Loading...
Findings - PZ - 1998 - CU-4-98/PPUD-1-98/PP-3-98 - Rocky Mt Business Park/26 Lots/40 Acres/ BEFORE THE EAGLE PLANNING AND ZONING COMMISSION IN THE MATTER OF AN APPLICATION FOR ) A CONDITIONAL USE PERMIT, PLANNED UNIT ) DEVELOPMENT PRELIMINARY DEVELOPMENT ) PLAN, AND PRELIMINARY PLAT FOR ROCKY ) MOUNTAIN BUSINESS PARK FOR REID P. ) MERRILL Jr. ) FINDINGS OF FACT AND CONCLUSIONS OF LAW CASE NUMBER CU-4-98/ PPUD-1-98/ PP-3-98 The above-entitled conditional use permit, planned unit development preliminary development plan, and preliminary plat applications came before the Eagle Planning and Zoning Commission for their recommendation on July 6, 1998. The public hearing was closed at that time, and the Commission having heard and taken oral and written testimony, and having duly considered the matter, makes the following Findings of Fact and Conclusions of Law; FINDINGS OF FACT: A. PROJECT SUMMARY: Reid P. Merrill is requesting Conditional Use, Planned Unit Development Preliminary Development Plan, and Preliminary Plat approvals for Rocky Mountain Business Park. The development consists of 26 lots on 40+ acres and is generally located between State Street and the Highway 44 Alternate Route extending from the north/south section of State Street (extension of Edgewood Lane) eastward approximately V2 mile. B. APPLICATION SUBMITTAL: The applications for this item was received by the City of Eagle on June 4, 1998. C. NOTICE OF PUBLIC HEARING: Notice of Public Hearing on the application for the Eagle Planning and Zoning Commission was published in accordance for requirements of Title 67, Chapter 65, Idaho Code and the Eagle City ordinances on June 19, 1998. Notice of this public hearing was mailed to property owners within three-hundred feet (300-feet) of the subject property in accordance with the requirements of Title 67, Chapter 65, Idaho Code and Eagle City Code on June 18, 1998. Requests for agencies' reviews were transmitted on June 5, 1998 in accordance with the requirements of the Eagle City Code. D. HISTORY OF RELEVANT PREVIOUS ACTIONS: On September 15, 1997, the City approved the design review application (DR-15- 97) for an indoor recreation facility to be located on this site. E. COMPANION APPLICATIONS: None Page 1 of 26 IIEaglellvo!l\SHAREDlP&ZIEagle ApplicationslSUBSl19981Rocky Mountain Busmess Park pzf.doc F. COMPREHENSIVE PLAN LAND USE MAP AND ZONING MAP DESIGNATIONS: COMP PLAN ZONING LAND USE DESIGNATION DESIGNATION Existing Mixed Use & MU (Mixed Use) & C-2 Vacant & Commercial Commercial (General Business District) Proposed No Change No Change Commercial Uses North of site Mixed Use, Commercial MU (Mixed Use), C-2 Commercial/ and light industrial (General Business District) Residentiall and M-l (Light Industrial) Agricultural/Light Industriall Vacant South of site Publici Semi-Public A (Agriculture) State Highway 44/ Agriculture East of site Commercial, Industrial C-2 (General Business Commerciall District), M-IA (Industrial Residential/ Park District) Agricultural/ Vacant West of site Mixed Use & Publici MU (Mixed Use), C-2 Vacant & Commercial Semi-Public (General Business District), PS (Public Semi- Public) G. DESIGN REVIEW OVERLAY DISTRICT: Not in the DDA, TDA or CEDA. H. SITE DATA: Total Acreage of Site - 40.23 Total Number of Lots - 27 - However, 2 of the lots are not a part of the PUD Residential - 0 Commercial - 26 Industrial - 0 Common - 1 (Eagle Drain) Total Number of Units - None proposed with the preliminary Development Plan Single-family - 0 Duplex - 0 Multi-family - 0 Total Acreage of Any Out-Parcels - 0 Note: The applicant has stated that the total number of lots may change with the final Page 2 of 26 IIEaglel IvollISHAREDlP&ZIEagle ApplicationsISUBS\1998\Rocky Mountain Business Park pzf.doc development plan and has agreed to consider adding some multi-family residential, if feasible, upon submittal of final development plan. Additional Site Data Proposed Required Dwelling Units Per Gross Acre n/a n/a Minimum Lot Size 29,517 sq. ft. MU Zone - 7,000 sq. ft. C-2 Zone - 1,300 sq. ft. Minimum Lot Width 75-feet MU Zone - 50-feet C-2 Zone - 25-feet Minimum Street Frontage n/a n/a Total Acreage of Common Lots 0 0 Percent of Site as Common Area 0% 0% I. GENERAL SITE DESIGN FEATURES: Greenbelt Areas and Landscape Screening: Eagle City Code Section 9-3-7(a) requires 20-foot wide landscape strips to screen adjacent incompatible features such as highways, railroads, commercial or industrial uses from proposed residential properties and the City of Eagle Comprehensive Plan Land Use Map shows a significant area of land to be public/semi-public along Highway 44. The applicant is proposing a 35-foot wide (average) landscape strip (with pathway) along Highway 44. The applicant is required to submit a subdivision landscape plan for review and approval by the Design Review Board prior to approval of any final development plans, and landscape plans for each proposed development are to be reviewed and approved as a part of any individual design review application. Open Space: Eagle City Code does not provide for a minimum area of open space for non- residential development. However, minimum landscape requirements will need to be met upon review of individual design review applications for the site. In addition to areas of open space which the applicant states will be provided within the PUD when final development plans or design review applications are submitted, the applicant is providing over two acres of land for the landscape strip along Highway 44. Storm Drainage and Flood Control: Street drainage plans have been submitted by the applicant as required by the Subdivision Ordinance. Specific drainage system plans are to be submitted to the Page 3 of 26 IIEaglel Ivoll ISHAREDlP&ZIEagle ApplicationslSUBSI19981Rocky Mountain Business Park pzf.doc City Engineer for review and approval prior to the City Engineer signing the final plat. The plans are to show how swales, or drain piping, will be developed in the drainage easements. Also, the CC&R's are to contain clauses to be reviewed and approved by the City Engineer and City Attorney, requiring that lots be so graded that all runoff runs either over the curb, or to the drainage easement, and that no runoff shall cross any lot line onto another lot except within a drainage easement. Utility and Drainage Easements, and Underground Utilities: Eagle City Code section 9-3-6 requires utility easements to be not less than 12 feet wide. Fire Hydrants and Water Mains: Hydrants are to be located and installed as required by the Eagle Fire District. On-site Septic System (yes or no) - no Preservation of Existing Natural Features: Staff is not aware of any existing natural features currently existing on the site which would be required to be preserved. However, at the beginning of June the City was made aware of mature trees that were cut down on this property. The total width of the remaining tree trucks equal 112-inches in caliper. Jerry Stallsmith, Certified Arborist, was asked to assess the conditions of the trees. He was unable to make a determination on condition or valuation because only the stumps remain. Staff is in the process of trying to obtain pictures of the trees so the Arborist can assess their value. Preservation of Existing Historical Assets: Staff is not aware of any existing historical assets on the site which would be required to be preserved. If during excavation or development of the site, any historical artifacts are discovered, state law requires immediate notification to the state. J. STREET DESIGN: Private or Public Streets: Public Applicant's Justification for Private Streets (if proposed): None proposed Blocks Less Than 500': None Cul-de-sac Design: One 300-foot long cul-de-sac is proposed with a circular turnaround with a 50- foot radius. Sidewalks: The applicant is proposing 5-foot wide meandering concrete sidewalks on each side of all streets except along the Eagle Drain. 