Findings - DR - 2004 - DR-74-04 - Construct A 2200 Sq' Office Building BEFORE THE EAGLE DESIGN REVIEW BOARD IN THE MATTER OF AN APPLICATION FOR) A DESIGN REVIEW FOR AN OFFICE BUILDING) FOR EXECUTIVE POWER INVESTMENTS, LLC ) FINDINGS OF FACT AND CONCLUSIONS OF LAW CASE NUMBER DR-74-04 The above-entitled design review application came before the Eagle Design Review Board for their action on August 12,2004. The Eagle Design Review Board having heard and taken oral and written testimony, and having duly considered the matter, makes the following Findings of Fact and Conclusions of Law; FINDINGS OF FACT: A. PROJECT SUMMARY: Executive Power Investments, LLC, represented by Jason Martin with Backstreet Architects, is requesting design review approval to construct a 2,200-square foot office building. The site is located on the north side of East State Street approximately 95-feet east of Palmetto A venue within the Winding Creek Development. B. APPLICATION SUBMITTAL: The City of Eagle received the application for this item on June 29, 2004. C. NOTICE OF AGENCIES' REVIEW: Requests for agencies' reviews were transmitted on July 9, 2004, in accordance with the requirements of the Eagle City Code. D. HISTORY OF RELEVANT PREVIOUS ACTIONS: On January 13, 2004, the Eagle City Council approved a rezone, conditional use permit, preliminary development plan, and preliminary plat applications for Winding Creek Planned Unit Development (RZ-6-03/CU-I0-03/PPUD-3-03/PP-6-03)(formerly Trolley Square Subdivision). On March 16, 2004, the Eagle City Council approved a design review application for the common area landscaping within Winding Creek PUD (DR-08-04). On June 22, 2004, the Eagle City Council approved a final development plan and final plat application for Winding Creek PUD (FPUD-03-04 & FP-05-04). E. COMPANION APPLICATIONS: DR-75-04 (design review sign application) Page 1 of 9 K:\Plalllllug DepllEngle ApplicnlionslDrl2004IDR-74-Q4 drf.uoc F. COMPREHENSIVE PLAN LAND USE MAP AND ZONING MAP DESIGNATIONS: COMP PLAN ZONING LAND USE DESIGNA TION DESIGNA TION Existing Mixed Use MU-P (Mixed Use PUD) Vacant Proposed No Change No Change Office building North of site Mixed Use MU-P (Mixed Use PUD) Vacant South of site Mixed Use MU (Mixed Use) Office building/State Street East of site Mixed Use MU-P (Mixed Use PUD) Vacant West of site General Business District C-2 (General Business Eagle Sewer District Office District) Building G. DESIGN REVIEW OVERLAY DISTRICT: Not in the DDA, TDA or CEDA. H. EXISTING SITE CHARACTERISTICS: N/A 1. SITE DESIGN INFORMATION: Site Data Proposed Required Total Acreage of Site 9,942-square feet (0.23-acres) 7,000-square feet (0. 16-acres) (minimum) Percentage of Site Devoted to 22% (approximately) 50% (maximum) Building Coverage Percentage of Site Devoted to 50% (approximately) 10% (minimum) Landscaping Number of Parking Spaces 9-parking spaces 9-parking spaces (minimum) Front Setback 39-feet (south) lO-feet (minimum per the PUD) Rear Setback 34-feet (north) 10-feet (minimum per the PUD) Side Setback lO-feet (west) 7.5-feet (minimum per the PUD) Side Setback 16-feet (east) 5-feet street side (minimum per the PUD) J. GENERAL SITE DESIGN PEA TURES: Number and Uses of Proposed Buildings: One building to be used as an office. Height and Number of Stories of Proposed Buildings: 16 W in height, one story. Page 2 of 9 K:\Plnnning DeptlEngLe ApplicntionslDrl2004\DR- 74-04 drf.Uoc Gross Floor Area of Proposed Buildings: 2,216-square feet. On and Off-Site Circulation: A 3,741-square foot (approximately) paved parking lot is to be constructed for vehicles using this site. One 25-foot wide driveway is to be located on the east side of this site approximately 120- feet north of East State Street providing access to Winding Creek Drive. K. BUILDING DESIGN PEATURES: Roof: Architectural shingles (medium gray) Walls: Brick (delware red), Stucco (sonata and dusty peach) Windows/Doors: Vinyl windows (beige), Aluminum doors (beige) FascialTrim: Aluminum fascia (almond) L. LANDSCAPING DESIGN: Retention of Existing Trees and Preservation Methods: There are no existing trees. Tree Replacement Calculations: N/ A Proposed Tree Mix (Species & Number): To be reviewed by the Design Review Board Street Trees: The street trees along Winding Creek Drive and East State Street were reviewed and approved with the common area landscaping within Winding Creek PUD (DR-08-04). The street trees and common area landscaping which abut this site are required to be installed prior to the City issuing a certificate of occupancy for this site. Maintenance Provisions and Proposed Irrigation Methods: Automatic irrigation required. Transition Zones: N/ A Parking Lot Landscaping: a. Perimeter Landscaping: Continuous landscaping is to be installed between the parking lot and East Winding Creek Drive. However, continuous landscaping has not been proposed on the north perimeter of the parking lot because this site will be integrated with the property to the north providing cross access between parcels. b. Interior Landscaping: 0% interior landscaping is required, 5% is proposed. M. TRASH ENCLOSURES: One 11O-square foot trash enclosure is to be located on the property to the north of this site approximately 1O0-feet west of the driveway on Winding Creek Drive. The enclosure is to be constructed of CMU block with stucco finish and metal gates, all of which will match the materials and colors used in the construction of the building. N. MECHANICAL UNITS: The applicant will use ground mounted mechanical units. The ground mounted mechanical units are proposed to be screened with landscaping. Page 3 of 9 K:\PLnnning DeptlEngle Applicntions\Drl2004\DR-74-04 drf.doc O. OUTDOOR LIGHTING: Three (3), 1O0-watt high pressure sodium, bollard light fixtures are to be located within the parking lot. Other than recessed soffit lighting, no exterior building lighting is proposed and none is approved. P. SIGNAGE: No signs are proposed with this application. A separate design review application (DR-75-04) has been submitted for the approval of a monument sign. Q. PUBLIC SERVICES A V AILABLE: Preliminary approval letters from Central District Health Department, Eagle Fire Department, Eagle Sewer District have been received by the City. A water service approval has not been received to date. Approval of the water company having jurisdiction will be required prior to issuance of a building permit. R. PUBLIC USES PROPOSED: None S. PUBLIC USES SHOWN ON FUTURE ACQUISITIONS MAP: No map currently exists T. SPECIAL ON-SITE FEATURES: Areas of Critical Environmental Concern - no Evidence of Erosion - no Fish - not known Floodplain - 500-year Floodway - no Mature Trees - yes Riparian Vegetation - no Steep Slopes - no Stream/Creek - no Unique Animal Life - unknown Unique Plant Life - unknown Unstable Soils - no Wildlife-yes U. SUMMARY OF REVIEW OF ENVIRONMENTAL ASSESSMENT PLAN (IF REQUIRED): Not required V. AGENCY RESPONSES: The following agencies have responded and their correspondence is incorporated herein by reference. Comments, which appear to be of special concern, are noted below: Ada County Highway District Central District Health Eagle Fire Department Eagle Sewer District Idaho Power Company United Water Company Page 4 of 9 K:\Plamling DeptlEngle Applicntions\Drl2004\DR- 74-04 urf.uoc W. LETTERS FROM THE PUBLIC: Letter from Ron Bath, Retail Development N. A. LLC, date stamped by the City on June 29, 2004 (incorporated herein by reference). STAFF ANALYSIS PROVIDED WITHIN THE STAFF REPORT: A. COMPREHENSIVE PLAN PROVISIONS, WHICH ARE OF SPECIAL CONCERN REGARDING THIS PROPOSAL: . The Comprehensive Plan Land Use Map designates this site as Commercial. B. ZONING CODE PROVISIONS, WHICH ARE OF SPECIAL CONCERN REGARDING THIS PROPOSAL: . Section 8-2A-7(K)(3) Parking Lot Perimeter Landscaping: Perimeter landscaping requirements define parking areas and prevent two (2) adjacent lots from becoming one large expanse of paving. This requirement does not hinder the ability to provide vehicular access between lots. a. Provide a minimum five foot (5') wide perimeter landscaped strip between the property lines and the parking tot, and plant with a minimum of one shade tree and five (5) shrubs per thirty five (35) linear feet of perimeter. C. DISCUSSION: . The applicant is proposing to construct the trash enclosure on the property to the north of this site. The applicant should be required to provide an agreement between this site and the property to the north to share the proposed trash enclosure. The agreement should be recorded in the Ada County Recorder's office and a copy submitted to the City prior to the City issuing a zoning certificate for this site. . Staff defers comment regarding building design and colors to the Design Review Board. ST AFF RECOMMENDATION PROVIDED WITHIN THE REPORT: Based upon the information provided to staff to date, staff recommends approval with the site specific conditions of approval and the standard conditions of approval provided within the staff report. PUBLIC MEETING OF THE BOARD: A. A meeting was held on the application before the Design Review Board on August 12,2004, at which time the Board made their decision. B. Oral testimony in opposition to this proposal was presented to the Design Review Board by no one. C. Oral testimony in favor of this proposal was presented to the Design Review Board by no one (not including the applicant/representative). BOARD DECISION: The Board voted 4 to 0 (Bowen and Flogel absent) to approve DR-74-04 for a design review application for an office building for Executive Power Investments, LLC, with the following staff recommended site specific conditions of approval and standard conditions of approval with text shown with underline to be added by the Board. Page 5 of 9 K:\Planning DeptlEngle ApplicntionslDrl2004\DR- 74-04 drf.doc SITE SPECIFIC CONDITIONS OF APPROVAL: 1. Comply with all applicable conditions of FPUD-03-04 and FP-05-04 (final development plan and final plat application for Winding Creek PUD). 