Loading...
Findings - PZ - 1994 - Wintery River PP/floodplain application - 52.81 Acres/1.65 Dwelling Units Per Acre/R5 Zone .' CITY OF EAGLE IN THE ~TTER OF ) WINTERY RIVER SUBDIVISION) AN APPLICATION FOR A ) SUBDIVISION PRELIMINARY) PLAT BY BIG SKY CONST ) dba DOUG JAYO ) FINDINGS OF FACTS AND CONCLUSIONS OF LAW On August 1, 1994, Pursuant to public notice and hearing procedures set forth in Section 67-6509, Idaho State Code, Steve Bradbury, Legal Council for the applicant and Dave Roylance, Engineer, Roylance and Assoc. and Doug Jayo, the applicant, came before the Eagle Planning and Zoning Commission, for the City of Eagle, Idaho, requesting approval for a subdivision preliminary plat. The project is located in the 100 year floodplain and in the floodway. The applicant included a floodplain application, statement from Paul Kunz, a consulting engineer and a Floodplain study and site wildlife assessment. This proj ect includes 52.81 acres, 1.65 dwelling units per acre, at 1.85 lots gross density. The project is located in a R5 zone. Based on testimony from the applicant and all interested parties, together with all documentary evidence submitted concerning the application, the Eagle City Planning and Zoning Commission finds the following: FINDINGS OF FACT AND CONCLUSIONS OF LAW: 1. On August 1,1994, a public hearing was conducted by the Eagle Planning and Zoning Commission. Testimony was presented by neighborhood property owners. There was opposing testimony regarding the floodplain and floodway areas. 2. The records in this matter indicate all notices, and publications have occurred as required by law. The records further reflect notice of the public hearing was sent to the appropriate public and private entities with responses to the proposal being received in the City Clerk's office from those entities. Those responses are as follows: RESPONSES RECEIVED FROM ENTITIES: DIVISION OF ENVIRONMENTAL QUALITY: 7/25/94, Joy Palmer, Regional Administrator. "DEQ will review the developer's sewer and water plans to insure that they meet state standards. The project will include a pressurized irrigation system, with water to be supplied by the Farmers Union Canal Company. We do not anticipate that connection to existing water or sewer services will have an adverse impact on water or air quality. . . . we are concerned with the potential negative impacts on water quality as a result of subsurface disposal or discharge to surface waters. These negative effects can be lessened by proper construction and maintenance of soil-vegetation disposal systems, which provide a greater degree of treatment than conventional seepage pits and trenches." ARMY CORPS OF ENGINEERS: June 13, 1994, Gregory J. Martinez, Proj ect Engineer. "Section 404 of the Clean Water Act requires that a Department of the Army permit be issued for the discharge of dredged or fill material into waters of the United States, including wetlands." If development of lots along Dry Creek would include work below the ordinary high water mark of Dry Creek, then a Department of the Army Permit would be required prior to any construction activities within Dry Creek. This would also include any utility line or roadway crossings of Dry Creek. FEDERAL EMERGENCY MANAGEMENT AGENCY, May 16, 1994 Marcia Melvin, Natural Hazards Program Specialist: Portions of this subdivision are in the floodway, including access roads. The floodplain ordinance prohibits any development in the floodway that would cause any rise (0.00 ft) in 1200 year base flood elevations. The City will need to require that an engineering analysis be completed. The developer will need to submit the study to FEMA and to contact Ada County regarding other developments that might need to be reflected in the engineering analysis. EAGLE SEWER DISTRICT: This development is within the District's planning area, but not annexed. They have not been approached by the developer, nor seen anyon-site sewer construction plans. Sewer service would be via the proposed Dry Creek sewer line. This is a 15" line that will parallel Dry Creek at the end of Dawn St., up to Floating Feather Rd. The line will serve the new middle school, the Crandlemire property, the Hormaechea property and this development. This construction line will require easements from 4 or 5 properties, and a crossing of the new Dry Creek Ditch Canal. The construction plans for the Dry Creek line have been submitted to the District's Engineer; however, they were submitted after the March meeting deadline. It is anticipated that the District Board may try to move the plan approval to the March meeting agenda. If the plans are not approved at the March meeting, the canal crossing most likely will not have time to be completed prior to the water season. EAGLE SEWER DISTRICT: July 19, 1994 letter reiterated information from March 10, 1994 letter above. EAGLE WATER - CO: will provide water service to this subdivision under it rules and regulations as provided for by IPUC. 7/15/94. DEPT. OF WATER RESOURCES, May 18, 1994, M. Gene Gibson, Stream Protection Specialist: This office administers the Stream Protection Act. This Act requires that before any activity can take place below the ordinary high water mark of a perennial stream, a Stream