Loading...
Findings - PZ - 2006 - A-02-06/RZ-02-06/PP-03-06 - A/Rz From Rut To R-E-Da/Thompson Acres Subd/37-Lot/73.53 Acre/1425 E Beacon Light Rd ORIGINAL BEFORE THE EAGLE PLANNING AND ZONING COMMISSION IN THE MATTER OF AN APPLICATION ) FOR AN ANNEXATION, REZONE, AND ) PRELIMINARY PLAT FOR THOMPSON ACRES ) FOR PATRIOT CAPITAL PARTNERS, LLC ) FINDINGS OF FACT AND CONCLUSIONS OF LAW CASE NUMBER A-02-06/RZ-02-06/PP-03-06 The above-entitled Annexation, Rezone, and Preliminary Plat applications came before the Eagle Planning and Zoning Commission for their recommendation on May I, 2006, at which time public testimony was taken and the public hearing was closed. The Eagle Planning and Zoning Commission, having heard and taken oral and written testimony, and having duly considered the matter, makes the following Findings of Fact and Conclusions of Law; FINDINGS OF FACT: A. PROJECT SUMMARY: Patriot Capital Partners, LLC, represented by Bart Longson, is requesting an annexation and rezone from RUT (Rural Urban Transition) to R-E-DA (Residential Estates I-unit per 2 acres with a Development Agreement), and preliminary plat approval for Thompson Acres subdivision, a 37-lot (32-buildable, 5-common) subdivision. The 73.53-acre site is generally located on the south side of Beacon Light Road between Los Luceros Drive and Edgewood Road at 1425 East Beacon Light Road. B. APPLICATION SUBMITTAL: The annexation and rezone applications for this item were received by the City of Eagle on February 16, 2006. The preliminary plat application for this item was received by the City of Eagle on March 2, 2006. C. NOTICE OF PUBLIC HEARING: Notice of Public Hearing on the application for the Eagle Planning and Zoning Commission was published in accordance for requirements of Title 67, Chapter 65, Idaho Code and the Eagle City ordinances on April 17, 2006. Notice of this public hearing was mailed to property owners within three-hundred feet (300-feet) of the subject property in accordance with the requirements of Title 67, Chapter 65, Idaho Code and Eagle City Code on April 4, 2006. Requests for agencies' reviews were transmitted on March 3, 2006 in accordance with the requirements of the Eagle City Code. The site was posted in accordance with the Eagle City Code on April 19,2006. Requests for agencies' reviews were transmitted on February 21,2006, for the annexation/rezone and on March 3,2006, for the preliminary plat application, both in accordance with the requirements of the Eagle City Code. D. HISTORY OF RELEVANT PREVIOUS ACTIONS: NA E. COMPANION APPLICATIONS: NA F. APPLICANT'S STATEMENT OF JUSTIFICATION OF A DEVELOPMENT AGREEMENT (if applicable): See applicant's justification letter date stamped by the City on February 16, 2006 (attached to the staff report). Page 1 of 25 K:IPlanning DeptlEagle ApplicationslSUBS\20061Thompson Acres pzf.doc G. COMPREHENSIVE PLAN LAND USE MAP AND ZONING MAP DESIGNATIONS: COMP PLAN ZONING LAND USE DESIGNATION DESIGNATION Existing Residential Estates (I RUT (Rural Urban Transition- Single Family Dwelling & unit per 2 acres) Ada County Designation) Pasture Proposed Residential Estates (I R-E-DA (Residential Estates I Single Family, Residential unit per 2 acres) unit per 2 acres with a Development development agreement) North of site Rural Residential (I unit RUT (Rural Urban Transition- Single family residential per 5 acres) Ada County Designation) subdivision (Beacon Light Estates) South of site Floodwayand R-2 DA P (Residential Two - 2 Single family residential Residential Two (up to 2 units per acre with a subdivision- Varied lot units per acre) Development Agreement and sizes (Brookwood Planned Unit Development) Subdivision) East of site Residential Estates (1 A-R (Agricultural Residential- Single family residential unit per 2 acres) I unit per 5 acres) subdivision (Rocket Bar Estates) West of site Residential Estates (I A-R (Agricultural Residential - Single family residential unit per 2 acres) I unit per 5 acres) subdivision (Los Luceros) H. DESIGN REVIEW OVERLAY DISTRICT: Not in the DDA, TDA, CEDA, or DSDA 1. SITE DATA: Total Acreage of Site - 73.53 Acres Total Number of Lots - 37 Residential - 32 Common - 5 Total Number of Units - 32 Single-family - 32 Existing - 0 Proposed - 32 Total Acreage of Any Out-Parcels - 0 Page 2 of 25 K:lPlanning DeptlEagle ApplicationslSUBS\20061Thompson Acres pzf.doc Additional Site Data Proposed Required Dwelling Units Per Gross Acre .435 units! Acre I-unit per 2 acres maximum (.5 units!acre) Minimum Lot Size 1.8 acres (78,408 sq. ft.) 1.8 acres (78,408 sq. ft.) Minimum Lot Width 170 ft. (approximately) 100 ft. Minimum Street Frontage 38.96 ft. 35-ft. Total Acreage of Common Lots 7.4 7 -acres o -acres minimum Percent of Site as Common Area 10.16% 0% J. GENERAL SITE DESIGN FEATURES: Landscape Screening: As required by Eagle City Code Section 8-2A-7(J)(4)(b), the applicant proposes to construct a fifty-foot (50') wide buffer along Beacon Light Road. Due to the right-of-way dedication requested by Ada County Highway District along Beacon Light Road, the applicant proposes a twenty-seven foot (27') wide buffer within a common lot abutting the northern boundary of the development and a twenty-three foot (23') wide landscape easement on Lot 2 and Lot 34. All berming, fencing and landscaping details, including any proposed pump houses for pressurized irrigation, are required for Design Review Board review and approval prior to submittal of a final plat. Open Space and Design: Even though Eagle City Code does not require a minimum area of open space for the R-E zoning district, the proposed development will provide a total of7.47 acres (10.16%) of common area. The total common area includes the two twenty-seven foot (27') wide common lot landscape buffers along Beacon Light Road. The majority of common area is located within a 7.03 common area lot located at the southeast comer of the property adjacent to Dry Creek. The gathering area for residents includes a pond, pathways, and benches. In addition to these areas, the applicant is also proposing a landscape island within the roadway at the project entrance and landscape islands within the cul-de-sacs. Storm Drainage and Flood Control: Street drainage plans have been submitted by the applicant as required by the Subdivision Ordinance. Specific drainage system plans are to be submitted to the City Engineer for review and approval prior to the City Engineer signing the final plat. The plans are to show how swales, or drain piping, will be developed in the drainage easements. Also, the CC&R's are to contain clauses to be reviewed and approved by the City Engineer and City Attorney, requiring that lots be so graded that all runoff runs either over the curb, or to the drainage easement, and that no runoff shall cross any lot line onto another lot except within a drainage easement. Utility and Drainage Easements, and Underground Utilities: Eagle City Code section 9-3-6 requires utility easements to be not less than twelve feet (12") wide. Page 3 of 25 K:lPlanning DeptlEagle ApplicationslSUBS\20061Thompson Acres pzf.doc Fire Hydrants and Water Mains: Hydrants are to be located and installed as required by the Eagle Fire District. On-site Septic System (yes or no) - no, the applicant will extend the existing mainline sewer, located at the north end of Brookwood Subdivision, through the site for connection to each lot. Preservation of Existing Natural Features: Eagle City Code Section 9-3-8 (B) states that existing natural features which add value to residential development and enhance the attractiveness of the community (such as trees, watercourses, historic spots and similar irreplaceable assets) shall be preserved in the design of the subdivision. Dry Creek is located along the southern boundary of the site and includes some wetland areas and mature trees, which are proposed to be preserved. Preservation of Existing Historical Assets: Staff is not aware of any existing historical assets on the site which would be required to be preserved. If during excavation or development of the site, any historical artifacts are discovered, state law requires immediate notification to the state. K. STREET DESIGN: Public Streets: Vizcaya Way, the only access point to the property, extends southerly from Beacon Light Road and terminates with a cul-de-sac. One additional road, Vizcaya Court, extends approximately 400 feet north ofVizcaya Way, also terminating with a cul-de-sac. Vizcaya Way is proposed to be built within a 70-feet wide right-of-way near Beacon Light Road (to accommodate the landscape median) and tapers down to a 50-feet right-of-way. The streets will be paved in sections ranging in width from 15-foot wide travel lanes (located on either side of the median near Beacon Light Road) to 30-feet wide, with abutting I-foot wide concrete ribbons and 8-feet wide grass-lined borrow ditches on both sides. Cul-de-sac Design: Cul-de-sacs proposed: two (2) bulb courts with 50-foot radius Curbs, Gutters, and Sidewalks: Beacon Light Road abutting this parcel is currently not improved with any curb, gutter, or sidewalk. A 5-foot wide meandering concrete sidewalk is required along Beacon Light Road abutting the northern portion of the site. The applicant will install I-foot wide concrete ribbon gutters and borrow ditches abutting the internal streets in-lieu of rolled curbs and gutters to accommodate storm water runoff, which meet Ada County Highway District standards (i.e. Public Street above). Sidewalks are not proposed