(C)(l)
Retention Of Existing Trees: Existing trees shall be retained unless removal is approved in
writing by the city. Where trees are approved by the city to be removed from the project site
(or from abutting right of way) replacement with an acceptable species is required as follows:
Existing Tree
1 inch to 6 inches caliper
6 1/4 inches to 12 inches
12 1/4 inches or more
Replacement
2x caliper of tree removed
1.5x caliper of tree removed
Ix caliper of tree removed
. Eagle City Code Section 8-2A-7(C)(2)
Damage During Construction: Existing trees or shrubs that are retained shall be protected from
damage to bark, branches, or roots during construction. Construction or excavation occurring
within the drip line of any public or private retained tree or shrub may severely damage the
tree or shrub. Any severely damaged tree or shrub shall be replaced in accordance with
subsection C I of this section.
D. DISCUSSION:
. This phase of Lakemoor Subdivision was approved to have private streets with a four foot (4')
wide sidewalk on one side of the street. The applicant is proposing to construct the four foot (4')
wide sidewalk adjacent to the lots surrounded by the loop road. A pedestrian ramp is proposed to
be located at the southeastern end of Lot 37, Block 9, providing access to the sidewalks located
across South Creek Pointe Lane. The applicant should be required to provide a revised landscape
plan showing a pedestrian ramp at the northwest end of Lot 37, Block 9, providing access to the
sidewalk proposed on the southwest edges of Lots 9. and 10, Block 9. The revised landscape plan
should be reviewed and approved by staff prior to the City Clerk signing the final plat.
. Sheet Ll.O, date stamped by the City on August 10. 2006, shows a four foot (4') wide sidewalk
located adjacent to the southwest edges of Lots 9, and 10, Block 9. The sidewalk terminates
Page 5 of 10
K:\Pbllllillg Dept\Eagle Applil:atinlls\Dr\W06\DR-89-06 lallJ Jrf.J,ll:
twenty eight feet (28') west of the east property line of Lot 9. Block 9. It is staff's opinion that the
sidewalk on Lot 9, Block 9, should continue to the west and provide a connection to the sidewalk
located adjacent to South Woodlet Way. The applicant should be required to provide a revised
landscape plan showing the four foot (4') wide sidewalk located on Lot 9, Block 9, connecting to
the sidewalk located adjacent to South Woodlet Way. The four foot (4') wide sidewalk does not
have to follow the southwest property line of Lot 9, Block 9. The revised landscape plan should
be reviewed and approved by staff prior to the City Clerk signing the final plat.
. Staff defers comment regarding the landscaping to the Design Review Board.
STAFF RECOMMENDATION PROVIDED WITHIN THE REPORT:
Based upon the information provided to staff to date, staff recommends approval with the site
specific conditions of approval and the standard conditions of approval provided within the staff
report.
PUBLIC MEETING OF THE BOARD:
A. A meeting was held on the application before the Design Review Board on September 14, 2006, at
which time the Board made their decision.
B. Oral testimony in opposition to this proposal was presented to the Design Review Board by no one.
C. Oral testimony in favor of this proposal was presented to the Design Review Board by no one (not
including the applicant/representative).
BOARD DECISION:
The Board voted 5 to 0 (Stanger and Weber absent) to approve DR-89-06 for a design review
application for the common area landscaping within Lakemoor Subdivision Number 3. for BW
Eagle, LLC, with the following staff recommended site specific conditions of approval and
standard conditions of approval.
SITE SPECIFIC CONDITIONS OF APPROVAL:
1. Comply with any applicable conditions of A-3-02IRZ-5-02/PP-3-05 (Lake moor Subdivision).
2. Provide a revised landscape plan showing a pedestrian ramp at the northwest end of Lot 37. Block 9.
providing access to the sidewalk proposed on the southwest edges of Lots 9, and 10, Block 9. The
revised landscape plan shall be reviewed and approved by staff prior to the City Clerk signing the final
plat.
3. Provide a revised landscape plan showing the four foot (4') wide sidewalk located on Lot 9, Block 9,
connecting to the sidewalk located adjacent to South Woodlet Way. The four foot (4') wide sidewalk
does not have to follow the southwest property line of Lot 9, Block 9. The revised landscape plan
shall be reviewed and approved by staff prior to the City Clerk signing the final plat.
4. No signs are proposed with this application. A separate design review application is required to be
submitted for approval of any signs for this site.
STANDARD CONDITIONS OF APPROVAL:
\. The applicant shall comply with all requirements of the Ada County Highway District and/or the Idaho
Transportation Department, including but not limited to approval of the drainage system. curbs,
gutters, streets and sidewalks. A letter of approval from the highway district having jurisdiction shall
be submitted to the City prior to issuance of any building permits or Certificate of Occupancy.
whichever occurs first.
2. Idaho Department of Health & Welfare approval of the sewer and water facilities is required prior
issuance of any building permits or Certificate of Occupancy, whichever occurs first.
