Loading...
Findings - CC - 2005 - DR-2-05 - Common Area Landscaping And Pressurized Irrigation Pump House/Loch Lomond Sb 2 BEFORE THE EAGLE CITY COUNCIL IN THE MATTER OF AN APPLICATION FOR A DESIGN REVIEW FOR THE COMMON AREA LANDSCAPING FOR LOCH LOMOND SUBDIVISION NO.2 FOR MARK AND LINDA BUTLER FINDINGS OF FACT AND CONCLUSIONS OF LA W CASE NUMBER DR-2-0S The above-entitled design review application came before the Eagle Design Review Board for their action on February 10, 200S. The Eagle Design Review Board having heard and taken oral and written testimony, and having duly considered the matter, makes the following Findings of Fact and Conclusions of Law; FINDINGS OF FACT: A. PROJECT SUMMARY: Mark Butler is requesting design review approval for the common area landscaping and pressurized irrigation pump house for Loch Lomond Subdivision No.2, an 8-lot residential subdivision. The site is located on Braveheart Lane 1320-feet north of Floating Feather Road. B. APPLICATION SUBMITTAL: The City of Eagle received the application for this item on January 6, 200S. C. HISTORY OF RELEVANT PREVIOUS ACTIONS: On January 2S, 200S, the Eagle City Council approved the combined preliminary and final plat (PP/FP-S-04) for Loch Lomond Subdivision No.2. ST AFF RECOMMENDATION PROVIDED WITHIN THE STAFF REPORT: Based upon the information provided to staff to date, staff recommends approval with the site specific conditions of approval and the standard conditions of approval provided within the staff report. PUBLIC MEETING OF THE DESIGN REVIEW BAORD BOARD: A. A meeting was held on the application before the Design Review Board on February 10, 200S, at which time the Board made their decision. B. Oral testimony in opposition to this proposal was presented to the Design Review Board by no one. C. Oral testimony in favor of this proposal was presented to the Design Review Board by no one. BOARD DECISION: The Board voted 6 to 0 (Barnes absent) to approve the above referenced application with the with the following staff recommended site specific conditions of approval and standard conditions of approval. SITE SPECIFIC CONDITIONS OF APPROVAL: 1. The electric main panel, meter box, and all other utility boxes and exposed conduits associated with the pressurized irrigation pump house shall be painted to match the exterior of the building. 2. Submit payment to the City for all Engineering fees incurred for reviewing this project prior to issuance of a building permit. Page 1 of 5 K:\Plalliting DeptlEagle Applications\Dr\200S\DR-2-05 land urf.uoc 3. The applicant shall be required to comply with any applicable conditions placed on this application by the City Engineer. 4. No signs are proposed with this application. A separate design review application is required to be submitted for approval of any signs for this site. ST ANDARD CONDITIONS OF APPROVAL: 1. The applicant shall comply with all requirements of the Ada County Highway District and/or the Idaho Transportation Department, including but not limited to approval of the drainage system, curbs, gutters, streets and sidewalks. A letter of approval from the highway district having jurisdiction shall be submitted to the City prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. 2. Idaho Department of Health & Welfare approval of the sewer and water facilities is required prior issuance of any building permits or Certificate of Occupancy, whichever occurs first. 3. All permits from Central District Health, Eagle Sewer District & Eagle Fire District shall be secured prior to issuance of building permit or Certificate of Occupancy, whichever occurs first. 4. Written approval of all well water for any shared or commercial well shall be obtained from the Idaho Department of Water Resources shall be submitted to the City prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. 5. Unless septic tanks are permitted, wet line sewers will be required and the applicant will be required to furnish the City Engineer with a letter from the sewer entity serving the property, accepting the project for service, prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. 6. The applicant shall submit a letter from the appropriate drainage entity approving the drainage system and/or accepting said drainage; or submit a letter from a registered professional engineer certifying that all drainage shall be retained on-site prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. A copy of the construction drawing(s) shall be submitted with the letter. 