Channel Alteration permit must be obtained from this Dept. The applicant should be aware the applications are required to be submitted 60 days before the work is scheduled. The Dept. is available to review preliminary plans. MERIDIAN SCHOOL DIST: The Dist. can predict when completed, this subdivision will house 36 elementary aged children, 28 middle school aged children and 25 senior high aged students. At the present time Eagle Elementary is 113% at capacity, Meridian Middle School is at 130% capacity and Centennial HS is at 113% of capacity. The District is not opposed to growth, but this development will cause increased overcrowding in all 3 schools. Before the District could support this subdivision, they would need land dedicated to the district or made available at a minimum price for a school site, with water and sewer capacity. Another bond would need to pass for construction of schools. The cost per student for newly constructed schools, excluding site purchase price and offsite improvements, exceeds $5,000 per elementary student and $10,000 per middle or high school student. The District asks for your help in dealing with the impact of growth on schools. ACHD: Ranch Drive was constructed as a private driveway from Eagle Road in towards this project approximately 100-feet several years ago. This roadway may require substantial reconstruction to be approved as a public street and then it would need to be extended approximately 400-feet to connect to the proposed subdivision project. Site Specific Requirements: 1. Dedicate 4S-feet of right-of-way from the centerline of Floating Feather Road abutting parcel (20 additional feet). The owner will be compensated for this additional right-of-way from available impact fee revenues in this benefit zone. 2. Direct lot or parcel access to Floating Feather Road is prohibited, in compliance with District policy. Lot access restrictions shall be stated on the final plat. 3. Utility street cuts in the new pavement on Floating Feather Road will not be allowed unless approved by the District Commission. 4. Provide a paved public turnaround (with appropriate easement) at the east end of Ranch Drive. 5. The landscape islands in the cul-de-sacs and the median shall be platted as private property to be maintained by a homeowners association. Provide a minimum of 20-feet (face-to-face of curb) for the street around the median. EAGLE FIRE DEPT: 1. Install address numbers on every building, house or apartment, so as to be clearly visible from the street. Numbers shall be a minimum of 3.50" high in accordance with Fire codes. 2. Fire apparatus access roads shall comply with Art. 10-Div 11, 1991 UFC, this section covers width and turn-arounds. 3. Fire Flow requirements for buildings: The minimum fire-flow and flow duration requirements for one and two family dwellings having a fire area which does not exceed 3,600 sq st shall be 1,000 gal per minute. Fire flow and flow duration for dwellings having a fire area in excess of 3,600 sq. ft shall not be less than that specified in Table No. A-111-A-1. A reduction in required fire flow of 50%, as approved by the chief, is allowed when the building is provided with an approved automatic sprinkler system. Recommendations on subdivisions with lesser density (2 acres or more per house) may be a. ponds and frost free draft hydrants, b. underground storage tanks fed by larger home domestic wells c. fire truck connectors on irrigation systems. The fire-flow for buildings other than one and two family dwellings shall be not less than that specified in Table No. A-111-A-1, 1991 UFC. 4. The average spacing between hydrants shall not exceed that listed on table A-111-B-1-, 1991 UFC CENTRAL DISTRICT HEALTH: Can approve this development for central sewage and water after submittal and approval of plans by DEQ and Dept. of Health & Welfare. Stormwater management shall be reviewed by the Dept of Water Resources. Documentation shall be provided that demonstrate groundwater quality will not be impacted. STORMWATER MANAGEMENT RECOMMENDATIONS: "We recommend that the first one half inch of stormwater be pretreated through a grassy swale prior to discharge to the subsurface to prevent impact to groundwater and surface water quality. NEW DRY CREEK DITCH CO: 5/11/94: ".. .the canal flows above ground on the south side of this porposed development. .. .the canal bank should be reinforced to a top width of no less than 4 feet wide and the bank should be raised one foot higher than it is at the present time. This earthwork should be the developers cost. NDCDCo. Must sign off on the acceptance of the work. .. . any common area located near the canal should be fenced from the canal... no landscape except grass will be allowed to infringe upon the canal's easement. ...There should be special attention paid to the area where Dry Creek and the NDCDCo. canal intersect. IDAHO POWER: "We require a permanent 10' wide public utilities easement along all lots adjacent to a road right-of-way dedicated to public or private use. II WRITTEN COMMENTS: S. E. Prescott: Concerned about irrigation water Ru~s and Jan Bushert: Floodplain and floodway concerns. Janet Buschert, 7/26/94: Wildlife, floodwas, Comp plan. 4. The Staff Report included the following: A. The developer must prove there is no effect of the encroachment or building. There must be some type of modeling to designate the floodway, i.e. FEMA map (Corp of Eng HEC 2 computer model). It would be the recommendation of FEMA not to allow building in the Floodway. The only way to build in the floodway is to re-channel, it is not possible to have no effect on floodway when structures are built in it. (Fred Eisenbarth, Department of Water Resources) information obtained by phone. 