Loading...
Tenant Improvement - 05-03-015 - 435 E Shore Dr Ste 120 - 03/07/2005 City of Eagle Zoning/Building Permit Permit#: 05-03-015 Mechanica/#: M-3164 Fees: Permit Fee $419.00 Plan Review $272.00 Development $0.00 Special Fee $0.00 IECC Fee $100.00 ACHD Fee $0.00 Mechanical-Res $0.00 Mechanical-Com $248.08 EM2 Fee $0.00 Property Owner Eagle River LLC Owner Address 485 E Riverside Dr. Ste 100 Owner City State Zip Eagle, ID 83616 Issue Date 3/7/2005 Foundation Only Issue Date Builder Name Guho Corporation Builder Address 391 W State Street Builder City State Zip Eagle, ID 83616 Builder Telephone (208) 939-8850 Subdivision Mixed Use Sub No.4 Block 4 Lot 15 Property Address 435 E Shore Dr Ste # 120 Total Fees Less Deposit Less Foundation Only $1,039.08 $100.00 $0.00 $939.08 Type TI Deposit Receipt# 2.000978 Foundation Only Receipt# Issue Receipt# 4.000473 SqFtLiving 1342 SqFtBmnt 0 SqFtGrg 0 SqFtPorch 0 Value Of Imprmnt $34,221.00 Eagle Water 0 EM2 Water 0 Eagle Sewer 0 Development 0 ACHD 0 Notes: Spec Suite # 120 Balance Due City Clerk/Authorized Personnel Builders Signature Said structure and/or use to conform to specifications and plans submitted and must be in full compliance with ordinances of the City of Eagle subject to inspection permits and fees as required. Monday, March 07, 2005 Page 1 of 1 City of Eagle Zoning/Building Permit Permit#: 05-03-015A Mechanical#: M-3164 Property Owner Eagle River LLC Owner Address 485 E Riverside Dr. Ste 100 Owner City State Zip Eagle, ID 83616 Issue Date 4/18/2005 Foundation Only Issue Date Builder Name Guho Corporation Builder Address 391 W State Street Builder City State Zip Eagle, ID 83616 Builder Telephone (208) 939-8850 Subdivision Mixed Use Sub No.4 Block 4 Lot 15 Property Address 435 E Shore Dr Ste # 120 Type 5NH sT.z: Deposit Receipt# Foundation Only Receipt# Issue Receipt# 2.001189 SqFtLiving SqFtBmnt 0 SqFtGrg 0 SqFtPorch 0 Value Of Imprmnt $0.00 Eagle Water EM2 Water 0 Eagle Sewer Development 0 ACHD Notes: temp co Builders Signature City Clerk/Authorized Personnel ~1l1~ Fees: Permit Fee $50.00 Plan Review $0.00 Development $0.00 Special Fee $0.00 IECC Fee $0.00 ACHD Fee $0.00 Mechanical-Res $0.00 Mechanical-Com $0.00 EM2 Fee $0.00 Total Fees Less Deposit Less Foundation Only Balance Due $50.00 $0.00 $0.00 $50.00 --""\ Said structure andlor use to conform to specifications and plans submitted and must be in full compliance with ordinances of the City of Eagle subject to inspection permits and fees as required. Monday, April 18, 2005 Page 1 of 1