within the subdivision, however a five foot (5') wide pathway is proposed on the east side of Vizcaya Way connecting Beacon Light Road to the 7.03 acre common area lot at the southeast comer of the property. Lighting: Lighting for the proposed public streets is required. Location and lighting specifications shall be provided to the City Zoning Administrator prior to the submittal of the final plat. Any modifications made to the lights shall be completed before the final plat approval. Street Names: Street name approval by the Ada County Street Name Committee is required prior to the submittal of a Final Plat. Any modifications of street names shall be completed before final plat approval. Page 4 of25 K:lPlanning DeptlEagle ApplicationslSUBS\20061Thompson Acres pzrdoc L. ON AND OFF-SITE PEDESTRIAN/BICYCLE CIRCULATION: Pedestrian Walkways/Pathways: The applicant will provide pedestrian pathways throughout the 7.03 acre common lot located at the southeast comer ofthe site for residents' use. A twenty foot (20') wide public access easement will extend from Vizcaya Way (within the common lot) south to the property line along Dry Creek. The applicant should provide a minimum six foot (6') feet wide pathway within the easement. Across the creek within Brookwood Subdivision, a multi-use pathway has been constructed, which is shown on the City of Eagle Transportation/Pathway Network Map. To further enhance the overall City pathway system, the applicant has discussed the idea of constructing a bridge over Dry Creek which would allow for pedestrian circulation between the two subdivisions as well as connecting the population north of Dry Creek to the existing multi-use pathway. Currenty the applicant is working with the adjacent neighbor to obtain the necessary easements to construct the bridge. If the easements are not obtained, the applicant proposes to make a deposit to the City of Eagle Parks and Pathways Development Committee account for future bridge construction by the City. The applicant should obtain written bids from contractors indicating the cost of the bridge and its installation at the site. For information purposes, the cost to purchase and install the First Street Pedestrian Bridge in Downtown Eagle was approximately $40,000.00 dollars. The applicant should deposit one half the cost of the accepted bid to the City of Eagle Parks and Pathways Development Committee account for future bridge construction by the City. Bike Paths: Eagle City Code section 9-4-1-7 states that a bicycle pathway shall be provided in all subdivisions as part of the public right-of-way or separate easement, as may be specified by the City Council. Cyclists will have access to the required four foot (4') wide on-street bike lanes provided on both sides of all the subdivision roads. M. PUBLIC USES PROPOSED: See "Open Space and Design" noted above. N. PUBLIC USES SHOWN ON FUTURE ACQUISITIONS MAP: No map currently exists O. SPECIAL ON-SITE FEATURES: Areas of Critical Environmental Concern - none Evidence of Erosion - no Fish Habitat - no Floodplain - yes, portions of the site are within the Dry Creek floodway and 100-year floodplain Mature Trees - yes, see Preservation of Existing Natural Features section above Riparian Vegetation - yes, wetlands along Dry Creek along the south property line Steep Slopes - no Stream/Creek: yes, Dry Creek along the south property line Unique Animal Life - unknown Unique Plant Life - unknown Unstable Soils - no Wildlife Habitat - yes, raccoon, skunk, hawk, dove, etc. as noted in the Preliminary Plat application submitted by the applicant P. SUMMARY OF REVIEW OF ENVIRONMENTAL ASSESSMENT PLAN (IF REQUIRED): Not required. Page 5 of 25 K:lPlanning DeptlEagle ApplicationslSUBS\2006\Thompson Acres pzf.doc Q. AGENCY RESPONSES: The following agencies have responded and their correspondence is attached. Comments which appear to be of special concern are noted below: City Engineer: All comments within the Engineer's letters dated April 25, 2006, are of special concern (see attached). Central District Health District Chevron Pipeline Department of Environmental Quality Eagle Fire District Eagle Sewer District Idaho Power Idaho Transportation Department Idaho Power Meridian School District R. LETTERS FROM THE PUBLIC: To date, no letters have been received from the public with regard to the proposed subdivision. S. PROPOSED TIME SCHEDULE FOR THE DEVELOPMENT OF THE SITE: The applicant is proposing to construct the development in one phase. STAFF ANALYSIS: A. COMPREHENSIVE PLAN PROVISIONS WHICH ARE OF SPECIAL CONCERN REGARDING THIS PROPOSAL: CHAPTER 4 - SCHOOLS, PUBLIC SERVICES AND UTILITIES 4.3 Goal To meet the expected demands of the City and its Impact area: a. Encourage the provision of public utilities, services, and schools. 4.5 Implementation Strategies b. Explore legally suitable opportunities for developers to assist in donating or purchasing school sites identified in the district(s) master facilities plan, according to student demand created by future land use development. c. The City and school district(s) should coordinate school site selection to ensure the availability of public services. d. Encourage land use development to reduce street hazards by developing access to elementary and secondary schools on local streets and/or pathways. CHAPTER 6 - LAND USE Residential Estates Suitable primarily for single family residential development on acreages may be in transition from agricultural to residential use or may combine small scale agricultural uses with residential uses. Page 6 of 25 K:lPlanning DeptlEagle ApplicationslSUBS\2006\Thompson Acres pzrdoc 6.5 Goal To preserve the rural transitional identity. 6.6 Objectives To encourage the preservation of open spaces. 6.7 Implementation Strategies a. Preserve the natural features and resources of Eagle. b. Establish land use patterns and zoning districts that do not exhaust available services such as sewer, water, police, fire, recreational areas, highways and transportation systems. c. Provide for a broad spectrum of housing types including apartments, townhouses, condominiums, single family attached, manufactured homes, affordable and subsidized housing and large acreage developments. I. Farm related uses and activities should be protected from land use conflicts or interference created by residential, commercial, or industrial development. The Idaho Right To Farm Act should be promoted. p. Support City of eagle flood and storm drainage regulations to achieve protection of property rights, environmental protection and flood damage reduction for community residents. CHAPTER 7 - NATURAL RESOURCES AND HAZARD AREAS 7.8 Hazard Areas The Floodplains of the Boise River and Dry Creek constitute the only hazard areas within the Eagle Impact Area. Future areas may be added to the Comprehensive Plan when deemed necessary. Areas of flooding consists of two parts: (I) the floodway which is the most severe area of flooding characterized by deep and fast moving water; and (2) the floodplain which is less severe than the floodway and is characterized by shallower and slower moving waters at the time of flooding. A natural state, such as a greenbelt, a wildlife habitat, an agricultural area, an open space area, a recreational area and/or a nature area may be encouraged in the 100-year floodplain of the Boise River and Dry Creek. The floodway is shown as a generalized area only on the Land Use Map. The Federal Emergency Management Administration (FEMA) maps show specifically where the floodway and floodplain boundaries are located. (Also, see Eagle City Code for definitions of terms relating to the floodplain areas.) 7.9 Goal Special concern and attention should be given to the preservation offish, wildlife, water resources, air quality, agriculture, open space and recreation-nature areas when implementing planning and zoning decisions. CHAPTER 8 - TRANSPORTATION 8.6 Implementation Strategies a. Work in conjunction with the Ada County Highway District (ACHD), Idaho Transportation Department (ITD), and Ada Planning Association Page 7 of 25 K:lPlanning Dept\Eagle ApplicationslSUBS\2006\Thompson Acres pzrdoc (AP A) to classifY roadways on the City of Eagle Transportation/Pathway Network Maps #1 and #2 incorporated into this Comprehensive Plan by reference. The Maps are to assure conformity to designations as delineated on the Land Use Map. The maps shall be provided to the Ada Planning Association for input into the Ada Planning Association's Functional Street Classification Map and Regional Transportation Plan. b. Integrate all modes of travel to support air quality improvement measures. c. Encourage roadway design standards that are consistent with the Idaho Transportation department (lID), Ada County Highway District (ACHD), Ada Planning Association, and other agencies that may be responsible for roadway planning and design. e. Encourage new development to provide for pedestrian, equestrian, and bicycle circulation in accordance with the City of Eagle Transportation/Pathway Network Maps #1 and #2, adopted local and regional pathway plans, as may be needed for intra-neighborhood connectivity and to ensure that bike and pedestrian traffic is not unnecessarily pushed out onto arterials and collectors. 