Loading...
Findings - CC - 2004 - RZ-7-04 - Rezone From Ar & R-2-Da To R-2-Da Mod/99.70 Acre W South Channel Rd ORIGINAL BEFORE THE EAGLE CITY COUNCIL IN THE MATTER OF AN APPLICATION FOR A REZONE ) FROM A (AGRICULTURAL) AND R-2-DA (RESIDENTIAL ) TWO WITH DEVELOPMENT AGREEMENT) TO R-2-DA ) (RESIDENTIAL TWO WITH A MODIFIED DEVELOPMENT ) AGREEMENT) FOR ROCKY RIDGE CONSTRUCTION ) DBA SOUTH CHANNEL LLC ) FINDINGS OF FACT AND CONCLUSIONS OF LAW CASE NUMBER RZ-7-04 The above-entitled rezone application came before the Eagle City Council for their action on August 24, 2004, at which time public testimony was taken and the public hearing was closed. The Council, having heard and taken oral and written testimony, and having duly considered the matter, makes the following Findings of Fact and Conclusions of Law; FINDINGS OF FACT: A. PROJECT SUMMARY: Rocky Ridge Construction dba South Channel LLC, represented by Steve Holt, P.E., with Toothman-Orton Engineering Co., is requesting a rezone from A (Agricultural) & R-2-DA Residential- up to two dwelling units per one acre with a development agreement) to R-2- DA (Residential - up to two dwelling units per acre with a modified development agreement). The 99.70-acre development is located west of Eagle Road, at 707, 781, 799, 807,844 & 1201 W. South Channel Road. B. APPLICATION SUBMITTAL: The application for this item was received by the City of Eagle on May 20, 2004. C. NOTICE OF PUBLIC HEARING: Notice of Public Hearing on the application for the Eagle Planning and Zoning Commission was published in accordance for requirements of Title 67, Chapter 65, Idaho Code and the Eagle City ordinances on June 21, 2004. Notice of this public hearing was mailed to property owners within three-hundred feet (300-feet) of the subject property in accordance with the requirements of Title 67, Chapter 65, Idaho Code and Eagle City Code on June 17, 2004. Requests for agencies' reviews were transmitted on May 21, 2004, in accordance with the requirements of the Eagle City Code. Notice of Public Hearing on the application for the Eagle City Council was published in accordance for requirements of Title 67, Chapter 65, Idaho Code and the Eagle City ordinances on August 9, 2004. Notice of this public hearing was mailed to property owners within three-hundred feet (300-feet) of the subject property in accordance with the requirements of Title 67, Chapter 65, Idaho Code and Eagle City Code on August 4, 2004. D. HISTORY OF RELEVANT PREVIOUS ACTIONS: On April 27, 1999, the City Council approved a rezone with development agreement of a portion of this site (RZ-8-98 - Jon Wroten property) from A (Agricultural) to R-2-DA (Residential- up to two dwelling units per acre with a development agreement). Page 1 of 9 K\Plallning Dept\Eagle Applications\RZ&A\2004\RZ-07-04 ccf.doc E. COMPANION APPLICATIONS: PP-5-04 (The Shores Subdivision) VAC-I-04 (Vacation to the final plat of Two Rivers No.8 Subdivision to remove an Ada County Highway District right-of-way) F. COMPREHENSIVE PLAN LAND USE MAP AND ZONING MAP DESIGNATIONS: COMP PLAN ZONING LAND USE DESIGNATION DESIGNATION Existing Residential Two (up to A (Agricultural) & R-2-DA Pasture & Residences two dwelling units per (Residential with acre) & Floodway development agreement) Proposed No Change No Change Residential Subdivision North of site Residential Two (up to A (Agricultural) & R-2-P Pasture & Residencesrrwo two dwelling units per (Residential PUD) Rivers Subdivision PUD acre) South of site Floodway & Residential R-2-P (Residential PUD) South Channel of the Boise Two (up to two dwelling River & Streamside units per acre) Subdivision PUD East of site Residential Two (up to R-2-P (Residential PUD) South Channel of the Boise two dwelling units per River & Streamside acre) Subdivision PUD West of site Floodway & Residential A (Agricultural) & R-2-P Banbury Meadows Two (up to two dwelling (Residential PUD) Subdivision PUD & Pasture units per acre) G. DESIGN REVIEW OVERLAY DISTRICT: Not in the DDA, TDA or CEDA. H. TOTAL ACREAGE OF SITE: 99.7-acres I. APPLICANT'S STATEMENT OF JUSTIFICATION FOR THE REZONE: The justification letter (date stamped by the City on May 20, 2004) provided by the applicant's representative is incorporated herein by reference. J. APPLICANT'S STATEMENT OF JUSTIFICATION OF A DEVELOPMENT AGREEMENT (if applicable): The justification letter (date stamped by the City on May 20, 2004) provided by the applicant's representative is incorporated herein by reference. K. A V AILABILITY AND ADEQUACY OF UTILITIES AND SERVICES: A preliminary approval letter from United Water has been received. The Eagle Sewer District states that the subject property would need to be annexed into the District's service boundaries, and construction drawings approved, to obtain central sewer service. Approval letters