2. Comply with all applicable conditions of DR-08-04 (design review application for the common area landscaping within Winding Creek PUD). 3. Provide an agreement between this site and the property to the north to share the proposed trash enclosure. The agreement shall be recorded in the Ada County Recorder's office and a copy submitted to the City prior to the City issuing a zoning certificate for this site. 4. Provide detailed cut sheets indicating the style, color, and size of the bike rack to be placed near the northwest corner of the building. The detailed cut sheets shall be reviewed and approved by staff prior to the City issuing a zoning certificate for this site. 5. The applicant shall be required to comply with any applicable conditions placed on this application by the City Engineer. 6. Submit payment to the City for all Engineering fees incurred for reviewing this project prior to issuance of a building permit. 7. No signs are proposed with this application. A separate design review application (DR-75-04) has been submitted for the approval of a monument sign for this site. The monument sign shall be reviewed and approved prior to the City issuing a zoning certificate for this site. 8. The applicant shall work with the adjacent property owner (Eagle Sewer District) to remove the barbwire fence located on this site's west property line. The barbwire fence shall be removed prior to the City issuing a certificate of occupancy for this site. 9. Provide a revised landscape plan showing the limits of the grass located between the south side of the building and the meandering sidewalk adjacent to East State Street. The revised landscape plan shall be reviewed and approved by staff prior to the City issuing a zoning certificate for this site. 10. All ground mounted transformers, cable, and phone boxes shall be screened by landscaping per Eagle City Code. STANDARD CONDITIONS OF APPROVAL: 1. The applicant shall comply with all requirements of the Ada County Highway District and/or the Idaho Transportation Department, including but not limited to approval of the drainage system, curbs, gutters, streets and sidewalks. A letter of approval from the highway district having jurisdiction shall be submitted to the City prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. 2. Idaho Department of Health & Welfare approval of the sewer and water facilities is required prior issuance of any building permits or Certificate of Occupancy, whichever occurs first. 3. All permits from Central District Health, Eagle Sewer District & Eagle Fire District shall be secured prior to issuance of building permit or Certificate of Occupancy, whichever occurs first. 4. Written approval of all well water for any shared or commercial well shall be obtained from the Idaho Department of Water Resources shall be submitted to the City prior to issuance of any building permits or Certificate of Occupancy, whichever occurs fIrst. 5. Unless septic tanks are permitted, wet line sewers will be required and the applicant will be required to furnish the City Engineer with a letter from the sewer entity serving the property, accepting the project for service, prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. Page 6 of 9 K:\Planning DeptlEngle ApplicntionslDrl2004\DR-74-04 urf.UoC 6. The applicant shall submit a letter from the appropriate drainage entity approving the drainage system and/or accepting said drainage; or submit a letter from a registered professional engineer certifying that all drainage shall be retained on-site prior to jssuance of any building permits or Certificate of Occupancy, whichever occurs first. A copy of the construction drawing(s) shall be submitted with the letter. 