Page 6 of 10
K:\PlulIuing Dtpt\Eaglt: Appli<.:utiulls\Dr\2006\DR-89-06 h.lllJ Ulf.Ju<,:
3. All permits from Central District Health, Eagle Sewer District & Eagle Fire District shall be secured
prior to issuance of building permit or Certificate of Occupancy, whichever occurs first.
4. Written approval of all well water for any shared or commercial well shall be obtained from the Idaho
Department of Water Resources shall be submitted to the City prior to issuance of any building permits
or Certificate of Occupancy, whichever occurs first.
5. Unless septic tanks are permitted, wet line sewers will be required and the applicant will be required to
furnish the City Engineer with a letter from the sewer entity serving the property, accepting the project
for service, prior to issuance of any building permits or Certificate of Occupancy, whichever occurs
first.
6. The applicant shall submit a letter from the appropriate drainage entity approving the drainage system
and/or accepting said drainage; or submit a letter from a registered professional engineer certifying that
all drainage shall be retained on-site prior to issuance of any building permits or Certificate of
Occupancy, whichever occurs first. A copy of the construction drawing(s) shall be submitted with the
letter.
7. The applicant shall submit plans and calculations prepared by a registered professional engineer to
handle the satisfactory disposal of all storm drainage on the applicant's site. Drainage system plans
shall be submitted to the City Engineer for review and approval prior to issuance of any building
permits or Certificate of Occupancy, whichever occurs first.
The plans shall show how swales, or drain piping, will be developed in the drainage easements. The
approved drainage system shall be constructed, or a performance bond shall be submitted to the City
Clerk, prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first.
The lot shall be so graded that all runoff runs either over the curb, or to the drainage easement and no
runoff shall cross any lot line onto another lot except within a drainage easement.
All design and calculations shall meet the requirements of Ada County Highway District. Construction
of the storm drain disposal system shall be complete before an occupancy permit is issued.
8. No ditch, pipe or other structure or canal, for irrigation water or irrigation waste water owned by an
organized irrigation district, canal company. ditch association. or other irrigation entity. shall be
obstructed. routed, covered or changed in any way unless such obstruction, rerouting, covering or
changing has first been approved in writing by the entity. A Registered Engineer shall certify that any
ditch rerouting, piping, covering or otherwise changing the existing irrigation or waste ditch (1) has
been made in such a manner that the flow of water will not be impeded or increased beyond carrying
capacity of the downstream ditch; (2) will not otherwise injure any person or persons using or
interested in such ditch or their property; and (3) satisfied the Idaho Standards for Public Works
Construction. A copy of such written approval and certification shall be filed with the construction
drawing and submitted to the City prior to issuance of any building permits or Certificate of
Occupancy, whichever occurs first.
9. Street light plans shall be submitted and approved as to the location, height and wattage to the City
Engineer (if applicable) prior to issuance of any building permits or Certificate of Occupancy,
whichever occurs first. All construction shall comply with the City's specifications and standards.
The applicant shall provide a recorded easement, acceptable to the City Engineer. for the purpose of
installing and maintaining street light fixtures, conduit and wiring lying outside any dedicated public
right-of-way, prior to issuance of any building permits or Certificate of Occupancy, whichever occurs
first.
The applicant shall pay applicable street light inspection fees prior to Certificate of Occupancy.
10. Parking lot light plan shall be submitted and approved as to the location. height and wattage by the
Page 7 of 10
K:\Plullllinj,' DCf1tlbgk Arplil.:<ltiolls\Dr\lOO6\DR-89-06 lauJ Lllt.JO":
City Engineer. All construction shall comply with the City's specifications and standards.
Lighting is required in the parking area and shall be properly illuminated to avoid accidents. Any
lights used to illuminate the parking lot shall be so arranged as to reflect the light away from the
adjoining property.
II. The parking area shall be paved and shall be maintained in good condition without holes and free of all
dust. trash, weeds and other debris.
12. One set of building plans, for any non single-family residential use, shall be submitted to the Eagle
Fire Department for approval. An approval letter from the Eagle Fire Department shall be submitted
to the City prior to issuance of any building permits or Certificate of Occupancy. whichever occurs
first. The letter shall include the following comments and minimum requirements, and any other items
of concern as may be determined by the Eagle Fire Department officials:
a. "The applicant has made arrangements to comply with all requirements of the Fire Department."
b. The fire hydrant locations shall be reviewed and be approved in writing by the Eagle Fire
Department prior to the City Engineer signing the final plat.
c. Minimum flow per hydrant shall be 1,000 gallons per minute for one and two family dwellings.
1,500 gallons per minute for dwellings having a fire area in excess of 3,600 square feet. and 1,500
gallons per minute for non-residential uses (i.e.; Commercial, Industrial, Schools. etc.). Flow rates
shall inspected in accordance with all agencies having jurisdiction. and shall be verified in writing
by the Eagle Fire Department prior to issuance of any building permits or certificate of Occupancy,
whichever occurs first.
d. The proposed fire protection system shall be reviewed and approved by the Eagle Fire Department
prior to issuance of a building permit or Certificate of Occupancy. whichever occurs first.