1. Encourage street lighting to increase roadway and neighborhood safety while preserving a rural environment free of any unnecessary lighting. m. Establish and require minimum setbacks between developments and roadways and to encourage installation of berms and landscaping for all developments to enhance safety and to enrich the roadway and community appearance. o. Encourage arterial and collector roadway design criteria consistent with the rural nature of planned and existing developments generally within the areas designated on the Land Use Map as Residential Rural (one dwelling unit per five acres maximum) and Residential Estates (one dwelling unit per two acres maximum). Such designs should include the following: I. Vertical Curbs should not be permitted, except where may be required by ACHD. Where curbs are needed, flat or rolled curbs should be encouraged. 2. Sidewalks and/or pathways should meander and be separated from any roadway edge or curb to allow for added pedestrian safety. Topography, trees, ditches and/or similar features may limit the distance between sidewalks and/or pathways and the roadway edge. Easements may be needed if portions of the sidewalk and/or pathway is to be located outside of the right-of- way. 3. Unless otherwise determined by ACHD to be necessary for public safety, roadways should be a maximum of two lanes with a center turn lane only at driveways and/or street intersections that are expected to generate a minimum of 1000 vehicle trips per day, or where determined to be necessary for safety by ACHD. Any portion of a center turn lane which is not used for such a driveway or intersection should be landscaped. Such landscaped medians would need to be maintained by the City and would require a license agreement with the highway district having jurisdiction. Page 8 of 25 K:lPlanning DeptlEagle ApplicationslSUBS\2006\Thompson Acres pzf.doc 4. The roadways should be constructed to provide a bike lane on both sides of the roadway. CHAPTER 9 - PARKS, RECREATION AND OPEN SPACES 9.5 PATHWAYS AND GREENBELTS Pathways are nonmotorized multi-use paths that are separated features from bicycle and pedestrian lanes constructed as a part of a roadway. 9.5.2 Objectives a. To create a pathway system that reflects desire to have a pedestrian and bicycle friendly community. b. To provide a network of central and neighborhood paths where residents are able to safely access and utilize pathways for alternative forms of transportation. e. All development should provide developed pathways for connection to Eagle's public pathway system and/or adjoining development's public pathway system. 9.5.3 Implementation Strategies d. Construct bridges to provide access to existing and future greenbelt and pathway system easements. f. Prioritize greenbelt and pathway development: I). greenbelt/pathway system along the Boise River: 2). greenbelt/pathway system along the Dry Creek: 3). Corridor preservation along future planned pathways and irrigation features: and 4). Road crossings. 9.6 OPEN SPACE Open space is land which is not used for buildings or structures and offers opportunities for parks, recreation, water amenities, greenbelts, river trails and pathways, tourism, leisure activities, viewpoints, and wildlife habitat. 9.6.1 Goal To provide wherever possible open space and natural features such as natural river frontage, greenbelts, river trails and pathways, creeks, flood plains and flood ways, drainage ways and canals, development buffers, wooded areas, grasslands, foothills, and viewpoints for public use and enjoyment. 9.6.2 Objectives a. To establish open space to protect the finite resource base of Eagle's natural environment - air, ground water, surface water, soil, forested areas, plant and wildlife habitats, agricultural lands, and aquifer recharge, watersheds, and wetlands. b. To provide an open space setting for active and passive recreation for all age groups throughout the community. c. To protect against hazards that are inherent to flood plains, flood ways, steep slopes, and areas of geological instability. Page 9 of 25 K:lPlanning DeptlEagle ApplicationslSUBS\2006\Thompson Acres pzrdoc e. To protect such unique environmental areas as historical, geological, and archaeological sites and monuments, natural areas, and wildlife habitat. 9.6.3 Implementation Strategies a. Require developers to utilize open space for above-ground, on-site storm water management (i.e., grassy swales, constructed wetlands, and water features. CHAPTER 11 - SPECIAL AREAS AND SITES 11.2 Recognized Special Areas and Sites Dry Creek Floodplain The Dry Floodplain is designated as a special area due to its ecological and scenic significance. The area comprises the length of the Dry creek Floodplain through the Impact Area. 11.4 Implementation and Strategies a. Protect and improve natural and man-made waterways. g. Preserve existing trees and establish appropriate landscaping as a part of new developments. h. Encourage the preservation of habitat areas which provide for fish and wildlife. CHAPTER 12 - COMMUNITY DESIGN 12.4 Implementation Strategies a. Establish and maintain a development pattern and design criteria in keeping with the rural transitional identity of Eagle. This includes growth within the Impact Area that discourages or precludes the establishment of other City centers. c. The floodway shall be reserved as a natural state such as a greenbelt, wildlife habitat, and open space recreational area and for agricultural uses. k. Encourage the preservation of natural resources such as creeks, drainages, steep slopes, and ridgelines as visual amenities. I. Encourage the development of pathways and open-space corridors throughout the City. o. Encourage the planting and preservation of trees that will create beauty and add to the healthy environment of downtown (see Eagle Tree Plan below). q. Maintain the rural residential character and open space environment in and around the City. 12.5 Eagle Tree Plan 12.5.1 Goal To establish and enhance areas of tree growth that will create beauty, add to a healthy environment and increase economic stability. Page 10 of25 K:lPlanning DeptlEagle ApplicationslSUBS\2006\Thompson Acres pzrdoc B. ZONING ORDINANCE PROVISIONS WHICH ARE OF SPECIAL CONCERN REGARDING THIS PROPOSAL: . Eagle City Code Section 8-1-2 Open Space A common area platted as a separate lot, provided within a recorded easement, or dedicated to and accepted by the City. The area shall be substantially open to the sky, exclusive of streets, buildings and other covered structures, and shall be designated and intended as a useable and convenient amenity to any proposed development. Wetland areas, drainage ditches, irrigation ditches, and similar features shall not be considered as a part of the minimum area of open space required. . Eagle City Code Section 8-2A-7 J(4)(b) Major Roadways: b. Any road designated as a minor arterial on the Ada County long range highway and street map: A minimum of fifty feet (50') wide buffer area (not including right of way) shall be provided with the following plants per one hundred (100) linear feet of right of way: five (5) shade trees, eight (8) evergreen trees, three (3) flowering/ornamental trees, and twenty four (24) shrubs. Each required shade tree may be substituted with two (2) flowering/ornamental trees, provided that not more than fifty percent (50%) of the shade trees are substituted. A minimum five foot (5') high, maximum eight foot (8') high, berm, decorative block wall, cultured stone, decorative rock, or similarly designed concrete wall, or combination thereof shall be provided within the buffer area. The maximum slope for any berm shall be three feet (3') horizontal distance to one foot (I ') vertical distance. If a decorative block wall, cultured stone, decorative rock, or similarly designed concrete wall is to be provided, in combination with the berm, a four foot (4') wide flat area shall be provided for the placement of the decorative wall. Chainlink, cedar, and similar high maintenance and/or unsightly fencing shall not be permitted. SUBDIVISION ORDINANCE PROVISIONS WHICH ARE OF SPECIAL CONCERN REGARDING THIS PROPOSAL: . Eagle City Code Section 9-3-2-1 (G) (2) Cul-De-Sac Streets: In zoning districts which prohibit densities greater than one dwelling unit per two (2) acres, cul-de-sac streets up to a maximum of one thousand five hundred feet (1,500') in length may be permitted by the City if approved by the Fire Department and the highway district having jurisdiction. No more than twenty (20) dwelling units shall be permitted on said cul-de-sac. . Eagle City Code Section 9-3-2-2 (A & B) Street Widths: A. Street and road right of way widths, grade, alignment, and so forth, shall conform to the adopted major street plan or comprehensive plan and shall be approved by the highway district and/or other agency having jurisdiction. E. Notwithstanding subsection A of this section, access from a frontage road onto an arterial street shall be limited to one thousand five hundred feet (l,500') between points. Page 11 of25 K:lPlanning DeptlEagle ApplicationslSUBS\20061Thompson Acres pzf.doc . Eagle City Code Section 9-3-6 (A) Easements: Unobstructed utility easements shall be provided along front lot lines, rear lot lines and side lot lines when deemed necessary. Total easement width shall not be less than twelve feet (12 '). . Eagle City Code Section 9-3-8 (B) Natural Features: Existing natural features which add value to residential development and enhance the attractiveness of the community (such as trees, watercourses, historic spots and similar irreplaceable assets) shall be preserved in the design of the subdivision. . Eagle city Code Section 9-4-1-2 Streets and Alleys: All streets and alleys shall be constructed in accordance with the standards and specifications adopted by the Ada County highway district. . Eagle City Code Section 9-4-1-6 (B)(I)(c & d) Location: I. The city shall require the creation and maintenance of pathways, (except in cases where it is shown to be inappropriate), that provides access to adjacent: c. Adopted pathway elements within the comprehensive plan and the ridge to rivers pathway plan; d. Neighborhoods; . Eagle City Code Section 9-4-1-6 (D) Pathway Design: While the city may exercise considerable discretion in determining the design of pathways, the following minimum standards should be followed: I. The paved portion of the pathway may range from six feet (6') to ten feet (10') in width. Micropathways within subdivisions which are designed for primary use by the residences of the subdivision shall be a minimum six feet (6') wide and shall be located within a sixteen foot (16') wide pedestrian access easement. Regional pathways such as the Boise River greenbelt and pathways located adjacent to major roadways shall be a minimum ten feet (10') wide and shall be located within a twenty foot (20') wide pedestrian access easement. 