Loading...
Findings - PZ - 2004 - FPUD-4-04 - Winding Creek East/44-Unit/3.9 Acre )RIGINAL BEFORE THE EAGLE PLANNING AND ZONING COMMISSION IN THE MATTER OF AN APPLICATION) FOR A FINAL DEVELOPMENT PLAN) FOR WINDING CREEK EAST PUD ) FOR SOUTHERS PROPERTIES ) FINDINGS OF FACT AND CONCLUSIONS OF LAW CASE NUMBER FPUD-4-04 The above-entitled final development plan and final plat applications came before the Eagle Planning and Zoning Commission for their recommendation on August 2, 2004. The Commission having heard and taken oral and written testimony, and having duly considered the matter, makes the following Findings of Fact and Conclusions of Law; FINDINGS OF FACT: A. PROJECT SUMMARY: Southers Properties, represented by Phil Hull with the Land Group, is requesting final development plan approval for Winding Creek East, a 44-unit multi-family residential PUD. The 3.9-acre site is located on the north side of State Street approximately 100-feet east of Palmetto A venue. B. HISTORY: The City Council approved the PUD for Winding Creek East on January 13, 2004. The Findings of Fact and Conclusions of Law, dated January 27,2004, for the conditional use permit and preliminary development plan are attached. C. PRELIMINARY PUD FINDINGS: Council Findings and Conclusions dated January 27, 2004, are attached. D. FINDINGS OF FACT REQUIRED BY EAGLE CITY CODE SECTION 8-6-6-3 B: The Commission shall find that the facts submitted with the application and presented to them establish that: 1. The proposed development can be initiated within one year of the date of approval; 2. Each individual unit of the development, as well as the total development, can exist as an independent unit capable of creating an environment of sustained desirability and stability or that adequate assurance will be provided that such objective will be attained and the uses proposed will not be detrimental to present and potential surrounding uses, but will have a beneficial effect which would not be achieved under standard district regulations; 3. The streets and thoroughfares proposed are suitable and adequate to carry anticipated traffic, and increased densities will not generate traffic in such amounts as to overload the street network outside the PUD; 4. Any proposed commercial development can be justified at the locations proposed; 5. Any exception from standard district requirements is warranted by the design and other amenities incorporated in the final development plan, in accordance with the PUD and the adopted policy of the Council; 6. The area surrounding said development can be planned and zoned in coordination and substantial compatibility with the proposed development; 7. The PUD is in general conformance with the Comprehensive Plan; and 8. The existing and proposed utility services are adequate for the population densities and Page 1 of 5 K:\Planning Dept\Eagle Applications\SUBS\2004\Winding Creek East fpud pzf.doc nonresidential uses proposed. E. FINDINGS OF FACT REQUIRED BY EAGLE CITY CODE SECTION 8-6-6-3 (C): Upon granting or denying the application, the Council shall specify: 1. The ordinance and standards used in evaluating the application; 2. The reasons for approval or denial; and 3. The actions, if any, that the applicant could take to obtain a permit. STAFF ANALYSIS PROVIDED WITHIN THE STAFF REPORT: The City Engineer and Planning staff have reviewed the final development plan. It is staff's opinion that this final development plan can meet the Findings of Fact required in Eagle City Code Section 8-6-6-3 Band C (as noted herein) with the conditions recommended herein. This development was initially reviewed as a preliminary development plan with a subdivision of the units (condominium plat) to follow at a later date. The condominium plat typically follows the substantial completion of construction of the buildings since the plat lines are essentially the interior walls of the buildings (the airspace) and precise measurements are necessary for an accurate subdivision. The final planned unit development is slightly different from the preliminary development plan with regard to a new entrance into the site, and the number of units to be constructed. The installation of the new Hill Road entrance (located approximately 240-feet north of the intersection of Hill Road and Winding Creek Drive) is not a substantial change to the development as it was addressed by the Ada County Highway District, as well as suggested by the City Engineer, during the review of the preliminary development plan. This new entrance created the need to replace a planned 6-unit building with a 4-unit building, resulting in a reduction of two units from that approved with the preliminary development plan. The applicant has designed the common access driveways to be constructed with three-inch (3") rolled curb and a four-foot wide (4') concrete sidewalk, separated from the back of curb by a five-foot (5') wide landscape strip. Site specific condition of approval number 13 of the Council's findings for the Winding Creek East PUD states that the common access driveways are to be constructed with six-inch (6") vertical curb and a five-foot (5') wide concrete sidewalk abutting both sides of the western driveway, and along the western side of the eastern drive. The final plat for Winding Creek Subdivision was recently approved by the City Council to allow the construction of rolled curb and four-foot (4') wide sidewalks in lieu of the vertical curb and five- foot (5') wide sidewalks, as required as a condition of approval for the preliminary plat. The applicant has stated that the reason for the narrower sidewalk is to accommodate utility easements and improvements, and to match the improvements within the Winding Creek development west of this site. Staff will defer to the Planning and Zoning Commission and the City Council to determine whether a four-foot wide sidewalk is more appropriate than a five-foot (5') wide sidewalk. REVIEW BY THE COMMISSION: A review by the Planning and Zoning Commission was completed on August 2, 2004. The Commission made their recommendation at that time. The minutes are incorporated herein by reference. Page 2 of 5 K:\Planning Dept\Eagle Applications\SUBS\2004\Winding Creek East fpud pzf.doc COMMISSION DECISION: The Commission voted 3 to 0 (Bandy, Deckers absent) to recommend approval of FPUD-4-04 for final development plan approval for Winding Creek East PUD with the following staff recommended site specific conditions of approval, with underlined text to be added by the Commission and strikethrough text to be deleted by the Commission: 1. Comply with all conditions of the City Engineer's letter dated July 13, 2004, prior to the City Engineer signing the final plat. 2. Comply with all conditions of RZ-6-03/CU-1O-03/PPUD-3-03/PP-6-03 (Winding Creek PUD Subdivision) that are relevant to this portion of the development. 3. Comply with all conditions of DR-26-04. 4. The applicant shall submit payment to the City for all Engineering fees incurred for reviewing this project, prior to the City Clerk signing the final plat. 5. In coordination with the Winding Creek PUD Subdivision, construct curb, gutter and a separated five-foot (5') wide concrete sidewalk along Winding Creek Road east of the Hill Road extension abutting this site, prior to the issuance of any building permits for the site. 6. URless otherwise appro'/OO, revise the eoRstruetioR c!ra'.viRgs to deliReate six iBeh (6") vertieal curb, '.vite glitter aRd five foot (5') eORerete sic!e'::alk separatec! from the baek of clirb by a fi'/e foot wide laRc!seape strip ablittiRg bote sides of the westem eommOB aeeess c!ri'.'e, aRc! aloRg tee westem side of tee eastem drive (clirb aRc! plaBRÍßg skip oBly OB the eastem side). PlaBs detailiRg tee revised roadway impro'lØffiØRts shall Ðe sliÐfRiUed f.or review aRd approval by tke City ERgiReer prior to the commeReemæt of aRY impro'leæeRts beiRg coRstmeted OB the sit.e. The applicant is permitted to construct three-inch (3") rolled curb and a four-foot (4') wide concrete sidewalk separated from the back of curb by a five-foot (5') wide landscape strip abutting both sides of the western common access drive, and along the western side of the eastern drive (curb and planning strip only on the eastern side). 7. The developer shall provide 3-inch minimum caliper shade-class trees abutting both sides of the common access drives. Trees shall be placed at the front of each multi-family dwelling, located in the 5-foot wide landscape strip between the concrete sidewalk and the curb, as shown on the landscape plans date stamped by the City on March 4, 2004. Prior to the City Clerk signing the final plat, the applicant shall either install the required trees, sod, and irrigation or provide the City with a letter of credit for 150% of the cost of the installation of all landscape and irrigation improvements within the 5-foot wide landscape strip. Trees shall be installed prior to obtaining any occupancy permits for the homes. A temporary occupancy may be issued if weather does not permit landscaping. 8. "No Parking" signs shall be posted within the 23-foot wide common access drives as shown on the construction plans dated stamped by the City of Eagle on July 1,2004. The signs shall be posted prior to the issuance of any building permits. Provide a note on the plat as well as a statement in the CC&Rs that states there shall be no parking allowed within the 23-foot wide common access drives. The "No Parking" signs shall be posted prior to the issuance of any certificate of occupancy permits. 9. Provide a note on the condominium plat and within the CC&Rs stating that homeowners have the perpetual right of vehicular and pedestrian ingress and egress over common lot Lot 1, Block 3, to provide access from the public right-of-way to the dwellings within the common lot, and that the perpetual easement shall run with the land. The applicant shall provide a copy of the CC&Rs for review and approval prior to the issuance of any building permits. Page 3 of 5 K:\Planning Dept\Eagle Applications\SUBS\2004\Winding Creek East fpud pzf.doc 10. Twelve-foot (12') wide utility easements abutting all perimeter boundary lines shall be delineated on the condominium plat. 11. The applicant shall provide a clause within the CC&Rs explaining all restrictions associated with the Eagle Drain easement, including items such as maintenance procedures and the right for Drainage District No.2 to access the easement according to the terms of the license agreement recorded as instrument number 104080562. The applicant shall provide a copy of the CC&Rs for review and approval prior to the issuance of any building permits. 