4/20/94 B. The Army Corp of Eng, Lucky Peak Project Office: All engineering studies and applications must be submitted and approved by the City Engineer. C. An agreement on the canal crossing with a sewer line will need to be secured with the Sewer District. D. This subdivision has not been reviewed by the Greenbelt/Pathway or Eagle Landscaping Committee. E. The sidewalk requirement should be addressed by the City Council, as well as consideration of prohibiting any fencing or out-buildings in the floodway and bordering the common areas. F. The name of the subdivision has been accepted and should not be changed. G. DEQ will review the developer's sewer and water plans to insure that they meet state standards, as per DEQ letter of 7/20/1994. 5. The development is bordered to the south by R5 zoning, the Methodist Church, Eagle Elementary School, the east by R5 and Agricultural land, the north by Agricultural and Downing Downs Subdivision to the west. 6. The standards used in evaluating the application are in the following sections of the Eagle City Code and Comprehensive Plan. 1993 EAGLE COMPREHENSIVE PLAN The standards used in evaluating the application are following sections of the Comprehensive Plan: in the Purpose and Scope: (a) to protect property rights and enhance property values, (f) to encourage urban and urban-type development within the incorporated City limits of Eagle (g) to avoid undue concentration of population overcrowding of land, (h) to ensure the development of land is commensurate with the physical characteristics of the land. ' Parks, Recreation and Open Space: 1. Create ample areas and facilities for our citizen's diverse indoor and outdoor park and recreational interest, 2. to encourage development of parks and recreational programs which meet the different needs, interest, and age levels of our citizens who reside in both the rural and urban areas, 3 Set aside for enj oyment adequate amounts of open space - - - 4. Developers shall be encouraged to dedicate and develop areas for parks or tot lots in new residential developments. Transportation: Transportation and land use planning must be compatible. The City of Eagle is responsible for land use and transportation planning within the Eagle Impact Area. The Eagle Planning and Zoning Commission shall coordinate with the appropriate transportation network planning agency for all planned development that falls outside the authority of the City. Housing: 1. A wide diversity of housing types and choice between ownership and rental dwelling units shall be encouraged for all income groups in a variety of locations suitable for residential development. 2. The location of all housing shall be coordinated with provisions for adequate public facilities and services. 3. Developments of housing for all income groups close to employment and shopping centers shall be encouraged, 4. Housing shall be encouraged which is in accordance with local building codes and provides for energy saving design, 5. An open housing market shall be encouraged for all persons regardless of income, race, age, sex, religion or ethnic background, 6. The use of materials and techniques that will maintain a high level of quality while lowering cost and speeding construction shall be encouraged. Land Use: Policies and Goals (1) The residential densities in the City limits shall not exceed twenty-five (25) units per acre. Medium Density Residential Sui table primarily for single family residential development wi thin an urbanized setting. Appropriate residential densities are 4 dwelling units or fewer per gross acre. NATURAL RESOURCES: An important part of the City and the Impact Area is in the Boise River and Dry Creek floodplain. This area contains important natural resources including wildlife, fish and water. The wildlife includes many different mammals such as red fox, beaver, raccoon, badger, skunk, muskrat, cottontail and jack rabbits, ground squirrels and numerous varieties of rodents. There is also a wide variety of songbirds, upland game birds and shore birds. Significant populations of duck, pheasant and geese make up a large part of this variety of bird life. The soils of the region consist of at least nine (9) major series with numerous subsidiaries of each soil type as defined by the U.S. Soil Conservation Service. While numerous minerals are lacking, there are deposits of sand and gravel. Special concern and attention must be given to fish and wildlife when implementing planning and zoning decisions. POLICIES AND GOALS: 1. To preserve and protect fish, wildlife and agriculture interests, open space and recreation-nature areas in the floodplain of the Boise River and Dry Creek area shall be encouraged in future development plans. 