7. The applicant shall submit plans and calculations prepared by a registered professional engineer to handle the satisfactory disposal of all storm drainage on the applicant's site. Drainage system plans shall be submitted to the City Engineer for review and approval prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. The plans shall show how swales, or drain piping, will be developed in the drainage easements. The approved drainage system shall be constructed, or a performance bond shall be submitted to the City Clerk, prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. The lot shall be so graded that all runoff runs either over the curb, or to the drainage easement and no runoff shall cross any lot line onto another lot except within a drainage easement. All design and calculations shall meet the requirements of Ada County Highway District. Construction of the storm drain disposal system shall be complete before an occupancy permit is issued. 8. No ditch, pipe or other structure or canal, for irrigation water or irrigation waste water owned by an organized irrigation district, canal company, ditch association, or other irrigation entity, shall be obstructed, routed, covered or changed in any way unless such obstruction, rerouting, covering or changing has first been approved in writing by the entity. A Registered Engineer shall certify that any ditch rerouting, piping, covering or otherwise changing the existing irrigation or waste ditch (1) has been made in such a manner that the flow of water will not be impeded or increased beyond carrying capacity of the downstream ditch; (2) will not otherwise injure any person or persons using or interested in such ditch or their property; and (3) satisfied the Idaho Standards for Public Works Construction. A copy of such written approval and certification shall be filed with the construction drawing and submitted to the City prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. 9. Street light plans shall be submitted and approved as to the location, height and wattage to the City Engineer (if applicable) prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. All construction shall comply with the City's specifications and standards. The applicant shall provide a recorded easement, acceptable to the City Engineer, for the purpose of installing and maintaining street light fixtures, conduit and wiring lying outside any dedicated public right-of-way, prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. The applicant shall pay applicable street light inspection fees prior to Certificate of Occupancy. 10. Parking lot light plan shall be submitted and approved as to the location, height and wattage by the City Engineer. All construction shall comply with the City's specifications and standards. Lighting is required in the parking area and shall be properly illuminated to avoid accidents. Any lights used to illuminate the parking lot shall be so arranged as to reflect the light away from the adjoining property. 11. The parking area shall be paved and shall be maintained in good condition without holes and free of all dust, trash, weeds and other debris. 12. One set of building plans, for any non single-family residential use, shall be submitted to the Eagle Fire Department for approval. An approval letter from the Eagle Fire Department shall be submitted to the City prior to issuance of any building permits or Certificate of Occupancy, whichever occurs Page 7 of 9 K:\Plntllling DeptlEngle ApplicntionslDrl2004\DR-74-04 drf.<loc first. The letter shall include the following comments and minimum requirements, and any other items of concern as may be determined by the Eagle Fire Department officials: a. "The applicant has made arrangements to comply with all requirements of the Fire Department." b. The fire hydrant locations shall be reviewed and be approved in writing by the Eagle Fire Department prior to the City Engineer signing the final plat. c. Minimum flow per hydrant shall be 1,000 gallons per minute for one and two family dwellings, 1,500 gallons per minute for dwellings having a fIre area in excess of 3,600 square feet, and 1,500 gallons per minute for non-residential uses (i.e.; Commercial, Industrial, Schools, etc.). Flow rates shall inspected in accordance with all agencies having jurisdiction, and shall be verified in writing by the Eagle Fire Department prior to issuance of any building permits or certificate of Occupancy, whichever occurs first. d. The proposed fire protection system shall be reviewed and approved by the Eagle Fire Department prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first. 13. Any recreation area, greenbelt area or pathway area along the Boise River, Dry Creek or any other area designated by the City Councilor Eagle City Pathway/Greenbelt Committee for a path or walkway shall be approved in writing by the Eagle City Pathway/Greenbelt Committee prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first. 