5-foot wide sidewalks on each Page 4 of 26 IIEaglel IvollISHARED\P&ZIEagle ApplicationslSUBSl19981Rocky Mountain Business Park pzf.doc side of the proposed streets will be required by ACHD. The City typically requires sidewalks, where feasible, to meander. Curbs and Gutters: Curbs and gutters which meet Ada County Highway District standards are proposed for the interior streets. Lighting: Lighting for the proposed public streets is required. Location and lighting specifications shall be provided to the City Zoning Administrator prior to the City Engineer signing the final plat. Street Names: Street names approved by the Ada County Street Names Committee are shown on the attached correspondence from that committee. K. ON AND OFF-SITE PEDESTRIANIBICYCLE CIRCULATION: Pedestrian Walkways: In addition to proposed sidewalks (see comments under sidewalks and above), the applicant is proposing to construct a 10-foot wide asphalt pathway along Highway 44. Pathways connecting the Highway 44 pathway to the interior of the proposed development are also planned. Bike Paths: Eagle City Code section 9-4-1-7 states that a bicycle pathway shall be provided in all subdivisions as part of the public right-of-way or separate easement, as may be specified by the City Council. L. PUBLIC USES PROPOSED: Public pathway along Highway 44. M. PUBLIC USES SHOWN ON FUTURE ACQUISITIONS MAP: No map currently exists N. SPECIAL ON-SITE FEATURES: Areas of Critical Environmental Concern - none Evidence of Erosion - no Fish Habitat - no Floodplain - Yes (approximately 4-acres along Highway 44) Mature Trees - Recently removed without City approval (See "Preservation of Existing Natural Features" above) Riparian Vegetation - no Steep Slopes - no Stream/Creek: Eagle Drain along Plaza Drive Unique Animal Life - unknown Unique Plant Life - unknown Unstable Soils - unknown Page 5 of 26 IIEaglel Ivoll ISHARED\P&ZIEagle ApplicationslSUBSl19981Rocky Mountain Business Park pzf.doc Wildlife Habitat - unknown O. SUMMARY OF REVIEW OF ENVIRONMENTAL ASSESSMENT PLAN (IF REQUIRED): See submitted EIS. No significant impact to floodplain since most of the floodplain area will be developed as a pathway/open space area. P. AGENCY RESPONSES: The following agencies have responded and their correspondence is attached. Comments which appear to be of special concern are noted below: City Engineer: All comments within the engineer's letter dated June 30, 1998, are of special concern (see attached). Central District Health Eagle Fire Department Eagle Sewer District Eagle Water Company Q. LETTERS FROM THE PUBLIC: None received to date. R. PROPOSED TIME SCHEDULE FOR THE DEVELOPMENT OF THE SITE: Per applicant - 2 years for infrastructure and several years for completion of individual development of each lot. The applicant states that he believes the project will be totally compete within 5-years. S. EAGLE CITY CODE FINDINGS FOR A CONDITIONAL USE PERMIT, PLANNED UNIT DEVELOPMENT PRELIMINARY DEVELOPMENT PLAN, and PRELIMINARY PLAT: 1. That the proposed PUD is in the public interest, advances the general welfare of the community and neighborhood, and will not be detrimental to the economic welfare of the community. 2. That the development be designed, constructed, operated and maintained to be harmonious and appropriate in appearance with the existing or intended character of the general vicinity and how such use will not change the essential character of the same area. 3. That the development will not be hazardous or disturbing to existing or future neighborhood uses. 4. That the development does not involve uses, activities, processes, materials, equipment, and/or conditions of operation that will be detrimental to any persons, property or the general welfare by reason of excessive production of traffic, noise, smoke, fumes, glare or odors. Page 6 of 26 \\Eaglel \voll ISHARED\P&Z\Eagle ApplicationslSUBSl1998\Rocky Mountain Business Park pzf.doc 5. That the development will be served adequately by essential public facilities such as highways, streets, police and fire protection, drainage structures, refuse disposal, water and sewer, and schools. 6. That the development will not create excessive additional requirements at public cost for public facilities and services. 7. That the development is provided with parks, ponds, open areas, areas of special interest, floodplain preservation, and/or other special features which would not typically be provided in a non-PUD proposal. 8. That the vehicular approaches to the property are designed to not create an interference with traffic on surrounding public thoroughfares. 9. That the development will not result in the destruction, loss, or damage of a natural, scenic or historic feature of maj or importance. 10. That the proposed development will be harmonious with and in accordance with the general objectives or with any specific objective of the Comprehensive Plan. 11. That the proposed development will be harmonious with and in accordance with the general objectives or with any specific objective of Eagle City Code Title 8. 12. That the benefits, combination of various land uses, and interrelationship with the surrounding area for this proposed development justifies any proposed deviation from any standard district regulations. In cased of large - scale PUDs (incorporating fifty (50) or more lots or dwelling units): 13. That public services shall be provided to the development including, but not limited to, fire protection, police protection, central water, central sewer, road construction, parks and open space, recreation, maintenance, schools and solid waste collection. 14. That an estimate of the public service costs to provide adequate service to the development has been provided by the developer. 15. That an estimate of the tax revenue that will be generated from the development has been provided by the developer. 16. That suggested public (or private) means of financing the services for the development if the cost for the public services would not be offset by the tax revenue received from the development has been provided by the developer. For a request of up to 10% of the gross land area to be directed to uses other than residential (ie; commercial, industrial, public and quasi public uses that are not allowed in the land use district): Page 7 of 26 \\Eagle I Ivoll ISHAREDlP&Z\Eagle Applications\SUBS\1998\Rocky Mountain Business Park pzf.doc 17. That the uses are appropriate with the residential uses. 18. That the uses will serve principally the residents of the PUD. 19. That the uses are planned to be an integral part of the PUD. 20. That the uses located and designed to provide direct access to a collector or arterial street. 21. That the proposed street connections will not create congestion or traffic hazards. In cases where an increase in residential density of up to 15% of the allowable number of dwelling units is requested: 22. LANDSCAPING - For up to 5% That the quality of the designs for landscaping, streetscape, open spaces and plazas, use of existing landscape, pedestrian way treatment, and recreational areas, incorporated into this development, exceed that of a non PUD development. 23. SITING - For up to 5% That the quality of the designs for visual focal points, use of existing features such as topography, view, sun orientation, prevalent wind direction, pedestrian/vehicular circulation pattern, physical environment, variation in building setbacks, and building grouping (such as clustering), incorporated into this development, exceed that of a non PUD development. 