from the Central District Health Department and the Eagle Fire Page 2 of9 K:\Plalluing Dept\Eagle Applicariolls\RZ&A\2004\RZ-07-04 cd.Joc Department will be required prior to the approval of a final plat. L. PUBLIC USES SHOWN ON FUTURE ACQUISITIONS MAP: No map currently exists. M. NON-CONFORMING USES: None known to exist N. AGENCY RESPONSES: The following agencies have responded and their correspondence is incorporated herein by reference. Comments, which appear to be of special concern, are noted below: Ada County Highway District Department of Environmental Quality Eagle Fire Department Eagle Sewer District Idaho Department of Lands Idaho Power Joint School District No.2 United Water Company O. LETTERS FROM THE PUBLIC: Letter from Barry Peters, 101 Eagle Glen Lane, Suite A, Eagle, ill 83616, date stamped by the City on June 23, 2004. STAFF ANALYSIS PROVIDED WITHIN THE STAFF REPORT: A. COMPREHENSIVE PLAN PROVISIONS WHICH ARE OF SPECIAL CONCERN REGARDING THIS PROPOSAL: . The Comprehensive Plan Land Use Map designates this site as Residential Two, suitable primarily for single family residential development within areas that are rural in character. Chapter 1 - Overview 1.1 City of Eagle Statement of Purpose d. To ensure that the important environmental features of the City and its Impact Area are protected and enhanced. g. To ensure that the development of land IS commensurate with the physical characteristics of the land. h. To protect life and property in areas subject to natural hazards and disasters. 1. To protect fish, wildlife, and recreation resources. 1.3 The City of Eagle Vision Statement e. an environmentally aware community with distinctive open space, parks and outdoor recreation; Page 3 of9 K:\Pb.1111ing Dept\Eagk Applil.:lltiolls\RZ&A \2004\RZ-07 -04 cd. doc Chapter 6 - Land Use 6.7 Implementation Strategies a. Preserve the natural features and resources of Eagle. n. Support City of Eagle flood and storm drainage regulations to achieve protection of property rights, environmental protection and flood damage reduction for community residents. B. ZONING ORDINANCE PROVISIONS WHICH ARE OF SPECIAL CONCERN REGARDING THIS PROPOSAL: . ECC Section 8-1O-1(A): REQUIREMENTS AND RESTRICTIONS (for development agreements): Purpose: Development agreements are a discretionary tool to be used by the Council as a condition of rezoning. Development agreements allow a specific project with a specific use to be developed on property in an area that is not appropriate for all uses allowed or conditional in the requested zone. C. DISCUSSION: . Staff believes that a R-2-DA (Residential with development agreement) zoning designation for this site is appropriate since the parcel is designated Residential Two as shown on the City of Eagle 2000 Comprehensive Plan Land Use Plan, and because the lands to the east and south are zoned R-2-P and have been developed with residential uses that are similar and compatible to the development proposed with this application. In addition, this site is compatible with the site to the west since that site is expected to develop in a manner consistent with the Residential Two designation and single-family residential uses as specified in the City of Eagle 2000 Comprehensive Plan. . In April of 1999, the City approved a rezone with development agreement (RZ-8-98) for the Wroten property, a forty-five (4S) acre parcel of which is now a portion of the larger subject development. At the time, at least three varying conceptual plans for the development of the property (residential subdivisions) were submitted to the City, none of which were attached to the development agreement as an approved development plan. Due to a change in the direction of the design and character in the development of the property, as well as the acquisition of additional properties surrounding the Wroten property, the applicant now desires to make the following modifications to the development agreement, with underlined text requested to be added and text shown with strike-thru requested to be deleted. Staff recommends that the proposed revisions may be accepted as written EXCEPT for the text shown in bold type which is recommended by staff to be revised as noted below said condition. 2.1 Except as may be provided herein, the development shall comply with the Eagle City Code, as it exists in final form at the time an application is made and the conditions within this agreement shall be satisfied. 2.2 If tile al3plicant deeiEies te eDRstruet a lake, Eagle Ileresy approves tlle exea'/atiEls sf aH eigllt (&) aere minimum fifteeH (IS) aere maximum lake witll tlle fellElwisg eeREiitieHs: Page 4 of 9 K:\Plannil1g Dept\Eagle Applicatiolls\RZ&A\2004\RZ-07-04 cd.doc 8. ExeavatioR ef tlle lake shall 13e eOHlj'lletea witlliH twe years af-ter eagle aJ3J3feves aHY developmeRt aflplieatieH fBr this site. A eHe year exteHsieR IRa)' be graHtea by tlle City CeuHeil, if requestea 13)' tlle aJ3J3lieant. b. CemJ3ly witll Eagle City Cese Seetiefl S 3 S K "Gravel Pits, Reek Quarries, SaHa aHd Clay Pits ails Otller Natural Reseurees ef Commereial Vallie". c. .