14. Conservation, recreation and river access easements (if applicable) shall be approved by the Eagle City Pathway/Greenbelt Committee and shall be shown on the final plat prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first. 15. The applicant shall comply with the provisions of the Eagle City Code, pertaining to floodplain and river protection regulations (if applicable) prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first. 16. The applicant shall obtain written approval of the development relative to the effects of the Boise River Flood Plain (if applicable) from the Corps. of Engineers prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first. 17. The applicant shall obtain approval of the development relative to its effects on wetlands or other natural waterways (if applicable) from the Corps. of Engineers and the Idaho Department of Water Resources and/or any other agency having jurisdiction prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first. 18. Basements in the flood plain are prohibited. 19. The Americans with Disabilities Act, Uniform Building Code, Eagle City Code, and all applicable County, State and Federal Codes and Regulations shall be complied with. All design and construction shall be in accordance with all applicable City of Eagle Codes unless specifically approved by the Commission and/or Council. 20. New plans, which incorporate any required changes, shall be submitted for staff approval. Staff may elect to take those plans to the Design Review Board and/or the Planning and Zoning Commission for review and approval. 21. Any changes to the plans and specifications upon which this approval is based, other than those required by the above conditions, will require submittal of an application for modification and approval of that application prior to commencing any change. 22. Any modification of the approved design review plans, including, but not limited to building design, location and details, landscaping, parking, and circulation, must be approved prior to construction/ installation of such changes. Failure to do so may result in the requirement to modify the project to comply with the approved design review and/or result in the inability to issue a final approval for occupancy of this project. Page 8 of 9 K:\Plamling DeptlEngLe ApplicationslDrl2004\DR- 74-04 urf.doc 23. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the City of Eagle of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. 24. Approval of any Design Review shall expire without notice to the applicant on the date of expiration of the Design Review if construction has not started prior to that date, as stipulated in Eagle City Code (one year from the Design Review Board approval date). 25. All ground-mounted accent lighting fixtures and monument sign lighting fixtures shall be screened from view with the use of landscaping (top of the fixture shall be no higher than the surrounding landscaping). The light source itself shall otherwise be screened as provided for within Eagle City Code. 26. The City's actions on the application does not grant the applicant any appropriation of water or interference with existing water rights. The applicant indemnifies and holds the City harmless for any and all water rights, claims in any way associated with this application. CONCLUSIONS OF LAW: 1. The application for this item was received by the City of Eagle on June 29, 2004. 2. Requests for agencies' reviews were transmitted on July 9, 2004, in accordance with the requirements of the Eagle City Code. 3. The Board reviewed the particular facts and circumstances of this proposed design review application (DR-74-04) with regard to the Eagle City Code Title 8, Chapter 2, Article A, DR Design Review Overlay District, and based upon the information provided with the conditions required herein, concludes that the proposed design review application is in accordance with the Eagle City Code and the Eagle Comprehensive Plan. 4. Will, in fact, constitute a permitted use as established in Eagle City Code Title 8, Chapter 2, Section 3, for the MU-DA-P (Mixed Use with development agreement PUD) zoning district. DATED this 26th day of August 2004. ATTEST: """""'" " '" ,...." ~ OF E-1 '" ,,"",~ ."..... () ~ '" :> (ì .. ... .....~ " i ... O~J'OR-1.r... \ : Ie; ~~: :*: -.- :*: . . . . ; \.... C' - " : ~ ..-t(' L) F ^ L 6.': : ~ (j> . 0 ".. 0 :: ~ '" ...II¡'nco. ,~«<).""- :: #"'. .,.~.......... #, -1 f .....- ~ ...." ##" E: 0 f fQ > "", ""'"", ..,.", A ("-+< "'= k ~ ,rJ Sharon K. Bergmann, Eagle C y Clerk Page 9 of 9 K:\Planning DeptlEngle Applications\Drl2004\DR- 74-04 drf.uoc