24. DESIGN FEATURES - For up to 5% That the quality of the designs for street sections, architectural styles, harmonious use of materials, parking areas broken by landscaping features, and varied use of housing types, incorporated into the development, exceed that of a non PUD development. STAFF ANALYSIS PROVIDED WITHIN THE STAFF REPORT: A. COMPREHENSIVE PLAN PROVISIONS WHICH ARE OF SPECIAL CONCERN REGARDING THIS PROPOSAL: . LAND USE MAP - MIXED USE - Most of this site is within the area designated as Mixed Use. The applicant is proposing a mix of uses and will consider residential uses upon review of final development plan. . HAZARD AREA - Floodplain criteria apply to a small portion of the site along Highway 44. This area is mostly planned for pathway/open space in accordance with the goals and objectives of the Comprehensive Plan. B. ZONING ORDINANCE PROVISIONS WHICH ARE OF SPECIAL CONCERN REGARDING THIS PROPOSAL: . Eagle City Code Section 8-6-4: USES PERMITTED: All uses that may be allowed within the land use district are permitted within a PUD. Also, up to ten percent (10%) of the gross land area may be directed to other commercial, industrial, public and quasi-public uses that are not allowed within the land use district; Page 8 of 26 IIEagle! Ivoll\SHAREDlP&ZIEagle Applications\SUBS\1998\Rocky Mountain Business Park pzf.doc provided, that there is a favorable finding by the Council: A. That the uses are appropriate with the residential uses; B. That the uses are intended to serve principally the residents of the PUD; C. That the uses are planned as an integral part of the PUD; D. That the uses be located and so designed as to provide direct access to a collector or an arterial street without creating congestion or traffic hazards; and E. That a minimum of fifty percent (50%) of the residential development occur prior to the development of the related commercial or industrial land uses. . Eagle City Code Section 8-6-6-3 - Requires all final development plans to be reviewed by the Planning and Zoning Commission as well as the City Council. F. SUBDIVISION ORDINANCE PROVISIONS WHICH OF SPECIAL CONCERN REGARDING THIS PROPOSAL: (None) G. DISCUSSION: . Although Lot 16, Block 1, and Lot 1 Block 2, are part of this subdivision they are not a part of the Rocky Mountain Business Park planned unit development. Therefore, a note should be provided on the final plat stating such. . Regarding the applicant's proposal for C-2 uses within 10% of the MU zone - In accordance with Eagle City Code Section 8-6-4 (noted above), staff would recommend approval of 10% of the PUD to allow uses shown as permitted on the City's land use chart under the C-2 zoning designation within the MU zone with the condition that the abutting residential property owner to the east (The Farnworths) agree to C-2 uses. Regarding required findings "A" through "E" within the above referenced code staff has the following opinion (shown in italics): A. That the uses are appropriate with the residential uses; No residential uses are proposed with the PUD and the only existing abutting residential use (Farnwortth parcel) should be required to provide written approval of the C-2 uses within this area of the PUD. If residential uses are proposed with the final development plan the uses will be reviewed so as to assure compatibility with each other. B. That the uses are intended to serve principally the residents of the PUD; This does not apply since there are no residences within the PUD and if residential units are proposed with a final development plan the residential units will be subordinate to the main use of the PUD which is commercial. C. That the uses are planned as an integral part of the PUD; The C-2 uses will need to follow the same landscape and design theme as the rest of the PUD and the roadways and pathways will need to connect through the area. Page 9 of 26 \\Eagle 1 Ivol1 \SHARED\P&Z\Eagle Applications\SUBS\ 19981Rocky Mountain Business Park pzf.doc D. That the uses be located and so designed as to provide direct access to a collector or an arterial street without creating congestion or traffic hazards; The proposed plan shows that this will be the case. E. That a minimum of fifty percent (50%) of the residential development occur prior to the development of the related commercial or industrial land uses. This does not apply since there are no residences within the PUD, and if residential units are proposed with a final development plan the residential units will be subordinate to the main use of the PUD which is commercial. This is not a residential PUD. . Eagle City Code Section 8-6-6-3, requires all final development plans to be reviewed by the Planning and Zoning Commission as well as the City Council. This is partly to allow for additional City review for flexibility needed for long range and large PUDs. Therefore, staff believes that the lot configuration should be approved in concept only so the PUD can allow flexibility for varying sizes of commercial development. The number oflots should be permitted to be increased or decreased and lot lines should be permitted to be adjusted as a part of any final development plan submitted to the City. Final development plans should be reviewed as "New Business" items and not as "Public Hearing" items unless the City determines that any difference between the preliminary development plan and final development plan needs additional public comment because of possible impacts to surrounding property owners or the community. If the City determines that a public hearing should be held on the final development plan, notice should be provided for (as was required for the preliminary development plan). The street configuration should remain substantially the same. . Regarding Eagle City Code findings for a conditional use permit, planned unit development preliminary development plan, and preliminary plat - As a part of the application submittal for this project, and in accordance with application submittal requirement #14, the applicant has provided a 17 page document, dated June 4, 1998. The document outlines how the applicant intends to guarantee that this project will meet the Eagle City Code required findings for a conditional use permit, planned unit development preliminary development plan, and preliminary plat. Staff has reviewed the document and believes that the issues have been substantially addressed. STAFF RECOMMENDATION PROVIDED WITHIN THE STAFF REPORT: Staff recommends approval with the site specific conditions of approval and the standard conditions of approval provided within the staff report. PUBLIC HEARING OF THE COMMISSION: A. A public hearing on the application was held before the Planning and Zoning Commission on July 6, 1998. Testimony was taken, the public hearing was closed and the Commission made their recommendation at that time. Page 10 of26 \\Eaglel Ivo!l\SHARED\P&Z\Eagle ApplicationslSUBS\1998lRocky Mountain Business Park pzf.doc B. Oral testimony in opposition to the application was presented no one before the Planning and Zoning Commission. C. Oral testimony in favor of the application was presented by one individual before the Planning and Zoning Commission. COMMISSION DECISION: The Commission voted 4 to 0 (Farnworth abstained from discussion and vote) to recommend approval of CU-4-98, PPUD-I-98 & PP-3-98 (ROCKY MOUNTAIN BUSINESS P ARK) with the following staff recommended site specific and standard conditions of approval with text shown with strike-thru to be deleted by the Commission. (Note: The Commission heard testimony on all three applications at one time but took separate action on each application.) SITE SPECIFIC CONDITIONS OF APPROVAL: 1. Place a note on the final plat stating, "Although Lot 16, Block 1, and Lot 1 Block 2, are part of this subdivision they are not a part of the Rocky Mountain Business Park planned unit development." With the exceptions of site specific conditions #8, #11, and #14, all other conditions of approval of this application also apply to Lot 16, Block 1, and Lot 1 Block 2. 2. As provided for within Eagle City Code Section 8-6-4, up to 10% (approximately 4.02-acres) of the land area zoned as MU (Mixed Use) within the planned unit development (PUD) may be used for any commercial use shown as a "Permitted Use" under the C-2 zoning designation within Eagle City Code Section 8-2-3 "Official Schedule of District Regulations". 3. Provide a written statement, to be recorded, from the easterly property owner (The Famworths) generally stating that they, as well as any future owners of the property, hereby waive their right to oppose any use permitted within the City's C-2 zoning designation which may be proposed within the Rocky Mountain Business Park PUD. 4. The lot configuration is approved in concept only. The number of lots shall be permitted to be increased or decreased and lot lines shall be permitted to be adjusted as a part of any final development plan submitted to the City. Final development plans should be reviewed as "New Business" items and not as "Public Hearing" items unless the City determines that any difference between the preliminary development plan and final development plan needs additional public comment because of possible impacts to surrounding property owners or the community. If the City determines that a public hearing shall be held on the final development plan, notice shall be provided for (as was required for the preliminary development plan). The street configuration shall remain substantially the same. 5. Comply with the conditions outlined within the application review letter provided by the City's Engineering firm, Holladay Engineering. 