7. The applicant shall submit plans and calculations prepared by a registered professional engineer to handle the satisfactory disposal of all storm drainage on the applicant's site. Drainage system plans shall be submitted to the City Engineer for review and approval prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. The plans shall show how swales, or drain piping, will be developed in the drainage easements. The approved drainage system shall be constructed, or a performance bond shall be submitted to the City Clerk, prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. The lot shall be so graded that all runoff runs either over the curb, or to the drainage easement and no runoff shall cross any lot line onto another lot except within a drainage easement. All design and calculations shall meet the requirements of Ada County Highway District. Construction of the storm drain disposal system shall be complete before an occupancy permit is issued. 8. No ditch, pipe or other structure or canal, for irrigation water or irrigation waste water owned by an organized irrigation district, canal company, ditch association, or other irrigation entity, shall be obstructed, routed, covered or changed in any way unless such obstruction, rerouting, covering or changing has first been approved in writing by the entity. A Registered Engineer shall certify that any ditch rerouting, piping, covering or otherwise changing the existing irrigation or waste ditch (1) has been made in such a manner that the flow of water will not be impeded or increased beyond carrying capacity of the downstream ditch; (2) will not otherwise injure any person or persons using or interested in such ditch or their property; and (3) satisfied the Idaho Standards for Public Works Page 2 of 5 K:\Planllillg DeptlEagle Applicatiolls\Dr\2005\DR-2-05 land urf.doc Construction. A copy of such written approval and certification shall be filed with the construction drawing and submitted to the City prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. 9. Street light plans shall be submitted and approved as to the location, height and wattage to the City Engineer (if applicable) prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. All construction shall comply with the City's specifications and standards. The applicant shall provide a recorded easement, acceptable to the City Engineer, for the purpose of installing and maintaining street light fixtures, conduit and wiring lying outside any dedicated public right-of-way, prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. The applicant shall pay applicable street light inspection fees prior to Certificate of Occupancy. 10. Parking lot light plan shall be submitted and approved as to the location, height and wattage by the City Engineer. All construction shall comply with the City's specifications and standards. Lighting is required in the parking area and shall be properly illuminated to avoid accidents. Any lights used to illuminate the parking lot shall be so arranged as to reflect the light away from the adjoining property. 11. The parking area shall be paved and shall be maintained in good condition without holes and free of all dust, trash, weeds and other debris. 12. One set of building plans, for any non single-family residential use, shall be submitted to the Eagle Fire Department for approval. An approval letter from the Eagle Fire Department shall be submitted to the City prior to issuance of any building permits or Certificate of Occupancy, whichever occurs first. The letter shall include the following comments and minimum requirements, and any other items of concern as may be determined by the Eagle Fire Department officials: a. "The applicant has made arrangements to comply with all requirements of the Fire Department." b. The fire hydrant locations shall be reviewed and be approved in writing by the Eagle Fire Department prior to the City Engineer signing the final plat. c. Minimum flow per hydrant shall be 1,000 gallons per minute for one and two family dwellings, I,SOO gallons per minute for dwellings having a fire area in excess of 3,600 square feet, and I,SOO gallons per minute for non-residential uses (i.e.; Commercial, Industrial, Schools, etc.). Flow rates shall inspected in accordance with all agencies having jurisdiction, and shall be verified in writing by the Eagle Fire Department prior to issuance of any building permits or certificate of Occupancy, whichever occurs fIrst. d. The proposed fire protection system shall be reviewed and approved by the Eagle Fire Department prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first. 13. Any recreation area, greenbelt area or pathway area along the Boise River, Dry Creek or any other area designated by the City Councilor Eagle City Pathway/Greenbelt Committee for a path or walkway shall be approved in writing by the Eagle City Pathway/Greenbelt Committee prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first. 