2. Barriers may be placed at the terminal ends of paths to restrict use by motor vehicles while allowing use by bicycles, wheelchairs and other modes of travel. 3. A five foot (5') wide landscaped arealbuilding and fence setback, as measured from both edges of the paved path, shall be required, and will be owned by either the abutting property owner(s) or a homeowners' association unless accepted by a public entity. The five foot (5') wide landscaped area on either side of the pathway may be decreased to a minimum of two feet (2') wide (as measured from the edge of asphalt to the easement line) when used in conjunction with a meandering pathway, however, the total width of the landscape area shall not be less than ten feet (10') (i.e., 2 feet on one side of the path and 8 feet on the other). For safety purposes, planting material in this area is limited to three feet (3') in height. The landscape, fence and building regulations for this area shall be indicated by a note on the plat. 4. The official design standards for pathways set forth in the following manuals are to be used as guides: the "Bicycle Pedestrian Design Manual" for Ada County, the "Design Guide for Accessible Outdoor Recreation", and the "Guide for the Development of Bicycle Facilities", or other nationally recognized design standards. Page 12 of25 K:lPlanning DeptlEagle ApplicationslSUBS\2006\Thompson Acres pzrdoc 5. A root barrier shall be placed on both sides of the pathway to prohibit tree roots from damaging the pathway surface. The root barrier shall consist of black injection molded panels with a minimum of 0.085 inch wall thickness in modules a minimum of twenty four inches (24") long by twenty four inches (24") deep. Each panel shall have no less than four (4) vertical deflecting ribs of a minimum 0.085 inch thickness protruding one-half inch (1/2") at ninety degrees (900) from the interior of the panel, spaced six inches (6") apart. A minimum of nine (9) antilift tabs, three (3) each between the vertical ribs, shall be integrated into each panel, measuring a minimum of 0.085 inch thickness and protruding three-eighths inch (3/8") from the panel wall. An integrated joining system shall be employed for instant assembly by sliding one panel into the other. An alternative type barrier system of equal root penetrative resistance may be considered on a case by case basis, subject to the approval of the zoning administrator. 6. In order to design for crime prevention the following design standards will be followed: a. The use of "see through" fencing is preferred, as it provides better visibility from adjacent homes or buildings. If solid fencing is used it may not exceed four feet (4') in height. b. Adequate lighting may be provided as determined by Eagle city council and may be owned and maintained by the city of Eagle once the path is turned over to the city for maintenance. c. The use of comers and curves in the design of the paths is discouraged. . Eagle City Code Section 9-4-1-6 (F) (2,3 & 6) Sidewalk Design: 2. Sidewalks and crosswalks shall be constructed and maintained in accordance with the standards and specifications of the Ada County Highway District. 3. Sidewalks shall be separated from the edge of the abutting roadway and / or back of curb by a minimum five-foot (5') wide landscape strip. The landscape strip shall be completed with sod, automatic irrigation, and planted with 3-inch minimum caliper shade-class trees along all streets within the subdivision. Installation oflandscaping shall be in accordance with Section 8-2A-7 of this Code. 6. In zoning districts which prohibit densities greater than one dwelling unit per two (2) acres and at the council's discretion, a four foot (4') wide striped path (with pedestrian designation markings such as diamonds or pedestrian/bicycle symbols) on both edges of all internal roadways may be permitted in lieu of constructing sidewalks. Trees shall be placed within five feet (5') of the edge of roadway. C. DISCUSSION: . The Eagle Comprehensive Plan Land Use Map designates the property as "Residential Estates" with a density not to exceed I unit per 2 acres. The overall density of the proposed Thompson Acres development is .435 units per acre. . Currently, the approximate 73-acre parcel is a farm which grows crops. The farm house and associated barns are located at the northeast comer of the property. With the development of this site, the applicant proposes a thirty-seven (37) lot residential subdivision (32 buildable lots and 5 common lots). The applicant is proposing to remove all existing structures from the site, which has been conditioned to be completed prior to the City Clerk signing the Final Plat. A demolition permit should be required prior to the removal of the structures and prior to the submittal of the final plat. . The proposed development provides lots ranging from 1.8 acres to 2.43 acres in size. The Page 13 of 25 K:lPlanning DeptlEagle ApplicationslSUBS\20061Thompson Acres pzf.doc applicant is requesting an R-E-DA zoning designation, minimum lot size of 1.8 acres, as specified in the 2000 Eagle Comprehensive Plan Zoning Compatibility Matrix. . The proposed design of this subdivision complies with the technical requirements (or will pursuant to the conditions outlined herein) of Eagle City Code and includes aesthetic features such as a landscaped common lot with a pond which serves the dual purpose of flood storage as well as open space for the use of the residents. . Even though Eagle City Code does not require a minimum area of open space for the R-E zoning district, the proposed development includes 7.47 acres (10.16%) of the site as common area open space including a pond, trails, benches in gathering areas, and landscape buffers. . The applicant proposes a pathway system through the site and within the common area lot, which provides both local and regional connectivity. A proposed bridge over Dry Creek connects Thompson Acres subdivision to the adjacent Brookwood Subdivision. A multi-use pathway, which is part of the City of Eagle Transportation/Pathway, is located within Brookwood Subdivision along the south side of the creek. The connection provides new linkages for residents north of the creek to schools south of Floating Feather Road and further beyond to the Downtown and residents south of the creek access to the Foothills. This new connection provides alternatives for pedestrians and bicyclist that currently must use arterial roads to move through the area. Currently, the applicant is working with the adjacent neighbor to obtain the necessary easement to construct the bridge. If the easements are not obtained and the bridge cannot be constructed with the other subdivision improvements, then the applicant should obtain written bids from contractors indicating the cost of the bridge and its installation. The applicant should deposit one half the amount of the accepted bid to the City of Eagle Parks and Pathways Development Committee account for future bridge construction by the City. This has been incorporated into the accompanying Development Agreement. STAFF RECOMMENDED FINDINGS: . Rezone: With regard to Eagle City Code Section 8-7-5 "Action by the Commission and Council", and based upon the information provided to staff to date, staff believes that the proposed rezone is in accordance with the City of Eagle Comprehensive Plan and established goals and objectives because: a. The requested zoning designation of R-E-DA (Residential Estates with development agreement) is consistent with the Residential Estates designation as shown on the Comprehensive Plan Land Use Map; b. The information provided from the agencies having jurisdiction over the public facilities needed for this site indicate that adequate public facilities exist, or are expected to be provided, to serve all uses allowed on this property under the proposed zone; c. The proposed R-E-DA zone (Residential Estates with a Development Agreement) is compatible with the R-E (Residential Estates) and R-2 (Residential-up to two units per acre) zones and land uses to the south since this area is developed with two subdivisions and is buffered from the proposed development by Dry Creek; d. The proposed R-E-DA (Residential Estates with a Development Agreement) IS compatible with the A-R (Agricultural-Residential) zone and land uses to the