2. Special emphasis shall be given to the preservation of fish, wildlife, agriculture, open space and recreation-nature areas in the implementation of any planning and zoning decisions. SPECIAL AREAS OR SITES: "Special areas or Sites" are defined as areas, sites or structures of historical, archaeological, architectural, ecological, or scenic significance. Special areas or sites within the Impact Area should be analyzed according to their defined function. Whenever possible, these sites should be preserved and conserved as open spaces or for educational and cultural centers. Development of Special Areas or Sites should take place in a manner that reflects harmony with their natural environment and recognized qualities which render them distinctly unique. POLICIES & GOALS: 1. To promote the conservation and efficient management of all Special Areas and Sites in addition to open space natural resources within the Impact Area. 2. To protect and maintain soil, water, air, and other natural resources so that they may be used and enjoyed by all. 3. To protect and improve natural and man-made waterways and preserve their natural resource and recreational value. 4. To preserve existing trees and natural growth wherever practicable and establish appropriate landscaping as a part of new developments. 5. To encourage the provision of habitat areas which provide for fish and wildlife. 6. To protect historical and geological sites or monuments and archaeological areas in the Impact Area. 7. To conserve and maintain all desirable fish and wildlife species and habitats particularly along the Boise River and Dry Creek. Developmental and governmental programs which provide for fish and wildlife conservation shall be encouraged. When additional public access to designated special areas is required, such access shall cause minimum disturbance to the present land use. 8. To require developers to prepare and submit an environmental assessment and any such additional reports as the City may from time to time require, to the Planning and Zoning Commission, and the City Council for any development of a principle use on vacant land within an area designated as a Special Area or Site or for any development impacting a designated Special Area or Site. 9. To require a plan for the restoration of land which shall be made available to the Planning and Zoning Commission and City Council for each parcel of land located within a Special Area or Site that is proposed for the extraction of sand, gravel, rock, or other mineral resource. RECOGNIZED SPECIAL AREAS AND SITES: Dry Creek Floodplain: The Dry Creek Floodplain is designated as a Special Area due to its ecological and scenic significance. This area comprises the length of the Dry Creek Floodplain through the Impact Area. HAZARD AREAS The lOa-year floodplain of the Boise River and Dry Creek, as now and in the future defined by the Corp of Engineers, constitutes the natural hazard areas within the City and Impact Area. Additional hazard areas may be added to the Comprehensive Plan when deemed necessary. The City considers a floodplain to consist of two parts: (1) the floodway which is the most severe part of the floodplain at the time of flooding characterized by deep and fast moving water, and (2) the floodway fringe which is less severe than the floodway and characterized by more shallow, slower moving waters at the time of flooding. The Dry Creek floodplain has potential for flash flooding while the Boise River can flood due to seasonal weather conditions. POLICIES & GOALS: 1. To protect the health and safety of Eagle residents while offering varied open space uses. 2. Whenever possible the existing natural floodplain of the Boise River and Dry Creek should remain in a natural state as a greenbelt, wildlife habitat, agricultural, open space and recreation-nature areas. 3. Special drainage studies, for those areas within the 100 year floodplain, and any other areas deemed necessary by the City, may be required before any development will be approved. This is to facilitate the orderly development and the preservation of downstream or downflow properties. 4. The City encourages area wide drainage studies and the City may require implementation and construction of storm drain systems. 5. No manufacture or storage of toxic, flammable or explosive material shall be permitted in the floodplain. 6. Industrial uses other than sand and gravel extraction will not be permitted in any portion of the floodplain. The Comprehensive Plan is a policy document intended to be used as a guide. It should be followed as closely, as reason, justice and its own general character make it practical and possible. The Comprehensive Plan is not a precise plan and does not show nor intend to show the exact outline of use districts. It shows, rather, the general location, character and extent of land use patterns. 