14. Conservation, recreation and river access easements (if applicable) shall be approved by the Eagle City Pathway/Greenbelt Committee and shall be shown on the final plat prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first. IS. The applicant shall comply with the provisions of the Eagle City Code, pertaining to floodplain and river protection regulations (if applicable) prior to issuance of a building permit or Certificate of Occupancy, whichever occurs first. 16. The applicant shall obtain written approval of the development relative to the effects of the Boise River Flood Plain (if applicable) from the Corps. of Engineers prior to issuance of a building permit or Page 3 of 5 K:\PlwlI1ing DeptlEagle Applications\Dr\2005\DR-2-05 land drf.Uoc Certificate of Occupancy, whichever occurs first. 17. The applicant shall obtain approval of the development relative to its effects on wetlands or other natural waterways (if applicable) from the Corps. of Engineers and the Idaho Department of Water Resources and/or any other agency having jurisdiction prior to issuance of a building permit or Certificate of Occupancy, whichever occurs fIrSt. 18. Basements in the flood plain are prohibited. 19. The Americans with Disabilities Act, Uniform Building Code, Eagle City Code, and all applicable County, State and Federal Codes and Regulations shall be complied with. All design and construction shall be in accordance with all applicable City of Eagle Codes unless specifically approved by the Commission and/or Council. 20. New plans, which incorporate any required changes, shall be submitted for staff approval. Staff may elect to take those plans to the Design Review Board and/or the Planning and Zoning Commission for review and approval. 21. Any changes to the plans and specifications upon which this approval is based, other than those required by the above conditions, will require submittal of an application for modification and approval of that application prior to commencing any change. 22. Any modification of the approved design review plans, including, but not limited to building design, location and details, landscaping, parking, and circulation, must be approved prior to construction/ installation of such changes. Failure to do so may result in the requirement to modify the project to comply with the approved design review and/or result in the inability to issue a final approval for occupancy of this project. 22. Any change by the applicant in the planned use of the property which is the subject of this application, shall require the applicant to comply with all rules, regulations, ordinances, plans, or other regulatory and legal restrictions in force at the time the applicant or its successors in interest advises the City of Eagle of its intent to change the planned use of the subject property unless a waiver/variance of said requirements or other legal relief is granted pursuant to the law in effect at the time the change in use is sought. 23. Approval of any Design Review shall expire without notice to the applicant on the date of expiration of the Design Review if construction has not started prior to that date, as stipulated in Eagle City Code (one year from the Design Review Board approval date). 2S. All ground-mounted accent lighting fixtures and monument sign lighting fixtures shall be screened from view with the use of landscaping (top of the fixture shall be no higher than the surrounding landscaping). The light source itself shall otherwise be screened as provided for within Eagle City Code. 26. The City's actions on the application does not grant the applicant any appropriation of water or interference with existing water rights. The applicant indemnifies and holds the City harmless for any and all water rights, claims in any way associated with this application. CONCLUSIONS OF LAW: 1. The application, as conditioned herein, complies with the applicable provisions of the Eagle City Code the preliminary/final plat approval (PP/FP-S-04) for Loch Lomond Subdivision No.2. Page 4 of 5 K:\Plal1lÜng DeptlEagle Applications\Dr\2005\DR-2-05 land drf.doc DATED this 24th day of February 200S. ATTEST: Clerk ",..'" u""" .." OLE """# .., ~t'- ........ *' #".. ~ L"... F e. ~ .. 0."".. Þ. í. e .. :: .. O~ ...'.. ~ : >-.: .Q. '; ':. C : :f-<:t:. <.>-~::-:.: ~U~c .:<: - - ~ .. - ' .. . ~ ".. .Q, ; .." """" *' <'" . '...J .,." #.. Sl . .' IIII .' ,.,- II'......." Page 5 of 5 K:\Plalllting DeptlEagle Applications\Dr\2005\DR-2-05 land drf.doc