east and west since that areas have the same Comprehensive Plan designation as this site, and are developed with lots of similar size. e. The proposed R-E-DA (Residential Estates with a Development Agreement) is compatible with RUT (Rural Urban Transition) zone to the north since this area is Page 14 of25 K:IPlanning DeptlEagle ApplicationslSUBS\2006\Thompson Acres pzf.doc developed with a residential subdivision and is buffered from the proposed development with a fifty foot (50') wide landscape/berm and Beacon Light Road. f. The land proposed for rezone is located within a "Hazard Area" and "Special Area" as described within the Comprehensive Plan, however, all building pads adjacent to Dry Creek will have a minimum fifty foot (50') setback from the floodway line and the entire development will be required to comply with Eagle City Code Title 10 - Flood Control; and g. As stated in the Development Agreement, the applicant will remove all existing structures on the site. Therefore, no non-conforming uses are expected to be created with this rezone. . Preliminarv Plat: With regard to Eagle City Code 9-2-3 (D)(3)(a) "Action by the Commission and Council", and based upon the information provided to staff to date, staff believes that the proposed preliminary plat is in accordance with the City of Eagle Code because: I. The subdivision will be harmonious with and in accordance with the general objectives or with any specific objective of the Comprehensive Plan and/or Eagle City Code Title 9, as shown within the findings provided within this document and the proposed residential use is in accordance with the residential land use designation of this area shown within the Comprehensive Plan; 2. The subdivision will be served adequately by essential public facilities such as streets, police and fire protection, schools, drainage structures, refuse disposal, water and sewer; or that the persons or agencies responsible for the establishment of the proposed use shall be able to provide adequately any such services, as noted in the documentation provided from said agencies and as required as a part of the conditions of approval; 3. That there are no known capital improvement programs for which this development would prevent continuity; 4. That based upon agency verification and additional written comments of the Eagle Fire District and Eagle Sewer District, as conditioned herein, there is adequate public financial capability to support the proposed development; 5. That any health, safety and environmental problems that were brought to the Commission and Council's attention have been adequately addressed by the applicant or will be conditions of approval as set forth within the conditions of approval herein. STAFF RECOMMENDATION PROVIDED WITHIN THE STAFF REPORT: Based upon the information provided staff recommends approval of the requested Annexation, Rezone, and Preliminary Plat with conditions as provided within the staff report. PUBLIC HEARING OF THE COMMISSION: A. A public hearing on the application was held before the Planning and Zoning Commission on May I, 2006, at which time testimony was taken and the public hearing was closed. The Commission made their recommendation at that time. B. Oral testimony in favor of this proposal was presented to the Planning and Zoning Commission from no one. C. Oral testimony in opposition to this proposal was presented to the Planning and Zoning Page 15 of25 K:lPlanning DeptlEagle ApplicationslSUBS\2006\Thompson Acres pzrdoc Commission by six (6) individuals who expresses concerns regarding potential flooding due to building in the floodplain, the proposed density of two acre lots, and the continual movement toward losing the rural atmosphere. * Note: II individuals signed the public hearing sign-up sheet (3 in favor, 8 were opposed); only 6 chose to provide oral testimony. COMMISSION DECISION: The Commission voted 4 to 0 (Lien absent) to recommend approval of A-02-06 and RZ-02-06 for an annexation and rezone from RUT to R-E-DA with the following staffrecommended conditions to be placed within a development agreement with underline text to be added by the Commission and strike thru to be deleted by the Commission. Further, the Commission voted 4-0 (Lien absent) to recommend approval of PP-03-06 for a preliminary plat for Thompson Acres Subdivision with the staff recommended site specific conditions of approval and standard condition shown herein (following the conditions to be placed in a development agreement) with underline text to be added by the Commission and strike thru to be deleted by the Commission. CONDITIONS TO BE PLACED IN A DEVELOMENT AGREEMENT: 2.1 The maximum overall density of the property shall not exceed .453 units per acre. 2.2 The Concept Plan (Exhibit A) represents the Owner's current concept for completion of the project. As the Concept Plan evolves, the City understands and agrees that certain changes in that concept may occur. If the City determines that any such changes require additional public comment due to potential impacts on surrounding property or the community, a public hearing shall be held on any proposed changes in the Concept Plan, notice shall be provided as may be required by the City. 2.3 The applicant shall obtain a license agreement from ACHD, to allow the right-of-way between this property and the edge of pavement along Beacon Light Road to be landscaped prior to the City of Eagle signing the final plat. 2.4 The development shall comply with the Eagle City Code, as it exists in final form at the time a design review application is made, including compliance with all of the conditions as provided within this development agreement. 2.5 A letter of approval shall be provided to the City from the Eagle Sewer District indicating that the property has been annexed into the Eagle Sewer District's service boundaries prior to the submittal of the final plat. Each lot within the proposed subdivision shall use and be connected to central sewer. 2.6 As required by Title 6 Chapter 5 Eagle City Code, the Property shall become part of the City of Eagle's municipal water system. The water main size, to be determined by the City Engineer, at the time of the final plat review shall be dedicated to the public and shall only be constructed on rights of way or easements. Easements or permi ts secured for the main extension shall be obtained in the name of the City, along with all rights and title to the main at the time of service is provided to the customer paying for the extension. Water mains shall be extended by the applicant to the north, east, and west boundaries of the development or as otherwise designated by the City Engineer where future water system extensions are expected to occur. 2.7 The applicant shall remit payment in the amount of twenty-seven thousand seven hundred fifty Page 16 of25 K:lPlanning DeptlEagle ApplicationslSUBS\2006\Thompson Acres pzrdoc dollars (27,750.00), to the City of Eagle, to fulfill the Eagle Municipal Water Service Area Fee for this project. Prior to the City accepting a final plat application for the property. 2.8 A twenty foot (20') wide public access easement for a pathway, to be constructed by the developer, connecting the south property line to Vizcaya Way shall be dedicated to the City of Eagle free of all liens and encumbrances. The specific location and design of the pathway shall be approved by the Design Review Board, prior to the City accepting a final plat application for the property. 2.9 At the terminus of the twenty foot (20') wide public access easement, a bridge crossing Dry Creek shall be constructed by the Developer. The specific location and design of the bridge shall be approved by the City Engineer at the time of final plat review. The applicant shall obtain all necessary easements and shall receive approval from the Army Corp of Engineers for the bridge construction. Upon completion, the easement of sufficient width to include the bridge, and title to all improvements constructed thereon, shall be given by the Developer to the City free of all liens and encumbrances. Thereafter, the Developer shall have no further obligation with respect to the repair and maintenance of said bridge, nor any liability for any use made thereof by the City. If the developer cannot obtain the necessary easements required to construct the bridge, the developer shall obtain written bids from contractors indicating the cost of the bridge and its installation at the site. The developer shall deposit one half of the accepted bid amount into the City of Eagle Parks and Pathways Development Committee account for future bridge construction by the City. The bridge shall be constructed by the Developer or the money shall be deposited into the City of Eagle Parks and Pathways Development Committee account prior to the issuance of a Certificate of Occupancy for the first single-family dwelling unit within the subdivision. 2.10 The developer shall remove all structures (houses, barns, sheds, etc.) from the site prior to the City Clerk signing the Final Plat. Demolition permits shall be obtained prior to the removal of said structures. SITE SPECIFIC CONDITIONS OF APPROVAL: I. Comply with all conditions within the development agreement for rezone application RZ-02-06. 2. Comply with all requirements of the City Engineer. 3. The applicant shall submit payment to the City for all engineering fees incurred for reviewing this project, prior to the City Clerk signing the final plat. 4. Comply with all requirements of the Ada County Highway District. 