10/93 TITLE 9-SUBDIVISIONS The standards used in evaluating the application are in the following sections of the Eagle City Code and Comprehensive Plan. With respect to the review of the preliminary plat: Title 9-Land Subdivisions: 9-1-3: PURPOSE: The purpose of these regulations is to promote the public health, safety and general welfare, and to provide for: A. The harmonious development of the City and its area of impact; B. The coordination of streets and roads within a subdivision with other existing or planned streets and roads; C. Adequate open space for travel, light air and recreation; D. Adequate transportation, water drainage and sanitary facilities; E. The avoidance of the scattered subdivision of land that would result in either of the following: 1. The lack of water supply sewer service. drainage. transportation or other vublic services; or 2. The unnecessary imposition of an excessive e~enditure of public funds for the supply of such services; or F. The requirements as to the extend and the manner in which: 1. roads shall be created, improved and maintained; and 2. water and sewer and other utility mains, piping connection, or other facilities shall be installed G. The manner and form of making and filing of any plats; and H. The administration of these regulations by defining the powers and duties of approving authorities. 9-2-3: Preliminary Plat Procedures 9-2-4: Final Plat Procedures 9-3-1: Design standards A. Street location and arrangements: When an official street plan or comprehensive development plan has been adoptedí subdivision streets shall conform to such plans B. Mînor Streets: Minor streets shall be so arranged as to discourage their use by through traffic C. Stub Streets: Where adjoining areas are not subdivided the arrangement of streets in the new subdivisions shall be such that said streets extend to the boundary line of the tract to make provisions for the future extension of said streets into adjacent areas, and shall have a cul-de-sac or temporary cul-de-sac. D. Relation to Topography: Streets shall be arranged in proper relation to topography so as to result in usable lots, ---- E. Alleys:--- F. Frontage Roads:--- G. Cul-De-Sac Streets: shall not be more than 500 ft. in length and shall terminate with an adequate turnaround having a minimum radius of 50 ft for right of way H. Half Streets:--- I. Private Streets: shall be prohibited--- J. Driveways: Providing access to no more than 2 dwelling units shall be allowed. 9-3-7: Planting strips and reserve strips standards a. planting strips shall be required to be placed next to the incompatible features such as highways, railroads, commercial or industrial uses to screen- - shall be a minimum of 20 ft wide and not part of the normal street right of way or utility easement. 9-4-1: Required improvements, 9-4-1-2: STREETS AND ALLEYS: In accordance with the standards and specs of ACHD 9-4-1-3: CURBS AND GUTTERS: vertical curbs and gutters shall be constructed on collector and arterial streets 9-4-1-4: STREET SIGNS: Street name signs shall be installed in the appropriate locations at each street intersection in accordance wI local standards. 9-4-1-5: STREET LIGHTS: AIl street subdividers within the City and area of impact shall be required to install, at the subdividers' expense, street lights in accordance with City specifications and standards at location designated by the Administrator, or representative----. 9-4-1-6: SIDEWALKS AND PEDESTRIAN WALKWAYS: Sidewalks shall be required on both sides of the street; except, that where the average width of lots as measured at the street frontage line or at the building setback line, is over 100', sidewalks on only one side of the street may be allowed. PEDESTRIAN WALKWAYS: when required, shall have easements at least 10' in width and include a paved walk at least 5' in width. 9-4- 7: BICYCLE PATHWAYS: Shall be provided, as part of the public right of way or separate easement as may be specified by the City Council. 9-4-1-8: UNDERGROUND UTILITIES: are required 9-4-1-12: Greenbelt Areas, landscaping screening 9-4-2-2: Guarantee of improvements a. Performance bond b. Cash deposit 9-5-4-4: Control during development, time limit TITLE 10: FLOOD PLAIN 10-1-1: FINDINGS OF FACT AND PURPOSE: B. It is the purpose of this Title to promote the public health, safety and general welfare, and to minimize public and private losses due to flood conditions in specific areas by provisions designed; 1. To protect human life and health; 2. To minimize expenditure of public money for costly flood control projects; To minimize the need for rescue and relief efforts associated with flooding and generally undertaken at the expense of the general public; 4. -- To minimize prolonged business interruptions; 5. To minimize damage to public facilities and utilities such as water and gas mains, electric, telephone and sewer lines, streets and bridges located in areas of special flood hazard; and To help maintain a stable tax base by providing for the sound use and development of areas of special flood hazard so as to minimize future flood blight areas; and To ensure that potential buyers are notified that property is in an area of special flood hazard; and To ensure that those who occupy the areas of special flood hazard assume responsibility for their actions. (Ord. 115, 5-12-87) 3. 6. 7. 8. 