12. The applicant shall place a note on the plat and within the CC&Rs that all common lots are to be owned and maintained by the Winding Creek East Homeowner's Association. The applicant shall provide a copy of the CC&Rs for review and approval prior to the issuance of any building permits. 13. Minimum setbacks for the development are allowed to be as follows, as measured from the perimeter boundary of the development: Back 24-feet (from common access drive to garage) 47-feet (from Hill Road) Front Interior Side Street Side lO-feet (from eastern property line) 20-feet (from Winding Creek Road) The additional5-foot setback required for two story structures shall be waived for the front, rear, back and street sides of all units within the development. All multi-family structures shall have a minimum separation of 25-feet from other multi-family structures. 14. Place a note on the condominium plat stating that no access (other than those approved with this application) to State Street, Hill Road and Academy Street shall be permitted. 15. The applicant shall take care to locate and protect from damage existing utilities, pipelines and similar structures. Documentation indicating that "Digline" has performed an inspection of the site shall be submitted prior to the issuance of any building permits for the site. CONCLUSIONS OF LAW: A. The final development plan application for this item was received by the City of Eagle on June 2, 2004. B. In accordance Eagle City Code Section 8-6-6-3 B the Commission finds that the facts submitted with the application and presented to the Commission, with the conditions herein, establish that: 1. The proposed development can be initiated within one year of the date of approval based upon the testimony and documentation presented by the developer; 2. Each individual unit of the development, as well as the total development, can exist as an independent unit capable of creating an environment of sustained desirability and stability or that adequate assurance will be provided that such objective will be attained and the uses proposed will not be detrimental to present and potential surrounding uses, but will have a beneficial effect which would not be achieved under standard district regulations because of the conditions placed on this development; 3. The streets and thoroughfares proposed are suitable and adequate to carry anticipated traffic, and increased densities will not generate traffic in such amounts as to overload the street network outside the PUD based upon written responses received from the City Engineer with Page 4 of 5 K:\Planning Dept\Eagle Applications\SUBS\2004\Winding Creek East fpud pzf.doc regard to the common access driveways as well as the highway district having jurisdiction over the public rights-of-way; 4. No commercial development is proposed for this specific PUD; 5. Any exception from standard district requirements is warranted by the design and other amenities incorporated in the [mal development plan, in accordance with the PUD and the adopted policy of the Council because the PUD will provide a development that creates a neighborhood of unique, attractive housing located near the downtown area, which contributes to an active, livable, and vibrant downtown (including pedestrian friendly access to nearby shopping and events); 6. The area surrounding said development can be planned and zoned in coordination and substantial compatibility with the proposed development since the development has been designed to incorporate traditional architectural features reminiscent of the craftsman and classic style designs. The character of the general vicinity will change for the better since this development provides an opportunity to establish a multi-family neighborhood that will contribute to a diverse housing supply within the City; 7. The PUD is in general conformance with the Comprehensive Plan since the Plan calls for a diverse mix of housing stock and urban-type growth of residential uses located close to the downtown, which this development will provide; and 8. The existing and proposed utility services are adequate to serve the multi-family residential uses on this property, as noted by the agencies which will serve the development. DATED this 16th day of August 2004. PLANNING AND ZONING COMMISSION OF THE CITY OF EAGLE Ada County, Idaho ATTEST: t""U""", ~,"';' OF B-1 #"'" ~.. '\ :.-e'.... () Î " I v'... -. ...""~ " I . ~t'OR-1»... , : I ..9 ..A . ~ ......, v'.. . . . . æ * : -.- : * : . . -. . ~ ~ SEAL~: : ~.(\ .....:: \<p» ..~~OR !.."i.<?;?",,~o ¡ '## "'1]'",o....e <)?-- 'O.." " .t; OF \ ,. 'O" '" ,...." """""" ~ (. -I .. - ~f?:¡" ~ Sharo~ K. Bergmann, Eagle City lerk Page 5 of 5 K:\Planning Dept\Eagle Applications\SUBS\2004\Winding Creek East fpud pzf.doc