6. Upon review of a final development plan for this PUD the City shall encourage multi-family residential uses located on the second floor of non-residential uses and/or apartment and/or Page 11 of26 \\Eagle 1 \voll ISHARED\P&Z\Eagle ApplicationslSUBSI19981Rocky Mountain Business Park pzf.doc condominium projects, if feasible, to provide an appropriate mix of uses as intended by the mixed use zone. This condition of approval is intended to be suggestive not mandatory. 7. Place a note on the final plat providing for cross access between all parcels. 8. Place a note on the final plat allowing for cross access between Lots 2, 3 and 4 of Block 3 and the property to the east. 9. Design Rocky Mountain Way to allow for a driveway/or roadway connection to the property abutting the east side of Lot 4, Block 3. 10. Provide an on-site landscape strip to be an average of 35-feet in width along Highway 44. Landscaping shall be reviewed and approved the Design Review Board prior to City Council approval of the final development plan/final plat. 11. CORstruet a 10 [oat wide BieyeleipedestriElfl pathway geRerally as Sh.OVIfl aR the preliFRiRlif)' dlweloflFReat fllan and flrelimiRB:l}' plEtt slismitted to the City '?lith this applieEttioR, with. the 0xceptioR thEtt eonstmetion of the pEttk.','ay along Lat Hi, Bloek 2 (existing residential dwelling) shall Flat Be required l:intil an applieEttioR for a de,..elopFRent flroposal is sl:iBFRitted for thEtt pareel. 12. The pathways shall be within an easement (generally as stated within note #9 on the submitted preliminary plat) to be reviewed and approved by the Zoning Administrator. 13. The pathways and meandering sidewalks shall be constructed in the locations generally as shown on the Preliminary Development Plan submitted to the City with this application. 14. The applicant shall plant street trees at approximately 35-foot on center on both sides of all proposed streets (except where may be prohibited by Drainage District #2). Where possible, trees shall be placed between the sidewalk and street curbing. The planting plan shall be reviewed and approved by the Design Review Board. 15. Provide historic lighting at a spacing similar to that which was required in front of the Rocky Mountain Fitness Center (approximately 75-feet apart) along the south side of Plaza Drive. Where possible, lights shall be placed between the sidewalk and street curbing and shall be close to intersections, driveways and pedestrian pathway intersections. Lighting plan shall be reviewed and approved by the Zoning Administrator. 16. Other than on Plaza Drive, provide historic lighting at approximately ISO-feet apart along both sides of all streets. Where possible, lights shall be placed between the sidewalk and street curbing, and shall be close to intersections, driveways and pedestrian pathway intersections. Lighting plan shall be reviewed and approved by the Zoning Administrator. 17. Provide lighting for the pedestrian pathways. Lighting plan shall be reviewed and approved by the Zoning Administrator. 18. Building setbacks shall be as stated within note #7 on the submitted preliminary plat. Page 12 of 26 \\Eagle1 \voll ISHARED\P&Z\Eagle Applications\SUBSI1998\Rocky Mountain Business Park pzfdoc 19. A Flood Plain Development Permit application shall be submitted to and approved by the City prior to commencing any work within the 100-year flood plain. 20. Lot 1, Lot 2 and Lot 5, Block 1, shall be redesigned to allow for an extension of Steirman Way or Palmetto Avenue connecting to Highway 44 in alignment with the planned public street to the south which was required by the Ada County Highway District on the Eagle River proposal currently under review by the City. 21. Provide a note on all deeds or all final plats or provide a development agreement generally stating that, "All property owners shall agree to participate in an LID, or similar funding method, which may be initiated by the City to provide crossings of Highway 44 between Eagle Road and the intersection of State Street with Highway 44 (approximately one mile east of Eagle Road). Two pedestrianlbicycle overpass or underpass crossings (one approximately 100- feet east of the Eagle RoadlHighway 44 intersection and another approximately 100-feet east of the Stierman Road/Palmetto Avenue extendedlHighway 44 intersection) shall be provided. Also, at grade intersection enhancements, such as landscaping, crosswalk pavers and signage, for pedestrian safety and comfort at the intersections of Highway 44 and Eagle Road, Highway 44 and Stierman Road/Palmetto Avenue extended and Highway 44 and State Street (east of Eagle Road) shall be provided." 22. Lot 2 and Lot 5, Block 1, shall be redesigned, and sufficient right-of-way shall be provided, to allow for a pedestrianlbicycle overpass or underpass crossing approximately 100-feet east of the Stierman Road/Palmetto Avenue extended/Highway 44 intersection. 23. An approval letter from Drainage District #2 shall be provided to the City prior to the City Clerk signing any final plats. Any conditions and easements required by the ditch company shall be shown and/or shall be referenced on the final plat. 24. In addition to any required trees, if the City determines that additional trees are to be provided to replace the mature trees which were removed (I 12-inches in caliper) without City approval, the number, placement and size of those additional trees shall be reviewed and approved by the Design Review Board. 25. Provide a license agreement, approved by ITD and/or ACHD, allowing the right-of-way between this site and the edge of pavement along State Highway 44 and State Street to be landscaped. 26. Provide bus stops as may be recommended by Boise Urban Stages. A bus stop shall be provided at or near the recreation center. 27. All uses shown as permitted or conditional uses under the MU (Mixed Use Distinct) zoning designation within Eagle City Code Section 8-2-3 "Official Schedule of District Use Regulations" shall be considered permitted uses with the approval of this PUD except that the following uses shall still require approval of a conditional use permit or amendment of the PUD: a. Mobile Home (Single Unit) Page 13 of 26 \\Eagle 1 Ivoll \SHARED\P&Z\Eagle Applications\SUBS\ 1998\Rocky Mountain Business Park pzf.doc b. Mobile Home (Single Unit Temporary Living Quarters) c. Mobile Home Park d. Kennel e. Mobile Office f. Riding Academies/Stables g. Storage (Fenced Area) h. Public Service Facilities STANDARD CONDITIONS OF APPROVAL: 1. The applicant shall comply with all requirements of the Ada County Highway District and/or the Idaho Transportation Department, including but not limited to approval of the drainage system, curbs, gutters, streets and sidewalks. 2. Correct street names, as approved by the Ada County Street Name Committee, shall be placed on the plat prior to the City Engineer signing the final plat. 3. Complete water and sewer system construction plans shall be reviewed and approved by the City Engineer. Required improvements shall include, but not be limited to, extending all utilities to the platted property. The developer may submit a letter in lieu of plans explaining why plans may not be necessary. 4. Idaho Department of Health & Welfare approval of the sewer and water facilities is required prior to the City Engineer signing the final plat (I.c. Title 50, Chapter 13 and LC. 39-118). 