\H eHviroRmeHtal .^.ssessment PlaH sllall 13e apJ3fElvea by tile City esgiHeer prier te startiHg the gravel oJ3eratieH. d. TrnlOk traffie shall Het go threugh aHY su13aivisieH develeJ3ed 13etweeR tllis site aHa Eagle Roaa eKeeJ3t via a aesigHatea eolleeter er resiaeHtial lOelleetor. c. Heurs of eJ3eraties sllall 13e limitea te betweeR "7 .\M to 7 PM e)leluaiHg ..veekeHas aHd lleliaays. f Tlle wsrk area aHd mas (if Het J3avea) usea f-er truclls sllall 13e wateres sliffieieHtly te elimiHate BUSt. g. OH site cruslliHg sllall 13e J3relli13iteE!. h. .\ J3emHt sllall be e13tainea ITem tHe DeJ3ar'.meHt ef '},rater Reseurees J3rior te startiRg tlle J3eHE! ellea'iatieH. I. CeHstrnctien €If the lake sllall be eempletea J3rior to issuaRee ef aHY dwelliHg uHit builsiHg permits. 2.2 All development within the 100-year floodplain shall comply with the Eagle City Code, as it exists in final form at the time aIt a preliminary plat application is made and the conditions within this agreement shall be satisfied. 2.3 A Flood Plain Development Permit application shall be submitted to and approved by Eagle prior to commencing any work within the 100-year flood plain. The applicant shall submit a Flood Plain Development Permit in compliance with all rules, regulations and ordinances as required within Title 10, Flood Control, of the Eagle City Code. 2.4 Provide twe (2) five (S) aefe pareels witlliH tlle Beise River fleeaJ3laiH te be set asiE!e aleHg the Beise Ri'ier as NatliFe Preserves aRS J3fe'iiae a twenty five (2S) foot wide pathway easement for a public pathway along the Boise River extending along the entire southern portion of the applieallt's site Prooertv. When Eagle has acquired all the necessary easements for the pathway to be completed along the north side of the south channel of the Boise River from Eagle Road to the Eagle Island State Park the apfllieaHt owner shall construct a ~~-foot wide J3atllwa)' adventure trail to match that required by the Citv for Two Rivers Subdivision to the east within the easement on the apJ3lieaHt's site Propertv. The pathway shall be constructed by the aJ3J3lilOaHt as aH uHJ3avea eemJ3acted gravel patll, witll mill aHa aeJ3th of gFavel te be as FeEJliiFed by tlle City EHgiHeer, aHa sllall 13e 13liilt abeve tlle IlSOO lOfs fie'1\' as measures at tlle GleRweea Boage Owner to match that required by the City for Two Rivers Subdivision to the east. Tile twe (2) five (S) alOre Page 5 of9 K:\Plaruullg Dt:pt\Eaglt: Applicalions\RZ&A\2004\RZ-07-04 cd.dor.; Natllre Pr-eserves Heea HOt remaill as Nature Preserves eRce tHe patllway is eeHstrllEtee. The applicant shall provide a twenty-five (25) foot wide greenbelt easement for a public pathway along the northern side of the South Channel of the Boise River extending along the entire southern portion of the property. The applicant shall construct a 10' wide compacted gravel or cinder surfaced pathway within the easement, to extend from the pathway within the Two Rivers Subdivision pathway system on the east side of the property and continue the entire length of the property abutting the Boise River. For any portion of the pathway passing through wetland areas, the ten-foot (10') wide path may instead be cleared of vegetation and constructed with a natural soil surface in lieu of the graveVcinder surface. The applicant shall work with the appropriate flood control district and emergency response agencies to ensure that the emergency access located within Lot 19, Block 1, is appropriately surfaced for heavy equipment use. The pathway shall be constructed prior to the issuance of any building permits for those lots inclusive of the pathway easement. . The applicant's property shall become annexed into the Eagle Sewer District's service boundaries and shall comply with all applicable Eagle Sewer District regulations and conditions prior to approval of any development plans for this site. STAFF RECOMMENDATION PROVIDED WITHIN THE STAFF REPORT: Based upon the information provided to staff to date, staff recommends approval of the requested rezone with a development agreement to include the conditions as outlined within the staff report. PUBLIC HEARING OF THE COMMISSION: A. A public hearing on the application was held before the Planning and Zoning Commission on July 6, 2004, at which time testimony was taken and the public hearing was closed. The Commission made their recommendation at that time. B. Oral testimony in opposition to this proposal was presented to the Planning and Zoning Commission by no one. C. Oral testimony