10-1-2: METHODS OF ACCOMPLISHING PURPOSE: In order to accomplish its purposes, this Chapter includes methods and provisions for: A. B. c. D. 10-1-6: 10-1-7: A. B. C. D. E. F. 10-1-8-3: A. 10-1-8-4: E. Restricting or prohibiting uses which are dangerous to health, safety and property due to water or erosion hazards, or which result in damaging increases in erosion or in flood heights or velocities; Requiring that uses vulnerable to flood, including facilities which serve such uses, be protected against flood damage at the time of initial construction; Controlling the al teration of natural floodplains, stream channels and natural protective barriers which help accommodate or channel flood waters; Controlling filling, grading, dredging and other development which may increase flood damage; and Preventing or regulating the construction of flood barriers which will unnaturally divert flood waters or which may increase flood hazards in other areas. FLOOD INSURANCE STUDY: DEVELOPMENT PERMIT REQUIREMENTS: Permits Required: Application for Permit: Review: Notice To Applicant: Appeals: Expiration and Revocation of Development Permit: WATER AND SEWER SYSTEMS: B. All new and replacement water supply systems and sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the systems; and discharge from the systems into flood waters. On-site waste disposal systems shall be located to avoid impairment of them or contamination from them during flooding; and All sewer and water systems shall be approved by District Health Department of the Idaho Department of Health and Welfare. c. SUBDIVISIONS: A. All subdivision proposals shall be consistent with the need to minimize flood damage; All subdivision proposals shall have public utilities and facilities such as sewer, gas electrical and water systems located and constructed to minimize flood damage i All subdivision proposals shall have adequate drainage provided to reduce exposure to flood damage; and Base flood elevation data shall be provided for subdivision proposals and other proposed development B. c. D. which contain at least fifty (50) lots or five (5) acres, whichever is less. 10-1-8-5: SPECIFIC STANDARDS: In all cases of special flood hazards where base flood elevation data has been provided as set forth in Section 10-1-6 of this Chapter, the provisions of this Section shall be required: Residential Construction: New construction and substantial improvement of any residential structure shal1 have the lowest floor, including basement, elevated to a minimum of one foot (1') above the elevation of the one hundred (100) year flood level. A. Fully enclosed areas below the lowest floor that are subject to flooding are prohibited, or shall be designed to automatically equalize hydrostatic flood forces on exterior walls by allowing for the entry and exit of floodwaters. Designs for meeting this requirement must either be certified by a registered professional engineer or architect or must meet or exceed the following minimum criteria: 1. 3. A minimum of two (2) openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding shall be provided. The bottom of all openings shall be no higher than one foot (1') above grade. Openings may be equipped with screens, louvers, or other coverings or devices provided that they perIni t the automatic entry and exit of floodwaters. Floodways: Located within areas of special flood hazard established in Section 10-1-6 of this Chapter, are areas designated as floodways. Since the floodway is an extremely hazardous area due to the velocity of flood waters which carry debris, potential proj ectile and erosion potential, the following provisions apply: D. 1. Encroachments, including fill, new -construction, substantial improvements and other development, unless certification by a registered professional engineer or architect is provided demonstrating that encroachments shall not result in any increase in flood levels during the occurrence of the base flood discharge, is prohibited. If paragraph 1 above is satisfied, all new construction and substantial improvements shall comply with all applicable flood hazard reduction provisions of this Section 10-1-8. The placement of any mobile homes, except in an existing mobile home park or existing mobile home subdivision, is prohibited. (Ord. 12-14-82) 2. 3. CONCLUSION The Eagle Planning and Zoning Commission concludes that based on the forgoing findings, the application on behalf of Wintry River Crossing in in compliance with the Eagle Comprehensive Plan and Eagle City Codes. RECOMMENDATION Based upon the foregoing FINDINGS OF FACTS AND CONCLUSIONS OF LAW, the Eagle Planning and Zoning Commission recommends to the Council the application for a subdivision preliminary plat be approved with the following conditions: 1. the recommendation by P&Z to approve the plat is with the exception of the two lots, now reference as 4 and 9, that are in the floodway. If the removal of those lots from the floodway designation is not accepted by FEMA they become common lots, maintained by the homeowners association, not building lots. If they are acceptable as building lots, without altering the stream bed they can become building lots; 2. that the pathway will be maintained by homeowners association, all landscaping be purposely designed "natural" on the dry creek area, but remain free of weeds, all landscaping subject to the City Landscaping Committee; 3. the standard subdivision conditions. ADOPTED by the Eagle Planning and Zoning Commission of the City of Eagle, Idaho this 15 day of August, 1994. APPROVED: ATTEST: COMMIS~ION