5. The swales (borrow ditches) along both sides of the roadways within this subdivision shall have a maximum slope of 4: I (or as approved by the Ada County Highway District), planted with grass seed or sod. 6. Provide a five foot (5') wide (minimum) meandering concrete sidewalk along Beacon Light Road within the 50-foot wide landscape buffer, prior to the submittal of a final plat. The sidewalk shall be installed prior to the issuance of any occupancy permits within the subdivision. 7. Provide a minimum six foot (6') wide pathway within the twenty foot (20') wide public access easement which extends from Vizcaya Way (within the common lot) south to the property line along Dry Creek, prior to the submittal of the final plat. The pathway shall be installed prior to the issuance of any occupancy permits within the subdivision. 8. Provide a revised preliminary plat showing a plat note or delineate minimuml2-feet wide utility easements along the front and rear property lines of each lot, prior to submittal of the final plat. Page 17 of25 K:lPlanning DeptlEagle ApplicationslSUBS\20061Thompson Acres pzLdoc 9. All utility poles providing service to the existing structures on the site shall be removed, prior to the issuance of any building permits for the site. All utility service lines serving existing structures shall be placed underground prior to the issuance of any building permits for the site. 10. The developer shall provide 3-inch minimum caliper shade-class trees (landscape plan to be reviewed and approved by the Design Review Board) along both sides of all streets within this development. Trees shall be placed at the front of each lot on the side lot lines, or as approved by the Design Review Board and within five-feet (5') of the edge of the roadway. Prior to the City Clerk signing the final plat, the applicant shall either install the required trees, sod, and irrigation or provide the City with a letter of credit for 150% of the cost of the installation of all landscape and irrigation improvements within the swales (borrow ditches). Trees shall be installed prior to obtaining any occupancy permits for the homes. A temporary occupancy may be issued if weather does not permit landscaping. II. All living trees that do not encroach upon the buildable area on any lot shall be preserved, unless otherwise determined by the City Forester. A detailed landscape plan showing how the trees will be integrated into the open space areas or private lots (unless approved for removal by the City Forester and the Design Review Board) shall be provided for Design Review Board approval prior to the submittal of a final plat. The applicant shall have an on-site meeting with the City Forester to survey all existing trees. Subsequent to the on-site meeting, construction fencing shall be installed (pursuant to the City Forester's direction) to protect all trees that are to be preserved, prior to the commencement of any construction on the site. 12. The applicant shall provide a landscape plan showing berming, fencing, and planting details within the required 50-foot wide buffer area along Beacon Light Road for review and approval by the Design Review Board, prior to submittal of the final plat. The berm and landscaping shall be installed prior to the issuance of any occupancy permits within the subdivision. 13. The applicant shall provide a license agreement from ACHD approving the landscaping located within the public rights-of-way abutting and within this site, prior to the City Clerk signing the final plat. 14. Extend the landscaping within the buffer area along Beacon Light Road to within 9-feet from the edge of pavement. The 9-feet between the landscaping and edge of pavement (along the entire frontage of this site) shall be graveled as approved by ACHD. The gravel shoulder area shall be maintained and kept free of weeds and debris. 15. The applicant shall submit a design review application showing any proposed subdivision signage and a landscape plan showing planting details within the proposed landscape islands located at the entrance to the subdivision and within all cul-de-sac's for review and approval by the Design Review Board prior to the submittal of the final plat. 16. The applicant shall submit a design review application with a landscape plan showing planting details, trail details, sidewalk details, benches, bridge details (if not depositing half the amount of the money to construct and install the bridge to the City of Eagle Parks and Pathways Development Committee account for future bridge construction by the City) and other proposed amenities within all common lots and any landscape easements for review and approval by the Design Review Board prior to the submittal of the final plat. 17. The applicant shall submit a design review application with a landscape plan showing planting details and screening details for an irrigation pump house or any type of irrigation facilities for review and approval by the Design Review Board prior to the submittal of a final plat. If proposed, a pump house shall be located to comply with all required setbacks for the R-E zoning district. Page 18 of25 K:lPlanning DeptlEagle ApplicationslSUBS\20061Thompson Acres pzf.doc 18. The entire Thompson Acres development shall remain under the control of one Homeowner's Association. 19. The applicant shall place a note on the final plat that all common areas are to be owned and maintained by the Thompson Acres Homeowner's Association. The applicant shall provide a copy of the CC&Rs (which include a similar statement regarding the common areas) for review and approval by the City attorney prior to the approval of the final plat. The CC&Rs for the Thompson Acres Homeowner's Association shall provide that the association shall have the duty to maintain and operate all of the common landscape areas in the subdivision in a competent and attractive manner, including the watering, mowing, fertilizing and caring for shrubs and trees, in accordance with Eagle City Code, in perpetuity. 20. Place a note on the final plat which states that the 23-foot wide landscape easement along the north property lines of Lots 2 and 34, is to be maintained by the homeowner's association. Provide a statement in the CC&Rs that one homeowners association in perpetuity shall maintain the easement. The CC&Rs shall be reviewed and approved by the City attorney and the City engineer prior to the approval of the final plat. 21. Delineate an easement on the final plat to encompass the pond located on Lots 23,24,25, and 26. The plat note and a clause in the CC&Rs shall generally state that the easement is for access and maintenance of the pond. The CC&Rs shall be reviewed and approved by the City attorney and the City engineer prior to the approval of the final plat. 22. Provide a clause in the CC&Rs that requires one homeowners association to maintain in perpetuity all swales (borrow ditches) located within the development. The clause shall further state that the swales (borrow ditches) are not to be filled with soil or other material that would block proper drainage. The CC&Rs shall be reviewed and approved by the City attorney and the City engineer prior to the approval of the final plat. 23. Place a note on the final plat which states in general that surrounding land with farm uses and related activities shall be protected pursuant to the Idaho Right to Farm Act. 24. Provide a letter from the Farmer's Union Canal Company approving of any construction plans involving the relocation or construction of irrigation facilities currently accessing the site and under the purview of the Company, prior to the approval of the final plat. 25. Submit construction drawings to the City Engineer for review and approval of any irrigation facility not under the purview of the Farmer's Union Canal Company to ensure the irrigation facilities are designed and constructed correctly to provide uninterrupted delivery of irrigation water to downstream users. 26. All street lighting shall incorporate the principles of "Dark Sky Lighting" to negate the effects of light pollution. The applicant shall submit cut sheets showing street lighting details for review and approval by the Zoning Administrator prior to the submittal of the final plat. 27. The applicant shall take care to locate and protect from damage existing utilities, pipelines and similar structures. Documentation indicating that "Digline" has performed an inspection of the site shall be submitted prior to the issuance of any building permits for the site. 28. Provide additional notes on the final plat indicating the Dry Creek flood way line and the Dry Creek 100-year floodplain line, prior to the submittal of the final plat. 29. Indicate all street names as approved by the Ada County Street Naming Committee, prior to the submittal of the final plat. 30. All existing structures (houses, barns, sheds, etc.) shall be removed from the site prior to the City Clerk signing the final plat. Demolition permits shall be obtained prior to the removal of said Page 19 of25 K:lPlanning DeptlEagle ApplicationslSUBS\2006\Thompson Acres pzf.doc structures. 31. The applicant shall install at the entrances to Thompson Acres Subdivision 4' x 4' plywood or other hard surface signs (mounted on two 4"x 4" posts with the bottom of the signs being a minimum of3-feet above the ground) noticing the contractors to clean up daily, no loud music, and no dogs off leash. 