13. Any recreation area, greenbelt area or pathway area along the Boise River, Dry Creek or any other area
designated by the City Councilor Eagle City Pathway/Greenbelt Committee for a path or walkway
shall be approved in writing by the Eagle City Pathway/Greenbelt Committee prior to issuance of a
building permit or Certificate of Occupancy, whichever occurs first.
14. Conservation. recreation and river access easements (if applicable) shall be approved by the Eagle City
Pathway/Greenbelt Committee and shall be shown on the final plat prior to issuance of a building
permit or Certificate of Occupancy, whichever occurs first.
15. The applicant shall comply with the provisions of the Eagle City Code, pertaining to floodplain and
river protection regulations (if applicable) prior to issuance of a building permit or Certificate of
Occupancy, whichever occurs first.
16. The applicant shall obtain written approval of the development relative to the effects of the Boise
River Flood Plain (if applicable) from the Corps. of Engineers prior to issuance of a building permit or
Certificate of Occupancy, whichever occurs first.
17. The applicant shall obtain approval of the development relative to its effects on wetlands or other
natural waterways (if applicable) from the Corps. of Engineers and the Idaho Department of Water
Resources and/or any other agency having jurisdiction prior to issuance of a building permit or
Certificate of Occupancy. whichever occurs first.
18. Basements in the flood plain are prohibited.
19. The Americans with Disabilities Act, Uniform Building Code, Eagle City Code, and all applicable
County, State and Federal Codes and Regulations shall be complied with. All design and construction
shall be in accordance with all applicable City of Eagle Codes unless specifically approved by the
Commission and/or Council.
20. New plans, which incorporate any required changes, shall be submitted for staff approval. Staff may
Page 8 of 10
K:\Plulllling lJ~pt\Euglt Arr1i<.:<ltilllls\Dr\2CHJ6\DR-89-06 lalllllh1".un<,;
elect to take those plans to the Design Review Board and/or the Planning and Zoning Commission for
review and approval.
21. Any changes to the plans and specifications upon which this approval is based, other than those
required by the above conditions, will require submittal of an application for modification and
approval of that application prior to commencing any change.
22. Any modification of the approved design review plans, including, but not limited to building design,
location and details, landscaping, parking, and circulation, must be approved prior to construction/
installation of such changes. Failure to do so may result in the requirement to modify the project to
comply with the approved design review and/or result in the inability to issue a final approval for
occupancy of this project.
23. Any change by the applicant in the planned use of the property which is the subject of this application,
shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory
and legal restrictions in force at the time the applicant or its successors in interest advises the City of
Eagle of its intent to change the planned use of the subject property unless a waiver/variance of said
requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is
sought.
24. Approval of any Design Review shall expire without notice to the applicant on the date of expiration
of the Design Review if construction has not started prior to that date, as stipulated in Eagle City Code
(one year from the Design Review Board approval date).
25. All ground-mounted accent lighting fixtures and monument sign lighting fixtures shall be screened
from view with the use of landscaping (top of the fixture shall be no higher than the surrounding
landscaping). The light source itself shall otherwise be screened as provided for within Eagle City
Code.
26. The City's actions on the application does not grant the applicant any appropriation of water or
interference with existing water rights. The applicant indemnifies and holds the City harmless for any
and all water rights, claims in any way associated with this application.
CONCLUSIONS OF LAW:
1. The application for this item was received by the City of Eagle on August 10, 2006.
2. Requests for agencies' reviews were transmitted on August 14, 2006, in accordance with the
requirements of the Eagle City Code.
3. The Board reviewed the particular facts and circumstances of this proposed design review application
(DR-89-06) with regard to the Eagle City Code Title 8, Chapter 2, Article A, DR Design Review
Overlay District, and based upon the information provided with the conditions required herein,
concludes that the proposed design review application is in accordance with the Eagle City Code and
the Eagle Comprehensive Plan.
4. Will, in fact, constitute a permitted use as established in Eagle City Code Title 8, Chapter 2, Section 3,
for the MU-DA (mixed use with development agreement) zoning district.
Page 9 of 10
K:\Plallllillg Dept\Eugle Arrlicati<1IIs\Dr\2006\DR-89-()() bllU Jrt.Jlll.:
DATED this 28th day of September 2006.
I
I
. Bergmann, Eagle City Cl
..".,' ...... ""'<<
.... (\ '. Y Of;' i>."~
...' ...... <:
$ ~~,'. ...."1
= "." ,KelJI( ...~
:.. 7A\ttl
: ...... .
.' . (1"'..
. V'.J ~ ') j.."" : .
~ e. < ..,...::11 ....... =
""CP . . ..... ..
.,. ~. . .'
"...~ -.. ~'J ~... .....
v' ..... -. "I ....
OF ID p> \\Ie ....
.--
.......",.
ATTEST:
Page 10 of 10