in favor of this proposal was presented to the Planning and Zoning Commission by one (1) individual (other than the applicant/representative) who felt that the design of the subdivision would not negatively impact the well-being of wildlife in the area and which may be enhanced based on observations of previous development in the area. D. Written testimony in favor of the proposal was presented to the Planning and Zoning Commission in the form of a letter signed by two (2) individuals who felt that the development supports the highest and best use of the land. COMMISSION DECISION: The Commission voted 3 to 0 (Bandy, Crook absent) to recommend approval of RZ-7-04 for a rezone with development agreement from A (Agricultural) & R-2-DA Residential- up to two dwelling units per one acre with a development agreement) to R-2-DA (Residential - up to two dwelling units per acre with a modified development agreement) for Rocky Ridge Construction dba South Channel LLC with conditions to be included within the development agreement as shown within their Findings of Fact and Conclusions of Law document, dated July 19,2004. Page 6 of9 K:\PIlllUling Dept\Eagle Applicalions\RZ&A\2004\RZ-07-04 ccf.doc PUBLIC HEARING OF THE COUNCIL: A. A public hearing on the application was held before the City Council on August 24, 2004, at which time testimony was taken and the public hearing was closed. The Council made their decision at that time. B. Oral testimony in opposition to this proposal was presented to the City Council by no one. C. Oral testimony in favor of this proposal was presented to the City Council by one (1) individual (not including the applicant/representative) who felt that the high quality standards that the developer practices would serve well with regard to the mitigation of wetlands located within the proposed development. COUNCIL DECISION: The Council voted 3 to 0 (Nordstrom absent) to approve RZ-7-04 for a rezone with development agreement from A (Agricultural) & R-2-DA Residential - up to two dwelling units per one acre with a development agreement) to R-2-DA (Residential - up to two dwelling units per acre with a modified development agreement) with the following Planning and Zoning Commission recommended conditions to be included within a development agreement, with text shown with underline to be added by the Council: 2.1 Except as may be provided herein, the development shall comply with the Eagle City Code, as it exists in final form at the time an application is made and the conditions within this agreement shall be satisfied. 2.2 All development within the 100-year floodplain shall comply with the Eagle City Code, as it exists in final form at the time a preliminary plat application is made and the conditions within this agreement shall be satisfied. 2.3 The applicant shall submit a Flood Plain Development Permit in compliance with all rules, regulations and ordinances as required within Title 10, Flood Control, of the Eagle City Code. 2.4 The applicant shall provide a twenty-five (25) foot wide greenbelt easement for a public pathway along the northern side of the South Channel of the Boise River extending along the entire southern portion of the property. The applicant shall construct a 10' wide compacted gravel or cinder surfaced pathway within the easement, to extend from the pathway within the Two Rivers Subdivision pathway system on the east side of the property and continue the entire length of the property abutting the Boise River. For any portion of the pathway passing through wetland areas, the ten-foot (10') wide path may instead be cleared of vegetation to be a natural soil surface in lieu of the gravel/cinder surface and shall meander around existing trees that are designated to be preserved by the City Forester. The applicant shall work with the appropriate flood control district and emergency response agencies to ensure that the emergency access located within Lot 19, Block 1, is appropriately surfaced for heavy equipment use. The pathway shall be constructed and markers/signs (describing the pathwav as intended for pedestrian ingress and egress and is a multi-purpose, non-motorized pathwav/conservation easement in favor of the City of Eagle) installed to delineate the pathway prior to the issuance of any building permits for those lots inclusive of the pathway easement. Plans showing the location of the markers/signs, language to be placed on the markers/signs, and other Page 7 of9 K:\Plumung Dt:pl\Eagk Applicllliulls\RZ&A\2004\R.Z-07-04 ccf.doc methods to be used to delineate the pathwav shall be submitted to the City for review prior to the approval of a final plat. During all types of construction, fencing shall be installed to protect the easement area and prohibit activity (other than pathway construction) from occurring within the easement area. A note shall be added to the CC&Rs stating provisions for the proper maintenance of the pathway surface and for the clearing and removal of anv vegetation which may interfere with the pathway. A copv of the CC&Rs shall be submitted to the City prior to the City Clerk signing the final plat. 2.S The applicant's property shall become annexed into the Eagle Sewer District's service boundaries and shall comply with all applicable Eagle Sewer District regulations and conditions prior to approval of any development plans for this site. CONCLUSIONS OF LAW: 1. The application for this item was received by the City of Eagle on May 20, 2004. 