5. Written approval of all well water for any shared or commercial well shall be obtained from the Idaho Department of Water Resources prior to the City Engineer signing the final plat. 6. Unless septic tanks are permitted, wet line sewers will be required and the applicant will be required to furnish the City Engineer with a letter from the sewer entity serving the property, accepting the project for service, prior to the City Engineer signing the final plat (B.C.C. 9-20-8.4) 7. All homes being constructed with individual septic systems shall have the septic systems placed on the street side ofthe home. 8. Per Idaho Code, Section 31-3805, concerning irrigation rights, transfer and disclosure, the water rights appurtenant to the lands in said subdivision which are within the irrigation entity will be transferred from said lands by the owner thereof; or the subdivider shall provide for underground title or other like satisfactory underground conduit to permit the delivery of water to those landowners within the subdivision who are also within the irrigation entity. See Eagle City Code Section 9-4-1-9(C) which provides overriding and additional specific criteria for pressurized irrigation facilities. Page 14 of 26 IIEagle 1 \voll \SHARED\P&ZIEagle Applications\SUBSI1998\Rocky Mountain Business Park pzf.doc Plans showing the delivery system must be approved by a registered professional engineer and shall be approved by the City Engineer prior to the City Engineer signing the final plat. 9. The applicant shall submit a letter from the appropriate drainage entity approving the drainage system and/or accepting said drainage; or submit a letter from a registered professional engineer certifying that all drainage shall be retained on-site prior to the City Engineer signing the final plat. A copy of the construction drawing(s) shall be submitted with the letter. 10. Drainage system plans shall be submitted to the City Engineer for review and approval prior to the City Engineer signing the final plat. The plans shall show how swales, or drain piping, will be developed in the drainage easements. The approved drainage system shall be constructed, or a performance bond shall be submitted to the City Clerk, prior to the City Engineer signing the final plat. The CC&R's shall contain clauses to be reviewed and approved by the City Engineer and City Attorney, prior to the City Engineer signing the final plat, requiring that lots be so graded that all runoff runs either over the curb, or to the drainage easement, and that no runoff shall cross any lot line onto another lot except within a drainage easement. 11. No ditch, pipe or other structure or canal, for irrigation water or irrigation waste water owned by an organized irrigation district, canal company, ditch association, or other irrigation entity, shall be obstructed, routed, covered or changed in any way unless such obstruction, rerouting, covering or changing has first been approved in writing by the entity. A Registered Engineer shall certify that any ditch rerouting, piping, covering or otherwise changing the existing irrigation or waste ditch (1) has been made in such a manner that the flow of water will not be impeded or increased beyond carrying capacity of the downstream ditch; (2) will not otherwise injure any person or persons using or interested in such ditch or their property; and (3) satisfied the Idaho Standards for Public Works Construction. A copy of such written approval and certification shall be filed with the construction drawing and submitted to the City Engineer prior to the City Engineer signing the final plat. 12. Street light plans shall be submitted and approved as to the location, height and wattage to the City Engineer prior to the City Engineer signing the final plat. All construction shall comply with the City's specifications and standards. The applicant shall delineate on the face of the final plat an easement, acceptable to the City Engineer, for the purpose of installing and maintaining street light fixtures, conduit and wiring lying outside any dedicated public right-of-way, prior to the City Engineer signing the final plat. The applicant shall pay applicable street light inspection fees on the proposed subdivision prior to signing of the final plat by the Eagle City Engineer. 13. The applicant shall provide utility easements as required by the public utility providing Page 15 of26 \\Eagle! Ivo11\SHAREDlP&ZIEagle ApplicationslSUBSl19981Rocky Mountain Business Park pzf.doc service, and as may be required by the Eagle City Code, prior to the City Engineer signing the final plat. 14. An approval letter from the Eagle Fire Department shall be submitted to the City prior to the City Engineer signing the final plat The letter shall include the following comments and minimum requirements, and any other items of concern as may be determined by the Eagle Fire Department officials: a. The applicant has made arrangements to comply with all requirements of the Fire Department. b. The proposed fire hydrant locations shall be reviewed and be approved in writing by the Eagle Fire Department prior to the City Engineer signing the final plat.. c. Minimum flow per hydrant shall be 1,000 gallons per minute for one and two family dwellings, 1,500 gallons per minute for dwellings having a fire area in excess of 3,600 square feet, and 1,500 gallons per minute for non-residential uses (ie; Commercial, Industrial, Schools, etc.). Flow rates shall inspected in accordance with all agencies having jurisdiction, and shall be verified in writing by the Eagle Fire Department prior to issuance of any building permits. d. The proposed fire protection system shall be reviewed and approved by the Eagle Fire Department prior to issuance of a building permit. 15. Covenants, homeowner's association by-laws or other similar deed restrictions, acceptable to the Eagle City Attorney which provide for the use, control and mutual maintenance of all common areas, storage facilities, recreational facilities, street lights or open spaces shall be reviewed and approved by the Eagle City Attorney prior to the City Engineer signing the final plat. A restrictive covenant must be recorded and a note on the face of the final plat IS required, providing for mutual maintenance and access easements. Appropriate papers describing decision-making procedures relating to the maintenance of structures, grounds and parking areas shall be reviewed and approved by the Eagle City Attorney prior to the City Engineer signing the final plat. 16. Should the homeowner's association be responsible for the operation and maintenance of the storm drainage facilities, the covenants and restrictions, homeowner's association by- laws or other similar deed restrictions acceptable to the Eagle City Attorney shall be reviewed and approved by the Eagle City Attorney prior to the City Engineer signing the final plat. 17. The applicant shall submit an application for Design Review, and shall obtain approval for all required landscaping, common area and subdivision signage prior to the City Engineer signing the final plat. 18. Any recreation area, greenbelt area or pathway area along the Boise River, Dry Creek or any other area designated by the City Councilor Eagle City Pathway/Greenbelt Committee for a path or walkway shall be approved in writing by the Eagle City Pathway/Greenbelt Committee prior to approval of the final plat by the City Council. Page 16 of26 llEaglellvol1\SHARED\P&ZIEagle Applications\SUBS\1998\Rocky Mountain Business Park pzf.doc 19. Conservation, recreation and river access easements (if applicable) shall be approved by the Eagle City Pathway/Greenbelt Committee and shall be shown on the final plat prior to approval ofthe final plat by the City Council. 20. The applicant shall place a note on the face of the plat which states: "Minimum building setback lines shall be in accordance with the applicable zoning and subdivision regulations at the time of issuance of the building permit or as specifically approved and/or required". 21. The applicant shall comply with the provisions of the Eagle City Code, pertaining to floodplain and river protection regulations (if applicable) prior to the City Engineer signing the final plat. 22. The development shall comply with the Boise River Plan (if applicable) in effect at the time of City Council consideration of the final plat. 23. The applicant shall obtain written approval of the development relative to the effects of the Boise River Flood Plain (if applicable) from the Corps. of Engineers prior to approval ofthe final plat by the City Engineer. 24. The applicant shall obtain approval of the development relative to its effects on wetlands or other natural waterways (if applicable) from the Corps. of Engineers and the Idaho Department of Water Resources and/or any other agency having jurisdiction prior to the City Engineer signing the final plat. 25. Basements in homes in the flood plain are prohibited. 26. The Americans with Disabilities Act, Uniform Building Code, Eagle City Code, Eagle Comprehensive Plan, and all applicable County, State and Federal Codes and Regulations shall be complied with. All design and construction shall be in accordance with all applicable City of Eagle Codes unless specifically approved by the Commission and/or Council. 27. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized representative of the City of Eagle. The burden shall be upon the applicant to obtain written confirmation of any change from the City of Eagle. 28. No public board, agency, commission, official or other authority shall proceed with the construction of or authorize the construction of any of the public improvements required by the Eagle City Code Title 9 "Land Subdivisions" until the final plat has received the approval of the City Council (ECC 9-6-5 (A) (2)). After Council approval of the final plat, the applicant may construct any approved improvements before the City Engineer signs the final plat. The applicant shall provide a financial guarantee of performance in the amount of 150% of the total estimated cost for Page 17 of 26 \\Eagle I Ivoll ISHARED\P&Z\Eagle ApplicationslSUBS\ 1 9981Rocky Mountain Business Park pzf.doc completing any required improvements (see resolution 98-3) prior to the City Engineer signing the final plat. The financial guarantee shall be a Letter of Credit, Certificate of Deposit, cash deposit or certified check. 29. In accordance with Eagle City Code, failure to obtain a recorded final plat for the subdivision within one year following City Council approval shall cause this approval to be null and void, unless a time extension is granted by the City Council. 30. Prior to submitting the final plat for recording, the following must provide endorsements or certifications: Owners or dedicators, Registered Land Surveyor, County Engineer, Central District Health Department, Ada County Treasurer, Ada County Highway District Commissioners, City Engineer, and City Clerk. Page 18 of26 \\Eagle I \voll ISHAREDlP&Z\Eagle Applications\SUBS\1998\Rocky Mountain Business Park pzf.doc CONCLUSIONS OF LAW: 1. The applications for these items were received by the City of Eagle June 4, 1998. 2. Notice of Public Hearing on the application for the Eagle Planning and Zoning Commission was published in accordance for requirements of Title 67, Chapter 65, Idaho Code and the Eagle City ordinanc~s on June 19, 1998. Notice of this public hearing was mailed to property owners within three-hundred feet (300-feet) of the subject property in accordance with the requirements of Title 67, Chapter 65, Idaho Code and Eagle City Code on June 18, 1998. Requests for agencies' reviews were transmitted on June 5, 1998 in accordance with the requirements ofthe Eagle City Code. 3. In accordance with Eagle City Code findings for a conditional use permit, planned unit development preliminary development plan, and preliminary plat the Eagle Planning and Zoning Commission makes the following conclusions for CU-4-98, PPUD-I-98 & PP-3-98 (ROCKY MOUNTAIN BUSINESS PARK), as proposed with the conditions recommended herein: 1. That the proposed PUD is in the public interest, advances the general welfare of the community and neighborhood, and will not be detrimental to the economic welfare of the community because; It will generate increased tax revenue for the schools, libraries, fire departments, law enforcement and city parks needed by the City of Eagle. The current property taxes for the entire 43 acres are approximately $4,900 per year in its current use and configuration. The conceptual plan for Rocky Mountain Business Plaza consists of approximately 294,000 square feet of building space. The project economic model forecasts that when completely developed, or built-out, the property taxes generated at today's building, development, and land cost multiplied by today's property tax multiplier will be somewhere between $425,000 and $500,000 per year. In effect, tax revenues could increase over $420,000 a year, or $4,200,000 in ten years, in property tax alone from this development. The conceptual plan currently calls for 24 buildings. There could be between 300 and 700 new jobs created here. The applicant's analysis states that these new jobs could account for $10,000,000 to $20,000,000 in payroll, depending on what types of businesses move or relocate here. Besides the new jobs created at the development, there would naturally be many additional follow-on jobs created to service the businesses at the development. This revenue will help to make up for the loss of business to the Central Business District that was brought about when the Eagle Bypass was built. This development is in downtown Eagle, and the people that fill these new job positions will naturally stay in the downtown area to eat and shop throughout the day. These new job positions could be filled by the people that live here in Eagle who no longer want to spend their time commuting to downtown Boise or elsewhere to work. They may live close enough so that they can walk or ride their bike to work. Page 19 of26 \\Eagle I \voll ISHARED\P&Z\Eagle Applications\SUBS\1998IRocky Mountain Business Park pzfdoc A greenbelt 25-feet to 35-feet wide will extend the full length of the property adjacent to the new Eagle Bypass. The greenbelt will be fully landscaped. There will be an abundance oflandscaped area and meandering sidewalks throughout the complex and around the buildings and parking areas to facilitate walking to and access around and between the many buildings. The green belt and the sidewalks will add to the beauty of the complex and the surrounding area. These sidewalks could be used throughout the day for walks during breaks at work, physical exercise, and family walks in the evenmg. This development will allow companies to bring their businesses to Eagle so that Eagle residents will have more services and amenities available here in Eagle for their use. It will mean less traveling because more of what Eagle citizens need will be available here. This will enhance and draw people from outside the immediate area to do business here and at downtown Eagle's Central Business District. At the north end ofthe project the new Rocky Mountain Fitness & Recreation Center will be in the center of a nucleus of planned health care related businesses. In summery, the Commission concludes that this project will be beneficial to the economic welfare of the community and will add new types of businesses benefiting the citizens of Eagle. 2. That the development be designed, constructed, operated and maintained to be harmonious and appropriate in appearance with the existing or intended character of the general vicinity and how such use will not change the essential character of the same area because; Rocky Mountain Business Plaza has been designed to follow the City of Eagle preferred concept idea, with parking generally behind the buildings away from the streets, desirable looking walls and fenestrations facing the by-pass and streets, and an abundance oflandscaping with walking paths and bike lanes. The new streets, when completed, will ease traffic movement in downtown Eagle. Covenants, Conditions and Restrictions (CC&R's) are being created that will require that the development plan be followed and meet the specifications set forth. The applicant is following the current City of Eagle's Comp Plan (the 1997 Comprehensive Plan, adopted on October 14, 1997). Rocky Mountain Business Plaza enhances the appearance of the general vicinity because it is a fully planned development with architecturally designed buildings that will have very pleasant looking walls and fenestrations. Around the buildings will be ample parking and mature landscaping with easy street access to and from the parking areas. All of the land area and buildings adjacent to the development is zoned MU / C-2 / PS 1M-I. The property is currently zoned MU and C-2. The land and all of the adjoining lands will generally be harmonious in use. As per the City of Eagle's Planned Unit Development Code Title 8-6-4: Uses Permitted: "Up to ten percent (10%) of the gross land area may be directed to other Page 20 of 26 IIEagle I\voll \SHARED\P&Z\Eagle Applications\SUBSI1998\Rocky Mountain Business Park pzf.doc commercial, industrial, public and quasi-public uses that are not allowed within the land use district...." Under this "land use criteria and acceptability", the site will incorporate 1 0% of the 43 acres, or 4.3 acres, for a use other than what it is zoned for (as C-2 General Business District uses instead ofMU Mixed Use District uses). 