32. Provide a clause in the CC&Rs stating all homeowners that own lots in the floodwav shall not use artificial means to constrict the water flow within the floodwav. The clause shall also make the homeowner aware of the risks about anv landscaping and/or other improvements within the floodwav. The CC&Rs shall be reviewed and approved bv the City attomev and the City engineer prior to the approval of the final plat. STANDARD CONDITIONS OF APPROVAL: I. The applicant shall comply with all requirements of the Ada County Highway District and/or the Idaho Transportation Department, including but not limited to approval of the drainage system, curbs, gutters, streets and sidewalks. 2. Correct street names, as approved by the Ada County Street Name Committee, shall be placed on the plat prior to the City Engineer signing the final plat. 3. Complete water and sewer system construction plans shall be reviewed and approved by the City Engineer. Required improvements shall include, but not be limited to, extending all utilities to the platted property. The developer may submit a letter in lieu of plans explaining why plans may not be necessary. 4. Idaho Department of Health & Welfare approval of the sewer and water facilities is required prior to the City Engineer signing the final plat (1.C. Title 50, Chapter 13 and 1.c. 39-118). 5. Written approval of all well water for any shared or commercial well shall be obtained from the Idaho Department of Water Resources prior to the City Engineer signing the final plat. 6. Unless septic tanks are permitted, wet line sewers will be required and the applicant will be required to furnish the City Engineer with a letter from the sewer entity serving the property, accepting the project for service, prior to the City Engineer signing the final plat (B.c.c. 9-20-8.4) 7. All homes being constructed with individual septic systems shall have the septic systems placed on the street side of the home or shall have their sewer drainage system designed with a stub at the house front to allow for future connection to a public sewer system. 8. Per Idaho Code, Section 31-3805, concerning irrigation rights, transfer and disclosure, the water rights appurtenant to the lands in said subdivision which are within the irrigation entity will be transferred from said lands by the owner thereof; or the subdivider shall provide for underground title or other like satisfactory underground conduit to permit the delivery of water to those landowners within the subdivision who are also within the irrigation entity. See Eagle City Code Section 9-4-1-9(C) which provides overriding and additional specific criteria for pressurized irrigation facilities. Plans showing the delivery system must be approved by a registered professional engineer and shall be approved by the City Engineer prior to the City Engineer signing the final plat. 9. The applicant shall submit a letter from the appropriate drainage entity approving the drainage system and/or accepting said drainage; or submit a letter from a registered professional engineer certifYing that all drainage shall be retained on-site prior to the City Engineer signing the final plat. A copy of the construction drawing(s) shall be submitted with the letter. Page 20 of 25 K:lPlanning DeptlEagle ApplicationslSUBS\2006\Thompson Acres pzf.doc 10. Drainage system plans shall be submitted to the City Engineer for review and approval prior to the City Engineer signing the final plat. The plans shall show how swales, or drain piping, will be developed in the drainage easements. The approved drainage system shall be constructed, or a performance bond shall be submitted to the City Clerk, prior to the City Engineer signing the final plat. The CC&R's shall contain clauses to be reviewed and approved by the City Engineer and City Attorney, prior to the City Engineer signing the final plat, requiring that lots be so graded that all runoff runs either over the curb, or to the drainage easement, and that no runoff shall cross any lot line onto another lot except within a drainage easement. 11. No ditch, pipe or other structure or canal, for irrigation water or irrigation waste water owned by an organized irrigation district, canal company, ditch association, or other irrigation entity, shall be obstructed, routed, covered or changed in any way unless such obstruction, rerouting, covering or changing has first been approved in writing by the entity. A Registered Engineer shall certifY that any ditch rerouting, piping, covering or otherwise changing the existing irrigation or waste ditch (I) has been made in such a manner that the flow of water will not be impeded or increased beyond carrying capacity of the downstream ditch; (2) will not otherwise injure any person or persons using or interested in such ditch or their property; and (3) satisfied the Idaho Standards for Public Works Construction. A copy of such written approval and certification shall be filed with the construction drawing and submitted to the City Engineer prior to the City Engineer signing the final plat. 12. Street light plans shall be submitted and approved as to the location, height and wattage to the City Engineer prior to the City Engineer signing the final plat. All construction shall comply with the City's specifications and standards. The applicant shall delineate on the face of the final plat an easement, acceptable to the City Engineer, for the purpose of installing and maintaining street light fixtures, conduit and wiring lying outside any dedicated public right-of-way, prior to the City Engineer signing the final plat. The applicant shall pay applicable street light inspection fees on the proposed subdivision prior to signing of the final plat by the Eagle City Engineer. 13. The applicant shall provide utility easements as required by the public utility providing service, and as may be required by the Eagle City Code, prior to the City Engineer signing the final plat. 14. An approval letter from the Eagle Fire Department shall be submitted to the City prior to the City Engineer signing the final plat. The letter shall include the following comments and minimum requirements, and any other iterns of concern as may be determined by the Eagle Fire Department officials: a. The applicant has made arrangements to comply with all requirements of the Fire Department. b. The proposed fire hydrant locations shall be reviewed and be approved in writing by the Eagle Fire Department prior to the City Engineer signing the final plat. c. Minimum flow per hydrant shall be 1,000 gallons per minute for one and two family dwellings, 1,500 gallons per minute for dwellings having a fire area in excess of 3,600 square feet, and 1,500 gallons per minute for non-residential uses (i.e.; Commercial, Industrial, Schools, etc.). Flow rates shall inspected in accordance with all agencies having jurisdiction, and shall be verified in writing by the Eagle Fire Department prior to issuance of any building permits. d. The proposed fire protection system shall be reviewed and approved by the Eagle Fire Department prior to issuance of a building permit. Page 21 of25 K:lPlanning DeptlEagle ApplicationslSUBS\2006\Thompson Acres pzf.doc 15. Covenants, homeowner's association by-laws or other similar deed restrictions, acceptable to the Eagle City Attorney which provide for the use, control and mutual maintenance of all common areas, storage facilities, recreational facilities, street lights or open spaces shall be reviewed and approved by the Eagle City Attorney prior to the City Engineer signing the final plat. A restrictive covenant must be recorded and a note on the face of the final plat is required, providing for mutual maintenance and access easements. Appropriate papers describing decision-making procedures relating to the maintenance of structures, grounds and parking areas shall be reviewed and approved by the Eagle City Attorney prior to the City Engineer signing the final plat. 16. Should the homeowner's association be responsible for the operation and maintenance of the storm drainage facilities, the covenants and restrictions, homeowner's association by-laws or other similar deed restrictions acceptable to the Eagle City Attorney shall be reviewed and approved by the Eagle City Attorney prior to the City Engineer signing the final plat. 17. The applicant shall submit an application for Design Review, and shall obtain approval for all required landscaping, common area and subdivision signage prior to the City Engineer signing the final plat. 18. Any recreation area, greenbelt area or pathway area along the Boise River, Dry Creek or any other area designated by the City Councilor Eagle City Pathway/Greenbelt Committee for a path or walkway shall be approved in writing by the Eagle City Pathway/Greenbelt Committee prior to approval of the final plat by the City Council. 19. Conservation, recreation and river access easements (if applicable) shall be approved by the Eagle City Pathway/Greenbelt Committee and shall be shown on the final plat prior to approval of the final plat by the City Council. 20. The applicant shall place a note on the face of the plat which states: "Minimum building setback lines shall be in accordance with the applicable zoning and subdivision regulations at the time of issuance of the building permit or as specifically approved and/or required". 21. The applicant shall comply with the provisions of the Eagle City Code, pertaining to floodplain and river protection regulations (if applicable) prior to the City Engineer signing the final plat. 22. The development shall comply with the Boise River Plan (if applicable) in effect at the time of City Council consideration of the final plat. 23. The applicant shall obtain written approval of the development relative to the effects of the Boise River Flood Plain (if applicable) from the Corps. of Engineers prior to approval of the final plat by the City Engineer. 24. The applicant shall obtain approval of the development relative to its effects on wetlands or other natural waterways (if applicable) from the Corps. of Engineers and the Idaho Department of Water Resources and/or any other agency having jurisdiction prior to the City Engineer signing the final plat. 25. Basements in homes in the flood plain are prohibited. 26. The Americans with Disabilities Act, Uniform Building Code, Eagle City Code, Eagle Comprehensive Plan, and all applicable County, State and Federal Codes and Regulations shall be complied with. All design and construction shall be in accordance with all applicable City of Eagle Codes unless specifically approved by the Commission and/or Council. 27. No change in the terms and conditions of this approval shall be valid unless they are in writing and signed by the applicant or the applicant's authorized representative and an authorized Page 22 of 25 K:lPlanning DeptlEagle ApplicationslSUBS\20061Thompson Acres pzf.doc representative of the City of Eagle. The burden shall be upon the applicant to obtain written confirmation of any change from the City of Eagle. 28. No public board, agency, commission, official or other authority shall proceed with the construction of or authorize the construction of any of the public improvements required by the Eagle City Code Title 9 "Land Subdivisions" until the final plat has received the approval of the City Council (ECC 9-6-5 (A) (2)). After Council approval of the final plat, the applicant may construct any approved improvements before the City Engineer signs the final plat. The applicant shall provide a financial guarantee of performance in the amount of 150% of the total estimated cost for completing any required improvements (see resolution 98-3) prior to the City Engineer signing the final plat. The financial guarantee shall be a Letter of Credit, Certificate of Deposit, cash deposit or certified check. 29. In accordance with Eagle City Code, failure to obtain a recorded final plat for the subdivision within one year following City Council approval shall cause this approval to be null and void, unless a time extension is granted by the City Council. 30. Prior to submitting the final plat for recording, the following must provide endorsements or certifications: Owners or dedicators, Registered Land Surveyor, County Engineer, Central District Health Department, Ada County Treasurer, Ada County Highway District Commissioners, City Engineer, and City Clerk. 31. The City's actions on the application does not grant the applicant any appropriation of water or interference with existing water rights. The applicant indemnifies and holds the City harmless for any and all water rights, claims in any way associated with this application. CONCLUSIONS OF LAW: I. The annexation and rezone applications for this itern were received by the City of Eagle on February 16, 2006. The preliminary plat application for this item was received by the City of Eagle on March 2, 2006. 2. Notice of Public Hearing on the application for the Eagle Planning and Zoning Commission was published in accordance for requirements of Title 67, Chapter 65, Idaho Code and the Eagle City ordinances on April 17, 2006. Notice of this public hearing was mailed to property owners within three-hundred feet (300-feet) of the subject property in accordance with the requirements of Title 67, Chapter 65, Idaho Code and Eagle City Code on April 4, 2006. Requests for agencies' reviews were transmitted on March 3, 2006 in accordance with the requirements of the Eagle City Code. The site was posted in accordance with the Eagle City Code on April 19, 2006. Requests for agencies' reviews were transmitted on February 21, 2006, for the annexation/rezone and on March 3, 2006, for the preliminary plat application, both in accordance with the requirements of the Eagle City Code. 3. The Commission reviewed the particular facts and circumstances of this proposed rezone upon annexation (A-02-06/RZ-02-06) with regard to Eagle City Code Section 8-7-5 "Action by the Commission and Council", and based upon the information provided concludes that the proposed rezone upon annexation is in accordance with the City of Eagle Comprehensive Plan and established goals and objectives because: a. The requested zoning designation of R-E-DA (Residential Estates with a Development Agreement) is in accordance with the Residential Estates classification as shown on the Comprehensive Plan Land Use Map; Page 23 of 25 K:lPlanning DeptlEagle ApplicationslSUBS\20061Thompson Acres pzrdoc b. The information provided from the agencies having jurisdiction over the public facilities needed for this site indicate that adequate public facilities exist, or are required to be provided, to serve a single-family dwelling residential subdivision on this property under the proposed zone; c. The proposed R-E-DA zone (Residential Estates with a Development Agreement) is compatible with the R-E (Residential Estates) and R-2 (Residential-up to two units per acre) zones and land uses to the south since this area is developed with two subdivisions and is buffered from the proposed development by Dry Creek; d. The proposed R-E-DA (Residential Estates with a Development Agreement) is compatible with the A-R (Agricultural-Residential) zone and land uses to the east and west since those areas have the same Comprehensive Plan designation as this site, and are developed with lots of similar size; e. The proposed R-E-DA (Residential Estates with a Development Agreement) is compatible with RUT (Rural Urban Transition) zone to the north since this area is developed with a residential subdivision and is buffered from the proposed development with a fifty foot (50') wide landscape/berm and Beacon Light Road; f. The land proposed for rezone is located within a "Hazard Area" and "Special Area" as described within the Comprehensive Plan, however, all building pads adjacent to Dry Creek will have a minimum fifty foot (50') setback from the floodway line and the entire development will be required to comply with Eagle City Code Title 10 - Flood Control; and g. As stated in the Development Agreement, the applicant will remove all existing structures on the site. Therefore, no non-conforming uses are expected to be created with this rezone. 4. The Commission reviewed the particular facts and circumstances of this proposed preliminary plat (PP-03-06) and based upon the information provided concludes that the proposed preliminary plat application is in accordance with the City of Eagle Title 9 (Subdivisions) because: a. The requested preliminary plat complies with the density of the approved zoning designation ofR-E-DA (Residential Estates with a Development Agreement); and b. Will be harmonious with and in accordance with the general objectives of Title 9 of the Eagle City Code since the development is consistent with the Comprehensive Plan and will provide the required improvements for a subdivision; and c. Will be designed, constructed, operated and maintained to be harmonious and appropriate in appearance with the existing and intended character of the general vicinity and that such use will not change the essential character of the same area; and d. Will not create excessive additional requirements at public cost for facilities and services as the site will be served by central sewer from the Eagle Sewer District and will use public water to be served from the City of Eagle. Fire protection will be available from the Eagle Fire District and fire hydrants will be provided where required; and e. Will have vehicular approaches to the property designed to not create an interference with traffic on surrounding public thoroughfares since the project is reviewed and approved by the highway district having jurisdiction and is subject to the conditions therein; and f. This development is in continuity with the capital improvement program since the required public improvements have been installed on site, or are expected to be installed with the development of individual lots as conditions of approval; and Page 24 of 25 K:lPlanning DeptlEagle ApplicationslSUBS\20061Thompson Acres pzrdoc g. That based upon agency verification and additional written comments of the Eagle Fire Department and the Ada County Highway District, or as conditioned herein, there is adequate public financial capability to support the proposed development; and h. That any health, safety and environmental problems that were brought to the Commission's attention have been adequately addressed by the applicant or will be conditions of preliminary and/or final plat approval as set forth within the conditions of approval above. DATED this 15th day of May 2006. PLANNING AND ZONING COMMISSION OF THE CITY OF EAGLE Ada County, Idaho ATTEST: ~""""."'" ~ OF EAr>. ~ ....... '/ -. ~~ ..- . -.. -,,(l.... ...., .- Q V ( ) ~ ~ '. ~ ... . or /'.- :(; ~.~: . . . * . ~.~ : * : . . : \~ SEALi": . .0. ......0 <1>...... 0". ~",<;)..~ .," -. "'-OR'" , . ...... <f l' ........ t- ........ l! Of \~ .....'"... Page 25 of 25 K:lPlanning DeptlEagle ApplicationslSUBS\20061Thompson Acres pzf.doc