2. Notice of Public Hearing on the application for the Eagle Planning and Zoning Commission was published in accordance for requirements of Title 67, Chapter 6S, Idaho Code and the Eagle City ordinances on June 21, 2004. Notice of this public hearing was mailed to property owners within three-hundred feet (300-feet) of the subject property in accordance with the requirements of Title 67, Chapter 6S, Idaho Code and Eagle City Code on June 17, 2004. Requests for agencies' reviews were transmitted on May 21, 2004, in accordance with the requirements of the Eagle City Code. Notice of Public Hearing on the application for the Eagle City Council was published in accordance for requirements of Title 67, Chapter 6S, Idaho Code and the Eagle City ordinances on August 9, 2004. Notice of this public hearing was mailed to property owners within three-hundred feet (300- feet) of the subject property in accordance with the requirements of Title 67, Chapter 6S, Idaho Code and Eagle City Code on August 4, 2004. 3. The Council reviewed the particular facts and circumstances of this proposed rezone (RZ-7-04) with regard to Eagle City Code Section 8-7-S "Action by the Commission and Council", and based upon the information provided concludes that the proposed rezone is in accordance with the City of Eagle Comprehensive Plan and established goals and objectives because: a. The requested zoning designation of R-2-DA (Residential - up to two unit units per acre with development agreement) is equal to the two units per acre maximum as shown on the Comprehensive Plan Land Use Map; b. The information provided from the agencies having jurisdiction over the public facilities needed for this site indicate that adequate public facilities exist, or are expected to be provided, to serve single-family dwelling units on this property under the proposed zone; c. The proposed R-2-DA (Residential - up to two unit units per acre with development agreement) is compatible with the R-2-P (Residential PUD) zoning designation and land uses to the east and south since this site will be developed with single-family dwellings of similar character, value and lot sizes comparable to those being built in said areas; d. The proposed R-2-DA (Residential - up to two unit units per acre with development agreement) is compatible with the A-R (Agricultural-Residential) zone and land uses to the north since those sites are currently single-family residences that will be buffered from this development by a combination of common open space on the subject site and a large pond located on the site to the Page 8 of9 K:\Planning Dept\Eagle Applicatiolls\RZ&A\2004\RZ-07-04 ccf.doc north; e. The proposed R-2-DA (Residential - up to two unit units per acre with development agreement) is compatible with the A (Agricultural) zone and land uses to the west since that site may be developed at two or fewer dwelling units per acre as designated on the Comprehensive Plan Land Use Map; f. While the land proposed for rezone is located within a "Hazard Area" or "Special Area" as de~cribed within the Comprehensive Plan, this development will be required to comply with all the applicable City of Eagle ordinances regarding construction in the floodplain, and preservation of the lands within the floodway as conditioned by the agencies having jurisdiction over the Boise River Floodplain; and g. No non-conforming uses are expected to be created with this rezone since all existing structures that may interfere with any proposed lot lines or right-of-ways are required to be removed prior to the development of each phase of the property. DATED this 14th day of September 2004. CITY COUNCIL OF THE CITY OF EAGLE Ada County, Idaho ,., ,........"", ~~~~'., OF E", ..... ~.. ~ ~ ........0<. ,# .: ,.~ ..- -.. -<P ~ ~ 'lrw'._ a\'OR..1">.... . .. . 0"- J '\ . ~ E : v <.' ~ ':. :*: .....- :*E i \ T ,,--~ : .. --:j.SEA,o - '\ -..00 ~ .~-_~.o 0 ~ ~iP)\ -.:!lC'?_'\""\/t. ",' l ### ~ ')., ......c... "1?--- ........ '" 'E 0 p \. ", 11",'...11."'...... ATT T: M~~-'5l-- \( ~~vr7~ ..-- Sharon . Bergmann, Eagle City Cler Page 9 of 9 K:\Plunuillg Dept\Eaglt: Applications\RZ&A\2004\RZ-07-04 ccf.dor.: