Findings - DR - 2006 - DR-03-06 - Construct A 1,952 Sq' Multi-Teant Office Building BEFORE THE EAGLE DESIGN REVIEW BOARD IN THE MATTER OF AN APPLICATION FOR A ) DESIGN REVIEW TO CONSTRUCT A MUL TI- TENANT ) OFFICE BUILDING WITHIN WINDING CREEK ) SUBDIVISION FOR MAYER CONSTRUCTION ) FINDINGS OF FACT AND CONCLUSIONS OF LAW CASE NUMBER DR-03-06 The above-entitled design review application came before the Eagle Design Review Board for their action on February 9,2006. The Eagle Design Review Board having heard and taken oral and written testimony, and having duly considered the matter, makes the following Findings of Fact and Conclusions of Law; FINDINGS OF FACT: A. PROJECT SUMMARY: Mayer Homes, represented by Jason Mayer, is requesting design review approval to construct a 1,952 square foot multi-tenant office building. The site is located on the south side of East Winding Creek Drive approximately 300-feet northwest of East State Street at 911 East Winding Creek Drive within Winding Creek Subdivision Phase 1. B. APPLICATION SUBMITTAL: The City of Eagle received the application for this item on January II, 2006. C. NOTICE OF AGENCIES' REVIEW: Requests for agencies' reviews were transmitted on January II, 2006, in accordance with the requirements of the Eagle City Code. D. HISTORY OF RELEVANT PREVIOUS ACTIONS: On January 13, 2004, the Eagle City Council approved a rezone, conditional use permit, preliminary development plan, and preliminary plat applications for Winding Creek Planned Unit Development (RZ-6-03/CU-IO-03/PPUD-3-03/PP-6-03)(formerly Trolley Square Subdivision). On March 16,2004, the Eagle City Council approved a design review application for the common area landscaping within Winding Creek PUD (DR-08-04). On June 22, 2004, the Eagle City Council approved a final development plan and final plat application for Winding Creek PUD (FPUD-03-04 & FP-05-04). E. COMPANION APPLICATIONS: DR-04-06 (design review sign application) Page 1 of 10 K\Planning Dept\Eagle Applications\Dr\2006\DR-03-06 drfdoc F. COMPREHENSIVE PLAN LAND USE MAP AND ZONING MAP DESIGNATIONS: COMP PLAN ZONING LAND USE DESIGNATION DESIGNATION Existing Commercial MU-P (Mixed Use- Planned Vacant lot within Winding Unit Development) Creek Subdivision Proposed No Change No Change Multi-tenant office building North of site Commercial MU-P (Mixed Use - Planned Residential Unit Development) South of site Commercial MU-P (Mixed Use - Planned Multi -tenant office Unit Development) building East of site Commercial MU-P (Mixed Use - Planned Vacant lot within Winding Unit Development) Creek Subdivision West of site Commercial MU-P (Mixed Use - Planned Existing Parking Unit Development) G. DESIGN REVIEW OVERLAY DISTRICT: Not in the DDA, TDA, CEDA, or DSDA. H. EXISTING SITE CHARACTERISTICS: The site is currently vacant. Infrastructure improvements such as drainage facilities, utilities, driveways, trash enclosures, and perimeter landscaping have been completed by the developer of Winding Creek Subdivision. I. SITE DESIGN INFORMATION: Site Data Proposed Required Total Acreage of Site 8,006-square feet (.I8-acres) 7,000-square feet (0.16-acres) (minimum) Percentage of Site Devoted to 25% (approximately) 50% (maximum) Building Coverage Percentage of Site Devoted to 23% (approximately) 10% (minimum) Landscaping Number of Parking Spaces 8-spaces 8-spaces (minimum) Front Setback 36-feet (south) 10-feet (minimum per the PUD) Rear Setback 16-feet (north) 10-feet (minimum per the PUD) Side Setback 15.6-feet (west) 7.5-feet (minimum per the PUD) Side Setback 10-feet (east) 7.5-feet (minimum per the PUD) Page 2 of 10 K:\Planning Dept\Eagle Applications\Dr\2006\DR-03-06 drfdoc J. GENERAL SITE DESIGN FEATURES: Number and Uses of Proposed Buildings: One multi-tenant office building Height and Number of Stories of Proposed Buildings: Single story, 15-feet in height Gross Floor Area of Proposed Buildings: I ,952-gross square feet On and Off-Site Circulation: Driveways, parking, and curbs for the three eXlstmg buildings within Winding Creek Subdivision Phase I have been completed. Currently, the subject site is gets access from the twenty four foot (24') wide asphalt driveway that is part of the existing improvements from the three existing buildings and ends at the west property line of the eastem most building. The applicant for the subject site will complete the proposed eight parking spaces including the curb adjacent to the proposed building. K. BUILDING DESIGN FEATURES: Roof: Asphalt shingles (Charcoal Black) Walls: Stucco (Tavern Taupe) and stone veneer (Profit Shale) WindowslDoors: Wood frames (Chestnut Bronze) Fascia: Cedar fascia (Cordovan/Chestnut Brown stain) L. LANDSCAPING DESIGN: Retention of Existing Trees and Preseryation Methods: There are no existing trees on the site. Tree Replacement Calculations: N/ A Proposed Tree Mix (Species & Number): To be reviewed by the Design Review Board and City Forester. See Landscape Plan Review Letter submitted by the City Forester (incorporated herein by reference). Street Trees: Street trees along East Winding Creek Drive were reviewed and approved with the common area landscaping of Winding Creek PUD (DR-08-04). The developer of Winding Creek Subdivision has already planted these trees. Maintenance Provisions and Proposed Irrigation Methods: Automatic irrigation required and provided by the applicant Transition Zones: N/ A Parking Lot Landscaping: a. Perimeter Landscaping: Continuous landscaping has not been proposed on the south, east, or west perimeter of the parking lot because this site will be integrated with the properties to the south, east, and west providing cross access between parcels. b. Interior Landscaping: 0% interior landscaping is required; a minimum of 3% is proposed. M. TRASH ENCLOSURES: An existing trash enclosure is located on the southwest corner of the site, built by the developer of Page 3 of 10 K:\Planning Dept\Eagle Applkations\Dr\2006\DR-03-06 drf,doc Winding Creek Subdivision. The enclosure consists of grey colored split-faced block with a white concrete cap and metal door. N. MECHANICAL UNITS: The applicant is proposing to use ground mounted mechanical units. The ground mounted mechanical units are proposed to be screened with a stucco wall matching the building and landscaping. O. OUTDOOR LIGHTING: The applicant will install a parking lot light pole which is consistent with the lights that were reviewed and approved with the common area landscaping of Winding Creek PUD (DR-08-04). The applicant proposes 24 recessed can lights with 75-watt incandescent indoor/outdoor bulbs within the soffit around the building. The circular light trim piece will be painted brown to match the color of the soffit. P. SIGNAGE: No signs have been proposed with this application. A separate design review application has been submitted for review and approval of a master sign plan, including two building wall signs for this building (DR-04-06). Q. PUBLIC SERVICES AVAILABLE: Approved with the development of Winding Creek East Subdivision Phase I. R. PUBLIC USES PROPOSED: None S. PUBLIC USES SHOWN ON FUTURE ACQUISITIONS MAP: No map currently exists T. SPECIAL ON-SITE FEATURES: Areas of Critical Environmental Concern - no Evidence of Erosion - no Fish Habitat - no Floodplain - no Mature Trees - no Riparian Vegetation - no Steep Slopes - no Stream/Creek: no Unique Animal Life - no Unique Plant Life - no Unstable Soils - no Wildlife Habitat - no U. SUMMARY OF REVIEW OF ENVIRONMENTAL ASSESSMENT PLAN (IF REQUIRED): N/A V. AGENCY RESPONSES: The following agencies have responded and their correspondence is incorporated herein by reference and attached to the staff report. Comments, which appear to be of special concern, are noted below: Ada County Highway District Central District Health Department Page 4 of 10 K:\Planning Dept\Eagle Applications\Dr\2006\DR-03-06 drfdoc Chevron Pipeline DEQ Eagle Fire Department Idaho Power Idaho Department of Transportation W. LETTERS FROM THE PUBLIC: Letter from Ron Bath, Manager of Retail Development of North America, date stamped by the City on January 11,2006 (incorporated herein by reference and attached to the staff report). Letter from Keith Atkins, City Forester, date stamped by the City on January 27,2006 (incorporated herein by reference and attached to the staffreport). STAFF ANALYSIS: A. COMPREHENSIVE PLAN PROVISIONS, WHICH ARE OF SPECIAL CONCERN REGARDING THIS PROPOSAL: . The Comprehensive Plan Land Use Map designates this site as Commercial. B. ZONING CODE PROVISIONS, WHICH ARE OF SPECIAL CONCERN REGARDING THIS PROPOSAL: . Eagle City Code Section 8-2A-6(A)(5)(b) The location and design of transformers, pad-mount and roof-mounted mechanicals and electrical equipment shall be reviewed and approved by the Design Review Board. All roof- mounted mechanicals shall be completely screened from view through the use of a parapet wall when utilizing a flat roof design or shall be enclosed within the building when utilizing a roof design other than a flat roof. Screened from view shall mean "not visible" at the same level or elevation of the parapet wall (e.g. the perspective generally as shown on an elevation plan). . Eagle City Code Section 8-2A-6(B)(5)(c) states in part All vents protruding through the roof, and similar features shall be painted so as to match the color of the roof. . Eagle City Code Section 8-2A-7(K)(3) Parking Lot Perimeter Landscaping: Perimeter landscaping requirements define parking areas and prevent two (2) adjacent lots from becoming one large expanse of paving. This requirement does not hinder the ability to provide vehicular access between lots. a. Provide a minimum five foot (5') wide perimeter landscaped strip between the property lines and the parking lot, and plant with a minimum of one shade tree and five (5) shrubs per thirty five (35) linear feet of perimeter. . Eagle City Code Section 8-4-5 Offices, Business and professional I per 250 square feet of gross floor area C. DISCUSSION: . The applicant seeks approval of one 1,952-square foot multi-tenant office building to house Mayer Homes and a future tenant. The site plan shows the parking spaces on the south side of the building with both main entrances on the south elevation of the building for easy access. The building has been designed in the Prairie School style with its rectangular shape and symmetrical architectural features. The architect uses a variety of building materials including stucco, stone veneer, and cedar fascia and soffits. Pad mounted mechanical equipment is located on the north Page 5 of 10 K:\Planning Dept\Eaglc Applications\0r\2006\DR-03-06 drldoc side of the building screened by a stucco wall and landscaping, the applicant has also placed bike storage behind the wall. Staff has received a letter of approval from the Retail Development of North America Design Review Committee. . The applicant has not proposed continuous landscaping around the perimeter of the parking lot because this site will be integrated with the surrounding properties providing cross access between parcels. Per Eagle City Code, a minimum five foot (5 ') wide perimeter landscaped strip is required between the property lines and the parking lot and should be planted with a minimum of one shade tree and five (5) shrubs per thirty five (35) linear feet of perimeter. It is staffs opinion that because this site will be integrated with the surrounding properties providing cross access between parcels and because the landscape buffer requirements of Eagle City Code require extensive landscaping to buffer the parking lot from the public right-of-way that the applicant should not be required to provide a perimeter landscape strip on the south, east, and west property lines. . Staff defers comment regarding landscaping to the Design Review Board. STAFF RECOMMENDATION PROVIDED WITHIN THE REPORT: Based upon the information provided to staff to date, staff recommends approval with the site specific conditions of approval and the standard conditions of approval provided within the staff report. PUBLIC MEETING OF THE BOARD: A. A meeting was held on the application before the Design Review Board on February 9, 2006, at which time the Board made their decision. B. Oral testimony in opposition to this proposal was presented to the Design Review Board by no one. C. Oral testimony in favor of this proposal was presented to the Design Review Board by no one (not including the applicant/representative). BOARD DECISION: The Board voted 3 to 0 (Stanger, Grubb, Wright, and Mac Donald absent) to approve DR-03-06 for a design review application to construct a multi-tenant office building within Winding Creek Subdivision for Mayer Construction, with the following staff recommended site specific conditions of approval and standard conditions of approval with text shown with underline to be added by the Board. SITE SPECIFIC CONDITIONS OF APPROVAL: I. All roof vents shall be painted to match the color of the roof. 2. Provide a copy of the written approval of the site grading plan from the developer of Winding Creek Subdivision Phase I prior to the City issuing a zoning certificate for this site. 3. All ground mounted transformers, cable, and phone boxes shall be screened by landscaping per Eagle City Code. 4. The applicant shall be required to comply with any applicable conditions placed on this application by the City Engineer. 5. Submit $350.00 to the City, at the time of building permit submittal, for all Engineering fees incurred for reviewing this project. 6. No signs are proposed with this application. A separate design review application (DR-04-06) has been submitted for the master sign plan of this building. The master sign plan shall be reviewed and Page 6 of 10 K:\Planning Dept\Eagle Applications\Dr\2006\DR-03-06 drfdoc approved prior to the City issuing a zoning certificate. 7. Provide a revised landscape plan showing a mixture of evergreen and deciduous plant material to be planted along the mechanical screen wall located on the north side of the building. The revised landscape plan shall be reviewed and approved by staff and one member of the Design Review Board prior to the City issuing a zoning certificate for this site. 8. Provide a revised landscape plan showing taller plant material on the east elevation of the building. The revised landscape plan shall be reviewed and approved by staff and one member of the Design Review Board prior to the City issuing a zoning certificate for this site. 9. Provide a revised landscape plan showing several more groupings of boulders within the site or the elimination of all the boulders. The revised landscape plan shall be reviewed and approved by staff and one member of the Design Review Board prior to the City issuing a zoning certificate for this site. 10. Provide a revised site plan showing the mechanical screen waiL located on the north side of the building. extend to the building using a gate on one or both sides. Provide detailed elevations of the gate or gates used showing styles. color. height. etc. The revised site plan and gate elevations shall be reviewed and approved by staff and one member of the Design Review Board prior to the City issuing a zoning certificate for this site. II. Provide a revised elevation plan showing the mechanical screen wall having a stone cap to match the building. The revised elevation plan shall be reviewed and approved by staff and one member of the Design Review Board prior to the City issuing a zoning certificate for this site. STANDARD CONDITIONS OF APPROVAL: I. The applicant shall comply with all requirements of the Ada County Highway District and/or the Idaho Transportation Department, including but not limited to approval of the drainage system, curbs, gutters, streets and sidewalks. A letter of approval from the highway district having jurisdiction shall be submitted to the City prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. 2. Idaho Department of Health & Welfare approval of the sewer and water facilities is required prior issuance of any building permits or Certificate of Occupancy, whichever occurs first. 3. All permits from Central District Health, Eagle Sewer District & Eagle Fire District shall be secured prior to issuance of building permit or Certificate of Occupancy, whichever occurs first. 4. Written approval of all well water for any shared or commercial well shall be obtained from the Idaho Department of Water Resources shall be submitted to the City prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. 5. Unless septic tanks are permitted, wet line sewers will be required and the applicant will be required to furnish the City Engineer with a letter from the sewer entity serving the property, accepting the project for service, prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. 6. The applicant shall submit a letter from the appropriate drainage entity approving the drainage system and/or accepting said drainage; or submit a letter from a registered professional engineer certifying that all drainage shall be retained on-site prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. A copy of the construction drawing(s) shall be submitted with the letter. 7. The applicant shall submit plans and calculations prepared by a registered professional engineer to handle the satisfactory disposal of all storm drainage on the applicant's site. Drainage system plans shall be submitted to the City Engineer for review and approval prior to issuance of any building Page 7 of 10 K:\Planning Dept\Eag1e Applications\Dr\2006\DR-03-06 drfdoc permits or Certificate of Occupancy, whichever occurs first. The plans shall show how swales, or drain piping, will be developed in the drainage easements. The approved drainage system shall be constructed, or a performance bond shall be submitted to the City Clerk, prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. The lot shall be so graded that all runoff runs either over the curb, or to the drainage easement and no runoff shall cross any lot line onto another lot except within a drainage easement. All design and calculations shall meet the requirements of Ada County Highway District. Construction of the storm drain disposal system shall be complete before an occupancy permit is issued. 8. No ditch, pipe or other structure or canal, for irrigation water or irrigation waste water owned by an organized irrigation district, canal company, ditch association, or other irrigation entity, shall be obstructed, routed, covered or changed in any way unless such obstruction, rerouting, covering or changing has first been approved in writing by the entity. A Registered Engineer shall certify that any ditch rerouting, piping, covering or otherwise changing the existing irrigation or waste ditch (I) has been made in such a manner that the flow of water will not be impeded or increased beyond carrying capacity of the downstream ditch; (2) will not otherwise injure any person or persons using or interested in such ditch or their property; and (3) satisfied the Idaho Standards for Public Works Construction. A copy of such written approval and certification shall be filed with the construction drawing and submitted to the City prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. 9. Street light plans shall be submitted and approved as to the location, height and wattage to the City Engineer (if applicable) prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. All construction shall comply with the City's specifications and standards. The applicant shall provide a recorded easement, acceptable to the City Engineer, for the purpose of installing and maintaining street light fixtures, conduit and wiring lying outside any dedicated public right-of-way, prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. The applicant shall pay applicable street light inspection fees prior to Certificate of Occupancy. 10. Parking lot light plan shall be submitted and approved as to the location, height and wattage by the City Engineer. All construction shall comply with the City's specifications and standards. Lighting is required in the parking area and shall be properly illuminated to avoid accidents. Any lights used to illuminate the parking lot shall be so arranged as to reflect the light away from the adjoining property. II. The parking area shall be paved and shall be maintained in good condition without holes and free of all dust, trash, weeds and other debris. 12. One set of building plans, for any non single-family residential use, shall be submitted to the Eagle Fire Department for approval. An approval letter from the Eagle Fire Department shall be submitted to the City prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. The letter shall include the following comments and minimum requirements, and any other items of concem as may be determined by the Eagle Fire Department officials: a. "The applicant has made arrangements to comply with all requirements ofthe Fire Department." b. The fire hydrant locations shall be reviewed and be approved in writing by the Eagle Fire Department prior to the City Engineer signing the final plat. c. Minimum flow per hydrant shall be 1,000 gallons per minute for one and two family dwellings, 1,500 gallons per minute for dwellings having a fire area in excess of3,600 square feet, and 1,500 gallons per minute for non-residential uses (i.e.; Commercial, Industrial, Schools, etc.). Flow rates Page 8 of 10 K:\Planning Dept\Eagle Applications\Dr\2006\DR-03-06 drfdoc shall inspected in accordance with all agencies having jurisdiction, and shall be verified in writing by the Eagle Fire Department prior to issuance of any building permits or certificate of Occupancy, whichever occurs first. d. The proposed fire protection system shall be reviewed and approved by the Eagle Fire Department prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first. 13. Any recreation area, greenbelt area or pathway area along the Boise River, Dry Creek or any other area designated by the City Councilor Eagle City Pathway/Greenbelt Committee for a path or walkway shall be approved in writing by the Eagle City Pathway/Greenbelt Committee prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first. 14. Conseryation, recreation and river access easements (if applicable) shall be approved by the Eagle City Pathway/Greenbelt Committee and shall be shown on the final plat prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first. 15. The applicant shall comply with the provisions of the Eagle City Code, pertaining to floodplain and river protection regulations (if applicable) prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first. 16. The applicant shall obtain written approval of the development relative to the effects of the Boise River Flood Plain (if applicable) from the Corps. of Engineers prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first. 17. The applicant shall obtain approval of the development relative to its effects on wetlands or other natural waterways (if applicable) from the Corps. of Engineers and the Idaho Department of Water Resources and/or any other agency having jurisdiction prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first. 18. Basements in the flood plain are prohibited. 19. The Americans with Disabilities Act, Uniform Building Code, Eagle City Code, and all applicable County, State and Federal Codes and Regulations shall be complied with. All design and construction shall be in accordance with all applicable City of Eagle Codes unless specifically approved by the Commission and/or Council. 20. New plans, which incorporate any required changes, shall be submitted for staff approval. Staff may elect to take those plans to the Design Review Board and/or the Planning and Zoning Commission for review and approval. 21. Any changes to the plans and specifications upon which this approval is based, other than those required by the above conditions, will require submittal of an application for modification and approval of that application prior to commencing any change. 22. Any modification of the approved design review plans, including, but not limited to building design, location and details, landscaping, parking, and circulation, must be approved prior to construction! installation of such changes. Failure to do so may result in the requirement to modify the project to comply with the approved design review and/or result in the inability to issue a final approval for occupancy of this project. 23. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the City of Eagle of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. 24. Approval of any Design Review shall expire without notice to the applicant on the date of expiration Page 9 of 10 K:\Planning Dept\Eagle Applications\Dr\2006\DR-03-Q6 drf.doc of the Design Review if construction has not started prior to that date, as stipulated in Eagle City Code (one year from the Design Review Board approval date). 25. All ground-mounted accent lighting fixtures and monument sign lighting fixtures shall be screened from view with the use oflandscaping (top of the fixture shall be no higher than the surrounding landscaping). The light source itself shall otherwise be screened as provided for within Eagle City Code. 26. The City's actions on the application does not grant the applicant any appropriation of water or interference with existing water rights. The applicant indemnifies and holds the City harmless for any and all water rights, claims in any way associated with this application. CONCLUSIONS OF LAW: I. The application for this item was received by the City of Eagle on January II, 2006. 2. Requests for agencies' reviews were transmitted on January II, 2006, in accordance with the requirements of the Eagle City Code. 3. The Board reviewed the particular facts and circumstances of this proposed design review application (DR-03-06) with regard to the Eagle City Code Title 8, Chapter 2, Article A, DR Design Review Overlay District, and based upon the information provided with the conditions required herein, concludes that the proposed design review application is in accordance with the Eagle City Code and the Eagle Comprehensive Plan. 4. Will, in fact, constitute a permitted use as established in Eagle City Code Title 8, Chapter 2, Section 3, for the MU-P (Mixed Use - Planned Unit Development) zoning district. DATED this 23rd day of February 2006. DESIGN REVIEW BOARD OF THE CITY OF EAGLE ~ ATTEST: Page 10 of 10 K:\Planning Dept\Eagle Applicatiol1.'l\Dr\2006\DR-03-06 drfdoc