3. That the development will not be hazardous or disturbing to existing or future neighborhood uses because; This development is planned to exclude businesses that utilize hazardous or odorous material or that will be extremely noisy. The completion of the three new streets in the development and the completion of Plaza Drive by the other land owners down to the Albertson's area will make it easier and less hazardous to drive around in downtown Eagle. Plaza Drive will be an extension of Hill Road. ACHD's future plans call for Hill Road traffic to come down and run across State Street and onto Plaza Drive. Traffic can travel along Plaza Drive to Eagle Road or can turn and go down State Street to Eagle Road or to the Bypass. Eagle's 2nd Street, proposed Rocky Mountain Way, and probably other streets will intersect with Plaza Drive. These new roads, with new sidewalks adjacent to them, and new intersections will make walking and driving in downtown Eagle much easier. New sidewalks and streetlights will provide a safer pedestrian environment throughout the project and help to make downtown Eagle more user friendly. The new bike path down the green belt in the development creates for bikes and pedestrians an alternative path to riding along the edge of Highway 44/55. 4. That the development does not involve uses, activities, processes, materials, equipment, and/or conditions of operation that will be detrimental to any persons, property or the general welfare by reason of excessive production of traffic, noise, smoke, fumes, glare or odors because; This development will exclude any out of the ordinary uses, activities, processes, materials, equipment, and/or conditions of operation that may be detrimental to any persons, property or the general welfare by reason of excessive production of traffic, noise, smoke, fumes, glare or odors. The businesses planned for the Rocky Mountain Business Plaza are medical office complexes, health care related offices and businesses, offices with smaller size warehouses, research facilities, retail, restaurants, large offices, tire stores, specialty stores, computer related businesses, The Rocky Mountain Fitness and Recreation Center and possibly residential units. 5. That the development will be served adequately by essential public facilities such as highways, streets, police and fire protection, drainage structures, refuse disposal, water and sewer, and schools because; This development is between State Street and Eagle Bypass 44/55 and has easy access to both. ACHD has reviewed the conceptual design plan and supports the proposed street layout. The new streets will enhance the flow of traffic in downtown Eagle. When the redesigned Eagle Road is complete, there will be five traffic lanes as well as bike lanes that will run from 1-84 to the Eagle Bypass in downtown Eagle. The new Eagle Road will allow traffic to flow more smoothly and timely from many parts of the valley, Page 21 of26 \\Eagle 1 Ivoll \SHARED\P&Z\Eagle ApplicationslSUBS\ 19981Rocky Mountain Business Park pzf.doc including Nampa, Caldwell, Meridian, and East, South and West Boise, to and from the City of Eagle and the Rocky Mountain Business Plaza. State Street 44 and Highway 55 will allow traffic from North Boise and the Horseshoe Bend area easy access to Rocky Mountain Business Plaza. Highway 44 traffic from Emmett and the Star area will also have easy access to this development. This traffic will bring people who may utilize all of the downtown businesses. Plaza Drive, when completed from State Street to Eagle Road, will allow traffic another route parallel and adjacent to State Street and could ease any congestion that might occur in downtown Eagle. The new businesses and additional services at the Rocky Mountain Business Plaza in downtown Eagle can minimize traffic trips for the people living in Eagle because they can now do their business here. Because Rocky Mountain Business Plaza is in downtown Eagle, fire and police protection is close at hand. The projected additional tax base has been estimated to cover the additional cost for their services. New drainage structures, water lines, sewer lines and utilities will be constructed as a part of the development. Eagle Water will provide the water. BFI will provide the disposal service. The Eagle Sewer District will provide the sewer service. Idaho Power will provide electrical power. Intermountain Gas Company will supply the gas. Construction of the new water system at this development will provide a looping segment, which will improve fire protection for downtown Eagle. Because this is planned to be mostly a commercial development, a positive impact on the school system is projected due to the additional tax base with minimal, if any, increase in the number of students. 6. That the development will not create excessive additional requirements at public cost for public facilities and services because; Typically, commercial developments generate substantially more public revenue than residential developments through impact fees and property taxes. The developer and/or builders will pay for the infrastructure of this development. Improvements created by the project will include new streets, sidewalks, street lighting, public green ways, sewer, water, electrical, natural gas, and telecommunications. Adjacent properties will benefit from much of this installed infrastructure. The looping of the water system will enhance the downtown fire protection. 7. That the development is provided with parks, ponds, open areas, areas of special interest, floodplain preservation, and/or other special features which would not typically be provided in a non-PUD proposal because; The master plan provides for the continuation of the City-planned greenbelt along the Bypass. The green belt will consist of approximately a 25-foot to 35-foot wide bermed area with a meandering sidewalk. The greenbelt area will be fully landscaped. Throughout the development and adjacent to all proposed streets, landscaped berms with detached meandering sidewalks will be constructed. These walkways will provide enhanced public pedestrian circulation throughout the project and the downtown area. Locating the building sites in a nucleus parking and landscape area with sidewalks running between the buildings will create a "campus" theme for the development. Page 22 of26 \\Eagle 1 Ivoll \SHARED\P&Z\EagJe Applications\SUBSI1998\Rocky Mountain Business Park pzf.doc 8. That the vehicular approaches to the property are designed to not create an interference with traffic on surrounding public thoroughfares because; ACHD has reviewed the preliminary master plan showing the proposed streets and curb cuts. ACHD staff has indicated that the design fits in with accepted engineering criteria and that traffic flow in downtown Eagle will be enhanced with this project. Plaza Drive, which intersects State Street, is included in ACHD's Functional Classification Map as a new collector road. Hill Road will come down and intersect State Street, where it then becomes Plaza Drive. Plaza Drive from this intersection will run down to Eagle Road adjacent to the new Albertson's store. Rocky Mountain Way will align with State Street Access East where it crosses State Street Access West (State Street). Rocky Mountain Way basically runs parallel with State Street and the Eagle Bypass. These new roads can lighten the traffic on State Street and other existing roads downtown and will facilitate the ease of driving, parking and the ingress and egress to parking areas. This second route will make it easier to utilize the businesses in the Central Business District. The additional roads can ease traffic, allowing persons to feel more comfortable slowing down to find the businesses or stores they are looking for or see a new business they didn't even know existed. 9. That the development will not result in the destruction, loss, or damage of a natural, scenic or historic feature of major importance because; Research of the proposal and site to date shows that project construction will not cause any destruction, loss or damage to any natural, scenic or historic feature of major importance. 10. That the proposed development will be harmonious with and in accordance with the general objectives or with any specific objective of the Comprehensive Plan because; As per "The 1997 Comprehensive Plan - City of Eagle, Idaho", which is the current and most recent comp plan, the 43 acres involved in this PUD are designated MU (Mixed Use), Commercial, and public/semi-public. 11. That the proposed development will be harmonious with and in accordance with the general objectives or with any specific objective of Eagle City Code Title 8 because; All zoning and design review criteria will be met and/or exceeded. Landscaping, parking and architectural requirements as currently required by city ordinance and as outlined in the current comprehensive plan will be met or exceeded. The following are direct responses to some of the City of Eagle's Title 8 sections: 8-1-1: D-l. All streets dedicated to the Ada County Highway District will meet ACHD requirements or what is required by this Code, whichever holds the higher standard. There are no "private streets" planned at this time. 8-2A-7: A&B etc. The applicants supplied a conceptual landscape plan prepared by The Page 23 of 26 \\Eagle! Ivoll\SHAREDlP&Z\Eagle Applications\SUBS\1998\Rocky Mountain Business Park pzf.doc Land Group, Inc. Landscape Architects of Eagle, Idaho. The only building in this PUD/subdivision land area designed at this time is the Rocky Mountain Fitness and Recreation Center. The landscape plan for the fitness center has already been designed specifically for this particular lot and building. As each lot is developed and buildings are designed, a landscape plan will be developed and submitted for approval at that time by applicants. The conceptual landscape plan, by requirement, will generally be followed. A building or group of buildings could have landscaping designed specifically for them, but the design would still have to be approved and the conceptual landscape plan followed. 8-2A-8: Sign Requirements. No signs have been designed at this time. The applicant plans to submit the sign designs to the City of Eagle for approval at a later date as buildings are designed and developed or as signs are designed. 8-4-5: Schedule of Parking Requirements. Parking will be required to meet Eagle City Code provisions. Approximately 1,470 parking stalls are planned for Rocky Mountain Business Plaza, currently averaging 1 parking stall for each 200 square feet of total floor area. Additionally, under Title 8-2A-6: 4-D, shared parking is anticipated to be incorporated into the design. Shared parking ingress and egress are also incorporated into the development plans. 8-6-3: Ownership Requirements. The owners of the property are filing this PUD application. The owner of this property is the Rocky Mountain Fitness and Recreation Center, LLC. The owners of the Rocky Mountain Fitness and Recreation Center, LLC are Beverly P. Merrill, Manager; Richard P. Craycroft, Manager of Accounting; and Reid P. Merrill, Manager of Development. This is a family owned company. Reid P. Merrill, as Manager of Development and by legal authority, will be signing for the PUD and/or development. The Rocky Mountain Business Park is owned entirely by The Rocky Mountain Fitness and Recreation Center, LLC. 8-6-5-5: Arrangement of Commercial Uses: The PUD consists of MU and C-2 zoning. All of the buildings and establishments in this development will be considered as commercial use, except for possible residential development that may be proposed upon review of final development plans. The conceptual plans call for this development to have a "campus theme", which consist of groups of buildings located in a nucleus parking landscape area with landscaping and sidewalks running between. 8-9-8: Designation of Historic Properties or Historic Landmarks: Based upon the review to date there are no Historic Properties or Historic Landmarks involved with or adjacent to the property. 12. That the benefits, combination of various land uses, and interrelationship with the surrounding area for this proposed development justifies any proposed deviation from any standard district regulations because; The proposal does not deviate from the standard district regulations. The applicant is closely following the "Policies and Goals" set forth in The 1997 Comprehensive Plan and the general and/or specific objectives of Eagle City Code Title 8. This proposed development meets the standard district regulations. This development will have a very good interrelationship with the surrounding area. By removing old buildings, bringing in new businesses, and adding new streets with ample landscaping, the surrounding area will be enhanced. These improvements could also bring in more people to associate with the Page 24 of 26 \\Eaglel Ivoll \SHARED\P&ZIEagle Applications\SUBS\1998\Rocky Mountain Business Park pzf.doc adjacent and surrounding business. 13. For a request of up to 10% of the gross land area to be directed to uses other than those permitted in the zone: A. That the uses are appropriate with the residential uses because; No residential uses are proposed with the PUD and the only eXlstmg abutting residential use (Farnworth parcel) is required herein to provide written approval of the C-2 uses within this area of the PUD. If residential uses are proposed with the final development plan the uses will be reviewed so as to assure compatibility with each other. B. That the uses are intended to serve principally the residents of the PUD; This does not apply since there are no residences within the PUD and if residential units are proposed with a final development plan the residential units will be subordinate to the main use of the PUD which is commercial. C. That the uses are planned as an integral part of the PUD because; The C-2 uses will need to follow the same landscape and design theme as the rest of the PUD and the roadways and pathways will need to connect through the area. D. That the uses be located and so designed as to provide direct access to a collector or an arterial street without creating congestion or traffic hazards because; The proposed plan and ACHD responses show that this will be the case. Page 25 of 26 \\Eagle I \voll \SHAREDlP&Z\Eagle Applications\SUBSI I 9981Rocky Mountain Business Park pzfdoc E. That a minimum of fifty percent (50%) of the residential development occur prior to the development of the related commercial or industrial land uses. This does not apply since there are no residences within the PUD, and if residential units are proposed with a final development plan the residential units will be subordinate to the main use of the PUD which is commercial. This is not a residential PUD. DATED this 20th day ofJuly, 1998. PLANNING AND ZONING COMMISSION OF THE CITY OF EAGLE Ada County, Idaho C'\ .\ ! (\\' .). . J ) 'I. . ~ ~l r), ,j )fl,~-Q-__ Donald J. Brinton, ~airman ATTEST: ,.".1-1.."....._ ..' F J:> ~-~ .,.,~ 0 ~40~~ :. ~ ........... '( ;... ..... ".v" " yO R<1 · ;:, . o~ 1-"", \ ~ w c.. v \ .. :*= .....-- *' S \~SEAL.J i '" 0(1 ~ I ~ .'IlC~ "\' ~ _ \ dI.......fr)'fI.f,).~.. A;J..i # -~'"h....~.~ .;,.~... "-#',..-4-~ 11'''' ~'0"~lt"*~ ~"......'~ ~ \- C .Jl. ~...4" ,,",~,...."oi,. Page 26 of 26 \\Eaglel \vo!1\SHAREDlP&ZIEagle Applieations\SUBS\1998\Roeky Mountain Business Park pzfdoe